RFQ - Regional Biosolids Feasibility Study (with CFPUA) - Clean Final for Advertisement (1).pdf
PDF 503 KB Posted
- Attached to
- RFQ: Regional Biosolids – Feasibility Study
- Solicitation number
- 299-297-41
- Issued by
- Brunswick County, North Carolina
About this file
This Request for Qualifications (RFQ) involves Brunswick County and the Cape Fear Public Utility Authority (CFPUA) seeking qualified professional engineering firms to conduct a Regional Biosolids Feasibility Study. The study will evaluate the feasibility of a jointly-owned and publicly-operated regional biosolids management facility serving Brunswick and surrounding counties in southeastern North Carolina. The services requested include comprehensive engineering analysis to identify and evaluate alternatives for long-term regional biosolids management, including assessment of current biosolids production across multiple wastewater and water treatment plants, market analysis for biosolids products, regulatory evaluation, technology screening, site requirements analysis, and development of preliminary alternatives with cost estimates. An optional pre-response meeting is scheduled for June 17, 2026, at 2:00 PM ET at 250 Grey Water Road, Supply, NC 28462. Statements of Qualifications must be submitted by July 2, 2026, at 4:30 PM ET in the form of eight hard copies and one electronic copy on USB drive. The contract will be awarded to a single firm selected by a joint committee with equal representation from Brunswick County and CFPUA, with the final contract based on a negotiated lump sum amount inclusive of all expenses.
The selected firm will be compensated on a lump sum basis with no additional reimbursement for permit fees, printing, mileage, or per diem expenses. Brunswick County will serve as the contracting party with overall management responsibility, though the final Scope of Work will be negotiated with the selected firm. Evaluation criteria include the firm's experience with similar projects (20 points), qualifications and accessibility of key personnel (20 points), ability to properly scope and manage the project (20 points), project approach alignment with intent (25 points), and ability to meet established schedules (15 points), for a total of 100 points. The agreement will be governed by North Carolina law and is subject to the Professional Services Agreement provided, which includes standard provisions for independent contractor status, insurance requirements, work product ownership by the County, indemnification, and compliance with E-Verify and workers' compensation requirements. No work shall commence until the agreement is fully executed by both parties.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Regional Biosolids – Feasibility Study
ISSUE DATE: June 1, 2026
DUE DATE: July 2, 2026
BRUNSWICK COUNTY
REQUEST FOR
QUALIFICATIONS
Request for Qualifications Statements
Regional Biosolids Feasibility Study
Brunswick County (the “County”), in consultation with the Cape Fear Public Utility Authority
(“CFPUA”) (together the “Parties” and individually a “Party”), are each engaged in the provision of municipal wastewater treatments to their ratepayers. Each Party currently owns, operates, and maintains reclamation facilities in southeastern North Carolina. Due to rising costs associated with significant population growth in the region, environmental impacts, and the potential for regulatory development, the Parties are jointly committed to finding a best practice for biosolid disposal, reducing both environmental and financial impacts on their ratepayers.
To that end, the County, in consultation with CFPUA, is requesting qualifications statements from qualified professional engineering firms for engineering services necessary to produce a feasibility study evaluating a regional approach to biosolids management, which will be used to objectively and rationally analyze whether the development of a jointly- and publicly-owned and publicly-operated regional biosolids facility is favorable, based on known details, estimates, strengths, and weaknesses of the potential future project.
Services will include, but not be limited to, professional engineering services in support of a feasibility study to identify and evaluate alternatives for a long-term regional management of biosolids in Brunswick and surrounding counties.
A more detailed description of the work to be performed is contained in the enclosed Scope of
Work. Firms submitting a Statement of Qualifications should use the enclosed Scope of Work as a guide but may develop their own scope based upon their experiences on similar projects. The
County will be the owner and contracting party of the contract with the awarded firm and shall have overall management responsibility under the awarded contract. The County will negotiate and refine a final Scope of Work with the selected firm. The firm’s final contract shall be based on a lump sum amount, inclusive of permit application fees and other expenses (printing, mileage, per diem, etc.). No additional compensation shall be made for reimbursable items.
Firms interested in being considered for this work should submit their Statement of
Qualifications to:
Post Office Delivery Hand Delivery or Alternate Shipping Service
Brunswick County Public Utilities Brunswick County Public Utilities
Attention: Robert Miller, PE Attention: Robert Miller, PE
250 Grey Water Road NE P. O. Box 249
Supply, NC 28462 Bolivia, NC 28422
(910) 253-1759
For consideration, eight (8) hard copies and one (1) electronic copy on a USB drive of the response to this Request for Qualifications must be received by the County by 4:30 PM ET on
July 2, 2026. Brunswick County will not be responsible for the failure of any mail or delivery service to deliver responses prior to the stated date and time. Regardless of the manner of submission, any response received after the stated date and time will not be considered.
Incomplete responses or responses inconsistent with the required format may be disqualified from consideration.
Statements of Qualifications shall be limited to twenty-five (25) pages (excluding resumes) with a minimum font size of 11 points.
Sections shall be divided by tabs that indicate the title of each section. At a minimum, the qualifications statement should include the following information:
1) The company’s full legal name, state of organization or incorporation, primary office location, office location of project personnel, years of experience, and a contact person.
2) Qualifications of the employees who will be assigned to the project. The project manager and other key team members should be clearly identified. If subcontractors are to be used for any portion of the work, they should be identified, and their qualifications included.
Brunswick County reserves the right to reject any subcontractors in its sole and absolute discretion.
a) The qualifications statement shall clearly indicate who will oversee the project as well as the roles that each individual shall perform.
b) Special emphasis shall be provided on the individuals’ backgrounds, qualifications, certifications, and experience on related and or similar projects.
3) Experience on at least three (3) similar projects. The qualifications statement should include a description and contact person for projects that were similar in size and scope as this project.
a) For each project experience listed, list the role played by each of the current team members.
4) A project schedule including key milestones should be included. The project schedule should start from the Notice to Proceed and include two-week review times for County staff reviews. A project schedule will be included in the contract for this work.
5) A brief description of the project approach to be used by the firm should be included.
a) In the firm’s own words, describe the understanding of the project, the requirements of the project, the challenges associated with the project, the approach to handling any project challenges, and the anticipated outcome of the project.
b) List all assumptions made in preparing the project approach.
c) Discuss any additions, deletions, or changes to the Scope of Work which may improve the project. Discuss how these changes will affect the associated resources and schedule.
6) A brief discussion of the firm’s ability to properly scope the project should be included.
This includes an estimate of man-hours required to complete the various components of the project. Man-hour estimates should be broken down by tasks with separate columns for labor classifications. Each task shall be subtotaled in addition to project totals.
Brunswick County reserves the right to request financial information for any firm in order to support the viability of the firm.
Brunswick County reserves the right to refuse or reject any or all qualifications and to waive any and all formalities, irregularities, or technicalities. Brunswick County reserves the right to select the firm that best meets its needs and negotiate a final Scope of Work that reflects the work to be done and the budget constraints. Based upon the number of qualifications statements received, the County may subsequently request oral presentations as a part of the selection process. All firms submitting a Statement of Qualifications will receive notification once the contract has been awarded.
Selection of a firm will be by committee, which committee shall be made up of an equal number of representatives from the County and CFPUA. The committee shall evaluate Statements of
Qualifications on the firm’s ability to meet the requirements of this Request for Qualifications.
Evaluation criteria will include, without limitation:
1. The firm’s experience in providing similar services for similar projects.
2. Qualifications and accessibility of key individuals identified in the qualifications statement that will be assigned to the project.
3. Ability to properly scope the project and the capability of the firm to manage the work.
4. Ability to provide a project approach that best meets the project intent.
5. Ability to meet established schedules.
Qualifications Selection Criteria Qualifications Selection
Criteria Weighting
Max Points
The firm’s experience in providing similar services for similar projects
Qualifications and accessibility of key individuals identified in the qualifications statement that will be assigned to the project
Ability to properly scope the project and the capability of the firm to manage the work
Ability to provide a project approach that best meets the project intent
Ability to meet established schedules 15
Total Points 100
Neither Brunswick County nor CFPUA will be responsible for any costs or expenses incurred by any firm in submitting a Statement of Qualifications. Brunswick County reserves the right to cancel the work described herein prior to the issuance and acceptance of any contractual agreement even if the Board of Commissioners has formally accepted the recommendation.
In addition to the terms and conditions contained in this Request for Qualifications, by submitting a Statement of Qualifications, if selected, the firm agrees to enter into and be bound by the provisions of a Professional Services Agreement in substantially the form attached hereto and incorporated herein by reference. To the extent that any of the terms of this Request for
Qualifications and the terms of the Professional Services Agreement conflict, the terms of the
Professional Services Agreement shall prevail. No work shall commence until an agreement has been fully executed by the parties.
An optional pre-response meeting is scheduled for Wednesday, June 17, 2026, at 2:00 PM ET.
The pre-response meeting will be held at 250 Grey Water Road, Supply, NC 28462.
Any questions or comments shall be submitted in writing to Robert Miller, PE at robert.miller@brunswickcountync.gov by 4:00 PM ET on June 24, 2026. A copy of all questions, further clarifications, and answers will be made in the form of an addendum to this
Request for Qualifications and will be provided to all known interested firms. Any addendum will also be posted to the County website. Notwithstanding the forgoing, firms will be responsible for ensuring that they have all addenda.
Interested firms are expressly prohibited from contacting any Brunswick County official or employee regarding this Request for Qualifications, except in the manner noted in this section. A violation of this provision is grounds for the immediate disqualification of the firm.
Certification
The firm submitting a Statement of Qualifications hereby certifies that it has carefully examined this Request for Qualifications and all attachments hereto, including, without limitation, the Professional Services Agreement. The firm submitting the Statement of
Qualifications further certifies that it understands and accepts all terms and conditions contained in the Request for Qualifications, including, without limitation, the Professional
Services Agreement, and the scope of work, and that it has knowledge and expertise to complete the project. By submitting a Statement of Qualifications, the firm further certifies that its submittal is fair in all respects and without collusion or fraud.
SCOPE OF WORK
Regional Biosolids Feasibility Study
1. BACKGROUND
Brunswick County Public Utilities and Cape Fear Public Utility Authority are seeking to evaluate the feasibility of a regional approach to biosolids management in Brunswick and
New Hanover counties (Phase I). If the Phase I Feasibility Study deems that a regional approach is a viable approach to the management of the Parties’ biosolids, the Parties will seek an engineering firm to provide a Preliminary Engineering Study (Phase II) to further evaluate the recommended approach for regional biosolids management.
The study may include additional local and/or regional government utilities/agencies. All partnering agencies own and/or operate wastewater treatment (“WWTP”) and water treatment (“WTP”) facilities. Each Party currently treats and then legally disposes of sewage sludge generated during the treatment of domestic sewage in a treatment works (“biosolids”).
Currently, the primary means of dewatered biosolids end-use for each WWTP/WTP is a combination of landfill disposal, composting, and/or land application.
1.1 Overview of Brunswick County Public Utilities
Brunswick County Public Utilities (“BCPU”) began operating its first WWTP in the late
1990’s to serve the growing community. BCPU now operates six (6) WWTPs with a treatment capacity of 13,355,000 gallons per day (“GPD”). BCPU also operates two (2)
WTPs: the Northwest WTP and the Highway 211 WTP with treatment capacities of twenty-four (24) and six (6) million gallons per day, respectively.
1.2 Overview of Cape Fear Public Utility Authority
Cape Fear Public Utility Authority was established in 2008 through the consolidation of the water and wastewater systems of the City of Wilmington and New Hanover County.
It is governed by an eleven-member board, with appointments made by the Wilmington
City Council and the New Hanover County Board of Commissioners. CFPUA serves more than 200,000 customers and operates two WWTPs—the James A. Loughlin
(Northside) Wastewater Treatment Plant (“NSWWTP”) which is rated at sixteen (16) million gallons per day and the M’Kean Maffitt (Southside) Wastewater Treatment Plant
(“SSWWTP”) which is rated at twelve (12) million gallons per day. Both of these plants collectively receive nearly eighteen (18) million gallons per day. CFPUA also operates two (2) WTPs: the Sweeney Water Treatment Plant and the Richardson Water Treatment
Plant, which provide approximately 20.5 million gallons per day of clean drinking water.
1.4 Biosolids Management Across the Agencies
Table 1 provides an overview of the biosolids management across each of the Parties with further details provided in the section below.
Table 1 – Current Biosolids Production and End Use
Authority Facility Current End Use
Current Biosolids
Production (Dry
Tons Per Year)
BCPU West Brunswick WRF Class A - Land Application
(liquid)
West Brunswick WRF Class B – Landfill (dried cake)
Northeast WWTP Class A - Land Application
(liquid)
Northwest WTP PACl – Land Application
(liquid) / Compost (dried) 1,100
Hwy 211 WTP Lime Sludge – Beneficial
Reuse (dried)
CFPUA NSWWTP
Biological Sludge – Landfill
(dried cake) 2,674
SSWWTP
Biological Sludge – Landfill
(dried cake) 1,061
Sweeney WTP Alum Sludge – Landfill
(dried cake) 1,462
1.3.1 BCPU Biosolids Management Overview
BCPU currently produces an average of 1,000 dry tons of biosolids per year through
Autothermal Thermophilic Aerobic Digestion (“ATAD”) at the West Brunswick
Water Reclamation Facility (“WRF”) and the Northeast WWTP. At this time, nearly all the biosolids produced are transported and land applied in liquid form in
Brunswick County, North Carolina. Occasionally, during emergency conditions, a small portion of Class B biosolids are dried and transported for landfill disposal in
Sampson County, North Carolina. BCPU is currently performing a design-build project at the West Brunswick WRF that will upgrade the current biosolids infrastructure and install two (2) belt filter presses with an expected completion date of December 2027. Upon completion and at current flow rates, BCPU will produce approximately 3,285 dry tons of Class A cake per year at the West Brunswick WRF facility.
BCPU produces an average of 1,100 dry tons of polyaluminumchloride (“PACl”) per year at the Northwest WTP. Approximately 90% of the PACl sludge is liquid land applied on local farms in Brunswick County, North Carolina. The remaining sludge is taken to McGill Composting. If conditions do not allow for land application, the sludge is taken to the landfill in Sampson County, North Carolina. BCPU produces an average of seven (7) dry tons of lime sludge at the Highway 211 WTP. The lime solids are being reused as a beneficial fill, based on solid waste determination, and are being used by a Brunswick County resident.
1.3.2 CFPUA Biosolids Management Overview
CFPUA currently produces an average of 5,197 dry tons of biosolids per year through its facilities. The NSWWTP generates an average of 2,674 dry tons of biological sludge. The SSWWTP generates an average of 1,061 dry tons of biological sludge.
The Sweeney WTP generates an average of 1,462 dry tons of alum sludge. All of the biosolids produced are landfilled at the GFL Environmental Landfill in Sampson
County, North Carolina.
2. STUDY AND REPORT PHASE
2.1 Additional Participants
At the time of this RFQ, the Parties participating in the feasibility study are limited to the
County and CFPUA, as described above. The selected firm will identify other potential agencies (municipal and/or public agency wastewater treatment facilities) within a 50-mile radius of Wilmington, NC who could be a potential participant in a regional biosolids management solution.
The selected firm shall identify and facilitate discussion with additional agencies that may have in interest in joining the regional effort. Consideration shall be given for how the Parties may be reimbursed for the efforts of this feasibility study should an agency join after this study is completed. The selected firm shall include these decisions in a technical memorandum such that future participating agencies may begin the process for joining the regional approach.
2.2 Agency Specific Needs and Challenges
The selected firm shall document each Party’s biosolids-specific goals and policies based on information provided by each Party and/or future participating agency. The selected firm will utilize existing Master Plans or Strategic Plans, when available, to identify potential challenges or needs. If such plans are not available, the selected firm will interview the
Parties and/or future participating agencies to obtain this information. The selected firm shall identify and combine, at a high level, the biosolids management challenges and needs for each Party and/or further participating agencies, such as:
• Current biosolids management costs, including landfill tipping costs, transportation costs, and hauling distances
• Limitations from land application
• Potential future limitations to biosolids beneficial use/disposal strategies
• Biosolids treatment capacity limitations and future expansion requirements
• Regulatory-driven solids process improvement needs
2.3 Case Studies of Regional Biosolids Facilities
The selected firm shall review case studies of other regional biosolids facilities that treat similar quantities and characteristics and present the findings in a technical memorandum that provides a high-level overview of each study facility. This memo should include descriptions of the benefits and concerns associated with each facility including technology used, constructability, sustainability, and operability of similar systems. This memo should also include an evaluation of the technologies utilized at each facility and the associated benefits and concerns.
2.4 Identify Solids Production Processes, Quantities, and Characteristics
Currently, the primary means of dewatered biosolids end-use for each WWTP/WTP is a combination of landfill disposal and/or land application. The Parties shall provide the selected firm with current solids production rates and characteristics. Operating data from each facility shall be provided in electronic form, including but not limited to, influent average daily flow rates (million gallons per day), wet tons of biosolids produced annually, and percentage of total solids.
2.4.1 Evaluate Solids Quantity
a) The Parties and/or future participating agencies shall provide the selected firm with current solids production rates and characteristics. Operating data from each plant shall be provided in electronic form (e.g., Excel spreadsheet) for the following criteria:
• Influent Average Daily Flow Rate (million gallons/day)
• Dewatered cake production information (e.g., dewatered cake total solids, wet cake mass, dry solids mass, etc.)
Wet Tons per Year
Percent Total Solids
Percent Volatile Solids
b) The Parties and/or future participating agencies shall provide the selected firm with future solids production estimates for a 30-year planning period (e.g., 2030 to 2060). For this purpose, an annual growth percentage or projected annual quantitative increase shall be provided by the respective Party and/or future participating agency. This feasibility study will use these unvalidated values provided. Future biosolids production rates can be further evaluated and confirmed/validated during Phase II, including an evaluation of projected influent flows and loads and their corresponding solids production rates.
c) The Parties and/or future participating agencies shall provide the selected firm a summary of their existing residuals dewatering infrastructure at each treatment facility, including dewatered cake performance. The selected firm will summarize the unvalidated values provided.
d) Each Party and/or future participating agency will provide an expected level of usage of the proposed regional facility or facilities as either a percentage of their overall production or as a total weight in dry pounds.
2.4.2 Solids Quality
a) The selected firm will assess available solids quality data and how each facility meets Class B or Class A pathogen removal and vector attraction reduction requirements. The description shall include the following parameters, assuming the information is available and provided by the
Agencies:
• Nutrient concentrations
• Pollutant (i.e., metal) concentrations (per 40 CFR Part 423)
• Pathogen reduction via process or measurement
• Vector attraction reduction via process or land application management
b) The selected firm will evaluate and discuss industry trends in the region for contaminants of emerging concern (PFAS, microplastics, pharmaceuticals, personal care products, flame retardants, pesticides/agricultural products, endocrine disrupting chemicals, etc.) and their potential impact on a regional facility or facilities. The selected firm shall also discuss potential mitigation strategies for the various contaminants as they pertain to a regional facility(ies).
2.5 Document Goals and Objectives
The selected firm shall document each Party’s and/or future participant agency’s biosolids-specific goals and policies based on communication and information provided by the respective parties.
2.6 Determine Specific Challenges and Needs
The selected firm shall identify at a high level, for further evaluation in Phase II, the solids treatment and biosolids management challenges and needs of each facility, such as:
• Current biosolids management costs, including tipping costs, transportation rates, and hauling distances;
• Potential future limitations to biosolids disposal/beneficial use strategies;
• Solids treatment capacity limitations and associated expansion needs;
• Regulatory- or condition-driven solids processing improvement needs;
• Biosolids management portfolio diversification needs; and
• Site-constraints limiting solids treatment expansion.
The selected firm will use existing Master Plans or Strategic Plans, when available, to identify challenges and needs. If such plans are not available, the selected firm will interview the Parties and/or future participating agencies to obtain this information. The selected firm will interview the respective parties providing a Master Plan or Strategic Plan to determine if any changes have developed since the document(s) was/were finalized. A detailed capacity and solids processing improvements assessment and an evaluation of the projected costs will be included in Phase II.
2.7 Identification of site requirements
The selected firm shall work collaboratively with the respective partnering agencies to evaluate the requirements of a future site that is suitably sized for current and full-scale buildout needs, suitable to minimize hauling burden for all respective partnering agencies. At a minimum the selected firm will consider the impacts of the following:
• Acreage required for the recommended technology and full build out of the facility
• Land use of neighboring parcels to minimize impacts from noise, traffic, and odor
• Establish compatible land uses and zoning
• Redundant and flood-resistant means of egress to the transportation grid
• Buildable, dry, and flat available land with low environmental concerns
• Access to utilities including medium voltage electrical, gas lines, water, and sewer
• Neighboring land use – agricultural/institutional/commercial compared to residential
2.8 Current and Future Market and Regulatory Analysis
A sub-optimal level of resiliency exists for many publicly-owned WWTPs with regard to the disposal or end use of biosolids. In many cases, this is the direct result of the frequency and severity of recent disruptions, challenges, and pressures in the legislative, regulatory, market, and labor sectors for dewatered biosolids end uses. Other agencies possess greater levels of resiliency but seek to reduce the overall costs of biosolids hauling or seek to further diversify their biosolids management portfolio to expand yet further on their levels of resiliency.
Regardless of position, the Agencies wish to consider alternative options for the disposal of biosolids in the future that include use of a publicly-owned and publicly-operated facility(ies). All evaluations shall place a greater priority on the improvement of resiliency over cost.
The selected firm shall provide a long-term, high-level potential market analysis for biosolids products specific to the regional process facility’s(ies’) biosolids quantity and type (Class A cake, pellet, or compost; Class B cake, Sub Class B, and ash). The selected firm’s analysis shall include the review and consideration/incorporation (where appropriate) of data and information from recent studies and plans prepared by various agencies. The results of the market analysis are an integral component to confirm the technologies that will create a final product with a stable and sustainable market with consideration for multiple beneficial use channels. This task will begin at the onset of the project.
a) The selected firm shall score end-use markets in accordance with the following criteria:
• Realistic, proven market: The market for a given biosolids product is well established and understood within the region.
• Market size: The market has capacity to absorb biosolids volumes on the scale of the Agencies’ production.
• Source product availability: The market has capacity to provide necessary products for the treatment of biosolids without negatively impacting others in the market space.
• Proven value: The cost associated with managing a given biosolids product in an end-use market.
• Future market capacity: The market is predicted to be stable or expanding over the life of the project.
• Resiliency to changes in the labor or supply chain sectors: The market is expected to withstand challenges from the labor and supply chain sectors.
• Resiliency to regulatory change: The market is expected to provide flexibility for beneficial reuse over the life of the project, based on current regulatory trends in the region.
• Year-round dependability: The market provides a reliable, year-round outlet for the Agencies’ biosolids.
b) Unique alternatives of significance – The selected firm shall identify at a high-level for later evaluation in Phase II any unique alternatives discovered onsite and offsite facility options for manufacturing marketable products while optimizing the use of the respective agencies’ facilities necessary in treating wastewater and other essential requirements. This effort shall be limited to a listing of alternatives discovered during the course of the work.
c) Diversification – The selected firm shall evaluate the potential for a flexible implementation plan for positioning the respective agencies to be able to participate in multiple markets while also considering public perception.
d) Market Analysis– The selected firm will provide a high-level, general market analysis for beneficial use of the end-use products leveraging the selected firm’s recent experience. Identification of specific opportunities, unless already known, is not required. The selected firm will:
• Identify local opportunities that exist for beneficial use in agriculture, blending, distribution, and other specialty markets.
• Identify approaches to eliminate or minimize hurdles to market issues.
• Identify continual and/or opportunistic reclamation opportunities, including:
mines, superfund sites, brownfields, fire damaged land, Salton Sea, etc.
• Define and list promising markets suitable for all products being considered.
• Estimate outside-the-gate expenses and revenues for the end-use products.
2.9 Current and Future Biosolids Management Regulations
In the past several years, agencies have experienced restrictions, disruptions, challenges, and pressures to biosolids end uses in the legislative and regulatory sectors. Amongst these elements are landfill and land application restrictions.
The selected firm shall provide a long-term analysis of the legislative and regulatory sectors as they relate to biosolids management. The selected firm shall identify and evaluate the current and future biosolids management challenges, drivers, opportunities, and trends from areas with relevance to North Carolina considering the following factors:
• Financial
• Environmental (Air, Land, and Water)
• Social (Nuisance issues and Public Perception)
• Regulatory, Legislation, and Legal (Federal, State, and Local)
a) The selected firm shall explore potential regulatory/legal constraints, barriers, and/or hurdles to regional management and approaches to eliminate or minimize hurdles.
Identify regulatory and legislative opportunities for a regional solution.
b) The selected firm shall analyze and provide a discussion of biosolids permitting programs in the region and permitting considerations, including but not limited to hauling, processing, storing, and land-applying biosolids. The selected firm shall consider impacts to existing permits for Class A and Class B products.
c) The selected firm shall provide a high-level regulatory and legislative analysis for beneficial use of the end-use products leveraging the selected firm’s recent experience. The selected firm will:
• Identify existing legislative and regulatory constraints, barriers, and/or hurdles
• Estimate the potential for future legislative and regulatory constraints, barriers, and/or hurdles
• Categorize the existing and potential items based on their risk to any regional facility(ies)
• Identify approaches to eliminate or minimize the constraints, barriers, and/or hurdles for a regional facility(ies)
2.10 Other Regional Efforts
In close cooperation with the respective agencies, the selected firm shall identify and provide background on other regional biosolids efforts (successful, unsuccessful, and those still considering) and lessons learned. Research shall be limited to up to three (3) other publicly-owned or publicly-operated regional biosolids facilities that may be identified. Lessons learned shall be coordinated with the applicable agency.
2.11 Preliminary Alternatives and Options Development
Selection of any eventual technology(ies) and property(ies) would, if the project proceeds, occur in Phase II. The intent of this Task is to identify, screen, and develop potential technologies and locations that will serve as the preliminary items upon which to evaluate further in future phases.
2.12 List of Technology Options
The selected firm will determine potential available technologies and/or management strategies appropriate to produce marketable biosolids products, such as, but not limited to thermal drying, biosolids composting, and/or other biosolids thermal conversion options. Land application of
Class B Biosolids shall also be considered, where allowable. More innovative technologies such as gasification, pyrolysis, hydrothermal liquefaction, etc. shall also be identified with basic information, including, without limitation: state of development (i.e., proof of concept, deployment, etc.); anticipated greenhouse gases emissions, etc. The selected firm shall provide the major benefits and drawbacks of the listed technologies and/or management strategies.
Selection of technology(ies) shall be reserved for Phase II.
2.13 Greenhouse Gas (“GHG”) Emission Consideration
In Phase I of the project, the selected firm shall identify at high level, the GHG emissions to be expected from the various proposed technologies. Carbon sequestration and avoidance of fossil fuel-intense inorganic fertilizer shall be evaluated for land application options. The Parties’ and/or any future participating agency’s goal is to maximize climate benefits from biosolids management. In Phase I, the selected firm shall utilize tools or knowledge in the industry to estimate/quantify GHG emissions from each technology and processing method and from various products generated from technologies. The selected firm will prepare high-level estimates of direct emissions based on emission factors and the assumed biosolids production rates. The high-level estimates should be a best-available estimate of the anticipated carbon footprint for each of the three (3) proposed technologies in the “short list” defined below.
Among the elements that must be considered in a Phase II of the project (not in this Study) will be a detailed estimate of GHG emissions (CO2, CH4, and N2O) resulting from the proposed biosolids management strategies. GHG emissions will need to be assessed in that future effort based upon biosolids conversion through final end use. The selected firm shall include in the preliminary or conceptual plans for Phase II a detailed evaluation of carbon footprint, once technologies and sites are considered more fully.
2.14 North Carolina Permitting Considerations
North Carolina Department of Environmental Quality (“NCDEQ”) processes are very complex and are very site-specific. For these reasons, the actual NCDEQ applications/processes must wait until later phases. The selected firm shall provide general explanations of the various steps, along with a range of possible NCDEQ and/or federal permitting requirements and timelines such that the Parties and any future participating agencies can gain a sense of the potential level of difficulty and involvement in permitting a regional biosolids facility(ies).
2.15 Establish Evaluation Criteria
Identify and evaluate, qualitatively, the elements of importance to the collective Parties and any future participating agencies for biosolids management at a regional facility(ies). Emphasis shall be placed on those criteria that assist the Parties and any future participating agencies in deciding whether to proceed to Phase II. These criteria will be used to rank the technology and site options. These criteria include, but are not limited to:
• Site Evaluation Criteria
Area availability
Minimized hauling burden and associated carbon footprint (i.e., from the agency facilities to the regional facility(ies))
Utility availability (power, water, etc.)
Management of sidestream loads
Social justice concerns and/or potential effects on neighbors (to be evaluated by the community engagement expert)
• Technology and Associated Biosolids Product Evaluation Criteria
• Compatibility with each Parties’ and/or any future participating agencies’ biosolids management goals and policies, including increases in resiliency to problems arising from:
Legislative/regulatory pressure
Labor market pressure (ability to find and retain employees)
Equipment and supply chain pressure
• High-level capital costs (based on costs developed for other facilities, scaled up to the needed capacity)
• High-level O&M and end-use costs (based on O&M costs developed for other facilities, scaled up to the needed capacity, and end-use costs estimated in the market analysis above)
Technology footprint needs
Technology state of development (i.e., number of installations processing biosolids and years of proven operations)
Adaptability of biosolids product to potential future regulations (i.e., PFAS, etc.)
Compatibility of biosolids product with current biosolids market and adaptability to potential future biosolids market changes
Carbon footprint associated with the technology and biosolids hauling and end-use
Minimized hauling burden (i.e., minimized biosolids product volumes, minimized hauling distance from the regional facility(ies) to the end-use site)
Community impacts, such as odors, noise, local air emissions, and truck traffic (to be evaluated in coordination with the community engagement expert)
2.16 Preliminary Technology and Site Screening
The selected firm shall use the evaluation criteria established above to grade/rank the identified technologies and screen them down to no fewer than three (3) alternatives for technology. At a minimum, consideration of the following technologies shall be made (or identified why these cannot be considered):
• Biosolids composting
• Incineration
2.17 Preliminary Biosolids Management Alternatives and Options Development
The selected firm shall develop preliminary design concepts for a regional biosolids facility(ies) that could be developed and implemented.
From the three (3) technologies selected from the screening above, the selected firm shall work with the Parties and any future participating agencies to narrow the technologies using a detailed preliminary screening process to select two (2) highest-ranked options, hereinafter referred to as the “Short List.” The “Short List” shall be preliminary concepts for a facility(ies) that, based upon all known information to date, would provide the best overall balance of increased resiliency and value for the Parties and any future participating agencies.
A high-level capital cost estimate will be developed for each of the two (2) Short List alternatives. Consistent with American Association of Cost Estimators (“AACE”) guidelines for a Class 5 estimate development will be based on a 0% to 2% level of development for the basis of the estimate and accuracy will range from a low end of -20% to -50% (average – 35%) and from a high end of +30% to +100% (average +65%). The alternatives will be compared on a 20-year net present worth (“NPW”) cost basis, including 20-year O&M costs. Given the uncertainty in the biosolids product end-use management cost/revenue assumptions, amongst other variables, a sensitivity analysis shall be performed to look at a range of possible end-use costs/revenues and other variables that may have a significant impact on the estimated costs.
It is assumed that all or most participating agencies will deliver dewatered cake solids from their respective treatment plants to a centralized regional facility(ies) in a suitable form for receiving at a wet cake receiving station. The selected firm shall identify at a high level whether on-site improvements would need to be made at any individual WWTPs to accommodate this requirement. Those on-site improvements shall be identified as prerequisite requirements for any applicable agencies.
2.18 Grant and Loan Funding Opportunities
The selected firm shall determine available local, state, and/or federal grants and/or funding opportunities to finance the regional facility(ies). To the extent applicable, the selected firm shall ensure compliance with all grant regulatory requirements, including the grant award terms and conditions. The selected firm will thoroughly review all essential documents and ensure that all funding obligations associated with any grant are fulfilled throughout the project. The selected firm shall provide all required reports and documentation and ensure compliance as required by any grant.
2.19 Business Case
The selected firm shall generate a business case evaluation that considers and compiles all of the information gathered during the feasibility study. The business case shall evaluate the required capital cost investment (Class 5 estimate), life-cycle cost analysis, and alternative end use markets. The business case should also provide a recommended cost sharing approach based on the planned and future contributions from all partnering agencies.
The selected firm shall consider potential storage options.
The selected firm shall provide a risk analysis and identification of externalities that might become obstacles to success for a jointly owned and/or operated regional biosolids facility.
2.20 Final Phase/Feasibility Study
Upon completion of the preceding Tasks, the selected firm will finalize the Regional Biosolids
Program Feasibility Study Phase I incorporating its preliminary or conceptual plans for the Phase
II Regional Biosolids Facility Program.
An executive summary detailing the findings, conclusions, and recommendations for subsequent actions will be prepared. A draft of the executive summary will be submitted to the Parties and any applicable participating agencies for review and comment prior to inclusion in the final
Regional Biosolids Program Feasibility Study Phase I.
The executive summary will be combined into the draft report and submitted to the Parties and any applicable participating agencies for review. Following the review meeting, comments will be incorporated and the selected firm will submit the Final Regional Biosolids Program
Feasibility Study Phase I to the Parties and any applicable participating agencies.
The final study shall, at a minimum, include the following factors:
• Summary of the current state and outlook of biosolids management for each Party and participating agency.
• Review current and potential market and regulatory requirements, project drivers, roadblocks and other considerations
• Meaningful public engagement and strategic communications
• High level GHG emissions considerations
• Explanation of future NCDEQ documentation and public review process considerations
• Governance and financial engineering considerations
• Identify potential resource recovery aspects
• Preliminary alternatives & options development and feasibility analysis
• Grant and loan funding opportunities
• Preliminary or Conceptual Plans for Phase II
2.21 Stakeholder Discussion and Decisions Workshop
The selected firm will conduct a final review workshop of the findings, conclusions, and recommendations for the feasibility study. The selected firm shall prepare a Microsoft
PowerPoint presentation with printable handouts summarizing the results of the feasibility study.
The target audience shall be governing body members of the Parties and any participating agency. The target speakers shall be staff from the Parties and any participating agency. The targeted delivery time shall be fifteen (15) minutes. The intent will be for staff to present the effort's results and seek guidance on potential participation in Phase II of the project. The product shall include full-color graphic elements suitable for a professional presentation. The selected firm will not be required to be present, in person or remotely, for these meetings.
This task concludes the Phase I Feasibility Assessment.
v11.042025
NORTH CAROLINA PROFESSIONAL SERVICES AGREEMENT
FOR ARCHITECTURAL, ENGINEERING
BRUNSWICK COUNTY AND/OR SURVEYING SERVICES
(Mini-Brooks Act/Qualification Based Selection)
THIS PROFESSIONAL SERVICES AGREEMENT (hereinafter referred to as the
“Agreement”) is made and entered into by and between Brunswick County, a body politic and corporate of the State of North Carolina, (hereinafter referred to as the “County” or “Owner”), party of the first part and {Vendor Name}, (hereinafter referred to as the “Provider”), party of the second part.
WITNESSETH:
1. SERVICES; FEES
The Provider agrees to perform the services (hereinafter referred to as the “Services”) in connection with the project (hereinafter referred to as the “Project”) at the agreed upon fees, all as more fully set forth on Exhibit “A” attached hereto.
Any exhibits or attachments referenced herein are hereby incorporated by reference and made a part of this Agreement. Any conflict between the language in an exhibit or attachment and the main body of this Agreement shall be resolved in favor of the main body of this Agreement.
2. TERM OF AGREEMENT; TIME OF COMPLETION
(1) Term. The term of this Agreement begins one (1) business day after approval by the
Brunswick County Board of Commissioners (the “Effective Date”) and continues in effect until {Expiration Date}, unless extended or sooner terminated as provided for herein or in the General Conditions of the Contract.
(2) Time of Completion. Notwithstanding the foregoing, the Provider shall complete the
Services in accordance with the schedule set forth herein (the “Time of Completion”), unless extended as provided for in the General Conditions of the Contract. No work may commence under this Agreement until the Agreement has been fully executed by both parties.
3. TERMINATION
The County may terminate this Agreement at any time without cause by giving sixty (60) days’ written notice to the Provider. As soon as practicable after receipt of a written notice of termination without cause, the Provider shall submit a statement to the County showing in detail the work performed under this Agreement through the effective date of termination. The County may terminate this Agreement for cause by giving written notice of a breach of the Agreement.
The Provider shall have fifteen (15) days to cure the breach following receipt of the notification.
Failure to cure the breach within the fifteen (15) days shall result in the immediate termination of the Agreement. Notwithstanding the foregoing, the County may terminate this Agreement immediately and without notice to the Provider if the Provider becomes insolvent, makes or has made an assignment for the benefit of creditors, is the subject of proceedings in voluntary or involuntary bankruptcy instituted on behalf of or against the Provider, or has a receiver or trustee appointed for substantially all of its property, or if the Provider allows any final judgment to stand against it unsatisfied for a period of forty-eight (48) hours.
4. BRUNSWICK COUNTY GENERAL CONDITIONS OF THE CONTRACT
This Agreement, in addition to any construction documents prepared hereunder, shall be subject to the Brunswick County, North Carolina General Conditions of the Contract (for construction contracts), unless the County directs otherwise. In the event of a conflict between the
General Conditions of the Contract and this Agreement, this Agreement shall prevail.
5. NONAPPROPRIATION
If the Board of County Commissioners does not appropriate the funding needed by the
County to make payments under this Agreement for a given fiscal year, the County will not be obligated to pay amounts due beyond the end of the last fiscal year for which funds were appropriated. In such event, the County will promptly notify the Provider of the non-appropriation and this Agreement will be terminated at the end of the last fiscal year for which funds were appropriated. No act or omission by the County which is attributable to non-appropriation of funds shall constitute a breach of or default under this Agreement.
6. COMPENSATION
The County agrees to pay fees as specified in Exhibit “A” or as set out above for the
Services satisfactorily performed in accordance with this Agreement. Unless otherwise specified, the Provider shall submit monthly invoices to the County and include detail of all Services delivered or performed under the terms of this Agreement. The County shall pay all undisputed and properly completed invoices within forty-five (45) days of receipt. Notwithstanding the foregoing, the County will not pay late fees on any charges under this Agreement. If the County disputes any portion of the charges on any invoice received from the Provider, the County shall inform the Provider in writing of the disputed charges. Once the dispute has been resolved, the
Provider shall re-invoice the County for the previously disputed charges, and, per any resolution between the County and the Provider, the County shall pay those charges in full at that time. No advance payment shall be made for the Services to be performed by the Provider under this
Agreement.
7. INDEPENDENT CONTRACTOR
Both the County and the Provider agree that the Provider shall act as an independent contractor and shall not represent itself as an agent or employee of the County for any purpose in the performance of its duties under this Agreement. The Provider represents that it has or will secure, at its own expense, all personnel required in performing the Services under this Agreement.
Accordingly, the Provider shall be responsible for payment of all federal, state, and local taxes arising out of its activities in accordance with this Agreement, including, without limitation, federal and state income tax, social security tax, unemployment insurance taxes and any other taxes or business license fees as required. The Provider shall not be entitled to participate in any plans, arrangements, or distributions by the County pertaining to or in connection with any pension, stock, bonus, profit sharing or other benefit extended to County employees.
In the event the Internal Revenue Service should determine that the Provider is, according to Internal Revenue Service guidelines, an employee subject to withholding and social security contributions, then the Provider hereby acknowledges that all payments hereunder are gross payments, and the Provider is responsible for all income taxes and social security payments thereon.
8. OPINIONS OF COST
If applicable, the Provider shall provide opinions of probable construction costs, including but not limited to, designer fees, costs of construction, costs of equipment, furnishings, signage, permit fees and appropriate contingencies, at Project intervals determined by the County. Such opinions of costs shall be representative of the Provider’s best judgment as an experienced and qualified professional generally familiar with the construction industry. The parties acknowledge that actual bids, proposals, and costs may vary from the Provider’s opinions of costs based on the cost of labor, materials, equipment, or services furnished by others, differing methods for determining prices, competitive bidding, or other market conditions. When requested by the
County, the Provider shall participate in rebidding, renegotiation, and design adjustments to the extent such are necessary to reduce Project costs. Such services shall be performed by the Provider without additional compensation.
9. ACCOUNTING RECORDS
The Provider shall maintain accounting records in accordance with generally accepted…