About this file
This document is an RFQ (Request for Quotes) issued by the Idaho Transportation Department (ITD) for the purchase and delivery of an electric self-propelled scissor lift. The solicitation provides detailed requirements and specifications for the lift, including brand name, warranty coverage, service center location, and delivery timeline. The lift must meet specific criteria such as maximum working height, platform dimensions, capacity, and power source. Vendors must submit quotes electronically and provide supporting documentation demonstrating the offered item meets the solicitation requirements. Award will be made to the responsive, responsible vendor with the lowest total cost.
The pricing terms indicate the lift must be new and delivered FOB Destination, with the contractor responsible for unloading and any necessary reassembly. The contractor must also have sufficient insurance to cover any damage during shipping and unloading. Payment terms require the contractor to submit an invoice within 30 calendar days of acceptance, which will be documented by ITD using a Deliverable Acceptance Form. ITD reserves the right to take remedial action if the lift does not conform to the contract requirements, including corrective action, subcontracting, or termination of the contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ38 - Attachment 4 - Deliverable Acceptance Form.docx | DOCX document | |
| RFQ_Event 206 Microsoft eLearning Tools.docx | DOCX document | |
| Signature-Page-RFQ.docx | DOCX document | |
| RFQ38 - Attachment 2 - Price Sheet.docx | DOCX document | |
| RFQ38 - Attachment 5 - Contract Discrepancy Notice.docx | DOCX document | |
| RFQ38 - Attachment 6 - Idaho Code 67-2359 Acknowledgement.docx | DOCX document | |
| Exhibit A - Bid Schedule.xlsx | XLSX spreadsheet | |
| RFP Event 427 Administrative Document.docx | DOCX document | |
| Solicitation_instructions-Jan-2017 (1).pdf | ||
| RFQ Event #100 Administration Document.docx | DOCX document | |
| Insurance Requirements.docx | DOCX document | |
| solicitation_instructions+Jan+2017.pdf | ||
| RFQ38 - Attachment 3 - Signature Page.docx | DOCX document | |
| Standard-Terms-and-Conditions_May-2021.pdf | ||
| Insurance Requirements 2023.pdf | ||
| Signature+Page.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ38
ATTACHMENT 1 – REQUIREMENTS & SPECIFICATIONS
ELECTRIC SELF-PROPELLED SCISSOR LIFT
GENERAL INFORMATION
1. Purpose Idaho Transportation Department is requesting Quotes from qualified Vendors for the purchase and delivery of an electric self-propelled scissor lift (Lift) accordance with the specifications provided.
2. Solicitation Contact The contact for this RFQ is:
Name: Denise Cooley, PPS-CPPB Email: denise.cooleyl@itd.idaho.gov (preferred method of contact)
3. Restrictions on Communications From the issue date of this RFQ, until a contract/purchase order is awarded or the RFQ is cancelled, vendors and their representatives are prohibited from communications (written or verbal) regarding this RFQ with the ITD staff, other than the ITD RFQ Lead. Any communications (written or verbal) with ITD staff other than the RFQ Lead may result in the submitting vendor being found Non Responsible and Non Responsive.
4. Requirements and Specifications See Sections 1 and 2.
5. Quote Your Quote may be submitted electronically via IPRO or email (see below for additional details). ITD will not be accepting manual submissions for this solicitation. Your Quote must include the Required Submittals listed below and be received prior to the deadline established in IPRO.
Electronic Submission:
IPRO – Enter your pricing in IPRO IPRO POWERED BY LUMA and upload all Required Submittals.
Email:
Send an email to the Solicitation Contact (see Section 2) and attach all Required Submittals.
6. Required Submittals:
Attachment 2 – Price Sheet Attachment 3 – Signature Page
Documentation, which demonstrates, to ITD’s satisfaction, that the offered item meets the requirements of the solicitation. Failure to provide satisfactory documentation may eliminate the Vendor from further consideration.
(See Attachment 1 – Requirements and Specifications)
7. Award Award will be made, all or none, to the responsive responsible vendor with the lowest total Cost.
Though it is not mandatory to submit your Quotation electronically via IPRO, all vendors participating in a solicitation issued through IPRO must establish an account in the IPRO system (even if submitting a quote outside of IPRO). It is free to establish an account and only takes a few minutes of your time.
ELECTRIC SELF-PROPELLED SCISSOR LIFT
SECTION 1 – REQUIREMENTS
Brand Name The brand names specified in this solicitation are intended to be descriptive, but not restrictive; indicative of the quality and characteristics of items that meet the minimum requirements. Vendors offering an “equal” must include documentation which demonstrates, to ITD’s satisfaction, that the offered item(s) meets the requirement of the solicitation. In the event documentation is not satisfactory, ITD reserves the right to seek clarification from the Vendor. Failure to provide satisfactory documentation or a clarifying response to ITD may eliminate the Vendor from further consideration.
Model & Assembly The Lift must be new, not used. Though they are not specifically covered herein, all parts necessary to provide a complete and functional Lift must be provided. All parts must conform in design, strength, quality of materials, and workmanship to current engineering practices and accepted standards of the industry. All parts must be the manufacturer’s standard unless otherwise specified in this RFQ.
Warranty Manufacturer standard warranty must cover the entire Lift for a minimum period of one (1) year. Manufacturer standard warranty must cover all defects, with the exception, of normal wear and tear under normal working conditions.
Warranty must include all tools, parts, equipment, labor, and freight to repair or replace a defective warranted item, which may also include the entire Lift. All warranty work must be completed within thirty (30) calendars days after receipt of written notice from ITD. If approved by the ITD, the Contractor may perform warranty work on-site, at the Delivery location identified in Section 7, in lieu of pick-up and return shipping. The Contractor shall be responsible for all travel costs and work-site clean-up associated with any necessary repairs. The timeframe for corrective action will still be as identified above. If the Contractor is unable to repair the Lift on-site within thirty (30) calendars days, or if the Lift continuously malfunctions and causes it to be out of service on multiple occasions, ITD reserves the right to require the Contractor to pick-up, repair, and return the Lift at no additional cost to ITD.
Authorized Destributor Submitting vendors must be an authorized destributor of the Lift offered.
SErvice Center A service center for the Lift offered must be located within sixty five (65) mile of ITD District 6 located at 206 N Yellowstone Highway, Rigby ID 83444.
Acceptance Documenting Acceptance - ITD’s Contract Monitor will be responsible for documenting Acceptance, in writing, using Attachment 4 - Deliverable Acceptance Form. This document will be emailed to the Contractor’s Contract Manager as proof of Acceptance and approval to proceed with the invoicing procedures and required in Section 9, Invoicing.
Documenting Non-Compliance - ITD’s Contract Monitor will be responsible for documenting non-compliance, in writing, using Attachment 5 - Contract Discrepancy Notice. This document will be emailed to the Contractor’s Contract Manager, providing details for each discrepancy that require corrective action. Invoicing must not occur until non-compliance has been corrected.
Correcting Non-Compliance - After receipt of the Contract Discrepancy Notice, the Contractor’s Contract Manager must respond, using the document, explaining how and when each discrepancy will be corrected. All discrepancies must be corrected and brought back into compliance with the Contract within thirty (30) calendar days after receipt of the notice from ITD. If the Contractor does not correct the discrepancies within this timeframe, ITD reserves the right to take further remedial action as detailed in Section 5, Remedial Action.
Remedial Action In addition to any remedies available to the State under law or equity, the State may at its sole discretion require one (1) or more of the following remedial actions if any of the service does not conform to the Contract requirements: 1) require the Contractor to take corrective action to ensure that performance conforms to the Contract requirements, 2) require the Contractor to subcontract all or part of the Contract at no additional cost to the State, 3) withhold payment or require payment of actual damages caused by the Discrepancy, 4) terminate the Contract pursuant to Section 6, Termination of Contract, in addition to any remedies imposed by the State.
If ITD must perform or hire a separate contractor to perform any of the Contract’s requirements, which is the responsibility of the Contractor under the terms of the Contract, ITD may withhold the actual cost to ITD from the Contractor’s payment(s).
Termination of Contract For Cause - See Section 2, Termination, of the State of Idaho Standard Terms and Conditions.
For Fiscal Necessity – See Section 27, Termination for Fiscal Necessity, of the State of Idaho Standard Terms and Conditions.
For Convenience – Either party may terminate this Contract for its convenience at any time upon providing its written notification at least ninety (90) calendar days prior to the desired termination date.
The Contractor’s sole obligation must be to complete the delivery of any Orders placed prior to receiving (or providing) a written notice of termination. ITD’s sole responsibility must be to pay for Orders placed prior to receiving (or providing) a written notice of termination.
Delivery Delivery is desired between one hundred and twenty (120) and one hundred and eighty (180) days ARO, FOB Destination, freight prepaid and allowed. ITD reserves the right to accept delivery dates outside of the desired delivery date if in the best interest of the State of Idaho. The Contractor must deliver and unload the Lift to the location listed below by the desired delivery date or the date provided on Attachment 2 - Price Sheet if determined to be in the best interest of the State of Idaho. The contractor is responsible for providing the necessary labor and equipment to unload the Lift, including any re-assembly of any Lift components that were unassembled for delivery or unloading.
Delivery Location:
ITD District 6 206 Yellowstone Highway Rigby, ID 83444
Delivery contact information will be provided at time of award.
Insurance Contractor must have insurance, sufficient enough to cover any damage caused to the Lift during shipping and unloading up to and including coverage to replace the entire Lift if needed.
Invoicing The Contractor must submit its invoice within thirty (30) calendar days after Acceptance to the billing contact identified on each Order. Invoices submitted prior to acceptance, or without the required information listed below, will be returned to the Contractor for correction and resubmission. The following information must be included with each invoice:
1. Contract Name and Order Number
2. Invoice Number and Date
3. Contractor Contact Information
4. Itemization of Property (description, quantity, unit of measure, unit price, and total price)
Electronic invoice submittal email: D6AP@ITD.IDAHO.GOV
ELECTRIC SELF-PROPELLED SCISSOR LIFT
SECTION 2 – SPECIFICATIONS
Genie® GS™ model # GS-2646 E-Drive electric slab scissor lift or equal and must at a minimum consist of the following:
1. Maximum indoor working height – thirty two (32) feet one (1) inch;
2. Maximum outdoor working height – twenty five (25) feet eight (8) inch;
3. Maximum indoor platform height – twenty six (26) feet one (1) inch;
4. Maximum outdoor platform height – nineteen (19) feet eight (8) inch;
5. Slide-platform extension deck length – three (3) feet;
6. Platform outside width – three (3) feet nine and one half (99.5) inches;
7. Guardrail height – three (3) feet seven (7) inches;
8. Wheel base – six (6) feet one (1) inch;
9. Ground clearance (center) - pothole guards retracted five (5) inches;
10. Ground clearance – pothole guards deployed zero point 9 (0.9) inches;
11. Lift capacity – one thousand (1000) pounds;
12. Lift capacity, extension deck extended – two hundred fifty (250) pounds;
13. Maximum platform drive height – twenty six (26) feet one (1) inch;
14. Drive speed stowed – two (2) miles per hour, raised zero point 5 (0.5) miles per hour;
15. Gradeability stowed – twenty five (25) percent;
16. Lifting speed raise/lower – forty one (41)/thirty (30) seconds;
17. Tilt sensor front to back and side to side;
18. Solid non marking tires – fifteen (15) x five (5) inches;
19. Power Full Load Amperes (FLA) – 24 volt DC:
20. Power lithium ion – 24 volt DC;
21. Hydraulic tank capacity – four (4) gallons;
22. Weight – Maximum four thousand three hundred forty six (4,346) pounds;
23. Maximum tire load – two thousand one hundred twenty seven (2,127) pounds and;
24. Maximum sound pressure level at ground and platform <70dBA (decibels).
Illustrations are for informational purposes only
| 5 | Page | dcc | |
| RFQ38 Electric Slab Scissor Lift | 07/23 |
image1.png image2.png
File details come from the government source that posted it. Updated .