RFQ M9 Chemical Paper.docx.pdf
PDF 997 KB Posted
- Solicitation number
- W912CH-24-R-0192
- Issued by
-
Department of the Army
About this file
This Request for Quote (RFQ) W912CH-24-R-0192 is for M9 Chemical Paper, a chemical agent detector paper used by the Department of the Army. The solicitation seeks a five-year, firm-fixed-price Indefinite Delivery/Indefinite Quantity (IDIQ) contract for 41,041,884 maximum rolls, with a minimum guaranteed quantity of 856,890 rolls. The contract will establish pricing for five one-year ordering periods, with deliveries to Blue Grass Army Depot in Richmond, Kentucky.
Key procurement details include a Technical Data Package with Distribution Statement D (limited access), first article testing requirement, and military preservation/packaging specifications. The solicitation uses North American Industry Classification System (NAICS) code 314999, and offerors must be registered in the System for Award Management (SAM). Offers must be submitted electronically via SAM.gov by January 1, 2026, at 4:30 p.m. local time, with a 90-day validity period. The contract will be awarded to the lowest evaluated offer that meets all material requirements and responsibility criteria.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| M9 Chemical Paper RFQ- SIGNED.pdf | ||
| M9 Chemical Paper RFQ.pdf | ||
| M9 Chemical Paper RFQ.pdf | ||
| Blank FAT Waiver.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
19. Item
No.
20.
Schedule Of Supplies/Services
21.
Quantity
22.
Unit
23.
Unit Price
24.
Amount
32a. Quantity In Column 21 Has Been
Received Inspected Accepted, And Conforms To The Contract, Except As Noted: _________________________________________________
32b. Signature Of Authorized Government Representative
32c. Date
32d. Printed Name and Title of Authorized Government Representative
32e. Mailing Address of Authorized Government Representative
32f. Telephone Number of Authorized Government Representative
32g. E-Mail of Authorized Government Representative
33. Ship Number 34. Voucher Number 35. Amount Verified 36. Payment 37. Check Number
Correct For
Partial Final Complete Partial Final
38. S/R Account No.
39. S/R Voucher Number
40. Paid By
41a. I Certify This Account Is Correct And Proper For Payment 42a. Received By (Print) 41b. Signature And Title Of Certifying Officer
41c. Date
42b. Received At (Location)
42c. Date Rec’d (YY/MM/DD)
42d. Total Containers
CONTINUATION SHEET
Reference No. of Document Being Continued
W912CH-24-R-0192
PIIN/SIIN MOD/AMD
Page of 2 72
Name of Offeror or Contractor:
Standard Form 1449 (Rev. 2/2012) Back
SUPPLEMENTAL INFORMATION
Buyer Name: EBONI ALBERT Buyer Office Symbol/Telephone Number:
CCTA-APS-A/(586)282-1234 Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
A.1 BACKGROUND/DESCRIPTION OF THE ACTION
1. This solicitation is issued under the authority of 41 United States Code (USC) Section 1903, Special Emergency Procurement Authority, as implemented by Federal Acquisition Regulation (FAR) Subpart 18.2, Emergency Acquisition Flexibilities, and is intended to result in the award of a five-year, firm-fixed price, Indefinite Delivery/Indefinite Quantity (IDIQ) type contract with first delivery order under
FAR 16.504, Indefinite-Quantity Contracts, for the supplies specified. The resulting contract will establish pricing that remains in effect for the period identified in the Schedule. Delivery orders will be placed as Government needs arise.
2. For further guidance related to an IDIQ type contract, refer to FAR Subpart 16.5, Indefinite-Delivery Contracts.
3. There is a Technical Data Package (TDP) associated with this procurement. The TDP is Distribution Statement D, which limits access to the Department of Defense (DoD) and U.S. DoD contractors only. Please refer to Section C for additional information. MINIMUM AND MAXIMUM
QUANTITY OF SUPPLIES
4. In accordance with (IAW) Federal Acquisition Regulation (FAR) 16.504(a)(4)(ii), the minimum quantity of supplies the Government will acquire under this contract is 856,890 rolls for M9 Paper. The Government will satisfy this minimum quantity requirement by issuing the first delivery order (DO) for the stated minimum at the time of IDIQ contract award. 5. The Government is NOT obligated to purchase any additional requirements beyond the Minimum Guaranteed Quantity.
6. The minimum quantity 856,890 rolls and the maximum quantity is 41,041,884 rolls for M9 paper.
ORDERING PERIOD 7. There will be five, one-year ordering periods beginning the date of IDIQ contract award.
DELIVERY ORDER AWARDS
8. Future delivery orders will be awarded IAW FAR 52.216-19, Order Limitations, and FAR 52.216-22, Indefinite Quantity, and DFARS
252.216-7006, Ordering.
SOLICITATION STRUCTURE
9. Particular attention should be given to clauses and paragraphs throughout the solicitation that require the contractor to fill-invarious information.
10. The Government will utilize North American Industry Classification System (NAICS) code 314999 (Other Electronic Component
Manufacturing). This NAICS code will also be assigned to subsequent awarded delivery orders thereunder.
11. System for Award Management (SAM), Size Standards, and NAICS Codes. Failure to register in SAM for the corresponding NAICS codeidentified in paragraph 10 prior to submitting a proposal against this solicitation may preclude an award being made to your company. SYSTEM FOR AWARD MANAGEMENT (SAM), SIZE STANDARDS, AND NAICS CODES
12. Failure to register in SAM for the corresponding NAICS code identified in paragraph A.3 prior to submitting a proposal against this
Solicitation may preclude an award being made to your company. Offerors should be aware of how U.S. Small Business (SB) concerns are defined in FAR Part 19, Defense Federal Acquisition Regulation Supplement (DFARS) Part 19, and 13 CFR 121, Small Business Size
Regulations. Offerors are advised to review 13 CFR 121.103, "How does SBA Determine Affiliation".
DISTRIBUTION AND DESTRUCTION OF EXPORT CONTROL TECHNICAL DATA PACKAGE
13. This solicitation and resulting contract contains technical data whose export is restricted by the Arms Export Control Act (Section
2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 48014852 of Title 50, United States
Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provision of DoD
W912CH-24-R-0192
PIIN/SIIN MOD/AMD
Page of 4 72
Name of Offeror or Contractor:
Directive 5230.25 and DoD Instruction 2040.02. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
14. To be eligible to gain access to this export controlled TDP (via SAM.gov) an offeror must have a current DD 2345, Militarily
Critical Technical Data Agreement certification on file with the Defense Logistics Information Service (DLIS). To obtain certification, contractors must submit a DD Form 2345 to the United States (U.S.)/Canada Joint Certification Office (JCO), along with a copy of supporting documentation. DD Form 2345 and instructions can be found on the Joint Certification Program website at:
http://www.dla.mil/HQ/InformationOperations/Offers/Products/LogisticsApplications/JCP.aspx Processing time is estimated at six (6) to ten (10) weeks after receipt. Upon receipt of certification, an offeror may request the TDP in accordance with the solicitation's
Section C Technical Data Package instructions.
15. Upon completion of the purposes for which Government Technical Data has been provided, the offeror, and all subcontractors, vendors,and sub-vendors of the offeror, are required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed.
16. Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the
TDPand/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
DISTRIBUTION AND DESTRUCTION OF EXPORT CONTROL TECHNICAL DATA PACKAGE
(a) This solicitation and resulting contract contains technical data whose export is restricted by the Arms Export Control Act
(Title22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq.
Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive
5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(b) To be eligible to gain access to this export controlled TDP (via SAM.gov) an offeror must have a current DD 2345, MilitarilyCritical Technical Data Agreement certification on file with the Defense Logistics Information Service (DLIS). To obtain certification, contractors must submit a DD Form 2345 to the United States (U.S.)/Canada Joint Certification Office (JCO), along with a copy of supporting documentation. DD Form 2345 and instructions can be found on the Joint Certification
Program website at: http://www.dla.mil/HQ/InformationOperations/Offers/Products/LogisticsApplications/JCP.aspx Processing time is estimated at six (6) to ten (10) weeks after receipt. Upon receipt of certification, an offeror may request the TDP in accordance with the solicitation's Section C Technical Data Package instructions.
(c) Upon completion of the purposes for which Government Technical Data has been provided, the offeror, and all subcontractors, vendors,and sub-vendors of the offeror, are required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed.
(d) Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the
TDPand/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
par A.2 ARMY CONTRACTING COMMAND DETROIT ARSENAL (DTA)
OMBUDSPERSON
Information regarding the Ombudsperson for this contract is located at the following website: https://www.tacom.army.mil/ombudsperson.
(Best viewed using Google Chrome or Microsoft Edge)
A.3 Electronic Contracting
All Army Contracting Command Detroit Arsenal solicitations will be publicized on the System for Award Management website(https://www.
SAM.gov). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, are embedded in the solicitation as separate attachments or links. This solicitation requires all proposals to be submitted via e-mail with the subject line "Solicitation W912CH-25-R-0115 Proposal" to the following personell:
Eboni Albert
Contract Specialist, Army Contracting Command-Detroit Arsenal E-MAIL: HYPERLINK
"mailto:eboni.q.albert.civ@army.mil"eboni.q.albert.civ@army.mil
Jonice Green
Contract Specialist, Army Contracting Command-Detroit Arsenal
E-MAIL: HYPERLINK "mailto:Jonice.d.green.civ@army.mil"Jonice.d.green.civ@army.mil
NOTE: FAX, HARDCOPY (PAPER), AND DVD/CD-ROM BIDS WILL NOT BE ACCEPTED. HAND-CARRIED BIDS, WHETHER HARDCOPY OR ELECTRONIC, WILL ALSO NOT BE ACCEPTED.
PIIN/SIIN
Page of Reference No. of Document Being Continued
MOD/AMD
5 72
W912CH-24-R-0192
(b) As of 10 August 2015, unless directed to do otherwise in Section L of this solicitation, vendors are required to submit a quote orproposal on the website SAM.gov.
(c) Please pay close attention to the Issued By block location on the cover page of the solicitation for closing date and time.
Theclosing date and time is based on the local time of the listed location of the Issued By office. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.
(d) It is the responsibility of the Offeror to ensure the proposal/quote is received by the date and time specified on the cover page ofthis solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the
Government infrastructure (in this case, received through SAM) by the exact date and time specified on the cover page of this solicitation, it will be determined late. Proposal/quote is defined to mean ALL volumes or parts required in the solicitation are included in the electronic submission. Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.
(e) Solicitations may remain posted on www.SAM.gov after the solicitation closing date. If the response deadline has passed for thesolicitation, vendors will no longer be able to submit electronic responses.
(f) Any award issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy ofany award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of the
Governments intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or Pricing data/information. If an Offeror objects to such release in the base contract or contract modifications, the Offeror must notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.
(g) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of thissolicitation within 2 weeks before the solicitation closing date). For technical assistance in doing business with the Government, and doing business electronically, please visit the Procurement Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center. A.4 ACKNOWLEDGEMENT OF AMENDMENTS
Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:
Amendment Number: Date:
A.5 ALL OR NONE
Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.
(1) ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.
(2) OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS SOLICITATION WILL BE DEEMED NONRESPONSIVE.
*** END OF NARRATIVE A0001 ***
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
SUPPLIES OR SERVICES AND PRICES/COSTS
W912CH-24-R-0192
PIIN/SIIN MOD/AMD
Page of 6 72
_____________________ FIRST
ARTICLE TESTING
COMMODITY NAME: M9 CHEMICAL PAPER
Mfr CAGE: 81361
Mfr Part Number: 567280
First Article Test Report (FATR), pursuant to the requirements listed in: Section E
-E.2.: Supplemental Requirements to First Article
Approval Contractor Testing E.3.: First Article
Test Contractor
Section I
FAR 52.209-3: First Article Approval Contractor
Testing (Alt 1 & 2)
Addenda
-Exhibit A: Contract Data Requirements List DD Form
1423, A004 NOTE: 1 LOT is Equivalent to 1 REPORT.
First Article Testing consist of:
The First Article sample shall consist of 500 M9 chemical agent detector paper units (500 rolls of M9 paper, each contained within a dispenser box), IAW
MIL-DTL-51518D, sample items shall be examined in accordance with the classification of characteristics in 4.3.5 and inspected for compliance with all the requirements of the applicable drawings, QAP's and Specification listed in TDP.
Additionally, a sample of SR119 paper, and a 250-gram sample of reprocessed SR119 dye in dry or slurry form that has been manufactured and packaged using the same methods, materials, equipment, and processes as will be used during regular production.
The SR119 paper used to produce theM9 paper shall be manufactured at the same time and under the same conditions as the sample of SR119 paper.
The first article sample shall be submitted for inspection and approval in accordance with the terms of the contract. First article sample items shall then be inspected by test and examination in accordance with
4.2.2.1 and
4.2.2.2 of
Page of Reference No. of Document Being Continued
MOD/AMD
7 72
W912CH-24-R-0192
MIL-DTL-51518D.
Packaging:
First Article shall consist of existing sampling plans in item specifications or quality assurance provisions shall take precedence; See specification MIL-DTL-51518. For acquisition purposes, the packaging requirements shall be as specified in the contract or order and in accordance with SPI P5-67-280. Otherwise, sampling shall include completed packs withdrawn from each lot in a random manner to make a representative sample sufficient in size to conduct all applicable inspections and tests as specified in
MILSTD-2073-1 Appendix G. Certification shall be required for ALL packaging materials and containers including applicable specifications and standards specified in this SPI; and palletization and marking requirements. Format and content shall be in accordance with the contract. As a minimum shall consist of documentation on company letterhead; contractor's name, address, phone number, contract number, item name, part number and/or national stock number, a statement specifying what it complies with (i.e.
material, size, specification, standard), dated, printed name and title of certifying official, and shall be signed.
The FAT Report; shall be reviewed by the DCMA QAR before submission to the Contracting Officer.
(End of narrative B001)
_____________________Packaging and Marking
_________________________Inspection and Acceptance
INSPECTION: Origin ACCEPTANCE: Origin
Government Approval/Disapproval Days: 30
_________________________Deliveries or Performance
DOC SUPPL
Page of Reference No. of Document Being Continued
MOD/AMD
8 72
______ ________ ______ ______ ________ REL
CD MILSTRIP ADDR SIG CD MARK FOR TP CD_____
001 FOB POINT:
Destination
SHIP TO:
(W22PVJ) XU W0L7 BLUE GRASS ARMY DEPOT
XU GEN SUP STORAGE PT CRP WHSE 211
431 BATTLEFIELD MEMORIAL HIGHWAY
RICHMOND,KY,40475-5070
IN THE FOUR DIGIT ITEM NUMBERS (CLINS) THAT FOLLOW,
Page of Reference No. of Document Being Continued
MOD/AMD
9 72
W912CH-24-R-0192
THE NUMBERING SYSTEM THAT IS USED IS AS FOLLOWS:
THE FIRST THREE DIGITS SIGNIFY ITEM AND THE
FOURTH(LAST) DIGIT SIGNIFIES THE APPLICABLE CONTRACT
YEAR,
i.e., CLIN 0011 IS FOR THE FIRST ITEM - FIRST
ORDERING YEAR, CLIN 0012 IS FOR THE FIRST ITEM
SECOND ORDERING YEAR, CLIN 0013 IS FOR THE FIRST
ITEM - THIRD ORDERING YEAR, ETC.
THE FINAL LINE ITEM(S) ASSOCIATED WITH EACH PART,
SUCH AS FAT, TECHNICAL MANUALS, SERVICES, OR
TRAINING, WILL BECOME THE LAST ITEM NUMBER IN
NUMERICAL SEQUENCE FOR EACH ITEM, e.g.
0016 (5 YEAR LONG TERM CONTRACT) OR 0014(3 YEAR LONG
TERM CONTRACT). IF MORE THAN ONE ITEM IS BEING
PROCURED, THE NUMBERS WILL BE 0026 OR 0024 DEPENDING
ON THE LENGTH OF THE LONG TERM CONTRACT.
THE FOLLOWING DEFINITIONS APPLY TO THE ENTIRE
SOLICITATION AND RESULTING CONTRACT:
FIRST ORDERING PERIOD OF THE CONTRACT IS THE DATE OF
AWARD PLUS 364 DAYS.
SECOND ORDERING PERIOD OF THE CONTRACT IS 365 DAYS
THROUGH 729 DAYS AFTER CONTRACT AWARD.
THIRD ORDERING PERIOD OF THE CONTRACT IS 730 DAYS
THROUGH 1,094 DAYS AFTER CONTRACT AWARD.
FOURTH ORDERING PERIOD OF THE CONTRACT IS 1,095 DAYS
THROUGH 1,459 DAYS AFTER CONTRACT AWARD.
FIFTH ORDERING PERIOD OF THE CONTRACT IS 1,460
DAYS THROUGH 1,824 DAYS AFTER CONTRACT AWARD.
NOTE: THE PRICE APPLICABLE TO AN INDIVIDUAL ORDER IS
THE PRICE FOR THE ORDERING PERIOD IN WHICH THE ORDER
IS ISSUED. THE DELIVERY DATE DOES NOT DETERMINE THE
ORDERING PERIOD.
The information presented below applies to Item
No.0011 Through 0015:
Minimum 5-Year Quantity: 17,860,440 rolls (This will be ordered at the time of the basic contract award).
Maximum 5-Year Quantity: 3,427,560 rolls(Inclusive of
Option Years, if applicable).
ONLY THE MINIMUM 5 YEAR QUANTITY IS GUARANTEED.
NOTE: EACH ORDERING YEAR ESTIMATE, AS WELL AS EACH
OPTION YEAR ESTIMATE, IF APPLICABLE, IS A 12 MONTH
AVERAGE MONTHLY DEMAND WITH CONTRACT FACTORS BUILT IN
AND A 25% INCREASE PER YEAR.
CAUTION: OFFERORS MUST SUBMIT OFFERS
ELECTRONICALLY IN ACCORDANCE WITH DIRECTIONS
Page of Reference No. of Document Being Continued
MOD/AMD
10 72
IN THE ACC-DETROIT ARSENAL PROCUREMENT NETWORK
WEBPAGE AT:
https://SAM.gov
ALL OFFERS MUST INCLUDE A SIGNED SF 33/SF 1449 COVER
SHEET.
SEE PARAGRAPH (d) OF Section A narrative, ACC-DETROIT
ARSENAL ELECTRONIC CONTRACTING, OF THIS SOLICITATION
FOR INSTRUCTION ON HOW TO SUBMIT YOUR OFFER.
(End of narrative A001)
___________________ FIRST
ORDERING YEAR
COMMODITY NAME: M9 CHEMICAL PAPER
CLIN CONTRACT TYPE:
Firm Fixed Price
_____________________Packaging and Marking
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKACGING CLAUSE LEVEL
PRESERVATION: Military LEVEL
PACKING: B
_________________________Inspection and Acceptance
INSPECTION: Origin ACCEPTANCE: Origin
_________________________Deliveries or Performance
FOB POINT: Destination
SHIP TO:
(W912CH) XR W6QK ACC- DTA
KO DIRECTORATE OF CONTRACTING
6501 EAST 11 MILE ROAD
WARREN,MI,48397-5000
W912CH is used as a placeholder. The actual delivery location will be notated on each Delivery Order issued.
(End of narrative F001)
EST 1786044
EA
Page of Reference No. of Document Being Continued
MOD/AMD
11 72
____________________ SECOND
COMMODITY NAME: M9 CHEMICAL PAPER
EST 3427560
CLIN CONTRACT TYPE:
PRESERVATION: Military LEVEL
PACKING: B
_________________________Inspection and Acceptance
INSPECTION: Origin ACCEPTANCE: Origin
_________________________Deliveries or Performance
FOB POINT: Destination
SHIP TO:
(W912CH) XR W6QK ACC- DTA
KO DIRECTORATE OF CONTRACTING
6501 EAST 11 MILE ROAD
WARREN,MI,48397-5000
W912CH is used as a placeholder. The actual delivery location will be notated on each Delivery Order
Page of Reference No. of Document Being Continued
MOD/AMD
12 72
___________________ THIRD
COMMODITY NAME: M9 CHEMICAL PAPER
CLIN CONTRACT TYPE:
PRESERVATION: Military LEVEL
PACKING: B
_________________________Inspection and Acceptance
INSPECTION: Origin ACCEPTANCE: Origin
FOB POINT: Destination
SHIP TO:
(W912CH) XR W6QK ACC- DTA
KO DIRECTORATE OF CONTRACTING
6501 EAST 11 MILE ROAD
WARREN,MI,48397-5000
W912CH is used as a placeholder. The actual delivery location will be notated on each Delivery Order
Page of Reference No. of Document Being Continued
MOD/AMD
13 72
___________________ THIRD
COMMODITY NAME: M9 CHEMICAL PAPER
PRESERVATION: Military LEVEL
PACKING: B
_________________________Inspection and Acceptance
INSPECTION: Origin ACCEPTANCE: Origin
_________________________Deliveries or Performance
FOB POINT: Destination
SHIP TO:
(W912CH) XR W6QK ACC- DTA
KO DIRECTORATE OF CONTRACTING
6501 EAST 11 MILE ROAD
WARREN,MI,48397-5000
___________________ FIFTH
COMMODITY NAME: M9 CHEMICAL PAPER
CLIN CONTRACT TYPE:
Firm Fixed Price
_____________________Packaging and Marking
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKACGING CLAUSE
LEVEL PRESERVATION: Military
Page of Reference No. of Document Being Continued
MOD/AMD
14 72
LEVEL PACKING: B
_________________________Inspection and Acceptance
INSPECTION: Origin ACCEPTANCE: Origin
_________________________Deliveries or Performance
FOB POINT: Destination
SHIP TO:
(W912CH) XR W6QK ACC- DTA
KO DIRECTORATE OF CONTRACTING
6501 EAST 11 MILE ROAD
WARREN,MI,48397-5000
W912CH is used as a placeholder. The actual delivery location will be notated on each Delivery Order
_______________________________CONTRACT DATA ITEM -
NOT PRICED
The below Exhibit Line Item Numbers (ELIN') are associated with the Data Item Numbers on the Contract
Data Requirements List (CDRL, DD Form 1423), in
Section J
(End of narrative A001)
A001
_______________________________________ENGINEERING
CHANGE PROPOSAL (ECP) - NOT
Page of Reference No. of Document Being Continued
MOD/AMD
15 72
SEPARATELY PRICED
SERVICE REQUESTED: CDRL - A001 ECP
CDRL A001 - ENGINEERING CHANGE PROPOSAL (ECP)
information is found in Section C, C.003
CONFIGURATION MANAGEMENT DOCUMENTATION, and Section
J, Exhibit A: DD FORM 1423. (End of narrative B001)
_________________________Inspection and Acceptance
INSPECTION: Origin ACCEPTANCE: Origin
** NSP **
A002
____________________________________________REQUEST
FOR DEVIATION (RFD) - NOT SEPARATELY
PRICED SERVICE REQUESTED: CDRL A002 - RFD
CDRL A002 - REQUEST FOR DEVIATION (RFD) information is found in Section C, C.003 CONFIGURATION
MANAGEMENT DOCUMENTATION, and Section J, Exhibit A:
DD FORM 1423. (End of narrative
B001)
_________________________Inspection and Acceptance
Page of Reference No. of Document Being Continued
MOD/AMD
16 72
A003
NOTICE OF REVISION (NOR) - NOT SEPARATELY PRICED
SERVICE REQUESTED: CDRL A003- NOR
CDRL A003 - NOTICE OF REVISION (NOR) information is found in Section C, C.003 CONFIGURATION
MANAGEMENT DOCUMENTATION, and Section J, Exhibit A:
DD FORM 1423. (End of narrative
B001)
_________________________Inspection and Acceptance
A004
CERTIFICATE OF COMPLIANCE (COC)
SERVICE REQUESTED: CDRL A004 - COC
CLIN CONTRACT TYPE:
Page of Reference No. of Document Being Continued
MOD/AMD
17 72
Certificate of conformance (COC) shall be in accordance with CDRL A004, Exhibit A, Section J, List of attachments.
(End of narrative B001)
Page of Reference No. of Document Being Continued
MOD/AMD
18 72
W912CH-24-R-0192
PIIN/SIIN MOD/AMD
Page of 19 72
Name of Offeror or Contractor:
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C.1 TECHNICAL DATA PACKAGE INFORMATION
The following "X"d item applies to this solicitation:
[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.
[x ] 2. The TDP for this solicitation resides within the System for Award Management (SAM) (https://SAM.gov) associated with this solicitation number: W912CH-24-R-0192 To access the data through SAM:
a. Log on to the SAM web site: https://SAM.gov.
b. Search for the solicitation number.
c. Click on the attachment you would like to view.
d. If the attachment is restricted, request access to the document.
(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Section 2751 of Title 22, United States
Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 48014852 of Title 50, United States Code).
(2) Further dissemination of the TDP must be in accordance with provisions of DoD Directive 5230.25, DoDI 5230.24, its Distribution
Statement markings, and U.S. export control laws. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(3) To obtain these TDPs, contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with Defense
Logistics Information Service (DLIS). To obtain certification, go to DD FORM 2345 Instructions and DD 2345.
(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy alldocuments, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor.
Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
e. If technical data is otherwise restricted, select "Request Explicit Access." This will generate an email to the Contract Specialist and Contracting Officer at Army Contract Command - Warren (DTA) with all the information needed to grant contractor access to restricted documents. SAM will automatically generate an email stating when the requesting contractor has permission to view or download TDP items.
If multiple individuals in the contractor's organization need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP.
Those same individuals MUST be registered in SAM. Any individuals no longer with the company should be deleted. Questions related to registration in SAM should be directed to https://www.sam.gov/ The SAM helpdesk phone number is (866) 606-8220. Vendors are responsible for placing correct information in SAM.
g. It is strongly suggested that contractors submit the explicit access request and provide the buyer with the completed "Use and
NonDisclosure Agreement" at the same time if the solicitation requires both to gain access to view to view the TDP.
W912CH-24-R-0192
PIIN/SIIN MOD/AMD
Page of 20 72
Name of Offeror or Contractor:
C.2 CONFIGURATION MANAGEMENT DOCUMENTATION
The Contractor may submit Engineering Change Proposals (ECPs), Requests for Variance (RFVs), and Notices of Revision (NORs) for the requirements in the Government-provided Technical Data Package (TDP).
a. The Configuration Change Management section of SAE EIA-649-1(current revision) Configuration Management Requirement for
DefenseContracts, Paragraph 3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3);
the second sentence of paragraph 3.3.1.8.1(1).
b. Furnished item(s) shall conform to the approved configuration requirements/revision, unless a Request for Variance (RFV) is processedand approved as provided by Paragraph E. below. The term "Request for Variance" includes Requests for Deviations and Waivers.
c. Value Engineering Change Proposals (VECPs) for cost saving improvements to the TDP should not be processed per SAE EIA-649-1 andshould be referred to Section I FAR Clause 52.248-1 - Value Engineering.
d. All ECPs submitted will be deemed routine. If an ECP is considered as an emergency or urgent; that justification for the rationaleshall be included in the ECP submittal with all applicable supporting documentation.
e. For ECPs, RFVs, or NORs, the Contractor must submit the documentation listed in sub-paragraphs e (i) through e (iii). Failure tosubmit a complete legible package may result in return of the ECP/RFV/SCN/NOR without processing. (i) for ECPs, the Contractor shall prepare and deliver the ECP in accordance with (IAW) CDRL A001.
(ii) for RFVs, the Contractor shall prepare and deliver the RFV IAW CDRL A002.
(iii) for NORs, the Contractor shall prepare and deliver the NOR IAW CDRL A003.
f. The Government's acceptance of the data deliverable required by CDRL/DD Form 1423 in e(i)-(iii) above signifies only that the datasatisfies the requirements of the DID and is considered acceptable for Government processing. Acceptance of the data deliverable does not signify "technical approval" of the change proposed by the deliverable and should not be interpreted as authorizing the
Contractor to proceed with the work proposed by the change. Disposition of the change (approval/disapproval) will follow acceptance of the CDRL at the Government's sole discretion. Incorporation of an approved RFV or ECP will require execution of a contract modification.
g. The Contractor should direct questions regarding the status of an ECP or RFV to the Procuring Contracting Officer (PCO) and copy theAdministrative Contracting Officer (ACO).
h. The submission of an ECP/RFV/SCN/NOR does not affect the required delivery date of the contract.C.3 USE OF CLASS I and CLASS II
OZONE DEPLETING SUBSTANCES
(a) Definitions.
(1) Class I and Class II Ozone-Depleting Substances (CIODS) refers to the class of substances identified in Section 602(a) of the Clean
Air Act, (42 U.S.C. 7671a(a)), complete list provided at: https://www.govinfo.gov/content/pkg/USCODE-2013-title42/html/USCODE-
2013title42-chap85-subchapVI-sec7671a.htm
(2) Directly requires the use of CIODS means that the Government's specification or technical data package, at any tier, explicitlyrequires the use of any Class I Ozone-Depleting Substance (CIODS) in performance of the contract.
(3) Indirectly requires the use of CIODS means that the Government's specification or technical data package, while not explicitlyrequiring the use of any CIODS, does require a feature that the contractor can meet or produce only by the use of CIODS.
(b) Per Section 326 of Public Law 102-484, the Army cannot award any contract that directly or indirectly requires the use of
CIODSwithout the approval of the Senior Acquisition Official, per current Army Policy the approval authority is the Army Acquisition
W912CH-24-R-0192
PIIN/SIIN MOD/AMD
Page of 21 72
Name of Offeror or Contractor:
Executive. Thus, no CIODS shall be used in meeting the requirements of this contract. If the use of CIODS is required in the performance of this contract, please notify the Contracting Officer immediately in writing.
(c) No Class II Ozone Depleting Substances shall be required in the performance of this contract without government approval. If the useof Class II ODS is required in the performance of this contract, please notify the Contracting Officer immediately in writing.
C.4 START OF WORK MEETING
a. The contractor shall hold a start of work meeting at its facility, unless some other location is designated in the contract, within30 days after contract award. The Start of Work Meeting is to assure a clear and mutual understanding of the contract terms, conditions, line items, technical requirements and sequence of events needed for successful execution of the subject contract effort.
The contractor shall participate with the Government to arrange a schedule and agenda for the meeting.
b. The contractor shall at a minimum invite Government contracting personnel (PCO/Contract Specialist). At the discretion of the
PCO,other Government technical personnel may be invited to the meeting: Contracting Officer's Representative (COR) identified in
Section G or in an appointment letter; Quality Assurance personnel; DCMA; etc. All Government invitees shall be given at least 14 days advance notice of the time, date, and location of the start of work meeting. The preferred method of notification is by email. The contractor shall provide the Government with minutes of the Start of Work Meeting within 14 days after the meeting is held. C.5
Engineering Exceptions
The following Engineering Exceptions shall apply to this procurement:
M9 Chemical Paper:
1. Agent testing is required. Test equipment, procedures, and chemical analysis must be certified and approved by thegovernment.
2. A Safety Data Sheet (SDS) shall be prepared and furnished to the government upon request. A copy of the SDS shall also beincluded in every shipment of M9 Paper.
*** END OF NARRATIVE C0001 ***
PACKAGING AND MARKING
D.1 PACKAGING REQUIREMENTS (SPECIAL PACKAGING INSTRUCTIONS)
(a) Military preservation, packing, and marking for this contract/order shall be accomplished in accordance with the specificrequirements identified below, all the applicable requirements of, MIL-STD-2073-1, and the Special Packaging Instruction, see below.
NSN: 6665-01-226-5589
NOUN: M9 CHEMICAL PAPER
PRESERVATION: MILITARY
LEVEL OF PACKING: B
QUANTITY PER UNIT PACKAGE: 001
SPI NUMBER P5-67-280, REV. L, DATED 18 APR 19
(Note: You must have the Adobe Acrobat reader installed on your PC to view the SPI. See Adobe's website (http://get.adobe.com/reader/) for information on obtaining the latest version of the reader. If you're experiencing problems opening the Special Packaging
Instructions in Adobe .PDF images using Internet Explorer, try the following: Go to "Tools," then "Internet Options." Click on the
"Advanced" tab. Scroll down to the "Security" section. Uncheck "Do not save encrypted pages to disk." Click "Apply." Click "OK.")
W912CH-24-R-0192
PIIN/SIIN MOD/AMD
Page of 22 72
Name of Offeror or Contractor:
(b) Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacementof 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load.
The preferred pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.
(c) Marking:
(1) In addition to any special markings called out on the SPI, all unit packages, intermediate packs, exterior shipping containers, andas applicable, unitized loads shall be marked in accordance with MIL-STD-129). The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract/order or not.
Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel.
(2) When an item is assigned a Unique Item Identifier (UII) as indicated by the inclusion of contract clause DFARS 252.211-7003, referto the DoD Guide to Uniquely Identifying Items (available at: https://www.acq.osd.mil/dpap/pdi/uid/guides.html) for development of the UII and MIL-STD-129 for UII package marking requirements. Contractors must verify the RFID and UII clauses cited above are included in this solicitation/contract. (d) Heat Treatment and Marking of Wood Packaging Materials (WPM):
(1) In accordance with DOD 4140.65-M and the requirements of the International Standards for Phytosanitary Measures 15 (ISPM), "Regulation of Wood Packaging Material in International Trade," current edition, (hereinafter "ISPM 15"), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging
Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organization's compliance program.
(2) Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a conventionalsteam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of
56 degrees Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging
Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org). WPM heat treated wood using dielectric heating (treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see
URL: http://www.alsc.org). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the necessary certifications.
(3) Marking: Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. The
ALSapproved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp. Foreign manufacturers shall comply with ISPM -15 and shall have the marking of WPM verified in accordance with their National Plant Protection Organization's compliance program. (e) Hazardous Materials (As applicable):
(1) Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capableof posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated.
(This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)
(2) Unless otherwise specified, packaging and marking for hazardous material shall comply with the requirements herein for the mode oftransport and the applicable performance packaging contained in the following documents:
W912CH-24-R-0192
PIIN/SIIN MOD/AMD
Page of 23 72
Name of Offeror or Contractor:
- International Air Transport Association (IATA) Dangerous Goods Regulations
- International Maritime Dangerous Goods Code (IMDG)
- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49 - Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB
505/MCO P4030.19(I)/DLAM 4145.3(I) (for military air shipments).
(3) If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the United
Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers. A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.r
(f) This SPI has been validated and the method of preservation/packing has proven successful in meeting the needs of the militarydistribution system, including indeterminate storage and shipment throughout the world. Special instructions and/or tailoring of the SPI is detailed in the Supplemental Instructions below. A prototype package is required to validate the sizes and fit requirements of the SPI. Minor dimensional and size changes are acceptable provided contractor provides the PCO and ACO with notification 60 days prior to delivery. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing or affecting the serviceability of the item will be considered and responded to within 10 days of submission to PCO and ACO. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, alternate blocking, bracing, cushioning, and packing.
(g) SUPPLEMENTAL INSTRUCTIONS: -PLACE A RED X AND THE WORDS "SHORT BOX" ON THE FRONT OF ANY BOX THAT HAS A SHORT QUANTITY, THEN PLACE
THAT BOX/BOXES WITH THE MARKINGS SHOWING ON THE TOP FRONT OF THE PALLET LOAD. -
*** END OF NARRATIVE D0001 ***
INSPECTION AND ACCEPTANCE
_______________ ______________________________________________________________________ ____________Regulatory Cite
Title Date
1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
2 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
E.1 INSPECTION AND ACCEPTANCE POINTS: ORIGIN
The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.
Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.
INSPECTION POINT: __________________________________________
(Name) (CAGE)
(Address) (City) (State) (Zip)
W912CH-24-R-0192
PIIN/SIIN MOD/AMD
Page of 24 72
Name of Offeror or Contractor:
ACCEPTANCE POINT: __________________________________________
(Name) (CAGE)
(Address) (City) (State) (Zip)
E.2 REWORK AND REPAIR OF NONCONFORMING MATERIAL
(a) Rework and Repair are defined as follows:
(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contractrequirements.
(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but notcompletely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.
(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to theGovernment Representative for review and approval prior to implementation. Rework procedures are subject to the Government's disapproval.
(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, to the Contracting
Officerfor review and written Government approval prior to implementation.
(d) Whenever the Contractor submits a repair or rework procedure for Government review and approval, the submission shall also include adescription of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.
(e) The Government approved rework or repair procedure shall also contain a provision for re-inspection which will take precedence overthe Technical Data Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements. E.3 DESTRUCTIVE TESTING
(a) All costs for destructive testing by the Contractor and items destroyed by the Government are considered as being included in thecontract unit price.
(b) Where destructive testing of items or components thereof is required by contract or specification, the number of items or componentsrequired to be destructively tested, whether destructively tested or not, shall be in addition to the quantity to be delivered to the Government as set forth in the Contract Schedule.
(c) All pieces of the complete First Article shall be considered as destructively tested items unless specifically exempted by otherprovisions of this contract.
(d) The Contractor shall not reuse any components from items used in a destructive test during First Article, lot acceptance or inprocess testing, unless specifically authorized by the Contracting Officer.
W912CH-24-R-0192
PIIN/SIIN MOD/AMD
Page of 25 72
Name of Offeror or Contractor:
(e) The Government reserves the right to take title to all or any items or components described above. The Government may take title toall or any items or components upon notice to the Contractor. The items or components of items to which the Government takes title shall be shipped in accordance with the Contracting Officer's instructions. Those items and components to which the Government does not obtain title shall be rendered inoperable and disposed of as scrap by the Contractor. E.4 USE OF MIL-STD 1916
(a) The Government will not accept lots whose samples submitted for acceptance contain non-conformances unless appropriately documented and approved by the contracting officer. The contractor shall use MIL-STD 1916, DOD Preferred Methods of Acceptance of Product. The
Verification Level (VL) shall be VL -1- for major characteristics and VL -2- for minor characteristics. (b) MIL-STD HDBK-1916 provides guidance on the use of MIL-STD 1916. This handbook is not contractually binding.
E.4 INCLUSION OF TESTING COSTS
(a) All test costs associated with the performance of this contract shall be borne by the contractor and shall be part of the overall unit cost of the item(s) to be delivered under this contract. (b) These costs shall include, but are not limited to:
(1) First Article Test (FAT).
(2) All pre-production material evaluations.
(3) All production lot testing (PLT)/acceptance inspection/test costs required to be performed or directed by government documents,contract clauses, drawing, specification or publications used to determine material compliance or suitability for use in this contract. (4) All transportation and/or shipping costs associated with the performance of FAT and/or PLT/acceptance inspection.
(5) All inspections and tests performed by government or commercial test laboratories.
(c) Testing that cannot be performed by a commercial testing laboratory because it involves actual chemical agents or simulant, and/orunique equipment may be contracted with the CCDC Chemical Biological Center (CBC). Test Laboratories, Aberdeen Proving Grounds
(Edgewood Area), MD. A test service agreement (TSA) will be established for this testing. It is the responsibility of the contractor to contact the CBC Testing Laboratories for a cost estimate of the testing, which will be included in the contractor's proposed unit price.
(d) Contacts for obtaining cost estimates for agent or simulant and physical testing or chemical agent testing are as follows:
For simulant, physical and chemical agent, Test Strategy & Project Management Branch (TSPMB), ATTN: FCDD-CBE-TT, 8242 Caliber St. Building E5165, Aberdeen Proving Ground, MD
210105424, Phone (443) 688-3055, Email: amanda.r.leahy.civ@army.mil
E.5 LAB PERFORMANCE CERTIFICATION REQUIREMENTS
For contracts requiring Agent/Simulant testing, the Contractor is not to commence any testing until the Performance Certification requirements have been met. A Performance Certification shall be required for each national stock number (NSN) or non-NSN that requires
Agent/Simulant testing on the contract. Performance Certification on the lab facility will be valid for up to 365 days from the date of approval. At the expiration of the Performance Certification, or if another NSN is awarded, a new Performance Certification is required.
The Contractor is required to follow these steps to receive a Performance Certification:
(a) Complete/fill out Certification Testing Log Sheet (Form 17). To obtain a copy of Certification Testing Log Sheet, please request acopy from: usarmy.ria.ccdc-cbc.mbx.labcerts@mail.mil.
W912CH-24-R-0192
PIIN/SIIN MOD/AMD
Page of 26 72
Name of Offeror or Contractor:
(b) Send completed Testing Log Sheet within 30 days of award of contract/delivery order/option/add-on to the contract, to
CCDCOMChemical Biological Center-Rock Island, FCDD-CBD-SQ, ATTN: Qualification Procedure Team Lead; by FAX to 309-782-1919, or email to: usarmy.ria.ccdc-cbc.mbx.labcerts@mail.mil.
(c) After receiving the completed Testing Log Sheet, a Quality Assurance Specialist will schedule a visit to the testing facility within15 calendar days of receipt of the documentation for the initial award of each NSN OR non-NSN that requires Agent/Simulant testing on the contract, and each year thereafter, if required.
(d) The Quality Assurance Specialist will verify or complete the following regarding the Performance Certification requirements, but isnot limited to: (1) Ensure the testing facility has the appropriate tech data packages or performance specification as required by the contract.
(2) Type of Agent/purity level 90% or above is recommended
(3) Test equipment (calibration methods/standards)
(4) Testing Processes/Procedures/Work Instructions
(5) Technical documentation, including drawings, specifications, handbooks, manuals, and other technical publications
(6) Training qualifications (records) to conduct test
(e) The Government will notify the Contractor within 5 days of the visit as to whether the Performance Certification requirement has been met or not.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .