This Request for Qualifications (RFQ) is issued by the Town of Leesburg, Virginia for construction pre-qualification of general contractors for the Leesburg Executive Airport Air Traffic Control Tower project. The project involves construction of an approximately 85-foot-tall, 5-story air traffic control tower with an 8-sided cab, steel structure, composite concrete floors, concrete mat slab foundation, passenger elevator, egress stair, and equipment for four air traffic controller positions. The tower includes mechanical systems (air-cooled heat pump with supplemental natural gas boiler), a 250-kilowatt natural gas generator, 30-kilowatt UPS with backup batteries, fire protection (wet system with fire pump and sprinkler riser/standpipe), electronic access control, intercom systems, camera systems, and telecommunications infrastructure to support FAA connectivity. The question deadline is Friday, November 6, 2026 at 2:00 p.m. local time, and the submittal due date is Monday, November 23, 2026 at 2:00 p.m. local time via the Commonwealth's eProcurement website (eVA). Interested contractors must complete and submit an Application for Construction Pre-Qualification, Qualification Statement and Questionnaire, and Submittal Protection Disclosure Form through eVA. Only general contractors (prime/main contractors) are required to prequalify; subcontractors are not. Only pre-qualified contractors will be eligible to submit bids.
Pre-qualification evaluation criteria include financial ability to obtain required bid, payment, and performance bonds; appropriate construction experience; absence of judgment history for breach of contracts within ten years; satisfactory prior performance on governmental and nongovernmental construction contracts; absence of criminal convictions related to construction or contracting within ten years; and current non-debarred status. Contractors must demonstrate "appropriate experience" by describing at minimum three separate projects that collectively evidence successful completion of: at least one steel structure project three or more stories tall within ten years; at least one project with minimum $15 million construction budget within ten years; at least one airport facility, government facility, or data center project within ten years; at least one project with International Building Code risk category IV classification within ten years; at least one project with backup generator installation within ten years; at least one project with heat pump mechanical system within ten years; and within five years, projects involving Building Automation System integration, HVAC controls commissioning (including test and balancing, functional performance testing, and commissioning support), and Building Information Modeling-based coordination. Project descriptions must include final construction cost, quality control program documentation, actual and contractual completion dates, major subcontractors, project manager and superintendent names, and current contact information for architect and owner references. If fewer than three pre-qualified contractors result, the Town reserves the right to cancel the pre-qualification process and issue an Invitation for Bid with minimum qualifications instead. No pricing information or contract award amounts are specified in this pre-qualification phase.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rev 3/4/25 Page 1 of 20
REQUEST FOR QUALIFICATIONS (RFQ)
PRE-QUALIFICATION FOR CONSTRUCTION
LEESBURG EXECUTIVE AIRPORT
AIR TRAFFIC CONTROL TOWER
ISSUE DATE: October 26, 2026
RFQ NO.: 320830-FY27-15
QUESTION DEADLINE: Friday, November 6, 2026 at 2:00 pm (local time)
SUBMITTAL DUE DATE: Monday, November 23, 2026 at 2:00 pm (local time)
DELIVERY ADDRESS: Commonwealth’s eProcurement website www.eva.virginia.gov
PROCUREMENT CONTACT: David A. Christianson, CPPB, VCA Deputy Procurement Officer Phone: 703-771-2711
Email: bidquestions@leesburgva.gov
NOTE: Effective January 1, 2021, and until further notice, all submittals in response to a formal solicitation issued by the Town will be securely received via eVA, the Commonwealth’s eProcurement website. All formal solicitations, including notices of addenda, will be posted on the Town’s Bid Board (http://www.leesburgva.gov/bidboard) and eVA (www.eva.virginia.gov).
Courtesy notifications will be provided to interested parties who have registered to receive updates.
Interested parties are responsible for providing the correct contact information to the Town.
Rev 3/4/25 Page 2 of 20
TABLE OF CONTENTS
SECTION & TITLE PAGE
INVITATION TO PRE-QUALIFY TO BID ............................................................. Page 3
INSTRUCTIONS TO CONTRACTORS ................................................................... Page 8
APPLICATION FOR CONSTRUCTION PRE-QUALIFICATION ....................... Page 13
QUALIFICATION STATEMENT AND QUESTIONNAIRE .............................. Page 14
SUBMITTAL PROTECTION DISCLOSURE FORM ........................................... Page 19
REFERENCE MATERIALS .................................................................................. Page 20
Rev 3/4/25 Page 3 of 20
INVITATION TO PRE-QUALIFY TO BID
LEESBURG EXECUTIV AIRPORT
AIR TRAFFIC CONTROL TOWER
Contractors interested in submitting construction bids on the above-referenced construction project for the Town of Leesburg, Virginia are invited to prequalify to bid. The pre-qualification process will be conducted in accordance with Virginia Code §2.2-4317, the Town’s Procurement Policies and Procedures Manual, and the instructions set forth in this RFQ.
I. Purpose
The purpose of this pre-qualification process is to provide the Town with a means to determine which General Contractors are qualified to participate in bidding for construction of the project.
The project is generally defined in Section IX below.
II. Pre-Qualification for General Contractors
General Contractors (Prime/Main Contractors) are the only Contractors required to prequalify to bid for this construction project. Subcontractors are not required to pre-qualify. Only General Contractors will be considered for this pre-qualification process. “Contractors” as used herein refers to General Contractors.
Only those Contractors who are notified to be qualified will be eligible to submit a bid for the construction project.
III. Submittal Instructions
Contractors are to complete and submit the following documents contained in this RFQ:
1) Application for Construction Pre-Qualification;
2) Qualification Statement and Questionnaire;
3) Submittal Protection Disclosure Form;
4) Contractor’s informational or marketing brochure, if available.
Submittals that are incomplete or illegible, may be rejected at the sole discretion of the Town.
Determination of completeness or legibility will be at the sole discretion of the Town.
Contractors are to submit the above-mentioned documents through the Commonwealth’s eProcurement website (www.eva.virginia.gov) prior to the submittal deadline delineated in this RFQ or as amended via any subsequent addenda issued by the Town. One (1) electronic copy of the complete submittal, and one (1) electronic copy with any trade secret, confidential, or proprietary information redacted are to be submitted. Submittals are to use the following naming convention: the RFQ number and the name of the Contractor (i.e. RFQ No. 320830-FY27-15 - Your Company’s Name).
Late submittals will not be accepted. Submittals via any method other than eVA website will not be accepted. Contractors assume full responsibility for the electronic delivery of the completed
Rev 3/4/25 Page 4 of 20 submittal to www.eva.virginia.gov on or before the deadline for submission. The Town is not responsible for any loss or delay with respect to the submission.
NOTE: eVA will not allow a Contractor to upload documents after the deadline set for receipt of submittals. Any submittal partially uploaded at the deadline date and time may be considered incomplete and may not be accepted.
eVA streamlines and automates government purchasing activities in the Commonwealth. The eVA portal is the gateway for vendors to conduct business with state agencies and public bodies.
Contractors desiring to provide goods and/or services to the Town must be a registered vendor in eVA. eVA Vendor Registration is free.
On the eVA website (www.eva.virginia.gov), Contractors must login as a vendor using their eVA username and password. Please contact eVA Customer Care for instructions and/or assistance in registering to become a vendor, login, and/or uploading documents. eVA Customer Care:
Hours: 8:00 AM to 4:45 PM, Monday through Friday Phone Toll Free: 866-289-7367
Email: eVACustomerCare@DGS.Virginia.gov
IV. Questions
Unless otherwise instructed, the Procurement Contact is the sole point of contact for questions concerning this RFQ. Questions concerning this RFQ must be made in writing to the Procurement Contact listed on the cover page of this RFQ. Questions must be received by date and time specified on the cover page of this RFQ.
An addendum responding to all questions received by the deadline will be made available no later than five (5) business days before the submittal due date. All addenda will be posted on the Town’s website. Verbal instructions are not binding and will not form a part of the submittal document. It is the Contractor’s responsibility to obtain all addenda from the Town’s website:
http://www.leesburgva.gov/bidboard
V. Addenda
The Town reserves the right to issue Addenda modifying any aspect of this RFQ. No clarifications, alterations, or changes to this RFQ are valid unless issued by the Town via Addenda. The Town will post addenda on the Town’s Bid Board (http://www.leesburgva.gov/bidboard) and eVA (www.eva.virginia.gov).
VI. Submittal Protection and Disposition
All submittals in response to this RFQ will be open to inspection by any citizen, or interested person, firm or corporation, in accordance with the Virginia Freedom of Information Act. Trade secrets or proprietary information submitted by a firm prior to or as part of its submittal will not be subject to public disclosure under the Virginia Freedom of Information Act only under the following circumstances: (1) the appropriate information is clearly identified by some distinct method such as highlighting or underlining; (2) only the specific words, figures, or paragraphs that constitute trade secrets or proprietary information are identified; and (3) a
Rev 3/4/25 Page 5 of 20 summary page is supplied immediately following the submittal title page that includes (a) the information to be protected, (b) the section(s)/page number(s) where this information is found in the submittal, and (c) a statement why protection is necessary for each section listed. The firm must also provide a separate electronic copy of the submittal with the trade secrets and/or proprietary information redacted. Unless all of these requirements are met, the firm’s entire submittal will be available for public inspection.
IMPORTANT:
A FIRM MAY NOT REQUEST THAT ITS ENTIRE SUBMITTAL TREATED AS A
TRADE SECRET OR PROPRIETARY INFORMATION, OR OTHERWISE BE
DEEMED CONFIDENTIAL. PURSUANT TO VIRGINIA CODE § 2.2-4342(F),
REDACTIONS THAT ATTEMPT TO PROTECT ENTIRE PAGES OF A SUBMITTAL
AND/OR PRICING ARE NOT ACCEPTABLE. IF A PUBLIC ENTITY IS
REFERENCED, THE PUBLIC ENTITY AND ASSOCIATED CONTACT
INFORMATION MUST REMAIN UNREDACTED. ADDITIONALLY, ANY
REFERENCES TO PUBLICLY-AVAILABLE INFORMATION MUST REMAIN
UNREDACTED.
THE TOWN IS NOT BOUND BY THE FIRM’S DESIGNATION OF ANY
INFORMATION AS A “TRADE SECRET,” “PROPRIETARY,” OR
“CONFIDENTIAL.” THE TOWN WILL MAKE THE FINAL DETERMINATION
REGARDING THE CHARACTERIZATION AND EXEMPT STATUS OF ALL
INFORMATION. ABSENT A SPECIFIC PROVISION OF LAW THAT ALLOWS
INFORMATION TO BE WITHHELD, THE TOWN WILL DISCLOSE THE
INFORMATION REGARDLESS OF ANY SUCH FIRM DESIGNATION. AS A
COURTESY, THE TOWN MAY NOTIFY THE FIRM OF DESIGNATIONS DEEMED
IMPROPER; HOWEVER, THE TOWN IS UNDER NO OBLIGATION TO DO SO.
All materials submitted in response to this RFQ will become the property of the Town. One (1) copy of each submittal shall be retained for official files and will become a public record. Unless submittal protection is properly invoked, these records will be available for public inspection. It is understood that the submittal will become a part of the official file on this matter without obligation on the part of the Town.
In compliance with the Town’s Procurement Policies, all submittals will be available for public inspection. Trade secrets and proprietary information submitted by a firm in connection with the RFQ shall not be subject to public disclosure under the Virginia Freedom of Information Act.
However, the firm must invoke the protection of this section before or upon submission of the data or other materials, and must identify the specific area or scope of data or other materials to be protected and state the reasons why protection is necessary. An all-inclusive statement that the entire submittal is proprietary is unacceptable. A statement that any cost information is to be protected is unacceptable.
VII. Expenses Incurred in Preparing Submittal
Contractor is solely responsible for all expenses incurred in the preparation and submission of a submittal. The Town accepts no responsibility for any expense incurred.
Rev 3/4/25 Page 6 of 20
VIII. Cancellation, Waiver of Informalities, and Requests for Additional Information
The Town reserves the right to cancel this RFQ at its sole discretion if the Town determines such cancellation is in the Town’s best interests.
The Town reserves the right to waive any informality and/or to request additional information from Contractors, at its discretion.
If this pre-qualification process results in less than three (3) pre-qualified Contractors, the Town reserves the right to cancel the pre-qualification process and issue an Invitation for Bid (IFB) with minimum qualifications in lieu of applying the pre-qualification or re-issuing the pre-qualification. The Town in its sole discretion will determine whether to proceed with the application of the prequalification process or not.
IX. Construction Project Description
The Leesburg Executive Airport Air Traffic Control Tower is a Federal Contract Tower, approximately 85’ tall, 5 story (plus cab level) air traffic control tower, with an 8-sided 440 square foot cab with 4 structural steel columns over a square shaft. The tower shaft includes one 3,500 lb capacity passenger elevator and one egress stair. Cab glass is 15-degree laminated glazing. The proposed tower cab floor elevation is 66'-2 1/2" feet above ground level (AGL)/449 feet AMSL with a proposed top of tower height (highest point on the structure) not to exceed 102 feet AGL/484 feet AMSL. The cab includes slatwall consoles and air traffic control equipment for the four Air Traffic Controller positions. The structural system is steel construction for the tower shaft and cab with a 42" thick concrete mat slab foundation. The tower and cab floors will be a composite cast-in-place concrete slab using a composite steel deck. The tower shaft lateral system is braced frames and the tower cab lateral system is moment frames. The equipment yard enclosure utilizes shallow foundations. Sitework includes removal of existing airplane tie-down stations, new site security fencing with a motorized vehicle gate and pedestrian gate, parking, and xeriscape landscaping. Sitework also includes horizontal directional drilling for utilities.
A domestic water booster pump will supply the tower fixtures and equipment with necessary water pressure. A duplex ejector pump will route tower sanitary waste to site utilities. The fire protection system is a wet system with fire pump and combined sprinkler riser/standpipe. Project will include a 250kw natural gas generator and a 30kw UPS with backup batteries, lightning protection system, and Class A fire alarm system. The mechanical system is an air-cooled heat pump (chiller/heater) with a supplemental hot water natural gas boiler. There is a stair and elevator pressurization system as well as a redundant air handling unit for the Cab.
Telecom systems include providing connectivity to Airport and FAA systems via airfield cabling design and new telco service to serve specific tower communications and weather equipment based on the FAA Minimum Equipment List (MEL) to replace the existing mobile tower operations. Equipment is to be located within network equipment cabinets in the electronics equipment room, with cabling up to additional equipment in the cab consoles. In addition, a wired and wireless building LAN is to be provided consisting of telecom outlets, wireless access points, and a network switch to meet the Town's IT standards.
Rev 3/4/25 Page 7 of 20
Security systems include an electronic access control system with card readers at the motorized entry gate, pedestrian gate, elevator, and doors throughout the building. An intercom system is also required for visitor management through the front gate and entry door. A camera system is also provided with both exterior and interior cameras. All security system headend equipment will be located in the electronics equipment room.
Refer to the Reference Materials attached to this RFQ for additional information.
Rev 3/4/25 Page 8 of 20
INSTRUCTIONS TO CONTRACTORS
LEESBURG EXECUTIVE AIRPORT
AIR TRAFFIC CONTROL TOWER
I. Application
Interested Contractors are to complete and submit the following documents contained in this
RFQ:
1) Application for Construction Pre-Qualification;
2) Qualification Statement and Questionnaire;
3) Submittal Protection Disclosure Form;
4) Contractor’s informational or marketing brochure, if available.
By submitting the above items, Contractor understands the importance to the pre-qualification process to obtain candid information about Contractor’s past performance. Accordingly, by submitting the above items, Contractor agrees that (1) the Town and/or its representative(s) may research and/or verify the information provided and contact third-parties regarding such information, at its discretion; and (2) Contractor shall make no threat to sue, claim or file a lawsuit, including without limitation, for disparagement or defamation, against the Town and/or any of its representatives and/or against any such third-parties providing information to the Town in connection with Contractor’s pre-qualification for this project.
The Town intends to contact references listed in the Contractor’s Application for Construction Pre-Qualification and Qualification Statement and Questionnaire and may contact other potential references referred to them in the course of this evaluation. The Town reserves the right to contact any party it deems appropriate and by submitting a response to this RFQ, the Contractor releases the Town and any references from all liability concerning this exchange of information.
Contractors should ensure that the reference information provided is current. Letters of reference shall not be included in the Contractor’s response to this RFQ.
II. Evaluation
A. The Town will evaluate Contractor qualifications in accordance with Virginia Code §2.2- 4317, the Town’s Procurement Policies and Procedures Manual, and the experience requirements set forth in these instructions. The criteria upon which qualifications of Contractors will be evaluated include:
1) Contractor has sufficient financial ability to perform the contract that would result from such procurement, including the ability to obtain bid, payment and performance bonds in required amounts from a surety listed on the United States Treasury list of acceptable surety corporations and licensed in the State of Virginia;
2) Contractor has appropriate experience to perform the construction project (as defined below);
3) neither the Contractor nor any officer, director or owner of the Contractor has had judgments entered against him or her within the past ten (10) years for the breach of contracts for governmental or nongovernmental construction, including, but not limited to, design-build or construction management;
Rev 3/4/25 Page 9 of 20
4) Contractor has not been in substantial non-compliance with the terms and conditions of prior construction contracts with the Town without good cause, or substantial non-compliance with the terms and conditions of comparable construction contracts with another governmental entity without good cause;
5) neither the Contractor nor any officer, director, owner, project manager, procurement manager or chief financial official of the Contractor has been convicted within the past ten (10) years of a crime related to governmental or nongovernmental construction or contracting, including, but not limited to, a violation of (i) Article 6 (§ 2.2-4367 et seq.), (ii) the Virginia Governmental Frauds Act (§ 18.2-498.1 et seq.), (iii) Chapter
4.2 (§ 59.1-68.6 et seq.) of Title 59.1, or (iv) any substantially similar law of the United States or another state;
6) neither the Contractor nor any officer, director or owner of the Contractor is currently debarred pursuant to an established debarment procedure from bidding or contracting by any governmental entity, agency of another state or agency of the federal government;
7) Contractor has provided all requested information relevant to Items 1 through 6 above to the Town in a timely manner.
B. Evaluation of Contractor’s appropriate experience to perform the work as stated in Item A. 2) above includes the following:
1) Specific construction experience that constitutes “appropriate experience” required to pre-qualify for this construction project must include:
a. Contractor must describe at a minimum three (3) separate projects that when combined together demonstrate experience in the successful completion of each of the following type projects for which the Contractor served as the General Contractor:
i. Successfully completed at least one (1) construction project with a steel structure at least 3 stories in height within the last 10 years; and
ii. Successfully completed at least one (1) construction project with a minimum $15M construction budget within the last 10 years; and
iii. Successfully completed at least one (1) construction project in one or more of the following types of buildings, facilities, or other structures within the last 10 years:
o Airport Facility;
o Government Facility;
o Data Center; and
iv. Successfully completed at least one (1) construction project in one or more buildings, facilities, or other structures with a risk category IV per section 1604.5 of the 2021 International Building Code (IBC) within the last 10 years; and
v. Successfully completed at least one (1) construction project that included installation of a backup generator within the last 10 years; and
vi. Successfully completed at least one (1) construction project that utilized a heat pump mechanical system within the last 10 years; and
Rev 3/4/25 Page 10 of 20
vii. Successfully completed at least one (1) construction project involving Building Automation System (BAS) integration within the last 5 years;
and
viii. Successfully completed at least one (1) construction project involving HVAC controls commissioning including experience with the following within the last 5 years:
o Test and Balancing (TAB);
o Functional Performance Testing;
o Commissioning Support; and
ix. Successfully utilized Building Information Modeling (BIM) based coordination on at least one (1) construction project within the last 5 years.
b. “Successful completion” for purposes of above subsection B. 1) a. shall mean:
that the projects were completed within the contract time, including any owner approved time extensions; that the projects were completed at or below the contract award amounts, including any subsequent owner-approved cost change orders; and that the projects were completed in accordance with the contract documents.
c. Each project description shall include at a minimum:
i. Name and location of the project.
ii. Project description shall provide sufficient detail to allow determination of project size and scope and list applicable appropriate experience that meets the specific construction experience requirements delineated in subsection B. 1) a. above.
iii. Identify and describe similar characteristics to the Town’s planned Leesburg Executive Airport Air Traffic Control Tower project as described in this RFQ.
iv. Final construction cost.
v. Quality Control (QC) program with a list of any plan deviations and non-conformance logs.
vi. Contractual substantial completion and final completion dates (including any owner-approved time extensions) and actual substantial completion and final completion dates.
vii. List of major subcontractors.
viii. Name of the Project Manager and Superintendent who had direct responsibility for the project.
ix. Names, current phone numbers, and current email addresses of the architect and owner. Contractor hereby releases listed references from all claims and liability for damages that may result from the information provided by the reference.
C. Acknowledgment of Management Personnel Qualification Requirements
Rev 3/4/25 Page 11 of 20
Contractors are not required to provide information (resumes) in response to Question 3.
c. in their Qualification Statement and Questionnaire. Contractors shall only provide an acknowledgment of the following requirements.
This section is provided for information only and the Town reserves the right to modify these requirements in the subsequent Invitation for Bid (IFB). The IFB will contain minimum qualification requirements for the Superintendent, the Project Manager and the Quality Control Manager that will be assigned to the project. Contractor will be required to provide evidence that they meet these requirements as part of the pre-construction meeting submittals.
The following are the anticipated minimum qualification requirements for the Project Manager, Superintendent, and Quality Control Manager that will be reviewed as a part of the bid evaluation. The Town will reserve the right to reject the Contractor’s proposed personnel if they fail to meet these requirements, in which instance the Contractor will propose other individuals for the Town’s review and approval.
Project Manager: The Project Manager must have a minimum of ten (10) years’ experience as a Project Manager and meet the same “appropriate experience” requirements for the Contractor delineated in paragraph B. 1) a. above. The Project Manager must be a direct employee of the Contractor.
Superintendent: The Superintendent must have a minimum of ten (10) years’ experience as a Superintendent and meet the same “appropriate experience” requirements for the Contractor delineated in paragraph B. 1) a. above. The Superintendent must have at a minimum an Occupational Safety and Health Administration (OSHA) “30-hour certification”.
Quality Control Manager: The Quality Control Manager (QCM) must have a minimum of five (5) years’ experience in a similar role. The QCM must have a U.S. Army Corps of Engineers Certification for Construction Quality Control Management for Contractors or equivalent.
The objective of the evaluation is to determine which Contractor(s), in the opinion of the Town and/or and its representative(s), are qualified to perform the work required for the construction project. Each Contractor retains sole responsibility for adequately demonstrating its own qualifications.
Additional information or clarification may be requested by the Town, and/or its representatives.
Contractors will respond to such requests within three (3) business days after receipt of such requests, unless extended by the Town’s Chief Procurement Officer or designee.
The Town reserves the right to impose additional minimum qualifications in the IFB for the project, above and beyond those requirements contained in this RFQ.
III. Results of Pre-Qualification Evaluation and Notification
All Contractors who submit a response to this RFQ will be notified of the Town’s determination.
Only those Contractors notified to be qualified will be permitted to bid on the construction project referenced. The decision to pre-qualify a Contractor shall not, however, constitute a determination
Rev 3/4/25 Page 12 of 20 that the Contractor is responsible, and such Contractor may be subsequently rejected as non-responsible on the basis of subsequently discovered information.
Contractors who are notified as not qualified may appeal the decision to the Town’s Chief Procurement Officer (or designee) in writing within (10) business days from such notification in accordance with Code of Virginia §2.2-4317 and Code of Virginia §2.2-4357.
Rev 3/4/25 Page 13 of 20
APPLICATION FOR CONSTRUCTION PRE-QUALIFICATION
Date: (insert date application is submitted)
To: Town of Leesburg 25 West Market Street Leesburg, VA 20176
Subject: Application for Construction Pre-Qualification Request for Qualifications No. 320830-FY27-15 (RFQ) Leesburg Executive Airport Air Traffic Control Tower
Greetings:
We hereby submit our application for pre-qualification for the subject construction project in accordance with the RFQ. The undersigned authorizes additional research into our company’s history and past work to be conducted by the Town of Leesburg and/or its representative(s). The undersigned certifies that insurance and bonding requirements for the construction project can be met by our company.
The following documents comprise our application:
1. this Application for Construction Pre-Qualification;
2. Qualification Statement and Questionnaire;
3. attachments as necessary to provide the information required by the Qualification Statement and
Questionnaire.
The undersigned certifies that our company is a Class A Contractor under 54.1-1100 et seq. of the Code of Virginia. The undersigned acknowledges receipt of Addenda #_____________________ and that our company has considered them in preparation of this application.
The undersigned certifies that the information contained in this application and attachments is complete, true, and accurate.
Sincerely, (Signature of Contractor’s Authorized Representative)
(Printed Name)
(Title)
Rev 3/4/25 Page 14 of 20
QUALIFICATION STATEMENT
AND QUESTIONNAIRE
Name, telephone number, and e-mail address of Contractor’s point of contact concerning this questionnaire:
Check the following, as applicable:
Organized under the laws of the State of _________________________
Federal ID Number __________________________ Registered Agent _______________________
State Corp. Commission Registration No. ___________________ (attach Certificate of Good Standing)
List all of Contractor’s subsidiaries, parent organization; and affiliates:
In accordance with § 2.2-4317 of the Code of Virginia, you may check below if the Contractor requests that all information voluntarily submitted shall be considered a trade secret or proprietary information protected from the Freedom of Information Act disclosure, subject to the provisions of §2.2-4342, of the Code of Virginia:
____Yes ____No
However, Contractors should take notice that in accordance with Virginia Code §§ 2.2-4342 and 2.2-3705.6(10), trade secrets or proprietary information submitted by a Contractor prior to or as part of its submittal will not be subject to public disclosure
Parent Organization
Office to Perform Work (If other than parent organization)
Name:
Mailing Address:
Street Address:
(If other than mailing address)
Telephone Number: ( ) ( )
E-mail Address:
___Corporation Partnership Individual Joint Venture Other
Rev 3/4/25 Page 15 of 20 under the Virginia Freedom of Information Act only if Contractor also identifies the specific data or other materials to be protected, and states the reasons why protection is necessary. Contractor may not designate the entire prequalification application, and may not so designate any portion of the prequalification application that does not contain trade secrets or proprietary information. Please see Section VI (Submittal Protection and Disposition) of the Invitation to Pre-Qualify to Bid portion of this RFQ for more detail.
Rev 3/4/25 Page 16 of 20
1. ORGANIZATION (of the office of the Contractor that is proposed to perform the Work)
a. How many years has the office that is proposed to perform the Work been in business as a Contractor?
b. How many years has the office that is proposed to perform the Work been in business under its present business name?
i. Under what other or former names has the office that is proposed to perform the Work operated?
c. If you answer “yes” to any of the following, please provide the name, address, phone number, persons to contact, and circumstances related to the question on a separate attachment.
i. Has the Contractor or any of its officers, directors, or owners had judgments entered against any of them within the past ten (10) years for the breach of contracts for governmental or nongovernmental construction, including, but not limited to, design-build or construction management:
____Yes ____No
ii. Has the Contractor or any of its officers, directors, owners, project managers, procurement managers, or chief financial officials been convicted within the past ten (10) years of a crime related to any activities at all related to any governmental or nongovernmental construction or contracting, including, but not limited to, a violation of Article 6 (§ 2.2-4367 et seq.) of this chapter, (ii) the Virginia Governmental Frauds Act (§ 18.2-498.1 et seq.), (iii) Chapter 4.2 (§ 59.1-68.6 et seq.) of Title 59.1, or (iv) any substantially similar law of the United States or another state:
iii. Is the Contractor or any officer, director, or owner thereof currently debarred pursuant to an established debarment procedure from bidding or contracting by any public body, agency of another state or agency of the federal government:
2. LICENSING (local, state, and/or nationwide)
a. Does the Contractor have a Class A Virginia General Contractor’s license (Va. Code § 54.1-1100 et.
seq.)?
b. What is the Contractor’s Class A Virginia General Contractor’s license number (attach a copy of license)?
c. Who is Contractor’s “Designated Employee” within the meaning of Va. Code § 54.1-1100 for purposes of its Virginia Class A General Contractor’s license?
Rev 3/4/25 Page 17 of 20
d. What is the title and role of the Contractor’s Designated Employee in the Contractor’s organization?
3. APPROPRIATE EXPERIENCE
a. Has Contractor ever failed to complete any work awarded to it?
If the answer to this question is yes, provide the name of the Project, Owner, and Architect/Engineer, including Company name, address, and phone number, associated with the event; and details of the failure to complete.
b. Relative to “appropriate experience” as stated in the Instructions to Contractors, Contractor must describe at a minimum three (3) separate projects that when combined together demonstrate experience in the successful completion of each of the following type projects for which the Contractor served as the General Contractor:
i. Successfully completed at least one (1) construction project with a steel structure at least 3 stories in height within the last 10 years; and
ii. Successfully completed at least one (1) construction project with a minimum $15M construction budget within the last 10 years; and
iii. Successfully completed at least one (1) construction project in one or more of the following types of buildings, facilities, or other structures within the last 10 years:
o Airport Facility;
o Government Facility;
o Data Center; and
iv. Successfully completed at least one (1) construction project in one or more buildings, facilities, or other structures with a risk category IV per section 1604.5 of the 2021 International Building Code (IBC) within the last 10 years; and
v. Successfully completed at least one (1) construction project that included installation of a backup generator within the last 10 years; and
vi. Successfully completed at least one (1) construction project that utilized a heat pump mechanical system within the last 10 years; and
vii. Successfully completed at least one (1) construction project involving Building Automation System (BAS) integration within the last 5 years; and
viii. Successfully completed at least one (1) construction project involving HVAC controls commissioning including experience with the following within the last 5 years:
o Test and Balancing (TAB);
o Functional Performance Testing;
o Commissioning Support; and
ix. Successfully utilized Building Information Modeling (BIM) based coordination on at least one (1) construction project within the last 5 years.
c. Contractor shall attach a list of completed projects demonstrating “appropriate experience” delineated in paragraph b. above. The list shall include the following:
i. Name and location of the project.
ii. Project description shall provide sufficient detail to allow determination of project size and scope and list applicable appropriate experience that meets the specific construction experience requirements delineated in subsection b. above.
iii. Identify and describe similar characteristics to the Town’s planned Leesburg Executive Airport Air
Rev 3/4/25 Page 18 of 20
Traffic Control Tower project.
iv. Final construction cost.
v. Quality Control (QC) program with a list of any plan deviations and non-conformance logs.
vi. Contractual substantial completion and final completion dates (including any owner-approved time extensions) and actual substantial completion and final completion dates.
vii. List of major subcontractors.
viii. Name of the Project Manager and Superintendent who had direct responsibility for the project.
ix. Names, current phone numbers, and current email addresses of the architect and owner. Contractor hereby releases listed references from all claims and liability for damages that may result from the information provided by the reference.
d. Contractor acknowledges the Management Personnel Qualifications Requirements delineated in Section
II. Evaluation, C. of the Instruction to Contractors.
____Yes
4. FINANCIAL
a. Can Contractor obtain Surety Bonds from a corporation included on the United States Treasury list of acceptable sureties corporations in the amount and type required for this project (Bid Bond as required by law, and Performance and Payment Bonds for 100% of contract sum) and provide evidence of such ability, if requested:
i. Name of surety/bonding company:
ii. Name and address of the bonding company agent:
iii. Current bonding capacity with a contract surety/bonding company:
For any single project: $________________________
For all projects: $________________________
iv. Current line of bonding credit that surety or sureties have extended to the Contractor (i.e., current outstanding bonds): $_____________________________
5. OTHER
a. Attach any additional information that Contractor believes will assist the Town in evaluating its qualifications for this construction project.
Rev 3/4/25 Page 19 of 20
SUBMITTAL PROTECTION DISCLOSURE FORM
RFQ NO. 320830-FY27-15
Please note that completion of the following form is to comply with the Virginia Freedom of Information Act. The Town of Leesburg will make the final determination as to whether a proposed redaction complies with the exemptions outlined under Va. Code §§ 2.2-3700 et seq. and 2.2-4342.
Instructions: To invoke protection of trade secrets or proprietary information, firms must identify the data or other materials to be protected and state the reasons why the protection is necessary.
Indicate the specific words, figures, or paragraphs that constitute trade secrets or proprietary materials. The term “trade secret” is defined for this purpose as:
"Trade secret" means information, including but not limited to, a formula, pattern, compilation, program, device, method, technique, or process, that:
1. Derives independent economic value, actual or potential, from not being generally known to, and not being readily ascertainable by proper means by, other persons who can obtain economic value from its disclosure or use, and
2. Is the subject of efforts that are reasonable under the circumstances to maintain its secrecy.
See Virginia Code §§ 2.2-3701 and 59.1-336.
Submittal Protection Disclosure Form
In accordance with the Code of Virginia § 2.2-4342(F), ______________________________________ (name of firm), invokes the protection of the following portion(s) of the firm’s submittal to the Town on ____________ (date of submittal):
Data/Material to be Protected Section(s)/Page
Number(s) Reason(s) why Protection is Necessary
FIRM MUST RETURN THIS FORM WITH THEIR SUBMITTAL
Rev 3/4/25 Page 20 of 20
REFERENCE MATERIALS
(See Attached)
F
F
F
F
N O
P A
R K
IN
G
NO PARKING
DO NOT BLOCK GATE
N O
P A
R K
IN
G
S A N S
EW
R (D
A
TR
) FO
R V
IS
U A
L PU
R
PO
S
ES
O N
LY
OVERHANG
D
IES
EL
O .H
G
EN
ER
A
TO
R
B U
ILD
IN
G
E
E
E
A
C
D
RELOCATED FIRE HYDRANT,
REFERENCE CIVIL DRAWINGS.
EXISTING FENCE, REFERENCE CIVIL
DRAWING C102
NEW GATE, REFERENCE CIVIL
DRAWING C102
B
PEDESTRIAN GATE WITH
CARD READER,
REFERENCE CIVIL
DRAWINGS
CARD READER, REFERENCE
TELECOM DRAWINGS
EXISTING FAA FENCE,
REFERENCE CIVIL DRAWINGS
EXISTING FAA FENCE TO REMAIN
NEW SECURITY FENCE,
REFERENCE CIVIL DRAWING C102
AIR SOURCE HEAT PUMP,
REFERENCE MECHANICAL DRAWINGS
DUMPSTER, REFERENCE
CIVIL DRAWINGS
SWING GATE AT SCREENED
ENCLOSURE
SCREENED ENCLOSURE
NEW FAA GATE, MAN
GATE, AND SECURITY
FENCE, REFERENCE CIVIL
DRAWING C102
PRIMARY BUILDING
ENTRANCE
NEW CONCRETE SIDEWALK
EXTENSION, REFERENCE CIVIL
DRAWINGS
PARKING AREA
(4 SPACES)
EXISTING FIRE HYDRANT,
REFERENCE CIVIL DRAWINGS
EXISTING PLANE ANCHOR TO
REMAIN, REFERENCE CIVIL
DRAWINGS
NEW TRANSFORMER,
REFERENCE ELECTRICAL
DRAWINGS
EXISTING TRANSFORMER,
REFERENCE ELECTRICAL
DRAWINGS
SITE LIGHTING, REFERENCE
ELECTRICAL DRAWINGS
TEMP GENSET CONNECTION BOX
AND LIFT PUMP CONTROLLER
AND DISCONNECT, REFERENCE
ELECTRICAL DRAWINGS
ELECTRIC METER ENCLOSURE
AND DISCONNECTS, REFERENCE
ELECTRICAL DRAWINGS
E
3 CARD READER, REFERENCE
TELECOM DRAWINGS
GAS METER
EQUIPMENT PAD BY
OTHERS, REFERENCE
CIVIL DRAWINGS
ENGINE GENERATOR,
REFERENCE ELECTRICAL
DRAWINGS
LINE OF CATWALK ABOVE
LINE OF CAB ABOVE
GRINDER PUMP DISCONNECT
SWITCH REFERENCE ELECTRICAL
DRAWINGS
SITE LIGHTING, REFERENCE
ELECTRICAL DRAWINGS
A751
NORTH
www.exp.com
• BUILDINGS • EARTH & ENVIRONMENT • ENERGY •
• INDUSTRIAL • INFRASTRUCTURE • SUSTAINABILITY •
exp
F
IL
E
D
A T
E
T
IM
E
N A
M E
J
I
B
A
D
C
F
E
G
H
J
I
B
A
D
C
F
E
G
H
14 13 12 11 10 9 8 7 6 5 4 3 2 1
14 13 12 11 10 9 8 7 6 5 4 3 2 1
REVDRAWING NO
PROJECT NO.exp
DESIGNED DRAWN CHECKED
VA
TOWN OF LEESBURG
FEDERAL CONTRACT TOWER
LEESBURG (LEESBURG EXECUTIVE AIRPORT)
205 N Michigan Ave. #3600 Chicago, IL 60601 312.616.0000
U.S. Services Inc.
TOWN NUMBER: TLCIPW2023-0009
/9 /2
:5 :0
P
M
JYO-E-ATCT-A100CHI-25013529-A0
Designer Author Checker
ARCHITECTURAL SITE PLAN
SCALE: 1/8"=1'-0"
8' 16'
A100 SCALE: 1/8" = 1'-0"
1 ARCHITECTURAL SITE PLAN
REV
APPROVED
DATE
DESCRIPTION
1 02/06/2026 ISSUED FOR 10%
2 06/26/2026 ISSUED FOR 50%
3 10/09/2026 ISSUED FOR 100%DRAFT
UP
SHEET GENERAL NOTES
SHEET KEYNOTES
UP
DN
UP
DN
A C
P
UP
DN
A
188 SF
STAIR 1
62 SF
TELECOM
237 SF
AIR TRAFFIC
MANAGER
OFFICE
231 SF
FIRE PUMP
108 SF
VESTIBULE
137 SF
LOBBY
114 SF
ELEVATOR
A201
A201 1
A201
A2012
A301
A301
A301
A301
C
D
26.03
B
A
A
1'-10 7/8" 5'-8" 9'-1 1/2" 6"
4'-11" 10'-4"
/4
B
/8
/4
/2
/8
A401
A403
1'-6"
E
5'-0 1/4"
10.0310.01
I1.1 F1.1
F1.1
1'-0" I2.1
I2.1
I2.1
15'-8 1/2"
10'-6"
F1.1
1'-0" F1.1
F1.1
22.05
27.02
10.01
21.01
22.02
22.03
S1.2
S1.2I2.1
I2.1
B
26.04 27.03
12.06
12.05
A556
A601
A631
F2.1
F1.1
F2.1 F1.1
23.04
03.07
03.07
03.07
6'-9 1/16"
1. REFER TO G200 AND A000 FOR GENERAL NOTES.
2. ALL MEP EQUIPMENT IS SHOWN FOR REFERENCE ONLY. REFER TO INDIVIDUAL DISCIPLINES
DRAWINGS FOR EQUIPMENT LAYOUTS, SCHEDULES AND DETAILS.
3. ALL INTERIOR PARTITIONS ARE TO EXTEND TO UNDERSIDE OF STRUCTURAL SLAB U.N.O.
4. REFER TO PLUMBING DRAWINGS FOR FLOOR DRAIN LOCATIONS.
5. REFER TO SHEET A621 FOR PARTITION TYPES
6. REFER TO SHEET A501 FOR DOOR TYPES & SCHEDULES
7. REFER TO SHEET A501 FOR ROOM FINISH SCHEDULES
8. COORDINATE FIRE- EXTINGUISHER CABINET RATING REQUIREMENTS WITH CORRESPONDING
INTERIOR WALL PARTITION. REFER TO G101 THROUGH G103 FOR FIRE RATING REQUIREMENTS.
9. UNLESS NOTED OTHERWISE, DOOR ROUGH OPENING TO BE LOCATED 4" FROM WALL ADJACENT TO
DOOR SWING.
10. ALL DIMENSIONS ARE TO FINISH FACE OF PARTITION, UNLESS NOTED OTHERWISE.
11. REFERENCE STRUCTURAL FOR OPENINGS IN FLOOR SLABS.
12. FURNITURE IS NOT IN CONTRACT EXCEPT CAB CHAIRS, REFERENCE SPEC SECTION 27 50 00.
SHOWN FOR REFERENCE ONLY.
13. REFERENCE FINISH PLANS, MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION
DRAWINGS AND SPECIFICATIONS FOR INTERIOR CONCRETE HOUSEKEEPING PAD LOCATIONS AND
ASSOCIATED EQUIPMENT. REFERENCE STRUCTURAL DRAWINGS. REFER TO ARCHITECTURAL FINISH
PLANS FOR HOUSEKEEPING PAD FINISH REQUIREMENTS.
14. All STRUCTURAL STEEL TO RECEIVE SPRAY APPLIED FIREPROOFING (07 81 00) UNLESS NOTED
OTHERWISE.
A
A201
A201 1
A201
A2012
A301
A301
A301
A301
209 SF
STAIR 1
114 SF
ELEVATOR 1
120 SF
CORRIDOR
242 SF
MAIN
ELECTRICAL
ROOM
303 SF
BOOSTER
PUMP
C
D
B
1'-10 3/4" 5'-8" 9'-1 1/2" 6" 4'-11" 10'-4" 1'-11 1/2"
/2
/4
/2
/4
A401
A403
A141
/8
E
4'-10"
E Q
E Q
34'-4 3/4"
C L E
A R
22 SF
ELEVATOR
CONTROL
ROOM
CLEAR
4'-5 3/8" 204
10.01
10.03
10.01
I2.1
I2.1
I2.1
I1.2
F1.1
1'-0"
C L E
A R
9"
27.02
26.05
23.03
22.01
22.02
22.08
I2.1
I2.1
S1.2
S1.2
I2.1
REFER TO
2/A141 FOR
ROOF PLAN
1'-0"
A556
/4
A601
27.01
22.02
A
A201
A201 1
A201
A2012
A301
A301
A301
A301
622 SF
MECHANICAL
22 SF
STAIR
PRESSURIZATION
SHAFT
206 SF
STAIR 1
114 SF
ELEVATOR 1
C
D
B
22.08
27.02
1'-10 3/4" 5'-8" 9'-1 1/2" 6" 4'-11" 10'-4"
1'-11 1/2"
/2
/4
/2
/4
A403
A401
/4
34'-4 3/4"
10 3/4"
E
4'-5"
10.01
I2.1
I2.1
S1.2S1.2
C L E
A R
6'-2"
S1.2
S1.2
CORRIDOR
23.01
A682
A
A201
A201 1
A201
A2012
A301
A301
A301
A301
207 SF
STAIR 1
114 SF
ELEVATOR 1
568 SF
ELECTRONICS
EQUIPMENT
ROOM
C
D
B
22.08
23.02
1'-10 3/4" 5'-8" 9'-1 1/2" 6" 4'-11" 10'-4" 1'-11 1/2"
/4
/2
A403
A401
S1.2
S1.2
/4
34'-4 3/4"
E
I1.1
C L E
A R
2'-0"
6'-9"
6'-2"I2.1
10.0310.01S1.1 80 SF
CORRIDOR
7 SF
STAIR
PRESSURIZATION
SHAFT
S1.1
F1.1
1'-10 3/4"
27.02 3
4'-5"
/2
22.01
27.01
23.04
32 SF
MECHANICAL
SHAFT
S1.1
A631
NORTH
www.exp.com
• BUILDINGS • EARTH & ENVIRONMENT • ENERGY •
• INDUSTRIAL • INFRASTRUCTURE • SUSTAINABILITY •
exp
F
IL
E
D
A T
E
T
IM
E
N A
M E
J
I
B
A
D
C
F
E
G
H
J
I
B
A
D
C
F
E
G
H
14 13 12 11 10 9 8 7 6 5 4 3 2 1
14 13 12 11 10 9 8 7 6 5 4 3 2 1
REVDRAWING NO
PROJECT NO.exp
DESIGNED DRAWN CHECKED
VA
TOWN OF LEESBURG
FEDERAL CONTRACT TOWER
LEESBURG (LEESBURG EXECUTIVE AIRPORT)
205 N Michigan Ave. #3600 Chicago, IL 60601 312.616.0000
U.S. Services Inc.
TOWN NUMBER: TLCIPW2023-0009
/9 /2
:5 :1
P
M
JYO-E-ATCT-A101CHI-25013529-A0
Designer Author Checker
FLOOR PLAN - LEVEL 1-4
SCALE: 1/4" = 1'-0"A101
1 FLOOR PLAN - LEVEL 1FLOOR PLAN - LEVEL 1
SCALE: 1/4"=1'-0"
4' 8'
SCALE: 1/4" = 1'-0"A101
2 FLOOR PLAN - LEVEL 2FLOOR PLAN - LEVEL 2
SCALE: 1/4" = 1'-0"A101
3 FLOOR PLAN - LEVEL 3FLOOR PLAN - LEVEL 3
SCALE: 1/4" = 1'-0"A101
4 FLOOR PLAN - LEVEL 4FLOOR PLAN - LEVEL 4
03.07 DOOR STOOPS. REFER TO STRUCTURAL DRAWINGS
10.01 FIRE EXTINGUISHER (10 44 16)
10.03 SEMI-RECESSED FIRE EXTINGUISHER CABINET (10 44 13)
12.05 18" DEEP LOCKER SET; PROVIDED BY OWNER INSTALLED BY GC
12.06 12" DEEP LOCKER SET; PROVIDED BY OWNER INSTALLED BY GC
21.01 FIRE PUMP TEST HEADER, REFER TO FIRE PROTECTION DRAWINGS
22.01
PLUMBING EQUIPMENT WITH ASSOCIATED HOUSE KEEPING PAD, REFERENCE
PLUMBING DRAWINGS
22.02 FLOOR DRAIN, REFERENCE PLUMBING DRAWINGS
22.03 PLUMBING EQUIPMENT, REFERENCE PLUMBING DRAWINGS
22.05 EXTERIOR HOSE-BIB. REFER TO PLUMBING DRAWINGS
22.08 PLUMBING RISER, TYP. REFERENCE PLUMB DRAWINGS
23.01 AIR HANDLING UNIT, REFERENCE MECHANICAL DRAWINGS
23.02 SUPPLY AND RETURN RISERS, REFERENCE MECHANICAL DRAWINGS
23.03
MECHANICAL EQUIPMENT WITH ASSOCIATED HOUSE KEEPING PAD,
REFERENCE MECHANICAL DRAWINGS
23.04 MECHANICAL EQUIPMENT, REFERENCE MECHANICAL DRAWINGS
26.03
ELECTRICAL METER, CT ENCLOSURE AND DISCONNECT. REFER TO
ELECTRICAL DRAWINGS
26.04
TEMP GENSET CONNECTION BOX; LIFT PUMP CONTROLLER AND
DISCONNECT, REFERENCE ELECTRICAL DRAWINGS
26.05 ELECTRICAL EQUIPMENT, REFERENCE ELECTRICAL DRAWINGS
27.01 ELECTRONICS EQUIPMENT, REFERENCE TELECOM DRAWINGS
27.02 CABLE TRAY AND CONDUIT RISER, REFERENCE TELECOM DRAWINGS
27.03 BUILDING KNOX BOX, REFERENCE TELECOM DRAWINGS
REV
APPROVED
DATE
DESCRIPTION
1 02/06/2026 ISSUED FOR 10%
SHEET KEYNOTES
UP
DN
UP
DN
DN
UP
UP
DN
1. REFER TO G200 AND A000 FOR GENERAL NOTES.
2. ALL MEP EQUIPMENT IS SHOWN FOR REFERENCE ONLY. REFER TO INDIVIDUAL DISCIPLINES
DRAWINGS FOR EQUIPMENT LAYOUTS, SCHEDULES AND DETAILS.
3. ALL INTERIOR PARTITIONS ARE TO EXTEND TO UNDERSIDE OF STRUCTURAL SLAB U.N.O.
4. REFER TO PLUMBING DRAWINGS FOR FLOOR DRAIN LOCATIONS.
5. REFER TO SHEET A621 FOR PARTITION TYPES
6. REFER TO SHEET A501 FOR DOOR TYPES & SCHEDULES
7. REFER TO SHEET A501 FOR ROOM FINISH SCHEDULES
8. COORDINATE FIRE- EXTINGUISHER CABINET RATING REQUIREMENTS WITH CORRESPONDING
INTERIOR WALL PARTITION. REFER TO G101 THROUGH G103 FOR FIRE RATING REQUIREMENTS.
9. UNLESS NOTED OTHERWISE, DOOR ROUGH OPENING TO BE LOCATED 4" FROM WALL ADJACENT TO
DOOR SWING.
10. ALL DIMENSIONS ARE TO FINISH FACE OF PARTITION, UNLESS NOTED OTHERWISE.
11. REFERENCE STRUCTURAL FOR OPENINGS IN FLOOR SLABS.
12. FURNITURE IS NOT IN CONTRACT EXCEPT CAB CHAIRS, REFERENCE SPEC SECTION 27 50 00.
SHOWN FOR REFERENCE ONLY.
13. REFERENCE FINISH PLANS, MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION
DRAWINGS AND SPECIFICATIONS FOR INTERIOR CONCRETE HOUSEKEEPING PAD LOCATIONS AND
ASSOCIATED EQUIPMENT. REFERENCE STRUCTURAL DRAWINGS. REFER TO ARCHITECTURAL FINISH
PLANS FOR HOUSEKEEPING PAD FINISH REQUIREMENTS.
14. All STRUCTURAL STEEL TO RECEIVE SPRAY APPLIED FIREPROOFING (07 81 00) UNLESS NOTED
OTHERWISE.
A
A201
A201 1
A201
A2012
A301
A301
A301
A301
187 SF
STAIR 1
114 SF
ELEVATOR 1
407 SF
BREAK ROOM
54 SF
UNISEX
172 SF
STAIR 2
C
D
12 SF
JANITOR
CLOSET
B
REF
22.08
27.02
OUTLINE OF CAB CATWALK ABOVE
A401
A402
A404
A404
1'-10 7/8" 5'-8" 9'-1 1/2" 6" 4'-11" 10'-4" 1'-11 3/8"
34'-4 3/4"
/8
/4
/2
/8
/4
A403
1'-5 1/2"
503A
TELECOM
CLOSET
503A
STAIR 2
E
10.03
26.07
22.02
F1.1
S1.2
A
A201
A201 1
A201
A2012
A301
A301
A301
A301
C
D
CIC
GC
CD
LC
B
A402
/4
/2
/4
5'-8" 9'-7 1/2" 4'-11" 10'-4"
30'-6 1/2"
E
R2
R8 R1
R6
R7
R3
10.03
CAB
A491
A490
A490
11.02
A
A201
A201 1
A201
A2012
A301
A301
A301
A301
C
D
B
/2
/4
/2
/4
/4
5'-2" 5'-8" 9'-1 1/2" 6" 4'-11" 10'-4" 5'-2 1/2"
31'-7 1/4"
A402
E
R2
R8 R1
R6
R7
R3
INTERSTITIAL SPACE
S L O
P E
/4
S L O
P E
/4
SLOPE
1/4" = 1'-0"
SLOPE
1/4" = 1'-0"
A490
F/O CONCRETE
F /O
C O
N C
R E
T E
F/O CONCRETE
A611
11.03
TYP.
9"
6' -1
1/
4" T
YP.
6' -1
1/
4" T
YP.
NORTH
www.exp.com
• BUILDINGS • EARTH & ENVIRONMENT • ENERGY •
• INDUSTRIAL • INFRASTRUCTURE • SUSTAINABILITY •
exp
F
IL
E
D
A T
E
T
IM
E
N A
M E
J
I
B
A
D
C
F
E
G
H
J
I
B
A
D
C
F
E
G
H
14 13 12 11 10 9 8 7 6 5 4 3 2 1
14 13 12 11 10 9 8 7 6 5 4 3 2 1
REVDRAWING NO
PROJECT NO.exp
DESIGNED DRAWN CHECKED
VA
TOWN OF LEESBURG
FEDERAL CONTRACT TOWER
LEESBURG (LEESBURG EXECUTIVE AIRPORT)
205 N Michigan Ave. #3600 Chicago, IL 60601 312.616.0000
U.S. Services Inc.
TOWN NUMBER: TLCIPW2023-0009
/9 /2
:5 :1
P
M
JYO-E-ATCT-A102CHI-25013529-A0
Designer Author Checker
FLOOR PLAN - LEVEL 5-6
SCALE: 1/4"=1'-0"
4' 8'
SCALE: 1/4" = 1'-0"A102
1 FLOOR PLAN - LEVEL 5FLOOR PLAN - LEVEL 5
SCALE: 1/4" = 1'-0"A102
3 FLOOR PLAN - LEVEL 6 - CABFLOOR PLAN - LEVEL 6 - CAB
02.01 OUTLINE OF CAB CATWALK ABOVE
10.03 SEMI-RECESSED FIRE EXTINGUISHER CABINET (10 44 13)
11.02 RETRACTABLE STAIR (11 33 00)
11.03 FLOOR MOUNTED SAFETY ANCHOR (11 08 06)
22.02 FLOOR DRAIN, REFERENCE PLUMBING DRAWINGS
22.08 PLUMBING RISER, TYP. REFERENCE PLUMB DRAWINGS
26.07
TELEVISION, REFERENCE ELECTRICAL DRAWINGS. PROVIDE BLOCKING FROM
FINISH FLOOR TO 7'-0" AFF.
27.02 CABLE TRAY AND CONDUIT RISER, REFERENCE TELECOM DRAWINGS
SCALE: 1/4" = 1'-0"A102
2 FLOOR PLAN - WALKWAY LEVELFLOOR PLAN - WALKWAY LEVEL
REV
APPROVED
DATE
DESCRIPTION
1 02/06/2026 ISSUED FOR 10%
LEVEL 1
0' - 0"
LEVEL - 6 CAB
66' - 2 1/2"
LEVEL 5
48' - 4"
WALKWAY LEVEL
63' - 6"
LEVEL 2
12' - 1"
LEVEL 3
24' - 2"
LEVEL 4
36' - 3"
EYE LEVEL
71' - 2 1/2"
T/TOWER
85' - 6 1/2"
521 4
PREFINISHED METAL PLATE WALL
PANELS
(07 42 13.16)
/2
A482
447.34' AMSL
449.00' AMSL
454.00' AMSL
468.33' AMSL
382.80' AMSL
394.88' AMSL
406.97' AMSL
419.05' AMSL
431.13' AMSL
A483
ELECTRICAL METER, CT ENCLOSURE
AND DISCONNECT. REFER TO
ELECTRICAL DRAWINGS
GALVANIZED STEEL ANTENNA
SUPPORT/GUARDRAIL, PAINTED (05
52 13)
<varies>
FIXED LOUVERS
(08 91 19) LV-1
FIXED LOUVERS
(08 91 19) LV-1
GLAZED ALUMINUM CURTAINWALL
WITH FRIT PATTERN (08 44 13)
FIXED LOUVERS - LV-1
LIGHTNING PROTECTION AIR
TERMINAL, REFER TO ELECTRICAL
DRAWINGS
/2
DECORATIVE METAL RAILING WITH
GUARDRAIL, POWDER COAT FINISH
(05 73 60)
PREFINISHED METAL PLATE WALL
PANELS
(07 42 13.16)
ELECTRICAL EQUIPMENT,
REFERENCE ELECTRICAL DRAWINGS
LIGHT BOLLARD, REFERENCE
ELECTRICAL DRAWINGS
LEVEL 1
0' - 0"
LEVEL - 6 CAB
66' - 2 1/2"
LEVEL 5
48' - 4"
WALKWAY LEVEL
63' - 6"
LEVEL 2
12' - 1"
LEVEL 3
24' - 2"
LEVEL 4
36' - 3"
EYE LEVEL
71' - 2 1/2"
T/TOWER
85' - 6 1/2"
A C DB
PREFINISHED METAL PLATE WALL
PANELS
(07 42 13.16)
A481
447.34' AMSL
449.00' AMSL
454.00' AMSL
468.33' AMSL
382.80' AMSL
394.88' AMSL
406.97' AMSL
419.05' AMSL
431.13' AMSL
A483
E
GLAZED ALUMINUM CURTAINWALL
WITH FRIT PATTERN (08 44 13)
PREFINISHED METAL PLATE WALL
PANELS
(07 42 13.16)
GLAZED ALUMINUM CURTAINWALL
WITH FRIT PATTERN (08 44 13)
PREFINISHED METAL PLATE WALL
PANELS
(07 42 13.16)
TEXTURED ULTRA HIGH
PERFORMANCE CONCRETE
RAINSCREEN PANEL SYSTEM UHPC-2
(07 42 47)
SMOOTH ULTRA HIGH
PERFORMANCE CONCRETE
RAINSCREEN PANEL SYSTEM UHPC-1
(07 42 47)
GALVANIZED STEEL ANTENNA
SUPPORT/GUARDRAIL, PAINTED (05
52 13)
FIXED LOUVERS
(08 91 19) LV-1
LIGHTNING PROTECTION AIR
TERMINAL, REFER TO ELECTRICAL
DRAWINGS
/2
/2
LEVEL 1
0' - 0"
LEVEL - 6 CAB
66' - 2 1/2"
LEVEL 5
48' - 4"
WALKWAY LEVEL
63' - 6"
LEVEL 2
12' - 1"
LEVEL 3
24' - 2"
LEVEL 4
36' - 3"
EYE LEVEL
71' - 2 1/2"
T/TOWER
85' - 6 1/2"
5 2 1
PREFINISHED METAL PLATE WALL
PANELS
(07 42 13.16)
A481
447.34' AMSL
449.00' AMSL
454.00' AMSL
468.33' AMSL
382.80' AMSL
394.88' AMSL
406.97' AMSL
419.05' AMSL
431.13' AMSL
/2
6 3
PREFINISHED METAL PLATE WALL
PANELS
(07 42 13.16)
GALVANIZED STEEL ANTENNA
SUPPORT/GUARDRAIL, PAINTED (05
52 13)
FIXED LOUVERS
(08 91 19) LV-1
GLAZED ALUMINUM CURTAINWALL
WITH FRIT PATTERN (08 44 13)
/2
LIGHTNING PROTECTION AIR
TE…