RFQ-Village of Newark Comprehensive Safety Action Plan - 2026.pdf

PDF 774 KB Posted

Attached to
Comprehensive Safety Action Plan, Village of Newark, NY
Solicitation number
2138114
Issued by
Ulster County, New York

About this file

Summary

This Request for Qualifications (RFQ) is issued by the Village of Newark, New York, for the development of a Comprehensive Safety Action Plan to be prepared by a design consultant. The Village received a $150,000 Safe Streets and Roads for All (SS4A) Grant from the United States Department of Transportation's Federal Highway Administration to support this initiative. The scope of work comprises seven primary tasks: establishing leadership commitment and goal-setting through an official public commitment to zero roadway fatalities and serious injuries; forming a planning committee for oversight; conducting a comprehensive safety analysis of existing conditions and crash data; engaging stakeholders through three public meetings; reviewing and assessing current policies to identify safety improvements; selecting and prioritizing projects and strategies based on data and evidence; and developing a method to measure progress and outcomes. The Village plans to select a consultant in September 2026, with the consultant agreement to be executed at the October board meeting. The Action Plan must be completed by May 1, 2028, and proposals are due by 4:00 PM on Thursday, September 17, 2026. Proposals should be limited to ten single-sided pages and submitted in five copies to Lynette Morrison, Village Clerk/Treasurer, either by email or mail.

Selection criteria, listed in order of importance, are: understanding of the work (35%), experience with similar SS4A projects and plan implementation (30%), experience and qualifications of proposed staff (25%), familiarity with Federal requirements (5%), and logistics and project area familiarity (5%). The Village encourages consultants to team with minority-owned, women-owned, and service-disabled veteran-owned businesses to satisfy federal small and disadvantaged business requirements under 2 C.F.R. 200.321. The grant agreement is subject to comprehensive Federal terms and conditions issued by the Federal Highway Administration, including requirements for quarterly performance and financial reporting, compliance with Federal labor and civil rights standards, domestic content procurement preferences, environmental review, and post-award monitoring. No specific contracting set-asides for MBE, WBE, or DBE goals have been established for this procurement. The consultant will also assist Village staff with preparing reimbursement requests and meeting various Federal reporting requirements outlined in the grant terms and conditions.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Mayor: Jonathan Taylor

Trustees: Robert Bendix, Stuart Blodgett

Joshua Arnold, Scott Verbridge

Clerk - Treasurer: Lynette Morrison

Tel 315-331-4770 • Fax 315-331-9767

DPW Operations

Tel 315-331-6199 • Fax 315-331-3609

Municipal Building • l00 East Miller Street • Newark, New York 14513

Website: villageofnewark.com • Email: lmorrison@villageofnewark.com

The Village of Newark, New York is an Equal Opportunity Provider and Employer

August 12, 2026

RE: Comprehensive Safety Action Plan for the Village of Newark

The Village of Newark has been awarded a 2025 Safe Streets and Roads for All, (SS4A) Grant Agreement to develop a Comprehensive Safety Action Plan for the Village of Newark.

The $150,000 grant was awarded by the United States Department of Transportation’s Federal Highway Administration. The Village shall adhere to the General Terms and Conditions under the Fiscal Year 2025 Safe Streets and Roads for All (SS4) Grant Program dated January 22, 2026. A copy of the general terms and conditions is attached.

The Village is seeking to retain a design consultant to prepare the Comprehensive Safety Action Plan in accordance with the General Terms and Conditions under the Fiscal Year 2025 Safe Streets and Roads for All (SS4) Grant Program and the scope of work below.

Action Plans are comprehensive safety plans aimed at reducing and eliminating serious-injury and fatal crashes affecting all roadway users.

Action plans use data analysis to characterize roadway safety problems and strengthens a community’s approach through projects and strategies that address the most significant safety risks.

Scope of Work

The Consultant shall lead the development of the Comprehensive Safety Action Plan which shall include the following seven tasks.

Task 1: Leadership Commitment and Goal Setting

Leadership and Goal setting is an official public commitment, (resolution, policy, ordinance) to an eventual goal of zero roadway fatalities and serious injuries. The Consultant shall assist the Village in determining the best format of this public commitment via resolution or policy or ordinance.

The commitment must include a goal and timeline for eliminating roadway fatalities and serious injuries.

The Consultant shall develop this official public commitment document for Village approval.

Task 2: Planning Structure

The Consultant shall assist the Village in forming a committee charged with the oversight of the Action Plan development, implementation, and monitoring.

http://villageofnewark.com/ mailto:Email:%20lmorrison@villageofnewark.com

Comprehensive Safety Action Plan RFQ for the Village of Newark, August 2026

Task 3: Safety Analysis

The Consultant shall perform a safety analysis of existing conditions and historical trends that provides a baseline level of crashes involving fatalities and serious injuries across the Village transportation system which includes State Highways.

The analysis shall include an analysis of locations where there are crashes and severity of the crashes, as well as contributing factors and crash types by road users, (motorists, pedestrians, transit users).

An analysis of systemic and specific safety needs shall be performed and identify high-risk road features, specific safety needs of relevant road users, public health approaches, analysis of built environment, demographics and structural issues.

Based on the analysis, a geospatial identification of higher risk locations shall be developed.

Task 4: Engagement and Collaboration

The Consultant shall attend and prepare material for meetings with the public and stakeholders. Comments from this engagement and collaboration shall be reviewed and incorporated into the Action Plan. Assume three meetings to include a kick-off meeting to explain the process, a second meeting to present findings of the safety analysis and preliminary measures to reduce accidents, and a third meeting to present the final Action Plan.

Task 5: Policy and Process Changes

The Consultant shall review and assess current policies, plans, guidelines and/or standards to identify opportunities to improve how processes prioritize transportation safety. The Action Plan shall discuss implementation through adoption of revised or new policies, guidelines, and/or standards as appropriate.

Task 6: Strategy and Project Selections

The Consultant shall present a comprehensive set of projects and strategies that is shaped by data, the best available evidence and noteworthy practices, and stakeholder input that will address the safety problems described in the Action Plan.

Once the projects are identified, the Consultant shall assist the Village in prioritizing the projects and provide a timeline for implementation, (short-, and mid- and long-term timeframes).

The Action Plan shall include an explanation of the prioritization criteria used.

Task 7: Progress and Transparency

The Consultant shall develop a method to measure progress over time after an Action Plan is developed or updated, including outcome data.

Project Administration

The selected Consultant shall also assist the Village staff preparing reimbursement requests and the various reporting requirements as described in the General terms and Conditions, Articles 11, 12, 13 and 14.

Comprehensive Safety Action Plan RFQ for the Village of Newark, August 2026

Project Schedule

The Village plans to select a consultant in September 2026 with an agreement executed at their October board meeting. The Grant requires the Action Plan to be completed by May 01, 2028.

The proposals will be reviewed by a committee. The most highly qualified firms will be selected based on the following criteria, listed in order of decreasing importance:

Understanding of the work to be done (35%)

Experience with similar SS4A type projects including the development of the Comprehensive Safety Action Plan and Implementation of the Plan (30%)

Experience and qualifications of staff related to the type of work (25%)

Familiarity with Federal requirements (5%)

Logistics and familiarity with the project area (5%)

The Village encourages the Consultant to team with minority businesses, women’s business enterprises and veteran-owned businesses to complete the scope of work as outlined in this RFP and allow the Village to comply with the requirements of 2 C.F.R 200.321 as described in section 18.2 of the General Terms and Conditions. The Village will also directly solicit M/WBEs and SDVOBs to satisfy the requirements of 2 C.F.R 200.321.

The proposals shall include an organizational chart, project schedule, understanding of work and resumes for the proposed Project Manager and Lead Engineer/Planner. Proposal shall be no more than ten (10) single sided, 8 ½” x 11” pages. Please submit five copies to Lynette Morrison, Village Clerk/Treasurer by 4:00 PM, Thursday, September 17, 2026

Proposals may be emailed to lmorrison@villageofnewark.com or mailed to Village of Newark, 100 East Miller Street, Newark, NY 14513, Attention: Lynette Morrison.

mailto:lmorrison@villageofnewark.com

U.S. DEPARTMENT OF TRANSPORTATION

GENERAL TERMS AND CONDITIONS UNDER THE

FISCAL YEAR 2025 SAFE STREETS AND ROADS FOR ALL (“SS4A”) GRANT

PROGRAM:

FHWA PROJECTS

January 22, 2026

Table of Contents

Article 7 Purpose

7.1 Purpose

Article 8 USDOT Role

8.1 Division of USDOT Responsibilities

8.2 USDOT Program Contact

Article 9 Recipient Role

9.1 Statements on the Project

9.2 Statements on Authority and Capacity

9.3 USDOT Reliance

9.4 Project Delivery

9.5 Rights and Powers Affecting the Project

9.6 Notification of Changes to Key Personnel

Article 10 Award Amount, Obligation, and Time Periods

10.1 Federal Award Amount

10.2 Federal Obligations

10.3 Budget Period

10.4 Period of Performance

Article 11 Statement of Work, Schedule, and Budget Changes

11.1 Notification Requirement

11.2 Statement of Work Changes

11.3 Schedule Changes

11.4 Budget Changes

11.5 USDOT Acceptance of Changes

Article 12 General Reporting Terms

12.1 Report Submission

12.2 Alternative Reporting Methods

12.3 Paperwork Reduction Act Notice

Article 13 Progress and Financial Reporting

13.1 Quarterly Performance Progress Reports

13.2 Quarterly Financial Status

13.3 Final Performance Progress Reports and Financial Status………………………………..…….13 Article 14 Performance Reporting

14.1 Baseline Performance Measurement

14.2 SS4A Final Report:

14.3 Performance Reporting Survival……………………….……………………………………….15

14.4 Program Evaluation……………………………………………………………………………..15

Article 15 Noncompliance and Remedies

15.1 Noncompliance Determinations

15.2 Remedies

15.3 Other Oversight Entities

Article 16 Agreement Termination………………………………………………………………17

16.1 USDOT Termination

16.2 Closeout Termination

16.3 Post-Termination Adjustments

16.4 Non-Terminating Events

16.5 Other Remedies

Article 17 Monitoring, Financial Management, Controls, and Records

17.1 Recipient Monitoring and Record Retention

17.2 Financial Records and Audits

17.3 Internal Controls

17.4 USDOT Record Access

Article 18 Contracting and Subawards

18.1 Build America, Buy America

18.2 Small and Disadvantaged Business Requirements

18.3 Engineering and Design Services

18.4 Foreign Market Restrictions

18.5 Prohibition on Certain Telecommunications and Video Surveillance Services or Equipment. .. 23

18.6 Recipient Responsibilities for Subawards

18.7 Subaward and Contract Authorization

Article 19 Costs, Payments, and Unexpended Funds

19.1 Limitation of Federal Award Amount

19.2 Projects Costs

19.3 Timing of Project Costs

19.4 Recipient Recovery of Federal Funds

19.5 Unexpended Federal Funds

19.6 Timing of Payments to the Recipient

19.7 Payment Method

19.8 Information Supporting Expenditures

19.9 Reimbursement Frequency

19.10 Match

Article 20 Liquidation, Adjustments, and Funds Availability...….……………………………...25

20.1 Liquidation of Recipient Obligations

Article 21 Agreement Modifications

21.1 Bilateral Amendments

21.2 Unilateral Contact Modifications

21.3 USDOT Unilateral Modifications

21.4 Other Modifications

Article 22 [RESERVED] Article 23 [RESERVED] Article 24 Labor and Work…………………………………………………………………… 26

24.1 Labor and Work……..………………………………………………………………………….26

Article 25 Critical Infrastructure Security and Resilience……………………………...……..26

25.1 Critical Infrastructure Security and Resilience…………………………………………………26 Article 26 Civil Rights and Title VI…………………………………………………….……

26.1 Civil Rights and Tile VI……………………………………………………………………...…26 Article 27 Federal Financial Assistance, Administrative, and National Policy Requirements

27.1 Uniform Administrative Requirements for Federal Awards

27.2 Federal Law and Public Policy Requirements

27.3 Federal Freedom of Information Act

27.4 History of Performance

27.5 Whistleblower Protection

27.6 External Award Terms and Obligations

27.7 Incorporated Certifications

Article 28 Assignment

28.1 Assignment Prohibited

Article 29 Waiver

29.1 Waivers

Article 30 Additional Terms and Conditions

30.1 Effect of Planning and Demonstration or Implementation Award

30.2 Disclaimer of Federal Liability

30.3 Environmental Review

30.4 Railroad Coordination

30.5 Relocation and Real Property Acquisition

30.6 Equipment Disposition

Article 31 Mandatory Award Information

31.1 Information Contained in a Federal Award

Article 32 Construction and Definitions

32.1 Attachments

32.2 Exhibits

32.3 Construction

32.4 Integration

32.5 Definitions

Article 33 Agreement Execution and Effective Date

33.1 Counterparts

33.2 Effective Date

Index of Definitions

Administering Operating Administration Environmental Review Entity………………………………………………………………… Federal Share

FHWA

NOFO

OMB

Program Statute Project……………………………………………………………………………………………22 Project Closeout SS4A Grant

USDOT

GENERAL TERMS AND CONDITIONS

The Infrastructure Investment and Jobs Act (Pub. L. 117–58, November 15, 2021; also referred to as the “IIJA”) established the Safe Streets and Roads for All (the “SS4A”) Discretionary Grant Program (IIJA Section 24112) and appropriated funds to the United States Department of Transportation (the “USDOT”) under Division J, Title VIII of IIJA to implement the program.

The funds are available to provide Federal financial assistance to support local initiatives to prevent death and serious injury on roads and streets, commonly referred to as “Vision Zero” or “Toward Zero Deaths” initiatives.

The USDOT published a Notice of Funding Opportunity (the “NOFO”) to solicit applications for Federal financial assistance in Fiscal Year 2025 for the SS4A Discretionary Grant Program.

These general terms and conditions are incorporated by reference in a project-specific grant agreement under the fiscal year 2025 SS4A grant program. Articles 1–6 are in the project-specific portion of the agreement. The term “Recipient” is defined in the project-specific portion of the agreement. Attachments A through D are project-specific attachments.

ARTICLE 7

PURPOSE

7.1 Purpose. The purpose of this award is to improve roadway safety by significantly reducing or eliminating roadway fatalities and serious injuries through safety action plan development or projects focused on all users, including pedestrians, bicyclists, public transportation users, motorists, personal conveyance and micromobility users, and commercial vehicle operators. The parties will accomplish that purpose by achieving the following objectives:

(1) timely completing the Project; and

(2) ensuring that this award does not substitute for non-Federal investment in the Project, except as proposed in the Grant Application, as modified by section 3.3 and Attachment B.

ARTICLE 8

USDOT ROLE

8.1 Division of USDOT Responsibilities.

(a) The Office of the Secretary of Transportation is ultimately responsible for the USDOT’s administration of the SS4A Grant Program.

(b) The Federal Highway Administration (the “FHWA”) will administer this grant agreement on behalf of the USDOT. In this agreement, the “Administering Operating Administration” means the FHWA.

8.2 USDOT Program Contact.

Safe Streets and Roads for All Federal Highway Administration Office of Safety 1200 New Jersey Avenue SE W56-485 Washington, DC 20590 SS4A.FHWA@dot.gov

ARTICLE 9

RECIPIENT ROLE

9.1 Statements on the Project. The Recipient states that:

(1) all material statements of fact in the Grant Application were accurate when that application was submitted; and

(2) Attachment B documents all material changes in the information contained in that application.

9.2 Statements on Authority and Capacity. The Recipient states that:

(1) it has the authority to receive Federal financial assistance under this agreement;

(2) it has the legal authority to complete the Project, including either ownership and/or maintenance responsibilities over a roadway network; safety responsibilities that affect roadways; or has an agreement from the agency that has ownership and/or maintenance responsibilities for the roadway within the applicant’s jurisdiction; if applicable;

(3) it has the capacity, including institutional, managerial, and financial capacity, to comply with its obligations under this agreement;

(4) not less than the difference between the “Total Eligible Project Cost” and the “SS4A Grant Amount” listed in section 3.3 are committed to fund the Project;

(5) it has sufficient funds available, or an agreement with the agency that has ownership and/or maintenance responsibilities for the roadway within the recipient’s jurisdiction, to ensure that infrastructure completed or improved under this agreement will be operated and maintained in compliance with this agreement and applicable Federal law; and

(6) the individual executing this agreement on behalf of the Recipient has authority to enter this agreement and make the statements in this article 9 and in section 27.7 on behalf of the Recipient.

9.3 USDOT Reliance. The Recipient acknowledges that:

(1) the USDOT relied on statements of fact in the Grant Application to select the Project to receive this award;

(2) the USDOT relied on statements of fact in both the Grant Application and this agreement to determine that the Recipient and the Project are eligible under the terms of the NOFO;

(3) the USDOT relied on statements of fact in both the Grant Application and this agreement to establish the terms of this agreement; and

(4) the USDOT’s selection of the Project to receive this award prevented awards under the NOFO to other eligible applicants.

9.4 Project Delivery.

(a) The Recipient shall complete the Project under the terms of this agreement.

(b) The Recipient shall ensure that the Project is financed, constructed, operated, and maintained in accordance with all applicable Federal laws, regulations, and policies.

(c) The Recipient shall provide any certifications or assurances deemed necessary by the USDOT in ensuring the Recipient’s compliance with all applicable laws, regulations, and policies.

(d) The Recipient shall provide access to records as provided at 2 C.F.R. 200.337.

9.5 Rights and Powers Affecting the Project.

(a) The Recipient shall not take or permit any action that deprives it of any rights or powers necessary to the Recipient’s performance under this agreement without written approval of the USDOT.

(b) The Recipient shall act, in a manner acceptable to the USDOT, promptly to acquire, extinguish, or modify any outstanding rights or claims of right of others that would interfere with the Recipient’s performance under this agreement.

9.6 Notification of Changes to Key Personnel. The Recipient shall notify all USDOT representatives who are identified in Section 4.3 in writing within 30 calendar days of any change in key personnel who are identified in Section 4.2.

ARTICLE 10

AWARD AMOUNT, OBLIGATION, AND TIME PERIODS

10.1 Federal Award Amount The USDOT hereby awards a SS4A Grant to the Recipient in the amount listed in section 2.2 as the SS4A Grant Amount.

10.2 Federal Obligations.

This agreement obligates funds for the period of performance listed on Page 1, Block 6 of the grant agreement.

(a) If the Federal Obligation Type identified in section 2.3 is “Single,” then the project-specific agreement obligates for the budget period the amount listed in Section 2.2. as the Grant Amount and sections 10.2 (c)–10.2(f) do not apply to the project specific agreement.

(b) If the Federal Obligation Type identified in section 2.3 is “Multiple,” (for phased agreements) then an amount up to the Grant Amount listed in Section 2.2 will be obligated with one initial obligation and one or more subsequent, optional obligations, as described in sections 10.2(c)–10.2(f).

(c) The Obligation Condition Table in section 2.3 allocates the Grant funds among separate phases of the Project for the purpose of the Federal obligation of funds. The scope of each phase of the Project that is identified in that table is described in section 2.3.

(d) The project-specific agreement obligates for the budget period only the amounts allocated in the Obligation Condition Table in section 2.3 to portions of the Project for which that table does not list an obligation condition.

(e) The project-specific agreement does not obligate amounts allocated in the Obligation Condition Table in section 2.3 to portions of the Project for which that table lists an obligation condition. The parties may obligate the amounts allocated to those portions of the Project only by modifying the project specific agreement under section 21.

(f) For each portion of the Project for which the Obligation Condition Table in section 2.3 lists an obligation condition, the amount allocated in that table to that portion of the Project will be obligated if the condition is met not later than the date listed in Section 2.4 of the project-specific agreement.

(g) For any portion of the Project for which the Obligation Condition Table in section 2.3 lists an obligation condition, if the obligation condition is satisfied, the parties amend this agreement documenting that:

(1) the FHWA determines that the obligation condition listed in that table for that portion of the Project is satisfied; and

(2) the FHWA determines that all applicable Federal requirements for obligating the amount are satisfied.

(h) The Recipient shall not request reimbursement of costs for a portion of the Project for which the Obligation Condition Table in section 2.3 lists an obligation condition, unless the amount allocated in that table to that portion of the Project is obligated under section 10.2(c)-(f).

(i) Reserved.

(j) The Recipient acknowledges that:

(1) the FHWA is not liable for payments for a portion of the Project for which the Obligation Condition Table in section 2.3 lists an obligation condition, unless the amount allocated in that table to that portion of the Project is obligated under section 10.2(c)-(f);

(2) any portion of the Grant that is not obligated under this section 10.2 by the budget period end date identified in the project-specific agreement for those funds lapses on the day after that date and becomes unavailable for the Project; and

(3) the FHWA may consider the failure to obligate funds by the budget period end date identified in the project-specific agreement as applicable to the Grant Program for those funds to be a basis for terminating the project-specific agreement under section 16.

10.3 Budget Period

The budget period for this award begins on the effective date of this agreement and ends on the budget period end date that is listed in section 2.4, which shall be no later than 5 years from the date of grant execution. In this agreement, “budget period” is used as defined at 2 C.F.R. 200.1.

10.4 Period of Performance.

(a) The period of performance for this award begins on the effective date of award listed in page 1, Block 2 and ends on the period of performance end date that is listed in Page 1, Block 6.

(b) In this agreement, “period of performance” is used as defined at 2 C.F.R. 200.1.

ARTICLE 11

STATEMENT OF WORK, SCHEDULE, AND BUDGET CHANGES

11.1 Notification Requirement. The Recipient shall notify all USDOT representatives who are identified in section 4.3 in writing within 30 calendar days of any change in circumstances or commitments that adversely affect the Recipient’s plan to complete the Project. In that notification, the Recipient shall describe the change and what actions the Recipient has taken or plans to take to ensure completion of the Project. This notification requirement under this section 11.1 is separate from any requirements under this article 11 that the Recipient request amendment of this agreement.

11.2 Statement of Work Changes. If the Project’s activities differ from the statement of work that is described in section 3.1 and Attachment B, then the Recipient shall request an amendment of this agreement to update section 3.1.

11.3 Schedule Changes. If one or more of the following conditions are satisfied, then the Recipient shall request an amendment of this agreement to update the relevant date(s):

(1) a substantial completion date for the Project or a component of the Project that is listed in section 3.2 and the Recipient’s estimate for that milestone changes to a date that is more than six months after the date listed in section 3.2; or

(2) a schedule change would require the period of performance to continue after the period of performance end date listed on Page 1, Block 6 (i.e., for projects with multiple phases, changes to the base phase budget period end date for projects with two phases, or changes to base or secondary phase budget period end dates for projects with three phases, etc., will not trigger notification/modification requirements).

For other schedule changes, the Recipient shall request an amendment of this agreement unless the USDOT has consented, in writing consistent with applicable requirements, to the change.

11.4 Budget Changes.

(a) The Recipient acknowledges that if the cost of completing the Project increases:

(1) that increase does not affect the Recipient’s obligation under this agreement to complete the Project; and

(2) the USDOT will not increase the amount of this award to address any funding shortfall.

(b) The Recipient shall request an amendment of this agreement to update section 3.3 and Attachment B if, in comparing the Project’s budget to the amounts listed in section 3.3:

(1) the “Non-Federal Funds” amount decreases; or

(2) the “Total Eligible Project Cost” amount decreases.

(c) For budget changes that are not identified in section 11.4(b), the Recipient shall request an amendment of this agreement to update section 3.3 and Attachment B unless the USDOT has consented, in writing consistent with applicable requirements, to the change.

(d) If the actual eligible project costs are less than the “Total Eligible Project Cost” that is listed in section 3.3, then the Recipient may propose to the USDOT, in writing consistent with applicable requirements, specific additional activities that are within the scope of this award, as defined in sections 7.1 and 3.1, and that the Recipient could complete with the difference between the “Total Eligible Project Cost” that is listed in section 3.3 and the actual eligible project costs.

(e) If the actual eligible project costs are less than the “Total Eligible Project Cost” that is listed in section 3.3 and either the Recipient does not make a proposal under section 11.4(d) or the USDOT does not accept the Recipient’s proposal under section 11.4(d), then:

(1) in a request under section 11.4(b), the Recipient shall reduce the Federal Share by the difference between the “Total Eligible Project Cost” that is listed in section

3.3 and the actual eligible project costs; and

(2) if that amendment reduces this award and the USDOT had reimbursed costs exceeding the revised award, the Recipient shall request to add additional project work that is within the scope of this project.

In this agreement, “Federal Share” means the sum of the “SS4A Grant Amount” and the “Other Federal Funds” amounts that are listed in section 3.3(a).

(f) The Recipient acknowledges that amounts that are required to be refunded under section 11.4(e)(2) constitute a debt to the Federal Government that the USDOT may collect under 2 C.F.R. 200.346 and the Standards for Administrative Collection of Claims (31 C.F.R. part 901).

11.5 USDOT Acceptance of Changes. The USDOT may accept or reject amendments requested under this article 11, and in doing so may elect to consider only the interests of the SS4A grant program and the USDOT. The Recipient acknowledges that requesting an amendment under this article 11 does not amend, modify, or supplement this agreement unless the USDOT accepts that amendment request and the parties modify this agreement under section 21.1.

ARTICLE 12

GENERAL REPORTING TERMS

12.1 Report Submission. The Recipient shall send all reports required by this agreement to all USDOT contacts who are listed in section 4.3. Reports will be added to a central repository maintained by FHWA.

12.2 Alternative Reporting Methods. FHWA may establish processes for the Recipient to submit reports required by this agreement, including electronic submission processes. If the Recipient is notified of those processes in writing, the Recipient shall use the processes required by the FHWA.

12.3 Paperwork Reduction Act Notice.

Under 5 C.F.R. 1320.6, the Recipient is not required to respond to a collection of information that does not display a currently valid control number issued by the Office of Management and Budget (the “OMB”). Collections of information conducted under this agreement are approved under OMB Control No. 2125-0675.

ARTICLE 13

PROGRESS AND FINANCIAL REPORTING

13.1 Quarterly Performance Progress Reports. Quarterly, on or before the 20th day of the first month of each calendar year (e.g., reports due on or before January 20th, April 20th, July 20th, and October 20th) and until the end of the period of performance, the Recipient shall submit to the USDOT a Quarterly Performance Progress Report in the format and with the content described in Exhibit C. If the date of this agreement is in the final month of a calendar year, then the Recipient shall submit the first Quarterly Performance Progress Report in the second calendar year quarter that begins after the date of this agreement.

13.2 Quarterly Financial Status. Quarterly, on or before the 20th day of the first month of each calendar year (e.g., reports due on or before January 20th, April 20th, July 20th, and October 20th) and until the end of the period of performance, the Recipient shall submit a Federal Financial Report using SF-425.

13.3 Final Performance Progress Reports and Financial Status. No later than 120 days after the end of the period of performance, the Recipient shall submit:

(1) a Final Performance Progress Report in the format and with the content described in Exhibit C for each Quarterly Performance Progress Report, including a final Federal Financial Report (SF-425); and

(2) any other information required under the Administering Operating Administration’s award closeout procedures.

ARTICLE 14

PERFORMANCE REPORTING

14.1 Baseline Performance Measurement. Recipients of Implementation Grants or Planning and Demonstration Grants with demonstration activities shall:

(1) collect data for each performance measure that is identified in the Performance Measure Table in Attachment A, accurate as of the Baseline Measurement Date that is identified in Attachment A; and

(2) on or before the Baseline Report Date that is stated in Attachment A, the Recipient shall submit a Baseline Performance Measurement Report that contains the data collected under this section 14.1 and a detailed description of the data sources, assumptions, variability, and estimated levels of precision for each performance measure that is identified in the Performance Measure Table in Attachment A.

14.2 SS4A Final Report.

The Recipient shall submit to the USDOT, not later than 120 days after the end of the period of performance, a report in the format specified by FHWA and with the content described in Attachment A that describes, consistent with sections 24112(g)-(h) of IIJA:

(1) the costs of each eligible project and strategy carried out using the grant;

(2) the roadway safety outcomes and any additional benefits (e.g., increased walking, biking, or transit use without a commensurate increase in serious and fatal crashes, etc.) that each such project and strategy has generated, as—

• identified in the grant application; and

• measured by data to the maximum extent practicable;

(3) [RESERVED]

(4) the lessons learned, and any recommendations related to future projects or strategies to prevent death and serious injuries on roads and streets.

14.3 Performance Reporting Survival.

The data collection and reporting requirements in this article 14 survive the termination of this agreement which is three years post period of performance.

14.4 Program Evaluation.

As a condition of grant award, the recipient may be required to participate in an evaluation undertaken by USDOT, or another agency or partner. The evaluation may take different forms such as an implementation assessment across grant recipients, an impact and/or outcomes analysis of all or selected sites within or across grant recipients, before/after photographs of the sites, qualitative activities such as videos describing the project and its impact on the community, or a benefit/cost analysis or assessment of return on investment. The Department may require applicants to collect data elements to aid the evaluation. As a part of the evaluation, as a condition of award, grant recipients must agree to: (1) make records available to the evaluation contractor; (2) provide access to program records, and any other relevant documents to calculate costs and benefits; (3) in the case of an impact analysis, facilitate the access to relevant information as requested; and (4) follow evaluation procedures as specified by the evaluation contractor or USDOT staff.

ARTICLE 15

NONCOMPLIANCE AND REMEDIES

15.1 Noncompliance Determinations.

(a) If the USDOT determines that the Recipient may have failed to comply with the United States Constitution, Federal law, or the terms and conditions of this agreement, the USDOT may notify the Recipient of a proposed determination of noncompliance. For the notice to be effective, it must be written and the USDOT must include an explanation of the nature of the noncompliance, describe a remedy, state whether that remedy is proposed or effective at an already determined date, and describe the process through and form in which the Recipient may respond to the notice.

(b) If the USDOT notifies the Recipient of a proposed determination of noncompliance under section 15.1(a), the Recipient may, not later than 7 calendar days after the notice, respond to that notice in the form and through the process described in that notice. In its response, the Recipient may:

(1) accept the remedy;

(2) acknowledge the noncompliance, but propose an alternative remedy; or

(3) dispute the noncompliance.

To dispute the noncompliance, the Recipient must include in its response documentation or other information supporting the Recipient’s compliance.

(c) The USDOT may make a final determination of noncompliance only:

(1) after considering the Recipient’s response under section 15.1(b); or

(2) if the Recipient fails to respond under section 15.1(b), after the time for that response has passed.

(d) To make a final determination of noncompliance, the USDOT must provide a notice to the Recipient that states the basis for that determination.

15.2 Remedies.

(a) If the USDOT makes a final determination of noncompliance under section 15.1(d), the USDOT may impose a remedy, including:

(1) additional conditions on the award;

(2) any remedy permitted under 2 C.F.R. 200.339–200.340, including withholding of payments; disallowance of previously reimbursed costs, requiring refunds from the Recipient to USDOT; suspension or termination of the award; or suspension and disbarment under 2 C.F.R. part 180; or

(3) any other remedy legally available.

(b) To impose a remedy, the USDOT must provide a written notice to the Recipient that describes the remedy, but the USDOT may make the remedy effective before the Recipient receives that notice.

(c) If the USDOT determines that it is in the public interest, the USDOT may impose a remedy, including all remedies described in section 15.2(a), before making a final determination of noncompliance under section 15.1(d). If it does so, then the notice provided under section 15.1(d) must also state whether the remedy imposed will continue, be rescinded, or modified.

(d) In imposing a remedy under this section 15.2 or making a public interest determination under section 15.2(c), the USDOT may elect to consider the interests of only the

USDOT.

(e) The Recipient acknowledges that amounts that the USDOT requires the Recipient to refund to the USDOT due to a remedy under this section 15.2 constitute a debt to the Federal Government that the USDOT may collect under 2 C.F.R. 200.346 and the Standards for Administrative Collection of Claims (31 C.F.R. part 901).

15.3 Other Oversight Entities.

Nothing in this article 15 limits any party’s authority to report activity under this agreement to the United States Department of Transportation Inspector General or other appropriate oversight entities.

ARTICLE 16

AGREEMENT TERMINATION

16.1 USDOT Termination.

(a) The USDOT may terminate this agreement and all its obligations under this agreement if any of the following occurs:

(1) the Recipient fails to obtain or provide any non-SS4A Grant contribution (all eligible project costs other than the SS4A Grant Amount, as described in section 3.3(a) of the grant agreement) or alternatives approved by the USDOT as provided in this agreement and consistent with article 3;

(2) a construction start date for the project or strategy is listed in section 3.2 and the Recipient fails to meet that milestone by six months after the date listed in section 3.2;

(3) a substantial completion date for the project or strategy is listed in section 3.2 and the Recipient fails to meet that milestone by six months after the date listed in section 3.2;

(4) the Recipient fails to comply with the terms and conditions of this agreement, including a material failure to comply with the schedule in section 3.2 even if it is beyond the reasonable control of the Recipient; or,

(5) the USDOT determines that termination of this agreement is in the public interest.

(6) the Recipient fails to expend the funds within 5 years after the date on which the government executes the grant agreement, which is the date funds are provided for the project.

(b) In terminating this agreement under this section, the USDOT may elect to consider only the interests of the USDOT.

(c) This section 16.1 does not limit the USDOT’s ability to terminate this agreement as a remedy under section 15.2.

(d) The Recipient may request that the USDOT terminate the agreement under this section 16.1.

16.2 Closeout Termination.

(a) This agreement terminates on Project Closeout.

(b) In this agreement, “Project Closeout” means the date that the USDOT notifies the Recipient that the award is closed out. Under 2 C.F.R. 200.344, Project Closeout should occur no later than one year after the end of the period of performance.

16.3 Post-Termination Adjustments. The Recipient acknowledges that under 2 C.F.R.

200.345–200.346, termination of the agreement does not extinguish the USDOT’s authority to disallow costs, including costs that USDOT reimbursed before termination, and recover funds from the Recipient.

16.4 Non-Terminating Events.

(a) The end of the period of performance described under section 10.4 does not terminate this agreement or the Recipient’s obligations under this agreement.

(b) The liquidation of funds under section 20.1 does not terminate this agreement or the Recipient’s obligations under this agreement.

16.5 Other Remedies. The termination authority under this article 16 supplements and does not limit the USDOT’s remedial authority under article 15 or 2 C.F.R. part 200, including 2 C.F.R. 200.339–200.340.

ARTICLE 17

MONITORING, FINANCIAL MANAGEMENT, CONTROLS, AND RECORDS

17.1 Recipient Monitoring and Record Retention.

(a) The Recipient shall monitor activities under this award, including activities under subawards and contracts, to ensure:

(1) that those activities comply with this agreement; and

(2) that funds provided under this award are not expended on costs that are not allowable under this award or not allocable to this award.

(b) If the Recipient makes a subaward under this award, the Recipient shall monitor the activities of the subrecipient in compliance with 2 C.F.R. 200.332(e).

(c) The Recipient shall retain records relevant to the award as required under 2 C.F.R.

200.334.

17.2 Financial Records and Audits.

(a) The Recipient shall keep all project accounts and records that fully disclose the amount and disposition by the Recipient of the award funds, the total cost of the project, and the amount or nature of that portion of the cost of the project supplied by other sources, and any other financial records related to the project.

(b) The Recipient shall keep accounts and records described under section 17.2(a) in accordance with a financial management system that meets the requirements of 2 C.F.R.

200.302–200.307, 2 C.F.R. part 200, subpart F, and title 23, United States Code, and will facilitate an effective audit in accordance with 31 U.S.C. 7501–7506.

(c) The Recipient shall separately identify expenditures under the fiscal year 2024 SS4A grants program in financial records required for audits under 31 U.S.C. 7501–7506.

Specifically, the Recipient shall:

(1) list expenditures under that program separately on the schedule of expenditures of Federal awards required under 2 C.F.R. part 200, subpart F, including “FY 2024” in the program name; and

(2) list expenditures under that program on a separate row under Part II, Item 1 (“Federal Awards Expended During Fiscal Period”) of Form SF-SAC, including “FY 2024” in column c (“Additional Award Identification”).

17.3 Internal Controls. The Recipient shall establish and maintain internal controls as required under 2 C.F.R. 200.303.

17.4 USDOT Record Access. The USDOT may access Recipient records related to this award under 2 C.F.R. 200.337.

ARTICLE 18

CONTRACTING AND SUBAWARDS

18.1 Build America, Buy America. This award term implements § 70914(a) of the Build America, Buy America Act, Pub. L. No. 117-58, div. G, tit. IX, subtitle A, 135 Stat. 429, 1294 (2021), 2 CFR part 184, and Office of Management and Budget (OMB) Memorandum M-24-02, “Implementation Guidance on Application of Buy America Preference in Federal Financial Assistance Programs for Infrastructure.”

Requirement to Use Iron, Steel, Manufactured Products, and Construction Materials Produced in the United States.

The Recipient shall not use funds provided under this award for a project for infrastructure unless:

(1) all iron and steel used in the project are produced in the United States—this means all manufacturing processes, from the initial melting stage through the application of coatings, occurred in the United States;

(2) all manufactured products used in the project are produced in the United States—this means the manufactured product was manufactured in the United States; and the cost of the components of the manufactured product that are mined, produced, or manufactured in the United States is greater than 55 percent of the total cost of all components of the manufactured product; and

(3) all construction materials are manufactured in the United States—this means that all manufacturing processes for the construction material occurred in the United States. The construction material standards for each construction material are provided at 2 CFR 184.6.

Inapplicability.

The domestic content procurement preference in this award term only applies to articles, materials, and supplies that are consumed in, incorporated into, or affixed to an infrastructure project. As such, it does not apply to tools, equipment, and supplies, such as temporary scaffolding, brought to the construction site and removed at or before the completion of the infrastructure project. Nor does a domestic content procurement preference apply to equipment and furnishings, such as movable chairs, desks, and portable computer equipment, that are used at or within the finished infrastructure project but are not an integral part of the structure or permanently affixed to the infrastructure project.

Categorization of articles, materials, and supplies.

An article, material, or supply should only be classified into one of the following categories: (i) Iron or steel products; (ii) manufactured products; (iii) construction materials; or

(iv) Section 70917(c) materials. An article, material, or supply should not be considered to fall into multiple categories. In some cases, an article, material, or supply may not fall under any of the categories listed in this paragraph. The classification of an article, material, or supply as falling into one of the categories listed in this paragraph must be made based on its status at the time it is brought to the work site for incorporation into an infrastructure project. In general, the work site is the location of the infrastructure project at which the iron, steel, manufactured products, and construction materials will be incorporated. An article, material, or supply incorporated into an infrastructure project must meet the requirements for only the single category in which it is classified.

Waivers.

When necessary, the Recipient may apply for, and the USDOT may grant, a waiver from the domestic content procurement preference in this award term.

A request to waive the application of the domestic content procurement preference must be in writing. The USDOT will provide instructions on the waiver process and on the format, contents, and supporting materials required for any waiver request. Waiver requests are subject to public comment periods of no less than 15 days and must be reviewed by the Office of Management and Budget (OMB) Made in America Office.

When the USDOT has made a determination that one of the following exceptions applies, the awarding official may waive the application of the domestic content procurement preference in any case in which the USDOT determines that:

(1) applying the domestic content procurement preference would be inconsistent with the public interest;

(2) the types of iron, steel, manufactured products, or construction materials are not produced in the United States in sufficient and reasonably available quantities or of a satisfactory quality; or

(3) the inclusion of iron, steel, manufactured products, or construction materials produced in the United States will increase the cost of the overall project by more than 25 percent.

There may be instances where an award qualifies, in whole or in part, for an existing waiver described at https://www.transportation.gov/office-policy/transportation-policy/made-in-america.

Definitions

“Construction materials” means articles, materials, or supplies that consist of only one of the items listed in paragraph (21) of this definition, except as provided in paragraph (2) of this definition. To the extent that one of the items listed in paragraph (1) contains as inputs other items listed in paragraph (1), it is nonetheless a construction material.

(1) The listed items are:

• non-ferrous metals;

• plastic and polymer-based products (including polyvinylchloride, composite building materials, and polymers used in fiber optic cables);

• glass (including optic glass);

• fiber optic cable (including drop cable)

• lumber;

• engineered wood; and

• drywall.

https://www.transportation.gov/office-policy/transportation-policy/made-in-america

(2) Minor additions of articles, materials, supplies, or binding agents to a construction material do not change the categorization of the construction material.

“Domestic content procurement preference” means all iron and steel used in the project are produced in the United States; the manufactured products used in the project are produced in the United States; or the construction materials used in the project are produced in the United States.

“Iron or steel products” means articles, materials, or supplies that consist wholly or predominantly or iron or steel or a combination of both.

“Manufactured products” means

(1) Articles, materials, or supplies that have been: (i) Processed into a specific form and shape; or (ii) combined with other articles, materials, or supplies to create a product with different properties than the individual articles, materials, or supplies.

(2) If an item is classified as an iron or steel product, a construction material, or a Section 70917(c) material under 2 CFR 184.4(e) and the definitions set forth in 2 CFR 184.3, then it is not a manufactured product. However, an article, material, or supply classified as a manufactured product under 2 CFR 184.4(e) and paragraph (1) of this definition may include components that are construction materials, iron or steel products, or Section 70917(c) materials.

“Predominantly of iron or steel or a combination of both” means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forging utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components.

“Project” means the development of a safety action plan (including supplemental and topical plans) or the temporary or permanent construction, alteration, maintenance, or repair of infrastructure in the United States.

“Section 70917(c) materials” cement and cementitious materials; aggregates such as stone, sand, or gravel; or aggregate binding agents or additives.

18.2 Small and Disadvantaged Business Requirements. The Recipient shall expend all funds under this award in compliance with the requirements at 2 C.F.R. 200.321 including any amendments thereto.

18.3 Engineering and Design Services. The Recipient shall award each contract or sub-contract for program management, construction management, planning studies, feasibility studies, architectural services, preliminary engineering, design, engineering, surveying, mapping, or related services with respect to the project in the same manner that a contract for architectural and engineering services is negotiated under 2 C.F.R. 200.320 or an equivalent qualifications-based requirement prescribed for or by the Recipient.

18.4 Foreign Market Restrictions. The Recipient shall not allow funds provided under this award to be used to fund the use of any product or service of a foreign country during the period in which such foreign country is listed by the United States Trade Representative as denying fair and equitable market opportunities for products and suppliers of the United States in procurement and construction.

18.5 Prohibition on Certain Telecommunications and Video Surveillance Services or Equipment. The Recipient acknowledges that Section 889 of Pub. L. No. 115-232, 2 C.F.R. 200.216 and 2 C.F.R. 200.471 prohibit the Recipient and all subrecipients from procuring or obtaining certain telecommunications and video surveillance services or equipment under this award.

18.6 Recipient Responsibilities for Subawards.

If the Recipient makes a subaward under this award, the Recipient shall comply with the requirements on pass-through entities under 2 C.F.R. parts 200 and 1201, including 2 C.F.R. 200.331–200.333.

18.7 Subaward and Contract Authorization.

If the USDOT Office for Subaward Authorization identified in section 5.1 is “FHWA Office of Acquisition and Grants Management,” then the Recipient must follow the requirements in 2 C.F.R. 200.308 (f) (6) and 2 C.F.R. 200.333, as applicable, for the subaward of any SS4A Grant work under the Project-Specific Agreement. Approvals under 2 CFR 200.308(f)(6) do not apply to the procurement acquisition of goods and services.

ARTICLE 19

COSTS, PAYMENTS, AND UNEXPENDED FUNDS

19.1 Limitation of Federal Award Amount. Under this award, the USDOT shall not provide funding greater than the amount obligated on the SS4A Grant…