RFQ892 - Attachment - 1 - Requirements and Specifications - Bottom Dump Trailer.docx
DOCX document 46 KB Posted
- Attached to
- Bottom Dump Trailer
- Solicitation number
- 892
- Issued by
- Shoshone County, Idaho
About this file
This is a Requirements and Specifications attachment for RFQ892 issued by the Idaho Transportation Department (ITD) for the purchase and delivery of a bottom dump trailer. ITD is requesting quotes from authorized vendors for a Manac/CPS Model 4B342A200 or equal bottom dump semi-trailer to be delivered to ITD District 4 in Shoshone, Idaho. The solicitation requires submission of quotes electronically via the IPRO system or by email to Doug Buswell (doug.buswell@ITD.Idaho.gov) prior to the deadline established in IPRO. Required submittals include a price sheet, signature page, product information sheet, warranty documentation, and an acceptance letter agreeing to warranty provisions. Delivery must occur within 180 days after receipt of order, Monday through Friday between 8:00 a.m. and 4:00 p.m. local time, FOB destination with freight prepaid. The trailer specifications include a triaxle configuration with 23-cubic-yard capacity, 96-inch width, 10-foot height with bang boards, 42-foot length, three 25,000-pound axles with air ride suspension, LED lighting system, electric tarp system, and white paint finish with red and white reflective striping.
Award will be made to the lowest total cost quote deemed responsive and responsible. Bidders must be authorized distributors or manufacturers with a written agreement with the trailer manufacturer and must comply with Idaho Code Section 49, Chapter 16 regarding dealers and salesmen licensing. The warranty package requires 100 percent coverage for one year or 500 hours (whichever comes first) on the entire trailer, three-year coverage on the frame against defects and weld cracking, and three-year paint warranty against fading and peeling under normal working conditions. A factory-authorized repair and warranty service facility must be located within 150 miles of the delivery location. All warranty work must be completed within 30 calendar days of written notice. Tires must be Goodyear, Michelin, or Bridgestone brand radial tires. The contractor must provide operator's, parts, and service manuals in both paper and PDF formats and submit an ITD0502 Report of Sale and Application for Certificate of Title upon payment. Invoicing is permitted within 30 calendar days after acceptance, which occurs automatically 14 calendar days after delivery unless ITD provides written notice of non-compliance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ892 - Attachment - 4 - Product Information - Bottom Dump Trailer.docx | DOCX document | |
| State of Idaho Contract Terms and Conditions_2024.docx | DOCX document | |
| RFQ892 - Attachment - 5 - Contract Discrepancy Notice - Bottom Dump Trailer.docx | DOCX document | |
| RFQ892 - Attachment - 2 - Price Sheet - Bottom Dump Trailer.docx | DOCX document | |
| RFQ892 - Attachment - 3 - Signature Page - Bottom Dump Trailer.docx | DOCX document | |
| RFQ892 - Attachment - 6 - Deliverable Acceptance Form - Bottom Dump Trailer.docx | DOCX document | |
| Insurance Requirements 2023.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ892
BOTTOM DUMP TRAILER
GENERAL INFORMATION
1 Purpose The Idaho Transportation Department (ITD) is requesting Quotes from Vendors for the purchase and delivery of bottom dump trailer (Trailer), as further detailed.
2 Solicitation Contact The contact for this RFQ is:
Name: Doug Buswell Phone: 208 772 8077 Email: doug.buswell@ITD.Idaho.gov (Preferred method of contact)
3 Restrictions on Communications From the issue date of this RFQ, until a contract/purchase order is awarded or the RFQ is cancelled, vendors and their representatives are prohibited from communications (written or verbal) regarding this RFQ with the ITD staff, other than the ITD RFQ Lead. Any communications (written or verbal) with ITD staff other than the RFQ Lead may result in the submitting vendor being found Non-Responsible and Non-Responsive.
4 Requirements and Specifications See Sections 1 & 2 5 Quote Your Quote may be submitted electronically via IPRO or email (see below for additional details). ITD will not be accepting manual submissions for this solicitation. Your Quote must include the Required Submittals listed below and be received prior to the deadline established in IPRO.
Electronic Submission:
IPRO – Enter your pricing in IPRO (https://purchasing.idaho.gov/information-for-vendors/and upload all Required Submittals.
Email Submission:
Send an email to the Solicitation Contact (see Section 2) and attach all Required Submittals.
6 Required Submittals Attachment 2 – Price Sheet Attachment 3 – Signature Page Attachment 4 – Product Information Sheet Warranty documentation and an acceptance letter agreeing to warranty provisions of the Trailers.
BOTTOM DUMP TRAILER TRAILER
GENERAL INFORMATION
7 Award Award will be made to the lowest total cost Quote deemed to be the responsive and responsible as provided on Attachment 2 – Price Sheet and Items Section in IPRO.
7.2. The State reserves the right to evaluate or make an award in the best interest of the State.
Though it is not mandatory to submit your Quotation electronically via IPRO, all vendors participating in a solicitation issued through IPRO must establish an account in the IPRO system (even if submitting a quote outside of IPRO). It is free to establish an account and only takes a few minutes of your time.
[Type here] [Type here] [Type here]
Page | 10 RFQ892 BOTTOM DUMP TRAILER dhb 04/25
ATTACHMENT 1
SECTION 1 - REQUIREMENTS
BOTTOM DUMP TRAILERS
1. Brand Names The brand names specified in this solicitation are intended to be descriptive, but not restrictive; indicative of the quality and characteristics of items that meet the minimum requirements. Vendors offering an “equal” must include documentation, which demonstrates, to ITD’s satisfaction, that the offered item(s) meets the requirement of the solicitation. In the event documentation is not satisfactory, ITD reserves the right to seek clarification from the Vendor. Failure to provide satisfactory documentation or a clarifying response to ITD may eliminate the Vendor from further consideration.
Model & Assembly The Trailer must be the most current model of the manufacturer's standard production, as offered to commercial trade. Though they are not specifically covered herein, all parts necessary to provide a complete and functional Trailer must be furnished. All parts must conform in design, strength, quality of materials, and workmanship to current engineering practices and accepted standards of the industry. All parts must be the manufacturer’s standard unless otherwise specified in this ITB.
The Trailer must be assembled and adjusted when delivered. All equipment, including standard and supplemental equipment, must be installed per the manufacturer’s specifications, and serviced and ready for continuous operation at the time of delivery, unless otherwise stated in this ITB.
Dealers and Salesman License and Manufacturer’s State of Origin Bidders must comply with Idaho Code, Section 49, Chapter 16, “Dealers and Salesmen Licensing”. The dealer furnishing the trailer must provide the original MSO and an ITD0502, Report of Sale and Application for Certificate of Title, directly to ITD upon payment of completed Trailer for titling as a new Trailer.
Manuals The Contractor must provide one (1) operator’s manual, one (1) parts manual, and one (1) service manual with Trailer at the time of delivery. The manual must be in paper and PDF format. The manuals must cover all systems and component parts.
Warranty One hundred (100) percent warranty must be for a minimum period of one (1) year, or five hundred (500) hours, whichever comes first, for the entire Trailer, after acceptance. The frame must be warranted one hundred (100) percent against defects in workmanship, cracking of steel members, and cracking of welds for three (3) years after acceptance. The paint must be warranted one hundred (100) percent against fading and peeling for three (3) years after acceptance, with the exception of normal wear under normal working conditions.
A factory authorized repair and warranty service facility must be located within a one hundred fifty (150) mile radius of delivery location listed in Section 11 below to provide full trailer service, repairs, factory support and full warranty repair on all units delivered.
Warranty must include all tools, parts, equipment, labor, travel and freight to repair or replace a defective warranted item, which may also include the entire Trailer. All warranty work must be complete within thirty (30) calendars days after receipt of written notice from the Agency. If approved by the Agency, the Contractor may perform warranty work on-site, at the Agency’s chosen location, in lieu of pick-up and return shipping. The Contractor shall be responsible for all travel costs and work-site clean-up associated with any necessary repairs. The timeframe for corrective action will still be as identified above. If the Contractor is unable to repair the trailer on-site within thirty (30) calendars days, or if the Trailer continuously malfunctions and causes it to be out of service on multiple occasions, the Agency reserves the right to require the Contractor to pick-up, repair, and return the Trailer at no additional cost to the Agencies.
If any warranty work is to be performed, the Contractor may elect to either have a dealer of its choice perform the work, or authorize ITD to perform the necessary warranty work, in accordance with the manufacturer’s standards. If ITD is authorized to perform any warranty work, the Contractor must bear all costs associated, and guarantee that the work is completed in accordance with the manufacturer’s standards. Warranty work performed by ITD, which are authorized by the Contractor, will not adversely affect the warranty.
Bidders must submit warranty documentation and an acceptance letter agreeing to warranty provisions of the Trailer.
Authorized Distributor Submitting vendors must be an authorized distributor or manufacturer of Trailer offered. An authorized distributor shall be defined as a company or organization that has a written agreement with the manufacturer to sell or service its products. Quotes from Contractors who are not an authorized distributor by the manufacturer shall not be considered.
Acceptance Upon receipt, the Trailer will be inspected by the ITD Maintenance Services Manager, or designee, to ensure the Trailer meets the specifications provided by the Contractor in their Quote submission. Acceptance will automatically occur fourteen (14) calendar days after delivery, unless ITD has notified the Contractor in writing that the Trailer do not meet specifications. If ITD determines that the Trailer are not in accordance with the specifications, ITD will provide the Contractor with a written notification. The Contractor must pick-up, correct any discrepancies, and re-deliver to ITD specified location at the Contractor’s expense. The timeframe for completion of corrective action must not exceed thirty (30) calendar days from receipt of written notification from ITD;
Documenting Acceptance - ITD’s Contract Monitor will be responsible for documenting Acceptance, in writing, using Attachment 5 - Deliverable Acceptance Form. This document will be emailed to the Contractor’s Contract Manager as proof of Acceptance and approval to proceed with the invoicing procedures and required in Section 13, Invoicing.
Documenting Non-Compliance - ITD’s Contract Monitor will be responsible for documenting non-compliance, in writing, using Attachment 6 - Contract Discrepancy Notice. This document will be emailed to the Contractor’s Contract Manager, providing details for each discrepancy that require corrective action. Invoicing shall not occur until non-compliance has been corrected and;
Correcting Non-Compliance - After receipt of the Contract Discrepancy Notice, the Contractor’s Contract Manager must respond, using the document, explaining how and when each discrepancy will be corrected. All discrepancies must be corrected and brought back into compliance with the Contract within thirty (30) calendar days after receipt of the notice from ITD. If the Contractor does not correct the discrepancies within this timeframe, ITD reserves the right to take further remedial action as detailed in Section 7, Remedial Action.
Remedial Action In addition to any remedies available to the State under law or equity, the State may it its sole discretion require one (1) or more of the following remedial actions if any of the service does not conform to the Contract requirements: 1) require the Contractor to take corrective action to ensure that performance conforms to the Contract requirements, 2) require the Contractor to subcontract all or part of the Contract at no additional cost to the State, 3) withhold payment or require payment of actual damages caused by the Discrepancy, 4) terminate the Contract pursuant to Section 5, Termination of Contract, in addition to any remedies imposed by the State and;
If ITD must perform or hire a separate contractor to perform any of the Contract’s requirements, which is the responsibility of the Contractor under the terms of the Contract, ITD may withhold the actual cost to ITD from the Contractor’s payment(s).
Termination of Contract For Cause - See Section 2, Termination, of the State of Idaho Standard Terms and Conditions;
For Fiscal Necessity – See Section 27, Termination for Fiscal Necessity, of the State of Idaho Standard Terms and Conditions;
For Convenience – Either party may terminate this Contract for its convenience at any time upon providing its written notification at least ninety (90) calendar days prior to the desired termination date and;
The Contractor’s sole obligation shall be to complete the delivery of any Orders placed prior to receiving (or providing) a written notice of termination. ITD’s sole responsibility shall be to pay for Orders placed prior to receiving (or providing) a written notice of termination.
Delivery timeline AND LOCATION Desired delivery of the Trailer FOB Destination, freight prepaid and allowed to the location below as coordinated with ITD’s contact for delivery within one hundred eighty (180) days ARO;
Delivery must be made Monday through Friday, 8:00 am to 4:00 pm local time (per Delivery Location), excluding state of Idaho recognized holidays https://www.idaho.gov/government/state-holidays/), unless otherwise approved by ITD and;
Delivery Location:
ITD District 4, 216 Date Street Shoshone, ID 83352
Delivery contact information will be provided at time of order.
Invoicing The Contractor must submit its invoice, within thirty (30) calendar days after Acceptance, to the billing contact identified on the Contract. Invoices submitted prior to acceptance, or without the required information listed below, will be returned to the Contractor for correction and resubmission;
The following information must be included with each invoice;
Contract Name and Number;
Invoice Number and Date;
Contractor Contact Information;
Itemization of Property delivered and accepted – description, quantity, unit of measure, unit price, extended price, and total invoice amount and;
Invoice will be emailed to HQFLEET@ITD.IDAHO.GOV
SECTION 2 – REQUIREMENTS AND SPECIFICATIONS
SPECIFICATIONS
Manac/CPS- Model 4B342A200 or equal and at a minimum must consist of the following:
1. TRAILER
Type – Triaxle, two (2) fixed, one (1) lift axle, fifth wheel, bottom dump semi-trailer;
Capacity – Twenty-three (23) cubic yards to top of bang boards;
Width – Ninety-six (96) inches;
Height – Ten (10) feet with bang boards;
Length – Forty-two (42) feet length and;
Fifth Wheel Height – To be forty-eight (48) into fifty-six (56) in loaded.
Hopper and construction Hopper Material – Ten (10) gauge steel;
Gate Material – Three sixteen (3/16) in steel ;
Windrow Deflector – Galvanized;
Fenders – Front and rear steel fenders;
Bang Boards – Ten (10) in wooden and;
Landing Gear – Galvanized square tube
Axles/Suspension Axles - Three (3) each twenty-five thousand (25,000) lb axles;
Lift axle – Rear (3rd) axle, dual bag style axle Axle Spacing – One hundred fourteen (114) in center of first axle to center of third axle;
Suspension – Tridem air ride;
Brakes – Sixteen and one half (16-½) in x seven (7) in air with automatic slack adjusters, spring brake chambers on center axle. Brakes to be rated at a minimum of twenty-five thousand (25,000) lb per axle;
Wheels – Steel. Must have nylon wheel guards placed between wheels and hubs and between dual wheels and;
Tires – Eleven (11) R x 24.5 – 16PR radial tires. Tires must be Goodyear, Michelin, or Bridgestone only.
Lighting and electrical Light Emitting Diode (LED) Lighting System – All trailer lighting will be LED including stop, turn tail and clearance lights per Federal Highways Administration specifications https://highways.dot.gov/ https://highways.dot.gov/safety/other/visibility/roadway-lighting-resources;
Wiring – All wiring that is run through cross members will have protective grommets in cross members;
Sealed Lighting – All lighting will be a sealed system rubber mounted;
Front Plug – Seven (7) way, SAE J560 and;
Gate Control Plug – Six (6) way;
Safety Tarp – Sliding or flip electric tarp system and;
Conspicuity – Continuous red and white or grey reflective striping each side and fully covering rear sill and push block, in compliance FMCSA https://www.fmcsa.dot.gov/regulations;
air system Air Tank – Sixty (60) gallon;
Gate Control – Cab and ground controlled;
Cab – Electric over air and;
Ground – Manual
Preparation and Finish The Trailer must be sand or shot blasted, cleaned, prime coated, and then painted per the paint manufacturer’s process for the application. If powder coat is used as the final topcoat, the powder coat must be ultraviolet resistant. The Trailer must be smooth and free of rust, runs, overspray, peeling, weld splatter, and other defects;
Color – White and;
Registration Holder – Weatherproof
TIRE/WHEEL Alignment – PRE-DELIVERY Inspection Tire/ Wheel alignment – Trailer must be aligned prior to delivery of the trailer to the Idaho Transportation Department District 4.
File details come from the government source that posted it. Updated .