RFQ REDM2324-11 Final Results vip.pdf
PDF 134 KB Posted
- Attached to
- Architectural/Engineering Services for Hurston Building North and South Design Chiller Replacement
- Solicitation number
- ITB-07872
- Issued by
- Orange County, Florida
About this file
This document is a public announcement from the State of Florida Department of Management Services, Division of Real Estate Development and Management, regarding a request for qualifications (RFQ) for architectural and engineering services for the Hurston Building North and South, Design Chiller Replacement project in Orlando, Florida. The Department has recommended OCI Associates, LLC as the number one firm, with McKim & Creed, Inc., SGM Engineering, Inc., and VoltAir Consulting Engineers, Inc. listed as the next highest ranked firms. The contract will be awarded to the top-ranked firm if the Department is able to negotiate a satisfactory contract at a fair, competitive, and reasonable price. The RFQ provided details on the project location, number, and the protest process.
The document does not provide information on pricing terms, set asides, incumbents, current environment, funding requirements and sources, or other salient commercial details. It focuses on the RFQ process and the recommended firms.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA, DEPARTMENT OF MANAGEMENT SERVICES,
DIVISION OF REAL ESTATE DEVELOPMENT AND MANAGEMENT
PUBLIC ANNOUNCEMENT FOR ARCHITECTURAL & ENGINEERING SERVICES FOR
HURSTON BUILDING NORTH AND SOUTH, DESIGN CHILLER REPLACEMENT
April 23, 2024
RFQ NUMBER: RFQ-REDM2324-11
PROJECT NUMBER: MSFM – 02309390
PROJECT NAME: Architectural/Engineering Services – Hurston Building North and South, Design Chiller Replacement PROJECT LOCATION: Orlando, Florida
The Department of Management Services, Division of Real Estate Development and Management, has recommended the approval of the firm listed below as number one (1). The Secretary, Department of Management Services, State of Florida will consider this recommendation after expiration of the seventy-two (72) hour notice. Should the Department be unable to negotiate a satisfactory contract with the number one (1) firm selected, at a price the Department determines to be fair, competitive, and reasonable, negotiations with that firm will be formally terminated and the Department will undertake negotiations with the firm listed as number two (2) and so on. Failure to file a protest within the time prescribed in Section 120.57 (3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120, Florida Statutes.
1. OCI Associates, LLC; Maitland, Florida
2. McKim & Creed, Inc.; Winter Park, Florida
3. SGM Engineering, Inc.; Orlando, Florida
4. VoltAir Consulting Engineers, Inc.; Orlando, Florida
Any protest concerning this agency decision or intended decision must be timely filed with the Agency Clerk. Protests may be filed by courier, hand delivery, or U.S. mail at Department of Management Services, Office of the General Counsel, Attention: Agency Clerk, 4050 Esplanade Way, Suite 160, Tallahassee, FL 32399-0950. Protests may also be filed by fax at 850-922-6312 or by email at agencyclerk@dms.myflorida.com. It is the filing party’s responsibility to meet all filing deadlines.
mailto:agencyclerk@dms.myflorida.com
File details come from the government source that posted it. Updated .