This is a Request for Quote (RFQ) N6449825Q0313 for security enhancements to doors at the Naval Foundry and Propeller Center (NFPC) in Philadelphia. The solicitation is set aside for Women-Owned Small Business (WOSB) and covers security system upgrades for five buildings: B546, B592, B1029, B20, and B712. The contract requires removing, replacing, and adding exit monitors, magnet switches, remote panels, control boards, and interconnections for the existing Lenel2 OnGaurd security system.
The procurement includes multiple line items for hardware such as dual reader controllers, power supplies, batteries, interface modules, command keypads, motion detectives, panic hardware, door components, and installation services. Key components must be compatible with the existing Lenel2 security system. The contract is firm fixed price with a delivery deadline of 31 December 2025. Offerors must submit quotes electronically through the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module by 11 September 2025. Award will be made to the lowest-priced, technically acceptable offeror deemed responsible under FAR Part 9.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Statement of Work.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WOMEN-OWNED SMALL
BUSINESS (WOSB)
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NUMBER 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NUMBER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
REQUEST
FOR QUOTE
(RFQ)
INVITATION
FOR BID
(IFB)
REQUEST
FOR
PROPOSAL
(RFP)
SEE ADDENDUM
19.
ITEM NUMBER
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH
AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND
ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS
SPECIFIED
29. AWARD OF CONTRACT: REFERENCE OFFER
DATED . . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 11/2021)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITION IS UNRESTRICTED OR
NORTH AMERICAN
INDUSTRY CLASSIFICATION
STANDARD (NAICS):
SIZE STANDARD:
13a. THIS CONTRACT IS A
RATED ORDER UNDER
THE DEFENSE PRIORITIES
AND ALLOCATIONS
SYSTEM - DPAS (15 CFR 700)
SET ASIDE: % FOR:
11. DELIVERY FOR FREE ON
BOARD (FOB) DESTINATION
UNLESS BLOCK IS MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3
AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
8(A)
ECONOMICALLY
DISADVANTAGED
WOMEN-OWNED SMALL
BUSINESS (EDWOSB)
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
(SDVOSB)
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.
Section A - Solicitation/Contract Form
OSC Door Changes
N6449825Q0313
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
Item Supplies/Service Quantity Unit Unit Price Amount
Part Number: LNL-X2220 GSA - Intelligent Dual Reader Controller (2 Rdrs, 8 Inputs, 4 outputs
Pricing Arrangement: Firm Fixed Price
4 Each
Part Number: LNL-AL400ULX GSA - LenelS2 UL Listed 4A Power Supply 12VDC 4A output, enclosure
Pricing Arrangement: Firm Fixed Price
4 Each
Part Number: LNL-AL600ULX-4CB6 GSA - LenelS2 UL Listed 10A Power Supply 12VDC 10A output, enclosure
Pricing Arrangement: Firm Fixed Price
4 Each
12V 7AMP BATTERY
12 VDC 7amp battery
Pricing Arrangement: Firm Fixed Price
12 Each
Part Number: LNL-1320-S3 GSA - Dual Reader Interface Module (2 Readers, 8 Inputs, 4 outputs
Pricing Arrangement: Firm Fixed Price
8 Each
Part Number: LNL-CK GSA - Command Display terminal Lenel Command Keypad
Pricing Arrangement: Firm Fixed Price
1 Each
Part Number: DS-939 Motion Detector 360 Ceiling Mount
Pricing Arrangement: Firm Fixed Price
1 Each
Part Number: LKM10KPKM 10K PANIC w/X10 & #2 STRIKE Type 4
Pricing Arrangement: Firm Fixed Price
9 Each
Part Number: 6220 Door Cord Armored 4-Conductor Cable 18" Length Sheath Steel Aluminum With (4) 22 AWG Conductor For 6
Pricing Arrangement: Firm Fixed Price
11 Each
0010 Part Number: 73370
4.5 X 4.5 TA2714 26D QC12 MCKinney Hinge
Pricing Arrangement: Firm Fixed Price
10 Each
Part Number: 74-01-2003 Bridgepoint EntryPoint Contact & Contactless Card + Pin Reader
Pricing Arrangement: Firm Fixed Price
14 Each
MISC - NON-INVENTORY
Concealment cover
Pricing Arrangement: Firm Fixed Price
14 Each
Part Number: N707AU/ST BMS Contact/Standard Magnet Set, UL2 High Security, Silver
Pricing Arrangement: Firm Fixed Price
16 Each
Part Number: DS160 Request to exit device, ivory
Pricing Arrangement: Firm Fixed Price
13 Each
Part Number: 9400-630 9400 Series Slim-Line, Outdoor Rated Surface Mounted Electric Strike, Satin SS
Pricing Arrangement: Firm Fixed Price
4 Each
Part Number: 1431-UO EN Door Closer, Heavy Duty, Non-Handed, Universal Arm, Aluminum Alloy, Powder Coated
Pricing Arrangement: Firm Fixed Price
14 Each
Part Number: ND12D RHO 626AM cylindrical lock - cage door lock in Bldg 592
Pricing Arrangement: Firm Fixed Price
1 Each
Part Number: 98EO-3FT-26D
RIM EXIT DEVICE
Pricing Arrangement: Firm Fixed Price
5 Each
Part Number: 996L-NL-R/V-06-26D-LHR
R/V 06 LEVER TRIM-NIGHTLATCH
Pricing Arrangement: Firm Fixed Price
3 Each
Part Number: E996-US26D Electric Trim, US 26D
Pricing Arrangement: Firm Fixed Price
1 Each
Part Number: N/A Best 6 pin construction core
Pricing Arrangement: Firm Fixed Price
13 Each
Part Number: N/A Misc: materials, cable, connectors and hardware
Pricing Arrangement: Firm Fixed Price
13 Each
Part Number: N/A - Composite Cable OSDP plenum box 4 Element Access Control Cable 22-04 UNS + 22-02 UNS+ 18-04
UNS + 22-1P OAS LC + 18-02 UNS
Pricing Arrangement: Firm Fixed Price
4 Each
Part Number: N/A- CONDUIT - 3/4" EMT - PER FT 3/4" EMT Conduit Per Foot; NEED 150ft
Pricing Arrangement: Firm Fixed Price
1 Each
Part Number: MNRL 1-B 3/4 " EMT / IMC/Rigid Conduit Hanger w/ Bolt Steel
Pricing Arrangement: Firm Fixed Price
13 Each
Part Number: MNRL MED-45
3/4" EMT CONDUIT STRAP (1) HOLE STEEL
Pricing Arrangement: Firm Fixed Price
13 Each
Part Number: PS1300-3/4-AS-EG
CLAMP CONDUIT EMT 3/4IN 400LB STL 0.06IN
Pricing Arrangement: Firm Fixed Price
22 Each
Part Number: BRIG 261-DC 3/4" EMT Compression Coupling Diecast
Pricing Arrangement: Firm Fixed Price
13 Each
Part Number: NDA-U-CBB
CONDUIT BACK BOX, 148MM
Pricing Arrangement: Firm Fixed Price
6 Each
Installation services Follow Statement of Work
Pricing Arrangement: Firm Fixed Price
1 Job
Section C - Description/Specifications/Statement of Work
Statement of Work (SOW)
Security enhancements to doors for the Naval Foundry and Propeller Center
1.0 INTRODUCTION
1.0.1 The Naval Surface Warfare Center Philadelphia Division (NSWCPD) is a Department of Defense entity responsible for research and development, test and evaluation, engineering and fleet support organization for the Navy's ships, submarines, military watercraft and unmanned vehicles. This requirement is for NSWCPD Code 1460, which is responsible for Safety.
1.0.2 This contract is for non-personal services. It does not create employment rights with the U.S. Government whether actual, inherent, or implied.
1.0.3 Government/Contractor Relationship
1.0.3.1 The services to be delivered under this contract are non-personal services and the parties recognize and agree that no employer-employee relationship exists or will exist under the Contract between the Government and the Contractor's personnel. Therefore, it is in the best interest of the Government to provide both parties with a full understanding of their respective obligations.
1.0.3.2 The Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishable badges or other visible identification for meetings with Government personnel. In addition, Contractor personnel appropriately identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence.
1.0.3.3 Contractor personnel under this contract shall not engage in any of the inherently Governmental functions listed at FAR Subpart 7.5 or DFARS Subpart 207.5.
1.0.4 Employee Relationship:
1.0.4.1 The services to be performed under this contract do not require the Contractor or its personnel to exercise personal judgment and discretion on behalf of the Government. Rather the Contractor's personnel will act and exercise personal judgment and discretion on behalf of the Contractor.
1.0.4.2 Rules, regulations, directives, and requirements that are issued by the U. S. Navy and NSWCPD under its responsibility for good order, administration, and security are applicable to all personnel who enter a government installation or who travel on Government transportation. This is not to be construed or interpreted to establish any degree of Government control that is inconsistent with a non-personal services contract.
1.0.4.3 Inapplicability of Employee Benefits: This contract does not create an employer-employee relationship. Accordingly, entitlements and benefits applicable to such relationships do not apply.
1.0.4.4 It is the Contractor's, as well as the Government's, responsibility to monitor contract activities and notify the Contracting Officer if the Contractor believes that the intent of this Section has been or may be violated.
1.0.4.4.1 The Contractor shall notify the Contracting Officer in writing via letter or email within three (3) calendar days from the date of any incident that the Contractor considers to constitute a violation of this Section. The notice should include the date, nature, and circumstances of the conduct;
the name, function, and activity of each Government employee or Contractor official or employee involved or knowledgeable about such conduct;
identify any documents or substance of any oral communication involved in the conduct; and the Contractor's estimated date when, absent a response, cost, schedule, or performance will be impacted.
1.0.4.4.2 The Contracting Officer will, within five (5) calendar days after receipt of notice, respond to the notice in writing. In response, the Contracting Officer will either:
(i) Confirm the conduct is in violation and when necessary direct the mode of further performance,
(ii) Countermand any communication regarded as a violation,
(iii) Deny that the conduct constitutes a violation and when necessary direct the mode of further performance, or
(iv) In the event the notice is inadequate to make a decision, advise the Contractor what additional information is required, and establish the date by which it should be furnished by the Contractor.
1.1 BACKGROUND
NFPC has the Lenel2 security system installed on the doors. NFPC requires security enhancements to coincide with door replacements and OnGaurd relocation for five buildings located in the compound. B546, B592, B1029, B20, and B712. These enhancements will consist of door replacements, door relocations, equipment replacements, and access control system expansion.
1.2 SCOPE OF WORK
The contractor will be removing, replacing, and adding exit monitors, magnet switches, remote panels, also adding/updating control boards as needed, and adjusting the interconnections and power cables connecting the doors to the existing Lenel2 s NFPC will provide software OnGaurd system. ( system admin access to Contractor)
CLIN 0001- CLIN 0029 Materials
CLIN 0030- Installation
2.0 APPLICABLE DOCUMENTS
Not applicable.
3.0. REQUIREMENTS
3.0.1 all new parts should be compatible with the existing Lenel2 security system
LNL-X2220 GSA - Intelligent Dual Reader Controller (2 Rdrs, 8 Inputs, 4 outputs 4
LNL-AL400ULX GSA - LenelS2 UL Listed 4A Power Supply 12VDC 4A output, enclosure 4
LNL-AL600ULX-4CB6 GSA - LenelS2 UL Listed 10A Power Supply 12VDC 10A output, enclosure 4
12V 7AMP BATTERY 12 VDC 7amp battery 12
LNL-1320-S3 GSA - Dual Reader Interface Module (2 Readers, 8 Inputs, 4 outputs 8
LNL-CK GSA - Command Display terminal Lenel Command Keypad 1
DS-939 Motion Detector 360 Ceiling Mount 1
LKM10KPKM 10K PANIC w/X10 & #2 STRIKE Type 4 9
6220 Door Cord Armored 4-Conductor Cable 18" Length Sheath Steel Aluminum With (4) 22 AWG Conductor For 6
73370 4.5 X 4.5 TA2714 26D QC12 MCKinney Hinge 10
74-01-2003 Bridgepoint EntryPoint Contact & Contactless Card + Pin Reader 14
MISC - NON-INVENTORY Concealment cover 14
N707AU/ST BMS Contact/Standard Magnet Set, UL2 High Security, Silver 16
DS160 Request to exit device, ivory 13
9400-630 9400 Series Slim-Line, Outdoor Rated Surface Mounted Electric Strike, Satin SS 4
1431-UO EN Door Closer, Heavy Duty, Non-Handed, Universal Arm, Aluminum Alloy, Powder Coated 14
ND12D RHO 626AM cylindrical lock - cage door lock in Bldg 592 1
98EO-3FT-26D RIM EXIT DEVICE 5
996L-NL-R/V-06-26D-LHR R/V 06 LEVER TRIM-NIGHTLATCH 3
E996-US26D Electric Trim, US 26D 1
MISC - NON-INVENTORY Best 6 pin construction core 13 EA
MISC - NON-INVENTORY Misc: materials, cable, connectors and hardware 13
Composite Cable OSDP plenum box
4 Element Access Control Cable 22-04 UNS + 22-02 UNS+ 18-04 UNS + 22-1P OAS LC + 18-02 UNS 4
CONDUIT - 3/4" EMT - PER
FT
3/4" EMT Conduit Per Foot 1 5 0
FT
MNRL 1-B 3/4 " EMT / IMC/Rigid Conduit Hanger w/ Bolt Steel 13
MNRL MED-45 3/4" EMT CONDUIT STRAP (1) HOLE STEEL 13
PS1300-3/4-AS-EG CLAMP CONDUIT EMT 3/4IN 400LB STL 0.06IN 22
BRIG 261-DC 3/4" EMT Compression Coupling Diecast 13
NDA-U-CBB CONDUIT BACK BOX, 148MM 6
3.1
B20H
. Remove request to exit monitor, remove magnet switch, and disconnect power to door lock.
. (If required) Remove remote Lenel panel located above door. Connections going from the remote Lenel to the master panel in the fire pump room must be removed. (B1029E hallway)
. Install new card readers and necessary hardware
. Test system to ensure it is operating as intended.
B20 SE
. Install new LKM10K hardware.(supplied by NFPC)
. Install a new card reader, new request to exit monitor, new magnetic switch, reconnect power to door lock, and other necessary hardware for the door to function.
. (If required) Install a new remote located above the door.panel, Connections must be added and installed from the remote panel to existing master Lenel panel in the fire pump room (B1029E hallway)
B20 SW
. Install new LKM10K(supplied by NFPC) hardware.
. Install a new card reader, new request to exit monitor, new magnetic switch, reconnect power to door lock, and other necessary hardware for the door to function.
. (If required) Install a new remote panel, located above the door.
Connections must be added and installed from the remote panel to existing
Master Lenel panel in the fire pump room (B1029E hallway).
B1029 E.1
. Remove request to exit monitor, remove magnet switch, and disconnect power to door lock.
. (If required) Remove remote Lenel panel located above door. Connections going from the remote Lenel to the master panel in the fire pump room must be removed. (B1029E hallway)
. Install a new card reader and necessary hardware
B1029 E.2
. Install new LKM10K (supplied by NFPC) hardware.
. Install a new card reader, new request to exit monitor, new magnetic switch, reconnect power to door lock, and other necessary hardware for the door to function.
. (If required) Install a new remote panel located above the door.
Connections must be added and installed from the remote panel to existing
Main Lenel panel in the fire pump room (B1029E hallway)
B1029 W
. Remove card reader, request to exit monitor, remove magnet switch, and disconnect power to door lock.
. Install new LKM10K(supplied by NFPC) hardware.
. Install a new card reader, new request to exit monitor, new magnetic switch, reconnect power to door lock, and other necessary hardware for the door to function.
. (If required) Install a new panel located above the door.
Connections must be added and installed from the remote panel to existing
B1029 Master Lenel Room (Fire Pump Room)
. Location of current Lenel head end. The contractor will deploy new control boards (ISC and door controllers) and a new cabinet/power supply in this room to drive the six doors above. Contractor will also install a cage door around the existing Lenel panel and the new master panel
. The cage door should have motion sensors and alarms installed.
B592 IT ROOM (MASTER LENEL)
. The contractor will also install a cage door around the existing and new master panels.
The cage door should have motion sensors and alarms installed.
B592 North Entrance disconnect power to door lock.
. Install new LKM10K(supplied by NFPC) hardware.
. Install a new card reader, new request to exit monitor, new magnetic switch, reconnect power to door lock, and other necessary hardware for the door to function.
. (If required) Install a new remote panel located above the door.
Connections must be added and installed from the remote panel to existing
B592 West Entrance Going to machine shop disconnect power to door lock.
. Install new LKM10K (supplied by NFPC) hardware.
. Install a new card reader, new request to exit monitor, new magnetic switch, reconnect power to door lock, and other necessary hardware for the door to function.
. (If required) Install a new remote panel located above the door.
Connections must be added and installed from the remote panel to existing
B546 North disconnect power to door lock.
. Install new LKM10K(supplied by NFPC) hardware.
. Install a new card reader, new request to exit monitor, new magnetic switch, reconnect power to door lock, and other necessary hardware for the door to function.
. (If required) Install a new remote panel located above the door.
Connections must be added and installed from the remote panel to existing
B546 South
. Troubleshoot and repair connection issue with B546 south door.
. Remove card reader, request to exit monitor, remove magnet switch, and disconnect power to door lock.
. Install new LKM10K (supplied by NFPC) hardware.
. Install a new card reader, new request to exit monitor, new magnetic switch, reconnect power to door lock, and other necessary hardware for the door to function.
. (If required) Install a new remote panel located above the door.
Connections must be added and installed from the remote panel to existing
B712
The two doors need to have card readers added to them. There is currently no Lenel operating in the building so an ISC board will have to be installed in the IT closet on the first floor. The switch required to be provided by NFPC will be identified by the contractor and shared with NFPC so that the right switch can be obtained for the contractor to install. New panic hardware will be provided for both doors. B712.N.1 will be locked with an electric strike and B712.N.2. will have an electrified trim installed.
The two doors include:
B712.N.1 (Single door)
B712.N.2 (Double door)
4.0 DATA REQUIREMENTS
5.0 SECURITY REQUIREMENTS
5.1 SECURITY TRAINING. The Contractor is responsible for completing all required Government mandated training to maintain security and network access to government sites and IT systems to include but not limited to: Antiterrorism Level 1 Awareness; Records Management in the DON:
Everyone's Responsibility; Training and Readiness: The Active Shooter; NAVSEA Introduction to Controlled Unclassified Information; Operations Security (OPSEC); NAVSEA Counterintelligence Training; Privacy and Personally Identifiable Information (PII) Awareness Training; NAVSEA Physical Security training and Cybersecurity 101 Training. Certificates of successful completion shall be sent to the COR and as otherwise specified in the contract.
5.1.1 In accordance with the National Industrial Security Program Operating Manual (NISPOM) (37 CFR Part 117), Contractor personnel that require access to Department of Navy (DON) information systems and/or work on-site require an open investigation or favorable adjudicated Tier 3 by the Vetting Risk Operations Center (VROC). An interim clearance is granted by VROC and recorded in the Defense Information System for Security (DISS). An open or closed investigation with a favorable adjudication is required prior to issuance of a badge providing access to NFPC buildings.
Furthermore, if the Navy Central Adjudication Facility have made an unfavorable determination access will be denied. For Common Access Card (CAC) you must have an open investigation and/or a favorably adjudicated investigation. Interim security clearance are acceptable for a CAC.
Access will be denied for anyone that has eligibility pending in DISS. Vetting through the National Crime Information Center, Sex Offender Registry, and the Terrorist screening database shall be process for a contractor that does not have a favorable adjudicated investigation.
5.1.2 Within 30 days after contract award, the contractor shall submit a list of all contractor personnel, including subcontractor employees, who will have access to DON information systems and/or work on-site at one of the NFPC sites to the appointed Contracting Officer Representative (COR) via email. The contractor shall provide each employee's first name, last name, contract number, the NFPC technical code, work location, whether or not the employee has a CAC and or Standard Access Control Badge (SACB), the systems the employee can access i.e., NMCI, and the name of the Contractor's local point of contact, phone number and email address. Throughout the period of performance of the contract, the Contractor shall immediately provide any updated information to the COR when any Contractor personnel changes occur including substitutions or departures.
5.2 ON Contractor personnel that require a badge to work on-site at one of the NFPC sites must provide an I-9 form to verify proof of SITE WORK.
citizenship. The I-9 form should be signed by the company Facility Security Officer or the company Human Resource Department. In addition to the I- 9 form, Contractors shall also bring their birth certificate, current United States Passport or naturalization certificate and state issued ID to the NFPC Security Officer at the time of badge request to verify citizenship. Any contractor that has unfavorable information that has not been favorably adjudicated, by Department of Defense Central Adjudication Facility (DOD CAF) will not be issued a badge. Finally, contractors shall supply a copy of their OPSEC Training Certificate or other proof that the training has been completed.
5.2.1 In accordance with NFPC security protocol, contractor employees who hold dual citizenship will not be granted security clearance to our facilities.
5.2.4 Reserved
5.3 DD254 REQUIREMENT .
Not applicable
5.4 OPERATIONS SECURITY (OPSEC)
Approved by security
5.4.1 The Contractor shall protect critical information associated with this contract to prevent unauthorized disclosure. The NFPC Critical Information List (CIL)/ CIIL (Critical Indicators and information list) will be provided on site, if warranted. Performance under this contract requires the contractor to adhere to OPSEC requirements, which may include the N Contractor OPSEC Plan. When the NFPC Contractor OPSEC Plan is required, the contractor shall return acknowledgment of the plan within 15 days of receipt. During the period of this contract, the Contractor may be exposed to, use, or produce, NFPC Critical Information (CI) and/or observables and indicators which may lead to discovery of CI. NFPC's CI will not be distributed to unauthorized third parties, including foreign governments, or companies under Foreign Ownership, Control, or Influence (FOCI) unless such FOCI has been appropriately mitigated through measures approved by the Defense Counterintelligence and Security Agency. Questions concerning these requirements shall be directed to the PCO.
5.4.2 CUI correspondence transmitted internally on the contractor's unclassified networks or information systems, and externally, shall be protected per NIST SP-800-171, Protecting Controlled Unclassified Information (CUI) in Non-federal Systems and Organizations.
Assembled large components/systems being transported to and from testing areas, other production or government facilities (whether or not on public roadways) shall be in an enclosed van trailer or covered flatbed trailer. Component/System outside storage, staging, and test areas shall be shielded /obscured from public view wherever physically possible.
5.4.3 NSWCPD's CI shall not be publicized in corporate wide newsletters, trade magazines, displays, intranet pages or public facing websites. Media requests related to this project shall be directed to the PCO, and the COR who will forward the required to the NFPC Public Release Authority for review.
5.4.4 Any attempt by unauthorized third parties to solicit, obtain, photograph, or record, or; incidents of loss/compromise of government Classified or CI, Business Sensitive, Company Proprietary information related to this or other program must be immediately reported to the contractor's Facility Security Officer and Cognizant Security Office and/or the Naval Criminal Investigative Service, and the NNSY-NFPC Security Division (Code 1123).
5.5 RECEIPT, STORAGE, AND GENERATION OF CONTROLLED UNCLASSIFIED INFORMATION (CUI) (REQUIRED to be included All Controlled Unclassified Information (CUI) associated with this contract must follow the minimum marking requirements of DoDI for all SOWS)
5200.48, Section 3, paragraph 3.4.a, and include the acronym "CUI" in the banner and footer of the document. In accordance with DoDI 5200.48, CUI must be safeguarded to prevent Unauthorized Disclosure (UD). CUI export controlled technical information or other scientific, technical, and engineering information must be marked with an export control warning as directed in DoDI 5230.24, DoDD 5230.25, and Part 250 of Title 32, CFR.
Nonfederal information systems storing and processing CUI shall be protected per NIST SP-800-171, or subsequent revisions. All transmissions to personal email accounts (AOL, Yahoo, Hotmail, Comcast, etc.) and posting on social media websites (Facebook, Instagram, Twitter, LinkedIn, etc.)
are prohibited. Destroy CUI associated with this contract by any of the following approved methods: A cross-cut shredder; a certified commercial destruction vendor; a central destruction facility; incineration; chemical decomposition; pulverizing, disintegration; or methods approved for classified destruction.
5.6 PLANNING, Programming, Budgeting and Execution (PPBE) Data.
When contractor employees, in the performance of their duties, are exposed to Planning, Programming, Budgeting and Execution (PPBE) data, a Non- Disclosure Agreement (NDA) with all affected contactor personnel must be executed in coordination with the COR and PCO to ensure safeguarding disclosure of this data.
6.0 PLACE OF PERFORMANCE
6.1. Delivery to NFPC
6.1.1 Delivery will occur at the following government sites:
Andrew Adams (215) 897-4737 andrew.b.adams17.civ@us.navy.mil
Naval Foundry & Propeller Center
2003 Constitution Ave
Philadelphia Navy Yard
Philadelphia, PA 19112
Shipping Receiving Hours of Operation - M/F 0730-1400
6.1.2. The specific location(s) will be provided at time of award of the
Contract. The Contractor shall provide a list of employees who require access to these areas, including standard security clearance information for each person, to the Contracting Officer Representative (COR) no later than three business days after the date of award. The workspace provided to the Contractor personnel shall be identified by the Awardee, with appropriate signage listing the company name and individual Contractor employee name.
6.1.4 Access to Government buildings at Naval Surface Warfare Center Philadelphia Division is from Monday through Friday, except 0600 to 1800 Federal holidays. Normal work hours are from , Monday through Friday. Contractor employees shall be under Government oversight at 0600 to 1800 all times. Government oversight requires that a Government employee be present in the same building/facility whenever Contractor employee(s) are performing work under this . Contractor personnel are not allowed to access any Government buildings at NFPC outside the hours of Contract 0600 to without the express approval of the Procuring Contracting Officer (PCO).1800
6.1.5 Reserved
6.1.6 Early Dismissal and Closure of Government Facilities
6.1.6.1 When a Government facility is closed and/or early dismissal of
Federal employees are directed due to severe weather, security threat, or a facility related problem that prevents personnel from working, onsite Contractor personnel regularly assigned to work at that facility should follow the same reporting and/or departure directions given to Government personnel. The Contractor shall not direct charge to the contract for time off, but shall follow its own company policies regarding leave. Non-essential Contractor personnel, who are not required to remain at or report to the facility, shall follow their parent company policy regarding whether they should go/stay home or report to another company facility. Subsequent to an early dismissal and during periods of inclement weather, onsite Contractors should monitor radio and television announcements before departing for work to determine if the facility is closed or operating on a delayed arrival basis.
6.1.6.2 When Federal employees are excused from work due to a holiday or a special event (that is unrelated to severe weather, a security threat, or a facility related problem), on site Contractors will continue working established work hours or take leave in accordance with parent company policy.
Those Contractors who take leave shall not direct charge the non-working hours to the Contractors are responsible for predetermining andContract.
disclosing their charging practices for early dismissal, delayed openings, and closings in accordance with the FAR, applicable cost accounting standards, and company policy. Contractors shall follow their disclosed charging practices during th period of performance and shall note Contract follow any verbal directions to the contrary. The PCO will make the determination of cost allowability for time lost due to facility closure in accordance with FAR, applicable Cost Accounting Standards, and the Contractor's established accounting policy.
6.1.7 The contractor shall ensure that each contractor employee who will be resident at NSWCPD completes the Environmental Management System (EMS) Awareness training within 30 days of commencing performance at NSWCPD. This document is available at: https://navsea.navy.deps.mil/wc/pnbc-code10/Safety/default.aspx
6.1.8 In accordance with C-223-W002, ON-SITE SAFETY REQUIREMENTS (NAVSEA), the contractor shall certify by e-mail to Paul Breeden (paul.breeden.civ@us.navy.mil) that on-site employees have read the "Philadelphia Division Environmental Policy and Commitment" and taken the EMS Awareness training within 30 days of commencing performance at NSWCPD. The e-mail shall include the employee's name, work site, and contract number.
7.0 TRAVEL
8.0 GOVERNMENT FURNISHED PROPERTY
Not applicable.
9.0 GOVERNMENT FURNISHED INFORMATION
Not applicable.
10.0 PURCHASES
Not applicable.
11.0 Counterfeit Material Prevention
11.1 All components for (LENEL S2 access hardware) electronic assemblies and subassemblies are purchased from Original Manufacturer (OM), authorized suppliers, or franchised distributors; At a minimum, the contractor shall ensure that procurement practices and processes to purchase and install components from OM, authorized suppliers, or franchised distributors are flowed down to subcontractors and suppliers at all tiers.
11.2 A counterfeit Prevention Plan shall be generated in accordance with DI-MISC-81832
Counterfeit Prevention Plan, and that the requirements of this DID and AS5553 are flowed down to all subcontractors and suppliers in this effort.
11.3 The Contractor shall maximize the use of authentic, originally designed and/or qualified parts.
11.4. Warranty "Counterfeit"
https://navsea.navy.deps.mil/wc/pnbc-code10/Safety/default.aspx
11.5. Seller warrants the goods delivered pursuant to this Contract, unless specifically stated otherwise in this Contract, shall (i) be new (ii) be free from defects in workmanship, materials, and design and (iii) be in accordance with all the requirements of this Contract. Seller further warrants that the performance of work and services shall conform with the requirements of this Contract and to high professional standards. All warranties in this Contract shall survive inspection, test, final acceptance and payment of goods and services.
12.0 PERSONNEL
13.0 NSWCPD Electronic Cost Reporting and Financial Tracking (eCRAFT) System
Requirements OSC Door Materials and Installation
Additional Regulation or Supplemental Clauses Incorporated by Full Text
C-202-H001 ADDITIONAL DEFINITIONS--BASIC (Oct 2018)
(a) Department means the Department of the Navy.
(b) Commander, Naval Sea Systems Command means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.
(c) References to The Federal Acquisition Regulation (FAR) All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.
(d) National Stock Numbers Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:
(1) . The number assigned to each approved Item Identification under the National Item Identification Number (NIIN) Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit nonsignificant number.
(2) . The National Stock Number (NSN) for an item of supply consists of the applicable National Stock Number (NSN) four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.
(Endof Text)
C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (Oct 2018)
(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as "protected information". File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.
(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:
(1) The support contractor not disclose any information;
(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;
(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,
(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.
(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.
(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.
(End of Text)
C-215-H002 CONTRACTOR PROPOSAL (NAVSEA) (OCT 2018) (Oct 2018)
(a) Performance of this contract by the Contractor shall be conducted and performed in accordance with detailed obligations to which the Contractor committed itself in Proposal dated in response to NAVSEA Solicitation No.
N6449825Q0313.
(b) The technical volume(s) of the Contractor's proposal is(are) hereby incorporated by reference and made subject to the "Order of Precedence" (FAR 52.215-8) clause of this contract. Under the "Order of Precedence" clause, the technical volume(s) of the Contractor's proposal referenced herein is (are) hereby designated as item (f) of the clause, following "the specifications" in the order of precedence.
(End of Text)
C-227-H014 PROTECTION OF DEPARTMENT OF NAVY TRADEMARKS - BASIC (NAVSEA)
(JUL 2021)
(Jul 2021)
(a) The contractor shall not assert any claim, in any jurisdiction, based on trademark or other name or design-based causes of action that are based on rights the contractor believes it has in the term(s) _____ [contracting officers shall list terms(s) (Government assigned or approved nomenclature)] (the "Designation(s)"), against the Government or others authorized by the Government to use the Designation(s) (including the word(s), name, symbol, or design) acting within the scope of such authorization (i.e. claims for trademark infringement, dilution, trade dress infringement, unfair competition, false advertising, palming off, passing off, or counterfeiting). Such authorization shall be implied by the award of a Government contract to any party for the manufacture, production, distribution, use, modification, maintenance, sustainment, or packaging of the products and services identified under this contract, and the scope of such implied authorization is defined as the use of the Designation
(s) in performance under such contract by the prime contractor and its subcontractors and suppliers at any tier. In all other cases, the scope of the authorization will be defined by the Government in writing.
(b) The contractor shall notify the contracting officer at least 30 days before asserting rights in, or filing an application to register, any one of the Designation(s) in any jurisdiction within the United States. Any such notification shall be in writing and shall identify the Designation(s) (including the word(s), name, symbol, or design), provide a statement as to its intended use(s) in commerce, and list the particular classes of goods or services in which registration will be sought.
(End of Text)
C-233-H001 DOCUMENTATION OF REQUESTS FOR EQUITABLE ADJUSTMENT--BASIC
(NAVSEA) (OCT 2018)
(Oct 2018)
(a) For the purposes of this special contract requirement, the term "change" includes not only a change that is made pursuant to a written order designated as a "change order" but also (1) an engineering change proposed by the Government or by the Contractor and (2) any act or omission to act on the part of the Government in respect of which a request is made for equitable adjustment.
(b) Whenever the Contractor requests or proposes an equitable adjustment of $100,000 or more per vessel in respect to a change made pursuant to a written order designated as a "change order" or in respect to a proposed engineering change and whenever the Contractor requests an equitable adjustment in any amount in respect to any other act or omission to act on the part of the Government, the proposal supporting such request shall contain the following information for each individual item or element of the request:
(1) A description (i) of the work required by the contract before the change, which has been deleted by the change, and (ii) of the work deleted by the change which already has been completed. The description is to include a list of components, equipment, and other identifiable property involved. Also, the status of manufacture, procurement, or installation of such property is to be indicated. Separate description is to be furnished for design and production work. Items of raw material, purchased parts, components and other identifiable hardware, which are made excess by the change and which are not to be retained by the Contractor, are to be listed for later disposition;
(2) Description of work necessary to undo work already completed which has been deleted by the change;
(3) Description of work not required by the terms hereof before the change, which is substituted or added by the change. A list of components and equipment (not bulk materials or items) involved should be included. Separate descriptions are to be furnished for design work and production work;
(4) Description of interference and inefficiencies in performing the change;
(5) Description of each element of disruption and exactly how work has been, or will be disrupted:
(i) The calendar period of time during which disruption occurred, or will occur;
(ii) Area(s) aboard the vessel where disruption occurred, or will occur;
(iii) Trade(s) disrupted, with a breakdown of manhours for each trade;
(iv) Scheduling of trades before, during, and after period of disruption;
(v) Description of measures taken to lessen the disruptive effect of the change;
(6) Delay in delivery attributable solely to the change;
(7) Other work attributable to the change;
(8) Supplementing the foregoing, a narrative statement of the direct "causal" relationship between any alleged Government act or omission and the claimed consequences therefor, crossreferenced to the detailed information provided as required above;
and
(9) A statement setting forth a comparative enumeration of the amounts "budgeted" for the cost elements, including the material costs, labor hours and pertinent indirect costs, estimated by the Contractor in preparing its initial and ultimate proposal
(s) for this contract, and the amounts claimed to have been incurred and/or projected to be incurred corresponding to each such "budgeted cost" elements.
(c) Each proposal in excess of $100,000 submitted in support of a claim for equitable adjustment under any requirement of this contract shall, in addition to the information required by paragraph (b) hereof, contain such information as the Contracting Officer may require with respect to each individual claim item.
(d) It is recognized that individual claims for equitable adjustment may not include all of the factors listed in paragraph (b) above. Accordingly, the Contractor is required to set forth in its proposal information only with respect to those factors which are comprehended in the individual claim for equitable adjustment. In any event, the information furnished hereunder shall be in sufficient detail to permit the Contracting Officer to cross-reference the claimed increased costs, or delay in delivery, or both, as appropriate, submitted pursuant to paragraph (c) of this requirement, with the information submitted pursuant to paragraph (b) hereof.
(End of Text)
C-242-H001 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (OCT 2018) (Oct 2018)
(a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $1,000 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.
(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.
(End of Text)
C-247-H001 PERMITS AND RESPONSIBILITIES (NAVSEA) (DEC 2018) (Dec 2018)
The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits for complying with any applicable Federal, State, and Municipal laws, codes, and regulations for shipping and transportation including, but not limited to, any movement over public highways of overweight/over dimensional materials.
(End of Text)
Section D - Packaging and Marking
Additional Regulation or Supplemental Clauses Incorporated by Full Text
D-247-H002 PACKAGING OF SUPPLIES—BASIC (NAVSEA) (DEC 2020) (Dec 2020)
Item(s) 0001-0029 The supplies furnished hereunder shall be packaged in accordance with ASTM-D-3951-18, Standard Practice for Commercial Packing.
(End of Text)
D-247-H004 MARKING AND PACKING LIST(S) – BASIC (NAVSEA) (FEB 2022) (Feb 2022)
(a) . Shipments, shipping containers and palletized unit loads shall be marked in accordance with ASTM-D-3951-18 approved 1 May 2018, Marking Standard Practice for Commercial Packing.
(b) . A packing list (DD Form 250 Material Inspection and Receiving Report may be used) identifying the contents of each shipment, Packing List(s) shipping container or palletized unit load shall be provided by the Contractor with each shipment. When a contract line item identified under a single stock number includes an assortment of related items such as kit or set components, detached parts or accessories, installation hardware or material, the packing list(s) shall identify the assorted items. Where assortment of related items is included in the shipping container, a packing list identifying the contents shall be furnished.
(c) . In addition to the requirements in paragraph (b) above, a master packing list shall be prepared where more than one Master Packing List shipment, shipping container or palletized unit load comprise the contract line item being shipped. The master packing list shall be attached to the number one container and so identified.
(d) . All items within the kit, set, installation hardware or material shall be suitably segregated and identified within the unit packPart Identification
(s) or shipping container by part number and/or national stock number.
(End of Text)
Section E - Inspection and Acceptance
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.246-2 Inspection of Supplies-Fixed-Price. Aug 1996 52.246-4 Inspection of Services-Fixed-Price. Aug 1996
Additional Regulation or Supplemental Clauses Incorporated by Full Text
E-246-H014 INSPECTION AND ACCEPTANCE OF ENGINEERING SERVICES (NAVSEA) (OCT
2018)
(Oct 2018)
Item(s) 0030 - Inspection and acceptance shall be made by the Contracting Officer's Representative (COR) or a designated representative of the Government.
(End of Text)
Overall Contract Inspection/Acceptance Locations
Inspection and Acceptance Location
Both Destination Instructions: Contact TPOC upon delivery
DoDAAC: N64498 CountryCode: USA
NSWC PHILADELPHIA DIV
1601 LANGLEY AVE BUILDING 542, PHILADELPHIA PA 19112
PHILADELPHIA, PA 19112
UNITED STATES
Alicia St. John, TPOC Email: alicia.stjohn1@navy.mil
Inspection and Acceptance Location
Both Destination Instructions: Contact TPOC upon delivery
DoDAAC: N64498 CountryCode: USA
NSWC PHILADELPHIA DIV
1601 LANGLEY AVE BUILDING 542, PHILADELPHIA PA 19112
PHILADELPHIA, PA 19112
UNITED STATES
Alicia St. John, TPOC Email: alicia.stjohn1@navy.mil
Inspection and Acceptance Location
Both Destination Instructions: Contact TPOC upon delivery
DoDAAC: N64498 CountryCode: USA
NSWC PHILADELPHIA DIV
1601 LANGLEY AVE BUILDING 542, PHILADELPHIA PA 19112
PHILADELPHIA, PA 19112
UNITED STATES
Alicia St. John, TPOC Email: alicia.stjohn1@navy.mil
Inspection and Acceptance Location
Both Destination Instructions: Contact TPOC upon delivery
DoDAAC: N64498 CountryCode: USA
NSWC PHILADELPHIA DIV
1601 LANGLEY AVE BUILDING 542, PHILADELPHIA PA 19112
PHILADELPHIA, PA 19112
UNITED STATES
Alicia St. John, TPOC Email: alicia.stjohn1@navy.mil
Inspection and Acceptance Location
Both Destination Instructions: Contact TPOC upon delivery
DoDAAC: N64498 CountryCode: USA
NSWC PHILADELPHIA DIV
1601 LANGLEY AVE BUILDING 542, PHILADELPHIA PA 19112
PHILADELPHIA, PA 19112
UNITED STATES
Alicia St. John, TPOC Email: alicia.stjohn1@navy.mil
Inspection and Acceptance Location
Both Destination Instructions: Contact TPOC upon delivery
DoDAAC: N64498 CountryCode: USA
NSWC PHILADELPHIA DIV
1601 LANGLEY AVE BUILDING 542, PHILADELPHIA PA 19112
PHILADELPHIA, PA 19112
UNITED STATES
Alicia St. John, TPOC Email: alicia.stjohn1@navy.mil
Inspection and Acceptance Location
Both Destination Instructions: Contact TPOC upon delivery
DoDAAC: N64498 CountryCode: USA
PHILADELPHIA, PA 19112
UNITED STATES
Alicia St. John, TPOC Email: alicia.stjohn1@navy.mil
Inspection and Acceptance Location
Both Destination Instructions: Contact TPOC upon delivery
DoDAAC: N64498 CountryCode: USA
NSWC PHILADELPHIA DIV
1601 LANGLEY AVE BUILDING 542, PHILADELPHIA PA 19112
PHILADELPHIA, PA 19112
UNITED STATES
Alicia St. John, TPOC Email: alicia.stjohn1@navy.mil
Inspection and Acceptance Location
Both Destination Instructions: Contact TPOC upon delivery
DoDAAC: N64498 CountryCode: USA
NSWC PHILADELPHIA DIV
1601 LANGLEY AVE BUILDING 542, PHILADELPHIA PA 19112
PHILADELPHIA, PA 19112
UNITED STATES
Alicia St. John, TPOC Email: alicia.stjohn1@navy.mil
Inspection and Acceptance Location
Both Destination Instructions: Contact TPOC upon delivery
DoDAAC: N64498 CountryCode: USA
NSWC PHILADELPHIA DIV
1601 LANGLEY AVE BUILDING 542, PHILADELPHIA PA 19112
PHILADELPHIA, PA 19112
UNITED…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .