About this file
This document is a Request for Qualifications (RFQ) REDM2526-01 for Continuing Contracts for Construction Management Services in Central Florida, issued by the Department of Management Services (DMS). The RFQ seeks to establish construction management (CM) firms for projects in the Central Florida region, with firms submitting complete proposals for selection. Project assignments will be made by a REDM Project Manager based on factors including availability, expertise, past experience, project location, and qualifications. The document clarifies that once a firm is selected for the Central Florida region, they do not need to reapply for additional regions where they have an office.
The RFQ provides additional key details through a Q&A format, including that bonding will be required per individual project, the Construction Manager (CM) is responsible for obtaining building permits, and there are no specific participation goals for small businesses or minority-owned businesses. Prequalification instructions can be found on the DMS website, and written statements will suffice for certain certifications. Interested firms must submit a complete proposal, with links provided for required documents such as the Contractor Questionnaire and Construction Manager Selection Form. The selection process emphasizes qualifications and will not involve rotation, mini-competitions, or predetermined assignment methods.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTINUING CONTRACTS FOR CONSTRUCTION MANAGEMENT SERVICES
CENTRAL FLORIDA
RFQ REDM2526-01
FAILURE TO FILE A PROTEST WITHIN THE TIME PRESCRIBED IN SECTION 120.57(3), FLORIDA STATUTES, OR FAILURE TO POST THE BOND OR OTHER SECURITY REQUIRED BY LAW WITHIN THE TIME ALLOWED FOR FILING A BOND SHALL CONSTITUTE A WAIVER OF PROCEEDINGS UNDER CHAPTER 120, FLORIDA
STATUTES.
The Department’s responses to timely submitted questions are below.
Question Number Question Response
1.
The link to the Contractor Questionnaire, as well as The Construction Manager Form is not available. Would you be able to supply us with the questionnaire please?
A direct link to the Contractor Questionnaire is accessible at:
https://dms-media.ccplatform.net/content/download/27146/file/C M01%20- %20Contractor%20Questionnaire%20%28Rev%208- 24%29.pdf
A direct link to the Construction Manager Selection Form is accessible at:
https://dms-media.ccplatform.net/content/download/86917/file/PD 24EvaluationSummarySheet- GeneralContractor%26ConstructionManagerSelection.
2.
“NOTE: If a firm is selected for a Continuing Contract for the Central Florida Region, the firm does not need to resubmit qualifications for any other Regions within the State of Florida in which the firm has an office. Selections will be made in accordance with Florida Administrative Code, Rule 60-D-5."
Our firm was recently shortlisted for another region. We have an office in the Central Region. Do we need to submit a full proposal for the Central Region or is there another way we are supposed to submit based off of the note above?
For each submission, a complete proposal is required.
Once a firm is selected in a Region, the firm does not need to apply and be selected for additional Regions.
3.
How will projects be assigned among the awarded CM firms — rotation, qualifications, availability, or mini-competitions?
Projects are assigned to a REDM Project Manager who then selects the Construction Manager. Their selection is based on multiple factors, including availability, expertise, past experience, location of the project, and qualifications.
4.
Are there participation goals or expectations for Small Business, MBE/WBE, or Florida-based subcontractors?
No.
5. Will DMS handle permitting coordination, or is that expected from the CM?
The CM is expected to obtain the building permit, See Article 4 of the Construction Manager Agreement.
Question Number Question Response
6. Will bonding be required per individual project activation, or will a master bond be accepted? Bonding is per individual project.
7.
Please clarify where we can find the prequalification form that needs to be included in the response.
The instructions for prequalification may be found at:
https://www.dms.myflorida.com/business_operations/r eal_estate_development_and_management/bureau_of_ building_construction/forms_and_documents under Documents, “DMS Prequalification Instructions to Submit Bid”.
8.
In reference to Section 9, Questions 8 and 9, is there a specific certification form that we are required to complete, or would a written statement suffice? If a form is required, could you please advise where it can be accessed?
A written statement for each certification will suffice.