RFQ27007137 Field House Roof SOW.pdf

PDF 320 KB Posted

Attached to
CCRI Field House Roof Replacement Knight Campus
Solicitation number
RFQ27007137
Issued by
Providence County, Rhode Island

About this file

This is a Scope of Work document for a Request for Proposal issued by the Community College of Rhode Island (CCRI) for the complete roof replacement of the Field House at the Knight Campus. The project involves removing the existing membrane roofing system and all flashing materials, then installing a new 30-year membrane roofing system with updated flashing, mechanical and electrical disconnects and reconnects, and plumbing drain resetting. Prospective vendors may view the roof online or visit the site to assess replacement requirements, though roof access is not available. The initial contract period begins upon issuance of the CCRI Purchase Order for one year, with renewal options for up to one additional 12-month period based on vendor performance and fund availability. Construction is scheduled to begin on-site April 12, 2027, with substantial completion required by October 10, 2027, and final completion by October 25, 2027. Vendors must possess a commercial roofing license issued by the Rhode Island Contractors' Registration and Licensing Board.

The solicitation requires bid surety bonds, payment and performance bonds, and insurance coverage including general liability of $1,000,000 per occurrence, workers compensation of $100,000 per accident, and automobile liability of $1,000,000 per occurrence. The project includes two allowances totaling $40,000: a $30,000 allowance for unforeseen concealed work directed by CCRI and a $10,000 allowance for manufacturer-required testing for warranty validity. Liquidated damages are assessed at $750 per day for schedule delays. Unit pricing has been removed from the project manual. The AIA A101-2017 Standard Form of Agreement and AIA A201-2007 General Conditions of the Contract for Construction, with State of Rhode Island revisions, govern the contract terms.

View the file

Other files

File Type Posted
RFQ27007137 Drawings.pdf PDF
RFQ27007137 Project Manual.pdf PDF
RFQ27007137_Nov_17_26_solicitation_doc.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2021-1 Page 1 of 3 Revised 06/10/2022

AGENCY SOLICITATION SPECIFICATIONS

RFQ –REQUEST FOR PROPOSAL PUBLIC WORKS

HEADER

TITLE: RFQ27007137 CCRI Field House Roof Replacement Knight Campus.

PRE-BID/ PROPOSAL CONFERENCE: NO

Vendors can go online to view the roof to see the extent of the requirements for its replacement or visit the site to look at the perimeter. Access to the roof will not be possible.

BONDING REQUIREMENTS

Bid Surety Bond Required: YES Payment and Performance Bond Required: YES

CONTRACT TERMS

The initial contract period will begin upon issuance of CCRI Purchase order for one (1) year. Contracts may be renewed for up to [1] additional 12-month periods based on vendor performance and the availability of funds.

Insurance Requirements (#14 in Instructions to Vendors on Requirements tab) In accordance with this solicitation, or as outlined in Section 13.19 of the General Conditions of Purchase, found at https://rules.sos.ri.gov/regulations/part/220-30-00-13 and General Conditions

- Addendum A found at https://www.ridop.ri.gov/documents/general-conditions-addendum-a.pdf, the following insurance coverage shall be required of the awarded vendor(s):

General Requirements:

14a) ☒ Liability - combined single limit of $1,000,000 per occurrence, $1,000,000 general aggregate and $1,000,000 products/completed operations aggregate.

14b) ☒ Workers compensation - $100,000 each accident, $100,000 disease or policy limit and $100,000 each employee.

14c) ☒ Automobile liability - $1,000,000 each occurrence combined single limit.

AIA Contract

Rhode Island custom AIA contract designated below outlining the scope and special terms and conditions covering the work, executed by an authorized representative of your company.

https://rules.sos.ri.gov/regulations/part/220-30-00-13 https://www.ridop.ri.gov/documents/general-conditions-addendum-a.pdf

2021-1 Page 2 of 3 Revised 06/10/2022

Vendor shall obtain the Rhode Island custom AIA contract at:

https://documentsondemand.aia.org/?filter=Rhode.

9a) ☒ AIA A101-2017 Standard Form of Agreement Between Owner and Contractor with State of Rhode Island revisions dated 7-25-19.

9g) ☒ AIA A201-2007 General Conditions of the Contract for Construction with State of Rhode Island Revisions dated 9-10-19.

SECTION A. BACKGROUND

The Community College of Rhode Island is the largest community college in New England, providing high-quality academic programs and career-oriented training for full- and part-time students, recent high school graduates, and adult learners.

Named the 2019 Two-Year College of the Year by Education Dive magazine, CCRI enrolls more than 13,000 students in credit-bearing degree and certificate programs and an additional 8,500 individuals in Workforce Development programs and adult education courses annually.

With campuses in Warwick, Providence, Newport, and Lincoln and satellite campuses in Westerly and Woonsocket, CCRI meets Rhode Islanders where they are, offering an outstanding college education that leads to strong learning outcomes, successful degree attainment, and job placement opportunities. Students can choose from more than 90 majors and programs and seven academic career paths. CCRI also offers online, hybrid, and in-person options in addition to seamless transfer opportunities for students looking to continue their education at a four-year college or university.

The Community College offers extensive community programming as well, opening its facilities for public use, sponsoring programs on issues of public concern, and offering workshops and seminars for businesses, government agencies, and individuals seeking to improve their skills or enhance their lives.

The purpose of this RFP is to completely remove the existing membrane roofing system and replace with a new 30-year membrane system at the Knight Campus at the Community College of Rhode Island Field House per the attached Construction Drawings.

SECTION B: SCOPE OF WORK AND REQUIREMENTS

The work includes but is not limited to the complete removal of the existing roofing system including all flashing materials. Replace with a new 30 year membrane roofing system, flashing, including all mechanical, electrical disconnects and reconnects, resetting plumbing drains, etc. A proposed substitution to the basis of bid manufacturer can be requested during the question period to be considered and or accepted in the Addendum.

**Vendor must posses a commercial roofing license Issued by the RI Contractors’ Registration and Licensing Board. Please enter your number under the contractor registration in OSP.

SECTION C: CONTRACT TIME

https://documentsondemand.aia.org/?filter=Rhode

2021-1 Page 3 of 3 Revised 06/10/2022

Start of onsite construction: April 12, 2027

Substantial completion: October 10, 2027

Final completion: October 25,2027

SECTION D: ALLOWANCES

1. ADD Allowance - unforeseen concealed work to be repaired as direction by CCRI. $30,000

2. Add Allowance - Manufacturer's required testing for Warranty validity.

$10,000

Total Allowances $ 40,000

SECTION E: LIQUIDATED DAMAGES

$750.00/Day

SECTION F: Unit Pricing

1. None – Unit price will be removed from Project Manual under Addendum 1

SECTION A. BACKGROUND
SECTION B: SCOPE OF WORK AND REQUIREMENTS
SECTION C: CONTRACT TIME
SECTION D: ALLOWANCES
SECTION E: LIQUIDATED DAMAGES
SECTION F: Unit Pricing

File details come from the government source that posted it. Updated .