Tech Eval Questions - Solid Waste Collection - Pine Ridge.pdf

PDF 52 KB Posted

Attached to
SOLID WASTE COLLECTION FOR THE PINE RIDGE IHS HOSPITAL
Solicitation number
RFQ-2011-032
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL EVALUATION QUESTIONS

SOLID WASTE COLLECTION

1. Quality and Environmental Issues: Include procedures and methods for: garbage disposal, protection of affected adjacent areas, operating on occupied facilities, MSDS sheets for chemicals to be used for cleaning and insect/rodent control. 10 Possible Points

2. Narrative of Project: Provide a comprehensive statement of the scope and purpose of the project.

Include a detailed description of the proposed work involved to accomplish the objectives of the statement of work. Include either by chart or narrative: reason for subcontracts; estimated time frames for equipment delivery; proposed collection schedule for each location; proposed receptacle maintenance schedule for cleaning and insect/rodent control. 20 Possible Points

3. EPA certified land fill: Provide the name, location and proof of EPA certification for the landfill to be used for disposal. The OST Landfill may be utilized as the disposal area for this requirement as long as the OST Landfill remains compliant with section 2 below. The contractor will be responsible for utilizing an alternate compliant landfill or disposal method if the OST Landfill becomes non-compliant during the course of this requirement. 20 Possible Points

4. Past Performance: Include at least 3 references of past performance on similar projects. Include contact person name and title, company, address, phone number, and brief description of service performed or product supplied. A signed, written reference on company letterhead is preferred.

Written references should include contractor's quality, workmanship, timeliness, professionalism, and overall performance rating. 20 Possible Points

5. Total Price for Contract: The total price for contract shall be itemized and include: dumpster rental, dumpster maintenance, collection charges, disposal fees, TERO fees and/or tipping fees.

30 Possible Points

File details come from the government source that posted it. Updated .