SOW - NOB_Main-entrance_Canopy_repairs_draftCC-long_rev1 (1).pdf
PDF 962 KB Posted
- Attached to
- Repair and Repaint Building Main Entrance Canopy
- Solicitation number
- RFQ19R01025Q0011
- Issued by
-
Department of State
About this file
This document is a Statement of Work (SOW) for repairing and repainting the main entrance canopy at the U.S. Embassy in Bucharest, Romania. The project involves comprehensive waterproofing and painting services for multiple surfaces, including awnings, concrete slab soffits, and terraces, with an estimated total work area of approximately 600 square meters. The total contract period is 49 calendar days, with work to be completed from Day Zero (contract award), including 46 days for mobilization and construction, and 3 days for final cleanup.
The contract is a firm fixed-price agreement payable in Romanian Leu, requiring the contractor to provide all materials, labor, equipment, and expertise to restore the canopy's functionality and appearance. Key requirements include power washing, removing damaged materials, repairing substrate defects, applying waterproofing primers and liquid membranes, and repainting surfaces to match existing conditions. The contractor must comply with safety regulations, use specified products like Sika waterproofing systems, follow strict quality control measures, and obtain Embassy approvals throughout the project. The work must be performed between 8:00 AM and 5:00 PM Monday through Friday, with no work permitted on local or American holidays.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Cover Page RFQ 19R01025Q0011.pdf | ||
| SF-1442 RFQ 19R01025Q0011.pdf | ||
| RFQ 19R01025Q0011 Repair Main Entrance Canopy.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Embassy of the United States of America
FACILITY MANAGEMENT OFFICE
NOB MAIN ENTRANCE CANOPY REPAIRS AND REPAINTING i
STATEMENT OF WORK FOR WORKS CONTRACT
DATE: March 18, 2025
PROJECT: NOB MAIN ENTRANCE CANOPY REPAIRS AND REPAINTING
LOCATION: U.S. EMBASSY of BUCHAREST
Contents
1.0 INTRODUCTION
2.0 GENERAL REQUIREMENTS
3.0 SPECIFIC REQUIREMENTS
4.0 SPECIFICATIONS
5.0 CONTRACT ADMINISTRATION
6.0 US EMBASSY OBLIGATIONS
7.0 WORKS CONTRACTOR OBLIGATIONS
8.0 SAFETY HEALTH AND ENVIROMENTAL MANAGEMENT (SHEM)
9.0 MOBILIZATION
10.0 SECURITY REQUIREMENTS - ACCESS TO GOVERNMENT BUILDINGS AND
STANDARDS OF CONDUCT
11.0 QUALITY CONTROL REQUIREMENTS
12.0 PAYMENTS
APPENDIX 1 - DRAWINGNS
APPENDIX 2 - SCOPE OF WORK REQUIREMENTS
I. PART ONE - GENERAL
I.1 SUMMARY
I.2 SUBMITTALS
I.3 SUBSTITUTIONS AND PRODUCT OPTIONS
I.4 QUALITY CONTROL
I.5 STORAGE OF MATERIALS
NOB MAIN ENTRANCE CANOPY REPAIRS AND REPAINTING
ii
I.6 TEMPORARY FACILITIES
I.7 PROJECT PROCEDURES
I.8 PROJECT SAFTEY
I.9 PROJECT SECURITY
I.10 FIELD QUALITY CONTROL
I.11 CLEANING and ADJUSTING
II. PART TWO – SCHEDULE
II.1 PERIOD OF PERFORMANCE
II.2 PROPOSAL SCHEDULE
III. PART THREE – NON-BINDING CONTRACT INFORMATION
III.1 BUCHAREST WEATHER DATA
III.2 EMBASSY of BUCHAREST HOLLIDAYS ON 2025
APPENDIX 3 – RECOMANDED PRODUCTS
I. NOB MAIN ENTRANCE CANOPY AWNINGS
II. NOB MAIN ENTRANCE CANOPY TERRACE
III. NOB MAIN ENTRANCE VESTIBULE TERRACE
Embassy of the United States of America
NOB MAIN ENTRANCE CANOPY REPAIRS AND REPAINTING 1
1.0 INTRODUCTION
1.1 The American Embassy in Bucharest (4-6 Dr. Liviu Librescu Av.) requires services of a Specialized
(Exterior finishings) Contractor to repair and repaint the NOB Main Entrance Canopy within the
Embassy compound, as identified in this Statement of Work (SOW). The surfaces required to be repaired and painted are not new construction. The roof surfaces have terrace layers over the vestibule, PVC membrane over topping slab in the central part of the canopy and a liquid membrane on the awning. The soffit of the canopy slab has a painted stucco finish. The services and works that are purchased are for the reparation of the upper waterproofing layers of the vestibule terrace and the canopy slab and to repair and repaint the soffit of the canopy.
1.2 This SOW is part of the Works Contract, any of its requirement prevail over the Contractor's offer if it is inferior the specifications in the SOW, and the Contractor will not be able to claim additional costs apart the financial bid submitted to meet the requirements of the SOW.
2.0 GENERAL REQUIREMENTS
2.1 This is a fixed price contract. The surfaces shall not be measured and paid on the unit rate basis.
This SOW identifies estimated quantities for finish surface areas based on drawings of the structures. The Contractor may choose to verify these measurements on-site prior submission of a cost proposal and the Contracting Officer’s Representative (COR) will facilitate such site visit.
2.2 The Contractor shall perform the works in accordance with specifications and on all elements / structures listed in this SOW including the below listed tasks.
2.3 The Contractor shall provide site assessment and survey services, project management, skilled staff for professional waterproofing rehabilitation and painting works, all equipment and tools to perform the works, logistics and material procurement services and general support services for this works contract.
2.4 The Contractor’s proposed and U.S. Government (USG) accepted works contract cost proposal and an initial program for the execution of the Works, including completion dates shall be incorporated into the task order. Additionally, the task order shall be a firm fixed price task order.
2.5 This SOW and applicable deliverables and documents as developed by the Contractor and accepted by the USG shall serve as the basis for describing and delineating the scope of the required services and works limits for Works contract to be furnished and executed by the
Contractor.
2.6 All deliverables, documents, proposals etc. submitted by the Contractor under this statement of work shall remain the property of the U.S. Government. All U.S. Government documents and data provided to the Contractor shall remain the property of the U.S. Government. The
Contractor shall limit duplication and dissemination of all U.S. Government documents and
Contractor developed documents under this statement of work to/within the Contractor’s execution team. Duplication or distribution of project documents outside the Contractor’s team is strictly prohibited without the express written approval and authorization of the contracting officer.
Upon completion of each part of works all documents, electronic media, photos, etc. shall be submitted to the Government, including all documents and data the Government provided to the
Contractor. All works contract documents and media shall be submitted to the Government along with the Contractor’s Partial/Final Statement of Completion.
2.7 The Contractor shall perform the Works after clearance of sequence of operation by the
Contracting Officer's Representative (COR) in a manner to cause the least disruptions to Embassy operations and the impact of the interference and its effects on the occupants or users. All detailed work schedules required by this statement of work shall be electronically documented and updated and made available to the Contracting Officer's Representative (COR) upon request, oral or written and the Contractor shall complete each phase of Works according to the approved program. If the COR determines that the Contractor’s schedule conflicts with critical post operations, the Contractor shall modify the schedule as required.
2.8 The Contractor shall deliver materials to work site in manufacturer's original, unopened packages and containers bearing manufacturer's name and label, and other identifying information. Store materials in tightly closed containers in a well-ventilated area. The Works Contractor will not use any method or substances, which may cause damage to the Embassy equipment or systems. Any damage or loss through negligence by the General Works Contractor, its Sub-Contractor or
Service Contractor's staff shall be the whole responsibility of the General Works Contractor. The
US Embassy in BUCHAREST will require the General Works Contractor to make good the damage or pay for the cost of rectification.
2.9 The Contractor shall keep storage area neat and orderly. Remove rags and waste daily. Follow
Safety Data Sheets directions to ensure workers and work areas are protected from fire and health hazards resulting from handling, mixing and application of paints used in this SOW.
2.10 After review of the US Government Statement of Work (SOW) and provided technical data by the
Contractor, any discrepancies, errors, conflicts etc. that are discovered by the Contractor, those items shall be forwarded to the CO via written correspondence. Submittal of this written correspondence shall be completed, within 3 days upon receipt of the US Government Statement of Work.
3.0 SPECIFIC REQUIREMENTS
3.1 The Contractor shall perform the works during climatic conditions that are suitable for application of the waterproofing layers and exterior paint. The Contractor shall comply with manufacturer’s recommendations concerning temperature, humidity, and dust.
3.2 The Contractor shall carry out repairs and clean the surfaces to be repair and painted with an approved method.
3.2.1 The roofing area to be repaired shall be repair in such manner that fulfills all requirements of the initial project regarding materials, system and degree of waterproofing. Removing old waterproofing layers of existing surface finish, wherever deemed necessary for removal of the existing broken finish and for proper application of new layers, shall be carried out as approved by COR. The Contractor shall take precautions to repair, reinstall/replace the existing roof drains (same type and in the same position as the existing ones) and reconnecting them to the internal downspouts which will be repair as needed.
3.2.2 The area to be painted shall be free from dust or any other loose matter. Scraping and sanding of existing surface finish, wherever deemed necessary for removal of the existing loose finish and for proper application of new paint, shall be carried out as approved by COR. The
Contractor shall take precautions and provide approved protection to electric fixtures and devices including cameras, intercoms, light fixtures, power receptacles etc. to avoid damage from water.
3.3 The Contractor shall take precautions and provide approved protection to doors, windows, glazing, aluminum and stone coping, stone cladding, aluminum powder coated surfaces, wall hydrant or any other surfaces and objects that are not the subject of SOW. The Contractor shall also paint other surfaces specifically identified for painting (i.e. vent pipes, exhaust pipes or other) if case. The Contractor shall use waterproof materials such as silicon tape, plastic sheets, and masking tapes for protection of items / surfaces not to be painted. The Contractor shall clean glue or painting marks from protected surfaces after completion of painting works. The Contractor shall use approved materials and methods for cleaning the protected surfaces to avoid damage and discoloration.
3.4 The Contractor shall notify if any item / surface is damaged during the process of cleaning. The
Contractor shall replace the item / surface, if required, to maintain the original finishing and function of the item.
3.5 The Contractor shall comply with local Ministry of Labor requirements for outdoor work.
3.6 The NOB main entrance canopy and other elements identified for repair and painting are listed below. Specific details for each of the building and elements are provided in the paragraphs following the below list.
3.6.1 The NOB main entrance canopy.
3.6.1.1 The total canopy surface area to be repaired and painted is not limited only to the roofing surface of the above said building, but it also includes repairs of the sofit plaster damages and cracks, joints, corners, edges, and through-plaster penetration flashings if necessary. The total canopy surfaces areas include the openings.
3.6.1.2 The total repair surfaces are according to Appendix 1:
▪ Awnings upper surface and exterior the attic parapet 95 sqm (estimation)
▪ Concrete awning edge 15 sqm (estimation)
▪ Canopy concrete slab soffit repairs 40 sqm (estimation)
▪ Canopy concrete slab soffit repaint (stucco) 330 sqm (estimation)
▪ Canopy terrace (bounded by a masonry attic) 150 sqm (estimation)
▪ Vestibule terrace 10 sqm (estimation)
NOTE: All potential bidders are invited to visit the site, ask for clarifications, and make their own estimates so that the submitted bid is complete and includes all the quantities of works necessary to meet the requirements of the contract. The proposal shall not be issued only on the unit rates basis, the bidder will submit a total price proposal based on his estimated quantities of works and unit rates resulting a maximum fixed price contract proposal.
4.0 SPECIFICATIONS
4.1 The Service Contractor warrants to the US Embassy that all materials, workmanship, and methods used by the Contractor, as a minimum, will:
a. comply with these requirements of the Terms and Conditions of service; and
b. comply with all applicable Romanian & USA Laws and Standards.
4.2 The Contractor shall use painting materials specified in “SCOPE of WORKS REQUIREMENTS -
APPENDIX TWO – PRODUCTS” or approved similar products in terms of performance and final finishing. The Contractor shall submit product specification sheet, safety data sheets for COR approval if similar products are proposed to be used. These similar products must be identified at the time of submission of cost proposal.
4.3 The Contractor will be responsible for submitting all the manufacturer product specification sheets, Safety Datasheet [SDS] and equipment cut sheets for all equipment, chemicals, if case
(including chemical composition), and testing procedures (if case) in both English and Romanian language for COR approval.
4.4 The Contractor will follow the general color scheme for different surfaces and will comply with the existing shades. The paint specifications indicated in “SCOPE of WORKS REQUIREMENTS -
APPENDIX TWO – PRODUCTS” are based on materials previously and currently used at the
Embassy Compound. The color changes will be approved by COR and requested by the
Contractor according to the "Modifications" clause of the contract.
4.5 All metal structures (i.e. pipes, not stainless-steel doors, and other metal elements.), if case, should be painted as per sample color provided by the Embassy.
4.6 The Contractor shall use rollers to apply paint flat surfaces and brushes for narrow and / or complex shaped profile surfaces. For each bin of paint, the Contractor shall change the rollers.
The paint shall be applied in minimum of two coats or until a uniform color appearance is achieved.
5.0 CONTRACT ADMINISTRATION
The rates below include all costs associated with providing the works in accordance with the attached scope of work, and the manufacturer’s warranty including materials, labor, insurance (see FAR 52.228-
4 [Workers’ Compensation and War-Hazard Insurance Overseas] and 52.228-5 [Insurance-Work on a
Government Installation]), overhead, profit and GST (if applicable).
5.1 This is a FIRM FIXED PRICE CONTRACT payable entirely in RON (Romanian Leu).
5.2 Prices are for all Contract Works. No additional sums will be payable for any escalation in the cost of materials, equipment, or labor, or because of the Contractor's failure to properly estimate or accurately predict the cost or difficulty of achieving the results required.
5.3 The contract price will not be adjusted due to fluctuations in currency exchange rates.
5.4 The Contractor shall not perform any work beyond this Statement of Work unless directed in writing by the Contracting Officer (CO). Any work performed by the Contractor beyond this SOW without direction from the CO will be at the Contractor’s own risk and at no cost to the US
Embassy of Bucharest.
5.4.1 Contracting Officer (CO)
Anthony P. GIORGIANNI, e-mail: GiorgianniAP@state.gov
Phone: +40 21 200 3667
5.5 NOTICE TO PROCEED: After Contract award and submission of acceptable insurance certificates and copies of all applicable licenses and permits have been provided, the Contracting
Officer will issue a Notice to Proceed. The Notice to Proceed will establish a date (a minimum of ten (10) calendar days from date of Contract award unless the Contractor agrees to an earlier date) on which performance shall start.
5.6 The Facility Manager at the US Embassy in Bucharest shall act as the Contracting Officer's
Representative (COR) for this work. Decision of the COR with respect to SOW will be final.
5.6.1 Contracting Officer’s Representative (COR)
Viorel NEGOESCU – Building Engineer e-mail: NegoescuV@State.Gov;
Phone: +40 21 200 3546
5.7 Within 7 days of commencement of the Contract the Service Contractor shall provide to the US
Embassy a schedule specifying the nature and timing of all the work to be completed.
5.8 The COR has right to inspect and test all services called for by the contract, to the extent practicable always and places during the term of the contract. The COR or his designee may perform quality assurance inspections and tests during performance of work to verify the work is performed according to approved methods.
5.9 The COR has the authority to issue a temporary stop order during the execution of any phase of this SOW for convenience of the US Embassy. During such suspension, the Contractor shall protect, store, and secure such part or all the Works (as the case may be) against any deterioration, loss or damage. The Contractor shall promptly notify the CO that work has been stopped. Delays caused by such stoppage of work shall be compensated with extension of the performance period.
The Contractor shall resume work as soon as practicable after receiving a Notice from the COR to proceed with the suspended work.
5.10 Within 3 days after Works completion, the Contractor will ask for the Performance Certificate
(both for each object identified in the contract and at the completion of all contracted works) sending a
Statement at completion containing the lists of quantities of works performed under the Contract, in the form of a payment measurements of works with a sketch of the object (s) of the Contract to which it relates, including the dimensions which formed the basis of the measurements of the works. This Statement will be a proof of the works performed and following their acceptance by
COR, the Contractor will be able to issue the invoice for the value of the accepted works.
5.11 All documentation produced under this contract will become the property of the Embassy upon completion of this contract.
mailto:GiorgianniAP@state.gov mailto:negoescuv@state.gov
6.0 US EMBASSY OBLIGATIONS
The US Embassy shall provide the Works Contractor with and make available to the Works
Contractor such reasonable access to the US Embassy Compound, electricity and other utilities as are reasonably required for the provision of the Works.
The Contractor shall coordinate with COR for temporary power connection, if needed, for operation of electric tools or temporary lighting. The Contractor shall provide 10mA rated ground fault protection for the connected load.
7.0 WORKS CONTRACTOR OBLIGATIONS
7.1 The Contractor shall be responsible for the professional quality, safety, and the coordination and other services furnished under this contract.
7.2 The Contractor shall comply with all the relevant labor Laws applicable to the Contractor’s
Personnel, including Laws relating to their employment (including wages and working hours), health, safety, welfare, immigration, and emigration, and shall allow them all their legal rights. The
Contractor shall require the Contractor’s Personnel to obey all applicable Laws, including those concerning health and safety at work.
7.3 The Contractor shall ensure adequately, appropriately qualified, and experienced supervised persons/employees as required by the Laws of the jurisdiction to carry out the Works. The
Contractor shall plan for the engagement of all Contractor’s Personnel, and for their payment, accommodation, feeding, transport, and welfare. The Contractor will identify a Project Coordinator
[PC] who will be responsible for the overall management of the works on site and will represent the Contractor during the performance of the contract. The Contractor will also have a Site
Manager [site engineer / foreman] to manage the works, full-time present on site. The Contractor shall provide evidence of qualifications and job history of the Service Contractor’s personnel if required by the US Embassy.
7.4 The Contractor shall provide and execute the Works in all respects, to the reasonable satisfaction of the US Embassy and in accordance with all reasonable instructions and requirements of the US
Embassy mentioned in the contract documents.
7.5 The Contractor shall obey all rules and instructions in force within the US Embassy Compound
(including access to US Embassy area, any non-smoking policy etc.).
7.6 The Contractor shall verify that all materials, equipment, and systems used within the contract provide operational dependability. The Contractor shall make good any damage to the equipment of the Embassy, or any part thereof caused by any act or omission of the Contractor's staff and equipment or any of his Sub-Contractor. The contractor shall immediately notify the US Embassy in writing of all matters affecting its responsibility and ensure that any lost or unclaimed property found by the Contractor is passed to the US Embassy at the first practicable opportunity.
7.7 Any cost associated with services subcontracted by the Contractor shall be borne by and be the complete responsibility of the Contractor under the fixed price of this contract.
7.8 The Contractor shall provide all equipment / tools including, but not limited to ladders, scaffoldings, safety harnesses etc., as needed to perform the work of this contract. The Contractor shall not remove from the Site any items of the Contractor’s Equipment without the consent of the
COR.
7.9 The Contractor shall remove, neutralize, and dispose on its own expenses under the fixed price of this contract:
a. all empty paint containers, rollers, plastic sheets etc.
b. debris regularly to avoid buildup at the Embassy compound. The Contractor shall provide construction trash skip as needed for the work.
The Contractor shall keep the work areas clear of hindrances, trip hazards, and unused materials always. The Contractor shall clean work areas every day at the end of program. The Contractor shall pay all royalties, rents, and other payments for the disposal and neutralization of material from demolitions and of other surplus material (whether natural or man-made).
7.10 Regular working hours at the Embassy are 8:00 AM to 5:00 PM from Monday through Friday.
The Contractor shall schedule work such that normal operations of the Embassy facility are not affected. The schedule may include activities that need to be done outside of regular working hours of the Embassy by request of the Embassy or Contractor, but a minimum 3-day notice of the COR or previous written request of the Contractor must be submitted and approved by the
COR.
The Contractor shall be entitled to Extension of Time if and to the extent that completion is or will be delayed by any of the following causes:
i. A Variation of scope of works
ii. Exceptionally adverse climatic conditions, which for the purpose of these Conditions shall mean adverse climatic conditions at the Site which are Unforeseeable
iii. Unforeseeable shortages in the availability of personnel or Goods caused by epidemic or governmental actions
iv. Any delay, impediment or prevention caused by or attributable to the Employer, the
Employer’s Personnel, or the Employer’s other contractors on the Site.
7.11 The execution period of the works according to this contract will be 7 weeks / 49 calendar days from the NTP date. The Contractor will prepare a Works Execution Program on contract objects after consultation with COR to schedule and complete the works during this period and within
10 days of the start of the contract, the Contractor will provide the US Embassy with a version of mentioned programs approved by COR.
The Works Execution Program on contract objects will become part of the contract. If, at any time actual progress is too slow to complete the Works or a Section (if any) within the relevant Time for Completion; and/or progress has fallen (or will fall) behind the approved Works Execution
Program, then the COR may instruct the Contractor to submit a revised program describing the revised methods which the Contractor proposes to adopt in order to expedite progress and complete the Works or a Section (if any) within the relevant Time for Completion.
If the Contractor fails to comply with Time for Completion [including all extensions approved by the
CO/COR], the Employer shall be entitled to payment of Delay Damages by the Contractor for this default. Delay Damages shall be the amount stated in the Contract Data, which shall be paid for every day which shall elapse between the relevant Time for Completion and the relevant Date of
Completion of the Works or Section.
7.12 The Contractor shall be liable to the Embassy for all damages to caused due to Contractor's negligent performance of any of the services furnished under this contract.
The Contractor shall assume 24 months works Performance Guarantee [Defect Notification Period
- DNP] and shall offer at least a 36-month materials manufacturer quality guaranty. The
Contractor shall execute all work required to remedy defects or damage, of which a Notice is given to the Contractor by (or on behalf of) the Employer on or before the expiry date of the DNP for the Works or Section or Part (as the case may be).
If a defect appears (including if the Works fail to pass the Tests after Completion, if any) or damage occurs during the relevant DNP, a Notice shall be given to the Contractor accordingly, by (or on behalf of) the Employer. Promptly thereafter:
i. The Contractor and the Employer’s Personnel shall jointly inspect the defect or damage.
ii. The Contractor shall then prepare and submit a proposal for necessary remedial work.
All remedy work shall be executed at the risk and cost of the Contractor, if and to the extent that the work is attributable to plant, materials or workmanship not being in accordance with the
Contract or improper operation or maintenance which was attributable to matters for which the
Contractor is responsible.
The Employer shall be entitled to an extension of the DNP for the Works, or a Section or a Part if and to the extent that the Works, Section, Part or a major item of Object (as the case may be, and after taking over) cannot be used for the intended purpose(s) by reason of a defect or damage which is attributable to any of the matters for which the Contractor is responsible.
7.13 Performance of the Contractor’s obligations under the Contract shall not be considered to have been completed until the COR has signed the Performance Certificate to the Contractor, stating the date on which the Contractor fulfilled the Contractor’s obligations under the Contract. The
COR shall sign the Performance Certificate to the Contractor as soon thereafter as the Contractor has:
7.13.1 Supplied all the Contractor’s Documents; and
7.13.2 Completed and tested all the Works (including remedying any defects) in accordance with the
Contract.
Only the Performance Certificate signed by COR shall be deemed to constitute acceptance of the
Works. After the issue of the Performance Certificate, each Party shall remain liable for the fulfilment of any obligation which remains unperformed at that time [to be mentioned in the Annex of Performance Certificate]. For the purposes of determining the nature and extent of unperformed obligations, the Contract shall be deemed to remain in force.
7.14 Promptly after the issue of the Performance Certificate, the Contractor shall:
7.14.1 Remove any remaining Contractor’s Equipment, surplus material, wreckage, rubbish and
Temporary Works from the Site.
7.14.2 Reinstate all parts of the Site which were affected by the Contractor’s activities during the execution of the Works and are not occupied by the Permanent Works; and
7.14.3 Leave the Site and the Works in a clean and safe condition.
8.0 SAFETY HEALTH AND ENVIROMENTAL MANAGEMENT (SHEM)
8.1 The Works Contractor shall take all reasonable and proper safety precautions to prevent death or injury to any person or damage to any property at the US Embassy Bucharest Compound and in particular all equipment used by the Works Contractor shall be used in such a manner and maintained to minimize the danger of accident, death, injury, loss, or damage arising from the use of such equipment. In addition to relevant statutory requirements, standards and other provisions of this Contract, the Works Contractor shall fulfill the following requirements:
8.1.1 Prepare and submit a Safety Management Plan for COR approval prior to starting performance under this contract. Training program(s) shall be presented and must satisfy the US Embassy
Bucharest during the submittal process.
8.1.2 The Works Contractor’s personnel shall be knowledgeable with and adhere to all relevant occupational health and safety legislation and Safety Data Sheets.
8.1.3 Ensure that the Works Contractor’s and its Sub-Contractor personnel comply with all safety procedures and requirements which apply to the US Embassy Compound. The COR may request for additional safety procedures if deemed necessary and the Contractor must comply with these.
8.1.4 Ensure the Works Contractor’s personnel are certified as having completed occupational health and safety training and have been issued all the necessary Personal Protection Equipment (PPE) required for safe implementation of this contract, including, but not limited to, coveralls, safety shoes, gloves, body harness, safety ropes etc. needed for safe performance of works.
8.1.5 Use approved and/or certified tools, ladders, and scaffolding for work on elevated surfaces.
8.1.6 All electrical equipment and associated materials for the Works Contract comply with the requirements of all Relevant Authorities and have been tested and tagged by a competent person at least once every 2 years.
8.1.7 Follow both Romanian legislation and all US NFPA rules and guidelines against fire, production of smoke or the venting of any noxious substances.
8.1.8 Ensure that the Service Contractor’s personnel are adequately trained and instructed in the safe and correct usage, handling and operation of materials and equipment relevant to the Works and provide reasonable proof of such to the US Embassy Bucharest on request. Provide training to workmen in handling and application of various types of paint materials. Follow directions provided in manufacturer’s Safety Data Sheet for each type of material. Maintain a copy of easily accessible Safety Data Sheet for all materials at work site.
The Contractor shall promptly report all accidents, minor or major, to the COR.
8.1.9 Delivery, storage, and handling:
a. Deliver materials to the job site in the manufacturer's original, new, unopened packages and containers bearing manufacturer's name and label and the following information:
1. Name or title of material
2. Manufacturer's name, stock number and date of manufacture
3. Color name and number [RAL]
4. Contents by volume, for major pigment and vehicle constituents
5. Handling instructions and precautions
6. Thinning instructions
7. Application instructions
b. Store materials not in immediate use in tightly covered containers at a minimum ambient temperature of 7°C in a well-ventilated area. Maintain used containers in storage of coatings in a clean condition, free of foreign materials and residue.
9.0 MOBILIZATION
9.1 Check the existing site conditions, utilities and permits to prepare the work plan. Submit to the
COR for approval the Program of Execution of Works and a Program of Stages of the Contract
Objects. Include the Technical Worksheet in the work plan for each object of the contract.
The Contractor shall proceed in accordance with the Program, subject to the Contractor’s other obligations under the Contract. The Employer’s Personnel shall be entitled to rely on the Program when planning their activities.
Nothing in any program, the Program or any supporting report shall be taken as, or relieve the
Contractor of any obligation to give, a Notice under the Contract.
If, at any time, the CO / COR gives a Notice to the Contractor that the Program fails (to the extent stated) to comply with the Contract or ceases to reflect actual progress or is otherwise inconsistent with the Contractor’s obligations, the Contractor shall within 5 days after receiving this Notice submit a revised program to complete the Works or a Section (if any) within the relevant Time for
Completion.
9.2 Provide submittals for all proposed materials for COR approval prior to procurement.
9.3 The Contractor shall mobilize materials, tools, equipment etc. and store at designated staging area after consultation with the COR.
10.0 SECURITY REQUIREMENTS - ACCESS TO GOVERNMENT BUILDINGS AND
STANDARDS OF CONDUCT
10.1 The Contractor shall designate a representative who shall supervise the Contractor’s technicians and be the Contractor's liaison with the US Embassy Bucharest. The Contractor's employees shall be on-site only for contractual duties and not for any other business or purposes. Contractor employees shall have access to dedicated rooms with security escorts, only with specific permission by the Facility Manager, Contracting Officer, or the COR.
10.2 Personnel security:
Following the award of the contract, the Contractor will provide identification information in a table format regarding all transport vehicles and personnel, including workers, transporters, and supervisory staff, who will need to enter the site. Such information will include and not be limited to staff and transport means identity information as the Embassy requests. All site workers will be escorted, and access to the site will be limited to work areas only.
The US Embassy reserves the right to deny access to U.S owned and U.S.- operated facilities to any individual. The Contractor shall provide the names, biographic data, and police clearance on all
Contractor personnel, who shall be used on this contract prior to their involvement into this contract.
10.3 The Contractor shall coordinate material and equipment deliveries with the COR for access approval. The Contractor shall provide vehicle and delivery personnel information at least 48 hours in advance of delivery.
10.4 All the ladders or scaffolds erected near the buildings for the painting works shall be laid down, moved away, or dismantled in such a way that they will be not provide any kind of accidents or foothold that will facilitate a person to climb over any building, perimeter wall or a screen wall.
10.5 Standards of Conduct:
10.5.1 General:
The Contractor shall maintain satisfactory standards of employee competency, conduct, cleanliness, appearance, and integrity and shall be responsible for taking such disciplinary action with respect to employees, as necessary. Each Contractor employee shall adhere to standards of conduct that reflect credit on themselves, their employer, and the United States Government. The
US Embassy reserves the right to direct the Contractor to remove an employee from the worksite for failure to comply with the standards of conduct. The Contractor shall immediately replace such an employee to maintain continuity of services at no additional cost to the Government.
10.5.2 Uniforms and Personal Equipment:
The Contractor's employees shall wear clean, neat, and complete uniforms when on duty. The
Contractor shall provide, to each employee and supervisor, uniforms, and personal equipment.
The Contractor shall be responsible for the cost of purchasing, cleaning, pressing, and repair of the uniforms.
10.5.3 Neglect of Duties:
Neglect of duties shall not be condoned. This includes sleeping while on duty, unreasonable delays, or failures to carry out assigned tasks, conducting personal affairs during duty hours, and refusing to render assistance or cooperate in upholding the integrity of the worksite security.
10.5.4 Intoxicants and Narcotics:
The Contractor shall not allow its employees while on duty to possess, sell, consume, or be under the influence of intoxicants, drugs or substances which produce similar effects.
11.0 QUALITY CONTROL REQUIREMENTS
11.1 The Contractor needs to attach to quotation Company’s registration and taxpayer documents as well as a portfolio of clients with similar works in the past.
The Works Contractor must allow the US Embassy access to the quality control system as well as the relevant quality systems of its subcontractors to enable monitoring and quality auditing of the contract specific construction works.
The US Embassy may reject any aspect of the Works that fails to comply with the requirements of the Contract, or its quality system, at any time.
If, because of an examination, inspection, measurement or testing, any Materials or workmanship is found to be defective or otherwise not in accordance with the Contract, the COR shall give a Notice to the Contractor describing the item of Materials or workmanship that has been found to be defective. The Contractor shall then promptly prepare and submit a proposal for necessary remedial work. If the rejection causes the Employer to incur additional costs, the Employer shall be entitled to payment of these costs by the Contractor.
In addition to any previous examination, inspection, measurement, or testing, at any time before the issue of the Taking-Over Certificate for the Works, the COR may instruct the Contractor to:
11.1.1 Repair or remedy (if necessary, off the Site), or remove from the Site and replace any Plant or
Materials which are not in accordance with the Contract.
11.1.2 Repair or remedy, or remove and re-execute, any other work which is not in accordance with the Contract; and
11.1.3 Carry out any remedial work which is urgently required for the safety of the Works, whether because of an accident, unforeseeable event or otherwise.
The Contractor shall comply with the instruction as soon as practicable and not later than the time
(if any) specified in the instruction, or immediately if urgency is specified under sub-paragraph
(11.1.3) above.
The Contractor shall bear the cost of all remedial work required, except to the extent that any work under sub-paragraph (11.1.3) above is attributable to any act by the Employer or the Employer’s
Personnel or an Exceptional Event.
11.2 Performance Monitoring and Reporting:
11.2.1 The Works Contractor shall provide a quality control plan for the COR approval. The plan shall describe work instructions, inspection procedures and corrective action procedures to be employed by the Contractor.
11.2.2 The Works Contractor shall monitor its own performance against the criteria and benchmarks identified in this document and shall provide reports when required by the US Embassy.
11.2.3 The giving of any approval, direction, instruction or information by the US Embassy
Representatives and compliance with the same by the Works Contractor will not relieve or reduce the Works Contractor’s sole responsibility for the performance of the Works in accordance with this Contract.
12.0 PAYMENTS
12.1 The Contractor shall pay all taxes, duties and fees required to be paid by the Contractor under the
Contract, and the Contract Price shall not be adjusted for any of these costs except adjustments for
Changes in Laws.
12.2 If certain payment(s) to the Contractor is/are to be made on completion of each Milestone (i.e., completion of works on Objects of the Contract), such payment(s) should be specified in a Schedule of
Payments in the Contract and consideration should be given to amending it to make express reference to the Milestone payments.
12.3 The Contractor shall submit a Statement to the COR after the end of the period of payment stated in the Contract Data (if not stated, after the end of each month). Each Statement shall:
12.3.1 be in a form acceptable to the COR
12.3.2 show in detail the amounts to which the Contractor considers that the Contractor is entitled for the period of payment, with supporting documents which shall include sufficient detail for the
COR to investigate these amounts, i.e. lists of quantities of works performed under the Contract, in the form of a payment measurements of works with a sketch of the object (s) of the Contract to which it relates, including the dimensions which formed the basis of the measurements of the works. Measurement shall be made of the net actual quantity of each item of the Permanent
Works and no allowance shall be made for bulking, shrinkage, or waste.
12.4 Within 3 days after the Date of Completion of the Works, the Contractor shall then prepare and submit to the COR a Statement at completion in the same form as Statements previously submitted, show in detail, with supporting documents:
12.4.1 the value of all work done in accordance with the Contract up to the Date of Completion of the
Works,
12.4.2 any further sums which the Contractor considers to be due at the Date of Completion of the
Works; and
12.4.3 an estimate of any other amounts which the Contractor considers have or will become due after the Date of Completion of the Works under the Contract or otherwise. These estimated amounts shall be shown separately to those of above and shall include estimated amounts for Claims for which the Contractor has submitted a Notice and the CO/COR approved.
12.5 When submitting the Final Statement, the Contractor shall submit a discharge which confirms that the total of such Statement represents full and final settlement of all moneys due to the Contractor under or in connection with the Contract.
12.6 The Final invoice shall be identified as such and shall include the amount which the COR fairly considers is finally due, including any additions and/or deductions which have become due or under the Contract or otherwise
12.7 The final invoice shall include the Contractor's Release of Claims Certificate and the Workmanship
Guarantee.
12.7.1 The Contractor shall be liable for any loss or damage caused by the Contractor to the Works, Goods or Contractor’s Documents after the issue of a Taking-Over Certificate. The Contractor shall also be liable for any loss or damage, which occurs after the issue of a Taking-Over
Certificate and which arose from an event which occurred before the issue of this Taking-Over
Certificate, for which the Contractor was liable.
NOB MAIN ENTRANCE CANOPY REPAIRS AND REPAINTING 14
APPENDIX 1 - DRAWINGNS
Awnings upper surface limits
Canopy terrace limits
Vestibule terrace limits
26300
NOB MAIN ENTRANCE CANOPY REPAIRS AND REPAINTING 15
NOB MAIN ENTRANCE CANOPY REPAIRS AND REPAINTING 16
APPENDIX 2 - SCOPE OF WORK REQUIREMENTS
I. PART ONE - GENERAL
I.1 SUMMARY
I.1.1 The American Embassy in Bucharest (4-6 Dr. Liviu Librescu Av.) requires services of a
Specialized (Exterior finishings) Contractor to repair and repaint the NOB Main Entrance
Canopy within the Embassy compound, as identified in this Statement of Work (SOW). The surfaces required to be repaired and painted are not new construction. The roof surfaces have terrace layers over the vestibule, PVC membrane over topping slab in the central part of the canopy and a liquid membrane on the awning. The soffit of the canopy slab has a painted stucco finish. The services and works that are purchased are for the reparation of the upper waterproofing layers of the vestibule terrace and the canopy slab and to repair and repaint the soffit of the canopy.
I.1.2 The proposed work includes repairs of the terrace and canopy waterproofing systems, but is not limited to, the following:
1. Canopy and terrace roofing access: scaffolding/working platforms on the ground-floor perimeter, where there is enough space to mount them, or ladders.
2. Install temporary protection on the lower finishes, furniture, doors/windows, and floor bellow the canopy and surrounding area.
3. Clean the substrate and examine the surfaces of the waterproofing systems. Inspect and identify any damage of the layers, roof drains, clamp rings, drain bowls, waterproofing cementations, counterflashing etc.
4. Remove loose, cracked, and damaged elements.
5. Repair or replace as needed the damaged elements in order to restore the functionality of the waterproofing system.
6. Clean any lower windows, doors, and walls areas affected by the works above.
7. Final Clean-up the site and disposal and neutralization of material from demolitions and of other surplus material.
I.1.3 The proposed work includes painting maintenance and repairs of the canopy awnings and sofit, but is not limited to, the following:
1. Canopy awnings and sofit access: scaffolding/working platforms on the ground-floor perimeter, where there is enough space to mount them, or ladders.
2. Install temporary protection on the lower finishes, furniture, doors/windows, and floor at base of walls.
3. First clean/degrease the surfaces and remove any paint chips or old paint that is bubbled using a scraper and sandpaper. Dust the wall to remove grime, dust, and loose dirt.
NOB MAIN ENTRANCE CANOPY REPAIRS AND REPAINTING 17
4. Inspect base damages, cracks, and panelized areas by mechanical sounding of the surface to confirm attachment to the concrete substructure when case.
5. Remove loose, cracked, and damaged plaster. "V" cut cracks to sound material.
6. Repair any holes with putty. After it is dried, sand off and wipe clean with a damp sponge before drying with a dry clean sponge. Gently sand over any surfaces you have repaired.
7. Use a soft sponge or cloth and warm soapy water to gently clean the surface (do not oversoak your sponge). For stubborn marks, leave the soapy solution for five to 10 minutes before rinsing off with clean water.
8. Inspect, if case, metal control/reveal joints, perimeter metal edge, and through-plaster penetration flashings for damages.
9. Remove by saw-cuts, if case, loose, damaged, corroded metal control/revel joints. Replace metal control/revel joints and metal corner elements to match original alignment.
10. Clean any lower windows, doors, and walls areas affected by plaster work above.
11. Remove loose, cracked, and damaged old waterproofing liquid membrane paint.
12. Apply specific primer for waterproofing liquid membrane paint on the awnings slab top and edge and allow to dry.
13. Apply one coat of waterproofing liquid membrane paint
14. Perform a color painting on mock-up areas before applying final primer and finish paint on stucco plaster sofit.
15. Apply primer and allow to dry.
16. Apply two coats of paint.
17. Paint miscellaneous walls-related ferrous metals, if case.
18. Final Clean-up the site and disposal and neutralization of material from demolitions and of other surplus material.
I.1.4 Provide all necessary materials and equipment for the successful completion of this painted surfaces maintenance and repair project.
I.1.5 NOB main entrance canopy and entrance vestibule terrace estimated surfaces for works:
▪ Awnings upper surface and exterior the attic parapet 95 sqm (estimation)
▪ Concrete awning edge 15 sqm (estimation)
▪ Canopy concrete slab soffit repairs 40 sqm (estimation)
▪ Canopy concrete slab soffit repaint (stucco) 330 sqm (estimation)
▪ Canopy terrace (bounded by a masonry attic) 150 sqm (estimation)
▪ Vestibule terrace 10 sqm (estimation)
NOB MAIN ENTRANCE CANOPY REPAIRS AND REPAINTING 18
I.2 SUBMITTALS
I.2.1 Contractor’s designated working force individual identification information for background checks.
I.2.2 List of all mechanical, electrical, rigging, and all other subcontractors with evidence of subcontractor's insurance coverage.
I.2.3 Project schedule showing work phasing and proposed daily progress.
I.2.4 Construction Accident Prevention Plan (CAPP)
I.2.5 Material manufacturers identification data and products and accessories technical data sheets to be used
I.3 SUBSTITUTIONS AND PRODUCT OPTIONS
I.3.1 Contractor's Request: Request for substitution constitutes a representation that the Contractor:
1. Has investigated proposed product and determined that it is at least equal to or superior to in all respects to that specified.
2. Shall coordinate installation of accepted substitution into Work and make such other changes as may be required for Work to be complete in all respects.
3. Waives all claims for additional costs, under his responsibility, related to substitution which subsequently becomes apparent.
4. If substitution is not approved or accepted, Contractor shall furnish initially specified product.
I.3.2 Substitutions:
1. For the time of Solicitation only written requests for substitutions of products in place of those specified will be considered. Such requests must be received at least two weeks prior to
Proposal Date to be used. Requests received after that time will not be considered. Approval of substitutions will be set forth in an Amendment to the Contract.
2. Requests for substitutions must be supported by complete manufacturer data, drawings/data sheet, and appropriate samples, shall include documents and information listed below:
a. Product description, applicable reference standards, performances, and test data
b. Changes required in other elements of Work because of substitution
c. Effect on the Program of Execution of Works and the Program of Stages of Contract
Objects.
I.3.3 Product Options: For products specified by naming several products or manufacturers, select any product and manufacturer named.
I.4 QUALITY CONTROL
I.4.1 The Embassy and OBO has the right to inspect and test all services, to the extent practicable at all times and places during the works performance. OBO may perform full time quality
NOB MAIN ENTRANCE CANOPY REPAIRS AND REPAINTING 19
assurance inspections [QAI] and tests during construction to confirm the work is installed according to the Contract Documents.
I.4.2 Contractor shall maintain quality control over manufacturers, suppliers, products, services, site conditions, and workmanship to produce work of specified quality.
I.4.3 The contractor must be approved by the manufacturer to perform the works, to grant the named warranty period.
I.5 STORAGE OF MATERIALS
I.5.1 Proper storage of materials is the sole responsibility of Contractor. The Contractor must keep all labels intact and legible, clearly showing the product, manufacturer, and other pertinent information.
I.5.2 The Contractor may store materials on site. The Contractor must cover and protect materials subject to damage by weather, including during transit. Stored materials shall be available for inspection.
I.5.3 The Contractor must store flammable and volatile liquids in sealed containers located a minimum of 7 meters (20 feet) from existing buildings.
I.5.4 Liquid products shall be delivered sealed, in original containers.
I.5.5 Secure equipment, materials, and debris to prevent them movement by wind or other unforeseen actions.
I.6 TEMPORARY FACILITIES
I.6.1 Temporary Water supply
1. Set up with Embassy the required water supply source for construction works. Embassy will pay for cost of water.
2. Do not disrupt existing water services for the buildings.
3. The Contractor shall provide hoses for water conveyance.
I.6.2 Temporary Electrical supply
1. Set up with Embassy the required electricity supply source for construction works. Embassy will pay for energy charges for temporary power and lighting.
2. Notify Embassy prior to each required interruption of mechanical or electrical services in buildings/compound and proceed after receiving the permission only.
3. The Contractor shall provide all necessary temporary wiring extensions and…