rfq24allames00067.pdf
PDF 865 KB Posted
- Attached to
- TxDOT Aviation Division- Notice to Consultants
- Solicitation number
- RFQ24ALLAMES00067
- Issued by
- Texas
About this file
This document is a Request for Qualifications (RFQ) issued by the Texas Department of Transportation (TxDOT) Aviation Division on behalf of the City of Lamesa and Dawson County for the Lamesa Municipal Airport. The scope of services requested includes preparing an Airport Layout Plan (ALP) Update with Narrative Report, incorporating FAA AGIS requirements and data collection, developing a Capital Improvement Plan, preparing/updating the airport property map, establishing phased goals for airport improvements, and developing airport height hazard protection and land use compatibility measures. The successful firm will be selected based on qualifications, relevant experience, ability to meet schedules, and proposed technical approach. Responses are due by July 10, 2024, at 2:00 PM CST, and will be scored according to the evaluation criteria provided. The DBE goal is set at 0%, and the contract is subject to 49 CFR Part 26.
The contract will be awarded to the top-rated firm following review of the responses, with the possibility of interviews for the top-rated firms. The selected firm will negotiate a fee with TxDOT. Funding for this project will come from local, state, federal, and alternative sources. Respondents must be registered in the TxDOT Aviation eGrants system to submit a response.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| rfq24allames00067ad1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TABLE OF CONTENTS
LAMESA MUNICIPAL AIRPORT
TXDOT SOLICITATION NO.: RFQ-24ALLAMES-00067
1. REQUEST FOR QUALIFICATIONS ANNOUNCEMENT
2. EVALUATION CRITERIA
3. INSTRUCTIONS FOR RESPONDING TO A SOLICITATION IN EGRANTS
4. AIRPORT LAYOUT PLAN
TxDOT Solicitation No.: RFQ-«CSJ»-00067
TxDOT CSJ/Project No.: «CSJ»
Texas Department of Transportation
Aviation Division
Request for Qualifications (RFQ) for Professional
Services
The of Lamesa and Dawson County through its agent, the Texas Department of
Transportation (TxDOT), intends to engage a qualified firm for services. This solicitation is subject to 49 U.S.C. §47107(a)(17) and will be administered in the same manner as a solicitation conducted under Chapter 2254, Subchapter A, of the Texas Government Code.
TxDOT Aviation Division will solicit and receive qualification statements for professional services as described below:
Airport Sponsor: City of Lamesa and Dawson County, Lamesa Municipal Airport;
TxDOT CSJ/Project No.: 24ALLAMES. The TxDOT Project Manager is Luis Camargo.
Scope: Prepare an Airport Layout Plan (ALP) Update with Narrative Report with tasks to include:
1. Prepare an ALP with Narrative consistent with the most current FAA Advisory
Circulars and Standard Operating Procedures;
2. Incorporate FAA AGIS requirements and data collection as needed, including an -
18B obstruction survey, and upload data to the FAA’s Airport Data and Information
Portal.
3. Develop a Capital Improvement Plan, including a recommended phasing plan and financial overview that considers local, state, federal, and alternative funding sources;
4. Prepare/update the airport property map (Exhibit A) consistent with the most current FAA Advisory Circulars and Standard Operating Procedures;
5. Establish phased, attainable goals for airport improvements and development based on a forecast for aviation demand and current and future critical aircraft; and
6. Develop and adopt into local zoning airport height hazard protection and airport land use compatibility measures, including associated maps, to ensure the protection of the public investment in the airport; and
Per FAA SOP 8.00, review any existing RSA determinations and update as needed or complete a determination for any runway that does not have one. If an RSA study is needed, that study will be conducted as part of this planning effort. A list of follow-on projects or studies will be a deliverable of this task.
The Agent, in accordance with the provisions of Title VI of the Civil Rights Act of 1964
(78 Stat. 252, 42 U.S.C. §§ 2000d to 2000d-4) and the Regulations, hereby notifies all respondents that it will affirmatively ensure that for any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit in response to this solicitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.
The proposed contract is subject to 49 CFR Part 26 concerning the participation of
Disadvantaged Business Enterprises (DBE).
The DBE goal is set at 0%.
To assist in your qualification statement preparation, the criteria and most recent Airport
Layout Plan are available online at http://www.dot.state.tx.us/avn/avninfo/notice/consult/index.html by selecting “Lamesa
Municipal Airport.”
Response Procedure:
The successful firms will be selected on the basis of a Response. A prime provider may only submit one Response. If a prime provider submits more than one Response, that prime provider will be deemed non-responsive. The Response must contain the required information, and should address the recommended information, as listed below. Response submissions will be scored accordingly. If the Response is non-compliant with any of the following requirements, the Response may be deemed non-responsive.
1. Qualifications Statement (QS) – The QS shall contain no more than nine 8.5x11-inch single-sided pages.
a. QS Format:
i. Readability – The submitter has latitude in formatting the QS for visual effectiveness. Graphics, tables, photos, and other visual aids are permitted within the nine allotted pages, except that Quick Response (QR) codes or other external link(s) are not permitted. There is no specific font, font size, color, or other formatting requirements, although a font size smaller than 10 is not recommended. Selection committee members may consider legibility and readability when scoring.
Unreadable text will not be considered and may cause the QS to be deemed non-responsive. It is the submitter’s responsibility to provide a legible, readable document.
http://www.dot.state.tx.us/avn/avninfo/notice/consult/index.htm
b. QS Content - It is recommended the QS include:
i. The RFQ number, airport name, name of firm, firm address, email address, telephone number and contact information for key personnel. The response shall also identify each proposed project team member, each proposed member’s time commitment to this project as a percentage of their total work week, and whether the proposed member is an employee of the responding firm or a sub-contractor to that firm.
c. QS Content – For scoring purposes, the QS must include:
i. Information showing the firm’s project understanding and technical approach, including similar project-related experience of the project manager and each task leader responsible for a major work category. For each project referenced, identify either the project manager’s or the task leader’s specific role(s) and work contributed. The project manager is required to be a Professional Engineer registered or licensed in
Texas, by the submission deadline. If applicable to project, an Architect, is required to be registered or licensed in Texas, by the submission deadline. License number(s) must be included in the response submission.
ii. In addition to individual project-related experience of the project manager and task leaders required under
(ii), list no more than ten relevant projects performed by the responding firm within the last 10 years. This shall include airport name, location, phone number, and airport contact person’s name, title, and phone number. It shall also include the original project completion time estimate vs. the actual completion time for the cited design project, as well as a brief narrative description of the project and whether or not your firm served as the prime or the sub on each project cited.
iii. Project Design Schedule: Indicate the number of weeks necessary to design the project in accordance with “Project Design Schedule Information” below.
The Response must be submitted in eGrants following the Submission Procedures at the end of this notice.
PROJECT DESIGN SCHEDULE
Based on the published project scope and your technical approach, indicate below the number of weeks necessary for each phase and total design time to design the project. Some of the basic responsibilities within each design phase are included for reference. Do not include review time. Assume, however, that your work will require some revision after review, and that the time required to address these comments should be included within your schedule. If time is required for specialized studies, indicate the additional time.
NOTE: This proposed schedule will set the basis for the contract deadlines in the professional services agreement if your firm is selected.
Preliminary Report Phase
• Attend pre-design conference
• Obtain and analyze necessary survey data
• Obtain and analyze necessary geotechnical data
• Prepare comprehensive report
Preliminary Design Phase
• Attend project meeting(s)
• Prepare project drawings (70%)
• Provide all technical specifications
• Provide project cost estimate
Final Design Phase
• Attend project meeting(s)
• Finalize drawings and contract documents (100%)
• Provide a revised opinion of probable total project costs
• Prepare a Construction Management Plan
• Update, if necessary, the Preliminary Report
• Prepare and submit airspace study to FAA
EVALUATION CRITERIA FOR AIRPORT PLANNING QUALIFICATIONS
1. Capability to perform all of the services required for this project and professional qualifications of key personnel assigned to this project relevant to the work to be performed. (25 points)
Does the consultant have the necessary resources to perform all of the services required (e.g.: planning, surveying, CAD, etc.)? Who are the professionals that will be working on this project on a daily basis and how do their qualifications and experience with general aviation airport planning projects compare with other respondents? [Sources of information: Aviation Planning Team, Recent Relevant
Airport Experience, Proposed Technical Approach, and possibly the Optional
Summary.]
2. Recent experience, within the last ten years, in the development of airport plans comparable to the proposed project. (25 points)
Does the consultant have direct experience developing general aviation airport plans and drainage studies similar to those proposed for this location?[Sources of information:
Aviation Planning Team, Recent Relevant Airport Experience, and possibly the Optional
Summary.]
3. Ability to meet the schedules and deadlines of this project and reputation for competence, timeliness, and quality of performance and work product. (25 points)
Does the proposed planning and engineering team have sufficient time to devote to this project in order to meet the schedule submitted in the qualifications? Is the proposed schedule realistic? Does the consultant consistently meet contractual timetables?
Has the work performed for other airports been satisfactory? [Sources of information:
Planning Team Form, Recent Relevant Airport Experience, Project Schedule, possibly the Optional Summary, and reference check.]
4. Proposed Technical Approach and Schedule to Accomplish the Project. (25 points)
Does the consultant show specific understanding and familiarity with the particular requirements of this project and how to address them? Is the consultant familiar with relevant planning and engineering? Is the schedule appropriate to accomplish the project? [Sources of information: Proposed Technical Approach, Proposed Schedule, and possibly the Optional Summary
Submission Procedure
The Response must be received in the TxDOT Aviation eGrants system no later than
July 10, 2024, 2:00 p.m. (CST).
Firms that wish to submit a response to this solicitation must be a user in the TxDOT
Aviation eGrants system no later than one business day before the solicitation due date. To request access to eGrants, please complete the Contact Us web form located at http://txdot.gov/government/funding/egrants-2016/aviation.html http://txdot.gov/government/funding/egrants-2016/aviation.html
The consultant selection committee will be composed of local government representatives.
The final selection by the committee will generally be made following the completion of review of responses. The committee will review all submissions responses and rate and rank each. The evaluation criteria for airport planning projects can be found at http://www.txdot.gov/inside-txdot/division/aviation/projects.html under Information for
Consultants. All firms will be notified, and the top-rated firm will be contacted to begin fee negotiations. The selection committee does, however, reserve the right to conduct interviews for the top-rated firms if the committee deems it necessary. If interviews are conducted, selection will be made following interviews.
Please contact TxDOT Aviation for any technical or procedural questions at (800)68-
PILOT (74568). For procedural questions, please contact Noemi Rios, Contract Specialist.
For technical questions please contact Luis Camargo, Project Manager.
For questions regarding responding to this solicitation in eGrants, please contact the
TxDOT Aviation help desk at 1-800-687-4568 or avn-egrantshelp@txdot.gov http://www.txdot.gov/inside-txdot/division/aviation/projects.html mailto:avn-egrantshelp@txdot.gov eGrants Workflow:
RFQ Response eGrants Role:
Subgrantee Administrator (SA)
Subgrantee Staff (SS) eGrants link eGrants help:
https://apps2.dot.state.tx.us/apps/egrants2/logout2.aspx eGrants help desk Monday – Friday 8AM – 4PM CD/ST (excluding state/federal holidays) avn-egrantshelp@txdot.gov or 1-800-687-4568
STEP ROLE ACTIONS NOTES
SA
Go to View Opportunities.
a. Select Apply Now to the opportunity
b. The RFQ Response Menu is opened
Very important to click on the name of the document and not the organization name
Make a note of the opportunity due date to ensure you respond in time
SA/SS
Click on View, Edit and Complete Forms
a. Select RFQ Applicant Form
b. Confirm Project information and address
c. Upload RFQ response
PLEASE MAKE SURE YOU SELECT THE
CORRECT PDF FILE BEFORE CHANGING
STATUS.*
d. Hit Save
You should print the proposal document to a PDF so that it becomes un-editable.
SA
When you are ready to submit your response, click on
"Save and submit to CS review". YOU ARE DONE
You will get an email saying the response was successfully submitted; the status must be changed to RFQ Response in CS Review by the due date and time posted in the solicitation.
04 SA/SS
WAIT UNTIL A SELECTION NOTIFICATION IS
SENT TO YOU
SS/SA
AFTER SELECTION NOTIFICATION IS RECEIVED
Log in to view status of response. Once the scores are verified, TxDOT will move the response to an interview, selected or not selected status of which you can log in to see the status of your response.
The selection notification will refer users to eGrants to view the status of their response.
User may also view the TxDOT website for selection information.
Aviation Division https://apps2.dot.state.tx.us/apps/egrants2/logo
*If the responder posts the incorrect file.
• If status has been changed and the due date for the response has not expired, contact the help desk to ask for the status to be administratively changed back to
Response in Process.
• If the incorrect submission was posted, the incorrect file may be deleted and the correct one posted as long as the status has not been changed to Response in CS Review.
Respondent will need to check the “delete” box and hit save. The page refreshes. Then post the correct submission, save, and change the status.
If you are not set up in eGrants and wish to respond to a posted solicitation, you may contact the aviation help desk for assistance by using the webform available at eGrants Help Desk Form
Some organizations will have many user members.
Each organization should determine which user member will submit the completed submission in eGrants. After the opportunity is selected for the organization, it will no longer appear on any other user’s home page unless the initiating user cancels the response.
https://form.jotform.com/62164883455160
RPZ
EASEMENT
1000'
ROAD ELEV. 2981.7'
SURFACE ELEV. 3010.B
CLEARANCE 29.1'
ROAD ELEV. 2982. T
SURFACE ElEV. 3010.8'
CLEARANCE 28.1'
ROAD ELEV. 2989.1'
SURFACE ELEV. 3017,4'
LEARANCE 28.3'
ULTIMAlE RPZ
EASEMENT
ROAD ELEV. 2990.2'
SURFACE ELEV. 3017.4
CLEARANCE 27.'Z
/P
/P
I] t /P
I ;JII I I I I
r '.;:
I
P/P
.1
I' 'K" I \
,f\, ' '
I o
: 75'
15'03'42" E c::::�- "
15'03' 42" W 725:5•/
700'
RUNWAY END
_ ELEV. 2991.8'
I I
I I
NO OFZ OBJECT
PENETRATIONS
ROAD ELEV, 2983, 7'
SURFACE ELEV. 3010.8'
CLEARANCE 27.1'
DIRT COUNTY ROAD
I l1
22;"
OB ANTENNA
14'8UILOING HEIGHT
AIRPORT BRNCH MARK TOP
OF BRASS DISK ON TOP OF
CONCRElE HEADWALL ON THE
SOUTH SIDE OF THE VEHICLE
PARKING ACCESS ROAD
ELEVATION 2995.41'
RL TAXJWAY "J" if •
- !O -- " -
PAVED COUNTY ROAD
oP
11 12
TAXIWAY A
b
RUNWAY END COORDINATES (NAD 83)
RUNWAY EXISTING ULTIMATE
LATITUDE 32"45'28. 7849" N 32"45'28. 7849" N
RUNWAY 7
101 '55'53.4827" W 101'55'53.4827" W LONGITUDE
LATITUDE 32°45'38. 7046" N 32'45'38.7046" N
RUNWAY 25
101"55'08.1408" W 101'55'08.1408" W LONGITUDE
LATITUDE 32'45'37.7331" N 32'45'37.7331" N
RUNWAY 16
101·55'05.8470" W 101 '55'05.8470" W LONGITUDE
LATITUDE 32'44'49.8745" N 32'44'49.8745" N
RUNWAY 34
101'54'51.0342" W 101'54'51.0342" W LONGITUDE
RUNWAY DATA
EXISTING
APPROACH CATEGORY B-[[
APPROACH VISIBILITY MINIMUMS VISUAL
RUNWAY DIMENSIONS, FEET 4,000 X 60
RUNWAY APPROACH SURFACE 20: 1 / 20: 1
SAFETY AREA, FEET 4,600' X 150'
OBJECT FREE AREA, FEET 4,600' X 500'
OBSTACLE FREE ZONE, FEET 4,400' X 400'
TAKE OFF RUN AVAILABLE (TORA) 4,000'
TAKE OFF DISTANCE AVAILABLE (TODA) 4,000'
ACCELERATE - STOP DISTANCE AVAILABLE (ASDA 4,000'
LANDING DISTANCE AVAILABLE (LOA) 4,000'
PAVEMENT MATERIAL ASPHALT
PAVE MENT STRENGTH (SW) LBS. 12,500
RUNWAY EFFECTIVE GRADIENT, % 0.0125
TOUCHDOWN ZONE ELEVATION 2998.8' / 2998.8'
MARKING VISUAL
LIGHTING MIRL
VISUAL APPROACH AIDS NONE
TAXIWAY LIGHTING GUIDANCE SIGNS
NOTES
1. TAXIWAY "A"-NOR1H 4,200' HAS AN EXISTING PAVEMENT
WIDTH OF 75'. MAINTAINED WID1H WILL BE 40'.
2. RUNWAY 16-34 - RUNWAY END ELEVATIONS - ELEVATIONS SHOWN
ON 1HIS DRAWING ARE 0.12' HIGHER THAN THE PUBLISHED ELEVATIONS
ON 1HE AERONAUTICAL DA TA SHEET DUE TO A 1 1 /2" OVERLAY.
BUILDINGS/FACILITIES
EXISTING ULTIMATE ELEVATION PROPOSED DESCRIPTION OBJECT DISPOSmON
1 3007.6' CONVENTIONAL HANGAR
2 3010.0' CONVENTIONAL HANGAR
3 3010.2° REQUEST FAA CONVENTIONAL HANGAR
AERONAUTICAL STUDY
4 3010.0' CONVENTIONAL HANGAR
5 3006.5' STORAGE BUILDING
6 3005.0' FBO HANGAR
7 3016. 1' FBO HANGAR
8 3052.5' REQUEST FAA BEACON
AERONAUTICAL STUDY
9 3014.0' CONVENTIONAL HANGAR
10 3011.6' CONVENTIONAL HANGAR
11 3008.5° T-HANGAR
12 3011.3' T-HANGAR
13 3004.2' T-HANGAR
14 3008.T T-HANGAR
15 3007.3' T-HANGAR
16 3009.8' CONVENTIONAL HANGAR
17 3004.7' T-HANGAR
18 T-HANGAR
19 T-HANGAR
20 T-HANGAR
21 T-HANGAR
22 3004.3' NOB RADIO BUILDING
23 3013.4' CONVENTIONAL HANGAR
24 3016.5' LIGHTED WINOCONE
25 3017.7' SUPPLEMENTAL WINDCONE
26 3010.4' REQUEST FAA VOR
AERONAUTICAL STUDY
RUNWAY 7-25 RUNWAY 16-34
ULTIMATE EXISTING ULTIMATE
B-II B-II B-[[
1 MILE 1 MILE 1 MILE
4,000 X 75 5,000 X 75 5,000 X 75
20: 1 / 20: 1 20: 1 / 20: 1 20: 1 / 20: 1
4,600' X 150' 5,600' X 150' 5,600' X 150'
4,600' X 500' 5,600' X 500' 5,600' X 500'
4,400' X 400' 5,400' X 400' 5,400' X 4QQ'
4,000' 5,000' 5,000'
4,000' 5,000' 5,000'
4,000' 5,000' 5,000'
4,000' 5,000' 5,000'
ASPHALT ASPHALT ASPHALT
12,500 20,000 20,000
0.0125 0.126 0.126
2998.8' / 2998.8' 2995.4' / 2993.8' 2995.4' / 2993.8'
NPI NPI NPI
MIRL MIRL MIRL
NONE PAPl-2 / PAPl-2 PAPl-2, REILS/PAPl-2, REILS
GUIDANCE SIGNS GUIDANCE SIGNS - LITL GUIDANCE SIGNS - LITL
TAXIWAY MARKING STD. W/ � REFLECTORS STD. W/ \: REFLECTORS STANDARD STANDARD
RUNWAY NAVIGATIONAL AIDS NONE GPS NOB - GPS NDB - GPS
N 74"55'30" E 50.0' 890.0
RUNWAY ENO
ELEV. 2985.5'
, LOW POINT)
S 14'59'50" E 810.0'
ROAD ELEV. 2978.1'
SURFACE ELEV. 3006.7'
CLEARANCE 28.6' S 14'59'52:_E_
810.0 �
--� S��:�Si" E ll.=26"41'49" R-1170.83' L-545.55'
N 74•57•30• E 425.36'
NOTES
200'
A=48'00'00" R-1090.83' L=913.83'
ILOING HEIGH
1000'
ROAD ELEV. 2977.8'
SURFACE ELEV. 3006.7'
CLEARANCE 28.9'
EXJSTING a/, �:�EMENT
10.0' ff--L,<J/ o u'//A
ROAD ELEV. 2978.0'
SURF ACE ELEV. 3006. 7'
CLEARANCE 28. 7'
1. DEPICTION OF FEATURES AND OBJECTS, INCLUDING RELATED ELEVATIONS AND CLEARANCES, W11HIN THE RUNWAY PROTECTION ZONES ARE DEPICTED ON 1HE INNER APPROACH PLANS.
2. RECOMMENDED LAND USES Wl1HIN THE AIRPORT ENVIRONS ARE DEPICTED ON 1HE AIRPORT
LAND USE PLAN.
3. BUILDING RESTRICTION LINE (BRL) IS ESTABLISHED IN ACCORDANCE Wl1H F.A.R. PART 77
CRITERIA. BUILDING HEIGHT SHOWN IS HEIGHT ABOVE THE ADJACENT RUNWAY CENTER LINE
ELEVATION. BUILDING RESTRICTION LINE ALONG THE WEST SIDE OF RUNWAY 16-34 AND
ALONG 1HE SOUTH SIDE OF RUNWAY 7-25 IS BEYOND THE AIRPORT PROPERTY LINE.
4. ULTIMATE AWOS LOCATION IS SHOWN AT 1,000' SOU1H OF THE END OF RUNWAY 16 AND
525' WEST OF 1HE CENTERLINE OF RUNWAY 16-34. LAND ACQUISITION WILL BE REQUIRED.
AIRPORT DATA TABLE
ITEM EXISTING
AIRPORT DESIGN GU[-A
AIRPORT REFERENCE CODE B-[
AIRPORT ELEVATION, FEET MSL NAVA 88 2998.8'
MEAN MAXIMUM TEMPERATURE OF HOTTEST MONTH, JULY 95' F
AIRPORT REFERENCE
POINT (ARP) NAO 83
AIRPORT/TERMINAL VISUAL AIDS
AIRPORT /TERMINAL NAVIGATIONAL AIDS
EXISTING ULTIMATE ----
LATITUDE 32'45'23" N
LONGITUDE 101°55'13" W
ROTATING BEACON
NOB - GPS
LEGEND
ITEM
PROPERTY LINES
ULTIMATE
GU[-A
B-1[ 2998.8' 95' F 32'45°23" N 101 '55'13" W
ROTATING BEACON
NDB - GPS
z
0...
6\ AIRPORT REFERENCE POINT
t---�-;",-------t-t---�-----t-t-:=-:=-:--==----------j ROTATING BEACON
I Z 7 7 71
-- BRL --
0000 0000 r-ov c::J
-- BRL --
r-ov
AVIGATION EASEMENT (IF APPLICABLE)
BUILDING CONSTRUCTION
BUILDING RESTRICTION LINE (BRL)
FACILITY CONSTRUCTION
FENCING
THRESHOLD LIGHTS
SUPPLEMENTAL WIND CONE
2 BOX PAPI
RUNWAY END IDENTIFIER LIGHTS (REIL)
LIGHTED WIND CONE AND SEGMENTED CIRCLE
SAFETY AREA
TOPOGRAPHY
ELECTRIC VAULT
FUEL STORAGE AREA
GUIDANCE/HOLD LINE SIGN
.LON)I !i"O I s;z £11£
0 80
� l5 Ir/ ..,
0) Ir/ .., + r-- �
10.5 KNOT
LAMESA MUNICIPAL AIRPORT WIND DATA
NO.
COMBINED SOURCE: MIDLAND, TEXAS
LUBBOCK, TEXAS
PERIOD: 1988-1997 (ALL WEATHER)
RUNWAY 16-34 WIND COVERAGE 90.70%, 13 KNO TS
RUNWAY 7-25 WIND COVERAGE 75.93%, 10.5 KNOTS
COMBINED WIND COVERAGE 98.26%
PERCENT CALM 4.2%
MAGNETIC DECLINATION
JANUARY 1, 1999
ANNUAL CHANGE -0"2.9'
0 300 600
GRAPHIC SCALE: 1" = 300'
REVISIONS
BY CHK'D DATE
TEXAS DEPARTMENT OF TRANSPORTATION
AVIATION DIVISION
AIRPORT SPONSOR
0 ALP APPROVED ACCORDING TO FAA AC 150/5300-13 CH 5
PLUS THE REQUIREMENTS OF A FAVORABLE EN\IRONMENTAL
FINDING PRIOR TO THE START OF ANY LAND ACQUISITION
CURRENT AND FUTURE DEVELOPMENT DEPICTED ON THIS ALP IS
APPROVED AND SUPPORTED BY AIRPORT SPONSOR
OR CONSTRUCTION AND AN FAA FORM 7460-1 SUBMlfilD
PRIOR TO ANY CONSTRUCTION ON AIRPORT PROPERTY
0 ALP APPROVED ACCORDING TO FAA AC 150/5300-13 CH 5
PLUS THE CONDITIONS/COMMENTS IN LETTER DATED,
/l . ✓ TITLE, AIRPORT SPONSOR'S REPRESEN::r
VE
. r,I ��...J..__/�-""-J.c'....:_:. ���=:::::::_7�2-bA�1/-'L½�o0 ClwL �0,4,,�, &:Ylis ;]�%-
DIRECTOR, AVIATION DIVISION DA TE SIGNATURE -Q.df('
PREPARED BY:
The Brannon Corporation ENOINURS. SURVEYORS, .ai: URBAN PLANNERS
1321 SOUTH BROADWAY e TYLi:R, TEXAS 715701
__,__ (IIU)--
B.F.L.
DESIGNED BY
R.L.R.
DRAWN BY
CHECKED BY
AIRPORT LAYOUT DRAWING
LAMESA MUNICIPAL AIRPORT
LAMESA, DAWSON COUNTY, TEXAS
MARCH 1999
DAlE
MARCH 1999
DAlE
DAlE
Texas eparfment Transportation
A viatfon Division
SHEET 2 OF 11