RFQ27007127 Field House Roof SOW.pdf

PDF 276 KB Posted

Attached to
CCRI Field House Roof Replacement Knight Campus
Solicitation number
RFQ27007127
Issued by
Kent County, Rhode Island

About this file

This Scope of Work document is issued by the Community College of Rhode Island (CCRI) for the complete removal and replacement of the existing membrane roofing system at the Field House located on the Knight Campus. The project scope includes removal of the existing roofing system, insulation, flashing materials, and related components, with replacement by a new 30-year membrane roofing system including all flashing, mechanical and electrical disconnects/reconnects, and plumbing drain resetting in accordance with provided construction drawings. No pre-bid conference will be held; however, vendors may view the roof online or visit the site to assess the perimeter, though roof access will not be permitted. The contract will commence upon issuance of the CCRI Purchase Order with an onsite construction start date of April 12, 2027, substantial completion by October 10, 2027, and final completion by October 25, 2027. The initial contract period is one year with potential renewal for up to one additional 12-month period based on vendor performance and fund availability. Vendors must possess a commercial roofing license issued by the Rhode Island Contractors' Registration and Licensing Board.

The solicitation requires a bid surety bond and payment/performance bonds. Insurance requirements include general liability of $1,000,000 per occurrence with $1,000,000 general aggregate and products/completed operations aggregate, workers compensation of $100,000 each accident and disease, and automobile liability of $1,000,000 combined single limit. The contract will utilize AIA A101-2017 and AIA A201-2007 forms with State of Rhode Island revisions. The scope includes two allowances totaling $40,000: $30,000 for unforeseen concealed work and $10,000 for manufacturer-required testing for warranty validity. Liquidated damages are assessed at $750 per day for schedule delays. Vendor substitutions to the basis of bid manufacturer may be requested during the question period for consideration in an addendum. Unit pricing has been removed from the project manual per Addendum 1.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2021-1 Page 1 of 3 Revised 06/10/2022

AGENCY SOLICITATION SPECIFICATIONS

RFQ –REQUEST FOR PROPOSAL PUBLIC WORKS

HEADER

TITLE: RFQ27007127 CCRI Field House Roof Replacement Knight Campus.

PRE-BID/ PROPOSAL CONFERENCE: NO

Vendors can go online to view the roof to see the extent of the requirements for its replacement or visit the site to look at the perimeter. Access to the roof will not be possible.

BONDING REQUIREMENTS

Bid Surety Bond Required: YES Payment and Performance Bond Required: YES

CONTRACT TERMS

The initial contract period will begin upon issuance of CCRI Purchase order for one (1) year. Contracts may be renewed for up to [1] additional 12-month periods based on vendor performance and the availability of funds.

Insurance Requirements (#14 in Instructions to Vendors on Requirements tab) In accordance with this solicitation, or as outlined in Section 13.19 of the General Conditions of Purchase, found at https://rules.sos.ri.gov/regulations/part/220-30-00-13 and General Conditions

- Addendum A found at https://www.ridop.ri.gov/documents/general-conditions-addendum-a.pdf, the following insurance coverage shall be required of the awarded vendor(s):

General Requirements:

14a) ☒ Liability - combined single limit of $1,000,000 per occurrence, $1,000,000 general aggregate and $1,000,000 products/completed operations aggregate.

14b) ☒ Workers compensation - $100,000 each accident, $100,000 disease or policy limit and $100,000 each employee.

14c) ☒ Automobile liability - $1,000,000 each occurrence combined single limit.

AIA Contract

Rhode Island custom AIA contract designated below outlining the scope and special terms and conditions covering the work, executed by an authorized representative of your company.

https://rules.sos.ri.gov/regulations/part/220-30-00-13 https://www.ridop.ri.gov/documents/general-conditions-addendum-a.pdf

2021-1 Page 2 of 3 Revised 06/10/2022

Vendor shall obtain the Rhode Island custom AIA contract at:

https://documentsondemand.aia.org/?filter=Rhode.

9a) ☒ AIA A101-2017 Standard Form of Agreement Between Owner and Contractor with State of Rhode Island revisions dated 7-25-19.

9g) ☒ AIA A201-2007 General Conditions of the Contract for Construction with State of Rhode Island Revisions dated 9-10-19.

SECTION A. BACKGROUND

The Community College of Rhode Island is the largest community college in New England, providing high-quality academic programs and career-oriented training for full- and part-time students, recent high school graduates, and adult learners.

Named the 2019 Two-Year College of the Year by Education Dive magazine, CCRI enrolls more than 13,000 students in credit-bearing degree and certificate programs and an additional 8,500 individuals in Workforce Development programs and adult education courses annually.

With campuses in Warwick, Providence, Newport, and Lincoln and satellite campuses in Westerly and Woonsocket, CCRI meets Rhode Islanders where they are, offering an outstanding college education that leads to strong learning outcomes, successful degree attainment, and job placement opportunities. Students can choose from more than 90 majors and programs and seven academic career paths. CCRI also offers online, hybrid, and in-person options in addition to seamless transfer opportunities for students looking to continue their education at a four-year college or university.

The Community College offers extensive community programming as well, opening its facilities for public use, sponsoring programs on issues of public concern, and offering workshops and seminars for businesses, government agencies, and individuals seeking to improve their skills or enhance their lives.

The purpose of this RFP is to completely remove the existing membrane roofing system and replace with a new 30-year membrane system at the Knight Campus at the Community College of Rhode Island Field House per the attached Construction Drawings.

SECTION B: SCOPE OF WORK AND REQUIREMENTS

The work includes but is not limited to the complete removal of the existing roofing system including all flashing materials. Replace with a new 30 year membrane roofing system, flashing, including all mechanical, electrical disconnects and reconnects, resetting plumbing drains, etc. A proposed substitution to the basis of bid manufacturer can be requested during the question period to be considered and or accepted in the Addendum.

**Vendor must posses a commercial roofing license Issued by the RI Contractors’ Registration and Licensing Board. Please enter your number under the contractor registration in OSP.

SECTION C: CONTRACT TIME

https://documentsondemand.aia.org/?filter=Rhode

2021-1 Page 3 of 3 Revised 06/10/2022

Start of onsite construction: April 12, 2027

Substantial completion: October 10, 2027

Final completion: October 25,2027

SECTION D: ALLOWANCES

1. ADD Allowance - unforeseen concealed work to be repaired as direction by CCRI. $30,000

2. Add Allowance - Manufacturer's required testing for Warranty validity.

$10,000

Total Allowances $ 40,000

SECTION E: LIQUIDATED DAMAGES

$750.00/Day

SECTION F: Unit Pricing

1. None – Unit price will be removed from Project Manual under Addendum 1

SECTION A. BACKGROUND
SECTION B: SCOPE OF WORK AND REQUIREMENTS
SECTION C: CONTRACT TIME
SECTION D: ALLOWANCES
SECTION E: LIQUIDATED DAMAGES
SECTION F: Unit Pricing

File details come from the government source that posted it. Updated .