RFQ Grounds irrigation and landscape services COB.docx
DOCX document 3 MB Posted
- Solicitation number
- 19MX5725Q0016
- Issued by
-
Department of State
About this file
This is a Request for Quotation (RFQ) for Grounds, Irrigation and Landscape Maintenance Services for the U.S. Consulate General in Hermosillo, Sonora, Mexico. The solicitation seeks a contractor to provide comprehensive groundskeeping services, including maintenance of grass, gardens, trees, landscaping elements, and irrigation systems across multiple compound areas. The contract is a firm-fixed-rate, 12-month base period with potential for a six-month extension, with services to be performed Monday through Friday between 8:30 AM and 3:30 PM.
Key requirements include submitting an Annual Groundskeeping and Irrigation Plan, maintaining specific landscape areas totaling approximately 3,800 m2, and performing tasks such as pruning desert and palm trees, managing ground cover, lawn care, pest control, and cleaning services. The solicitation requires the contractor to provide all necessary personnel, equipment, and materials, with specific safety and certification requirements. Quotations are due by August 29, 2025, and the U.S. Department of State intends to award to the lowest-priced, technically acceptable offeror. Prospective bidders must be registered in the System for Award Management (SAM) and must attend a mandatory pre-quotation conference on August 11, 2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Rain Bird file.pdf | ||
| Site visit minute.pdf | ||
| Q and A 19MX5725Q0016.pdf | ||
| SF 1449 Grounds irrigation and landscape services.docx | DOCX document | |
| letter to offerors 19MX5725Q0016.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TABLE OF CONTENTS
SECTION 1 - THE SCHEDULE
· SF 1449 cover sheet
· Continuation To SF-1449, RFQ Number 19MX5725 Q 0016, Prices, Block 23
· Continuation To SF-1449, RFQ Number 19MX5725 Q 0016, Block 20 Description/Specifications/Work Statement
· Attachments 1 - 6
SECTION 2 - CONTRACT CLAUSES
· Contract Clauses
· Addendum to Contract Clauses - FAR and DOSAR Clauses not Prescribed in Part 12
SECTION 3 - SOLICITATION PROVISIONS
· Solicitation Provisions
· Addendum to Solicitation Provisions - FAR and DOSAR Provisions not Prescribed in Part 12
SECTION 4 - EVALUATION FACTORS
· Evaluation Factors
· Addendum to Evaluation Factors - FAR and DOSAR Provisions not Prescribed in Part 12
SECTION 5 - REPRESENTATIONS AND CERTIFICATIONS
· Offeror Representations and Certifications
· Addendum to Offeror Representations and Certifications - FAR and DOSAR Provisions not Prescribed in Part 12
SECTION 1
COVER PAGE
See SF-1449 in attached file.
THE SCHEDULE
CONTINUATION TO SF-1449
RFQ NUMBER 19MX5725 Q 0016
PRICES, BLOCK 23
1.1 GENERAL
The contractor shall provide Grounds, Irrigation and Landscape Maintenance Services including furnishing all labor, material, equipment and services for U.S. Consulate General in Hermosillo, Sonora, Mexico.
1.2 TYPE OF CONTRACT
The contract type is firm-fixed rates. Orders will be placed by firm-fixed purchase order.
1.3 PERIOD OF PERFORMANCE
The performance period of this contract is from the star date in the Notice to Proceed and continues for 12 months. The initial period of performance includes any transition period authorized under the contract.
The Contracting Officer may also extend this contract for an additional six (6) months, if required by the Government, in accordance with the FAR clause 52.217-8 Option to Extend Services, in Section 2 of this contract.
1.4 NOTICE TO PROCEED
After contract award and submission of acceptable insurance certificates, the Contracting Officer shall issue a Notice to Proceed. The Notice to Proceed will establish a date (a minimum of ten (10) days from date of contract award unless the Contractor agrees to an earlier date) on which performance shall start.
1.5 PRICING
This is a fixed-price contract.
(a) The Contractor shall provide the supplies or services for the base period of the contract at the rates shown below and any option years exercised by the U.S. Government.
(b) The U.S. Government will pay the Contractor the fixed price per service described after they has been satisfactorily performed and received by the Contracting Officer (CO) or the Contracting Officer Representative (COR), along with required reports and paperwork including proper invoice.
| (c) | The price listed below shall include all managerial, administrative and direct labor, required uniforms, materials, tools and/or equipment, insurance (see FAR 52.228-4 and 52.228-5), overhead, |
| and profit. The Government will pay the Contractor the fixed price per month for standard services that have been satisfactorily performed. The U.S. Government will not pay any additional expenses. |
PRICING
1.5.1 CURRENCY
1.5.1.1 Offers and Payments in U.S. Dollars
U.S. firms are eligible to be paid in U.S. dollars. U.S. firms desiring to be paid in U.S. dollars should submit their offer in U.S. dollars. A U.S. firm is defined as a company which operates as a corporation incorporated under the laws of a state within the United States.
Local companies are eligible to be paid in U.S. dollars provided that such company has a bank account in U.S. dollars at a Local Bank.
1.5.1.2 Offers and Payment in Pesos, Mexican currency.
Any firm that is not a U.S. firm is a foreign firm. Any local or foreign firm that does not meet the definition of a U.S. firm shall submit its prices and receive payment in local currency unless the foreign or local firm has a U.S. dollar bank account at a Local Bank.
1.5.2 VALUE ADDED TAX
1.5.2.1 U.S. Firms
Value Added Tax (VAT) is not applicable to U.S. firms, therefore it shall not be included in U.S.
firms’ rates or Invoices.
1.5.2.2 Local Companies
Value Added Tax (VAT) for offers submitted by local companies, either in U.S. Dollars or in Pesos, Mexican currency, is not included in line-item rates. Instead, it will be priced as a separate amount in the contract and on the Invoices. Local law dictates the portion of the contract price that is subject to VAT; this percentage is multiplied only against that portion.
1.5.3 BASE YEAR PRICES
The contractor shall provide the services stated below for the Base Period of the contract, starting on the effective date in the Notice to Proceed and continuing for a period of 12 months.
As per paragraph 1.5.1 above, prices are in _________ (Insert Currency).
| CLIN |
| Description |
| Unit of Measure |
| Month |
| Unit Price |
| Sub-Total |
| Grounds, Irrigation and Landscape Maintenance Services as stated under the Performance Work Statement. |
| Month |
| 12 |
| $ |
| $ |
VAT
Total Price
PERFORMANCE WORK STATEMENT
CONTINUATION TO SF-1449
RFQ NUMBER 19MX5725 Q 0016
PRICES, BLOCK 20
1.6 PERFORMANCE WORK STATEMENT
The purpose of this contract is to obtain grounds, irrigation and landscape maintenance service for the U.S. Consulate General Hermosillo Compound, located in Hermosillo, Sonora, Mexico.
The main purpose of this PWS is to provide guidance to interested contractors on:
How the contractor will meet the Consulate requirements.
1.7 GENERAL REQUIREMENTS
Maintenance and appearance of the grass, garden areas, trees, and related landscape elements, as all the groundskeeping and irrigation system maintenance of the Hermosillo, Sonora New Consulate Compound are an important part of the representational responsibilities of the U.S. mission. The Government will measure the Contractor’s work by the services covered by this contract. The Contractor shall perform complete gardening, groundskeeping and irrigation maintenance as described in this contract for all Government properties listed in this document.
Contractor shall provide coordination, supervision, materials, tools, consumables, reagents, personal protective equipment “PPE”, management, and maintenance services to complete the requirements of this contract. There are no USG materials/products/tools provided for this service.
Activities as mentioned below, shall be performed between 8:30 AM and 3:30 PM Monday through Friday. Contractor can take advantage of mentioned schedule and based on that, assign the number of workers to assist.
Contractor furnished materials shall include, but not be limited to, any material needed to satisfactorily complete and deliver a high quality product, the materials considered shall be: cleaning accessories, different sizes and material brushes, ladders, tools, telescopic poles, vacuum/blowing cleaning equipment, cleaning and treatment chemicals, containers and labels for any substance used, PPE like gloves and safety glasses, plastic bags and containers to pick-up debris and garbage.
Contractor shall adhere to The Green Seal Standard for Commercial and Institutional Cleaning Services, GS-42. This standar establishes requirements for cleaning services to ensure a quality operation carried out by a highly trained workforce skilled in effective green cleaning practices to reduce the impact on human health and the environment.
All cleaning products and chemicals to be used shall meet the requirements of LEED v4.1 O+M EQ Prerequisite Green Cleaning Policy and must be approved by the COR before using. Before using any cleaning products, the contractor must provide samples and SDS/product information for the COR to review. No products may be used onsite without specific COR approval in writing.
The Contractor shall submit an Annual Groundskeeping Services and Irrigation Maintenance Plan that reflects the proposed frequency for meeting the requirements of this contract. The plan will be developed to fit the requirements of local conditions, types of vegetation and climate factors. The Contractor shall submit the mentioned document with the proposal.
SECTION 1
PERFORMANCE WORK STATEMENT
This plan also shall include necessary preventive measurements to avoid having death plants or grass, unfortunately climate conditions doesn't qualify to justify any loss of dead plants or grass.
Another information to include is a tentative schedule for a routine working week, mentioning number of persons to assist and hours per day. With the proposal, Contractor should mention a summary of experience with this kind of service.
All work shall be performed during normal working hours as mentioned before and other hours, if requested by Contractor, may be approved by the COR. Changes in work hours, initiated by the Contractor, will not be a cause for a price increase. For those items other than routine daily services, the Contractor shall provide the COR with a detailed plan as to the personnel to be used and the time frame to perform the service.
The Contractor shall include all planning, administration, and management necessary to assure that all services comply with the contract, the COR's schedules and instructions, and all applicable laws and regulations. The Contractor shall meet all the standards of performance identified in the contract. The Contractor shall perform all related support functions such as supply, subcontracting, quality control, financial oversight, and maintenance of complete records and files.
1.8 SPECIFIC REQUIREMENTS
1.8.1 MANAGEMENT AND SUPERVISON
The Contractor shall designate a representative who shall be responsible for on-site supervision of the Contractor's workforce whenever is required by the COR. This supervisor shall be the focal point for the Contractor and shall be the point of contact with U.S. Government personnel. The supervisor shall have supervision as his or her sole function. Supervisor should cover at least, 2 visits per week.
Contractor shall institute an appropriate inspection system including:
a. Develop and maintain checklists of duties to be carried out.
b. Ensure these duties are closely monitored by the supervisor and skilled workers.
c. Perform inspections at all work locations to determine whether the various services are being performed according to the contract requirements.
The Contractor’s Supervisor designated under this Contract is:
Supervisor: __________________________________________ Telephone Number(s): ___________________ E-mail: _________________________________
1.8.2 SCHEDULES
The Contractor shall maintain work schedules. The schedules shall take into consideration the hours that the staff can effectively perform their services without placing a burden on the security personnel of the Post. The Contractor shall deliver standard services between 8:30 AM and 3:30 PM Monday through Friday. For those items other than routine daily services, the Contractor shall provide the COR with a detailed plan as to the personnel to be used and the time frame to perform the service.
SECTION 1
PERFORMANCE WORK STATEMENT
1.8.3 QUALITY CONTROL
The Contractor shall be responsible for quality management. The Contractor shall deliver a Quality Management Plan (QMP) to the Contracting Officer’s Representative (COR) for review within thirty (30) days after award of the contract. The COR must approve this QMP before issuance. The QMP shall define the procedures to perform Quality Checklist, on-site inspections, and Perform Quality Assurance and Quality Control.
1.8.4 MONTHLY REPORT
Deliver a written monthly report to the COR by email, indicating the performed activities checklist in the period how and when the services were accomplished during the month, general conditions, the outcomes of the quality management plan, findings, issues detected, the complaints received, if any, and a brief schedule of relevant activities planned for next month. This report is a requirement to submit the invoice.
1.8.5 TECHNICAL GUIDANCE
The Contractor shall have the services of a trained horticulturist with experience in the climate and soil conditions found locally, to give technical guidance to the Contractor's workforce and to develop and guide the Contractor's planting programs for green roof, groundcover, lawn, shrub and tree care. All personnel assigned by the contractor for the performance of the respective services shall be supervised by the contractor.
The contractor’s personnel must take the online training prior to have the certificate in using ladders and step ladders. To take this training, go to: https://www.laddersafetytraining.org/, and provide the certificate to the COR.
All personnel that will work on heights and with chemicals, must present a formal certification or document to demonstrate this aptitude.
1.9 GROUNDS, IRRIGATION AND LANDSCAPE MAINTENANCE PLAN
The Contractor shall submit an Annual Groundskeeping and Irrigation Plan that reflects the proposed frequency for meeting the requirements of this contract. The Grounds and Irrigation Maintenance Plan will be developed to fit the requirements of local conditions, types of vegetation, and climate factors. The Contractor shall submit the Grounds and Irrigation Maintenance Plan to the COR for approval same date of proposal submission.
NO STORAGE OF CHEMICALS IS ALLOWED ON SITE BUT FOR THE AMOUNT IN THE BOTTLE OR PACKAGE IN USE. NO LIQUID CHLORINE CAN BE USED IN THE PREMISES.
1.9.1 DESERT TREES
PRUNING
Pruning a tree in desert climates, like Desert Willows, Palo Verde, or Africans, requires specific care due to the harsh growing conditions. These trees are adapted to thrive in dry environments, so proper pruning is essential for their health and appearance. Here are the general steps to prune a desert tree effectively.
1. Inspect the Tree, look for any dead, diseased, or broken branches that should be removed first. Removing dead wood will prevent pests and diseases from taking hold. Identify branches that rub against each other or cross over one another. These can cause wounds that allow pests or diseases to enter the tree. You should also evaluate the overall structure of the tree and make note of areas that may need thinning or shaping to promote better air circulation and sunlight penetration.
2. Prune for Health, cut away dead, damaged, or diseased branches, cutting them back to healthy tissue. This helps prevent rot and disease from spreading to healthy parts of the tree. When removing dead or diseased wood, always cut back to the base of the branch or to a healthy branch. Avoid leaving stubs, as they can become entry points for pests and diseases.
3. Prune for Shape and Size, desert trees often have a natural, irregular shape. Prune back any long or leggy growth to maintain a balanced and attractive appearance. Trim branches that are growing inwards or towards the center of the tree to help maintain an open, airy structure. If the tree has outgrown its space or is becoming too large, prune to control its height and width. Remove any branches that are crowding pathways or structures. Keep the cuts gradual, never removing more than a third of the tree at a time to avoid stress.
4. Remove Suckers and Water Sprouts, suckers are shoots that grow from the base of the tree or from the roots. These should be removed to maintain the tree’s shape and prevent them from drawing energy away from the main tree. These fast-growing, vertical shoots typically form after heavy pruning. If left unchecked, water sprouts can weaken the tree's overall structure.
5. Thinning for Airflow, prune away any small or weak branches inside the tree to improve airflow and light penetration. This is especially important for desert trees, as it helps to prevent fungal diseases and allows for better photosynthesis. While thinning is important, don’t overdo it. Desert trees need their leaves to survive in dry conditions, and too much thinning can cause stress and reduce the tree's ability to photosynthesize effectively.
IMPORTANT THINGS TO HAVE IN MIND WHILE PRUNING
When pruning a tree, it is important to use the proper cutting tools such as hand shears, loppers, or pruners, depending on the size of the branch being removed. Additionally, always angle cuts away from the stem to prevent water from pooling and causing decay. For larger limbs, it is often best to make several smaller cuts rather than one large cut to avoid damaging the tree. If two branches are rubbing against each other, cut one back to reduce friction and prevent wounds that can invite disease or pests. Also, remove any branches that cross or grow toward the center of the tree, which can crowd the tree’s interior and reduce airflow.
When managing height and width, the goal is to maintain a natural appearance and balanced shape. This can be achieved by selectively trimming branches that are too long or growing too closely together.
It is important not to remove more than one-third of the tree’s branches at any time, as this can stress the tree and cause long-term damage. If pruning multiple branches, ensure they are spaced evenly to preserve the overall shape.
SECTION 1
PERFORMANCE WORK STATEMENT
Lastly, always make cuts just above a bud or leaf node to encourage healthy new growth in the desired direction. By following these tips, you can keep your tree healthy, well-shaped, and thriving for years to come.
For flowering desert trees like Desert Willow, prune spent flowers and seed pods to prevent the tree from expending too much energy on seed production. This will also help the tree look tidy and promote further blooming.
1.9.2 PALM TREES
Maintain palms always clean and in good condition. Trim those whenever is necessary or requested by the COR. This task implies height work which must be considered in the safety plan mentioned above.
PRUNING
1. Assess Possible Hazardous Growth, look at the overall shape of the Bismarck palm's canopy of fanlike fronds. It naturally becomes a rounded mass of leaves, even extending fronds horizontally and to the ground in young plants that lack a trunk or have a short one. Note if any fronds pose a hazard such as blocking a walkway, rubbing into a building facade or encroaching upon another prized plant in the garden.
2. Remove Hazardous or Sagging Fronds, remove fronds that pose a hazard or are already dried or light brown in color and sagging along the trunk. According to the University of Florida, there is no reason to remove healthy fronds or those that grow horizontally or upward angled in the canopy. In fact, removing healthy palm fronds stresses the plant and slows its growth and production of food.
3. Use a Pruning Saw, saw into the base of the frond with a pruning saw about 6 inches from the trunk. Grasp the stem petiole of the Bismarck palm frond with your spare hand and balance it as you cut; it is large, heavy and cumbersome. As you penetrate the stem with the saw, be prepared to support more weight of the dropping frond. Balance the frond as you saw to prevent it from tearing at the base and to help guide its fall.
4. Remove the Pruned Fronds, lift the cut frond away from the palm or direct its drop to the ground after the pruning cut severs it.
5. Trim Flower Stalks, to prune other parts of the palm tree in early summer, such as the flower stalks that grow from the cluster of frond bases. Bismarck palms are either male or female based on their flowers; only pollinated female palms yield the blue-green fruits that ripen to black. Removing flower stalks improves the visual "cleanness" of the palm in some people's eyes. Keeping the flower stalks is fine, too, but they will dry to brown in fall and not look attractive.
IMPORTANT THINGS TO HAVE IN MIND WHILE PRUNING
Always prioritize removing dead, yellowing, or brown fronds. These fronds no longer serve the tree and can attract pests or diseases. In addition, palm trees rely on their healthy, green fronds for photosynthesis and
SECTION 1
PERFORMANCE WORK STATEMENT
energy production. Only remove fronds that are completely dead or diseased. Remember that when removing fronds, make sure to cut them as close to the trunk as possible without damaging the trunk itself.
The central leader (the topmost growing point) should never be pruned. It is crucial for the palm’s growth. Cutting this part can stunt the tree’s growth and may kill it.
1.9.3 SMALLER PLANTS (SHRUBS/GROUND-COVERS)
1.9.3.1 JUSTICIA CALIFORNICA (CHUPAROSA)
Pruning a Justicia californica (also known as Chuparosa or California Fuchsia) is a straightforward process that helps maintain the health, shape, and appearance of the plant. This shrub is native to desert regions and thrives in dry conditions, so proper pruning can encourage vigorous growth and improve flowering.
1. Remove Dead or Damaged Growth, look for any dead, damaged, or diseased stems and remove them at their base. This will help the plant focus energy on healthy growth and prevent the spread of disease.
2. Identify Spent Blooms, cut back spent blooms to encourage the plant to continue blooming or to prevent the plant from expending energy on seed production.
3. Shape the Plant, maintain a compact, bushy shape, prune back leggy growth, cutting just above a set of leaves or buds. This will encourage the plant to grow more densely and prevent it from becoming too spindly. If the plant has outgrown its space or become too large, you can trim back the stems to the desired size. Be cautious not to remove more than one-third of the plant's size in a single pruning session.
4. Cut Back to Promote New Growth, prune back to healthy nodes or leaves, especially if the plant has become too leggy. Cutting back to these points will stimulate fresh new growth in the spring, resulting in a more vibrant and fuller plant. Unless the plant is severely overgrown or needs rejuvenation, avoid cutting back too far to the ground. Justices californica can be pruned more drastically if it has become woody, but it is typically best to leave some structure.
5. Remove Spent Flowers and Seed Pods, After the flowering season, remove any spent flowers and seedpods. This will keep the plant looking tidy and may help to promote a second flowering in some cases. If you want to control where the plant blooms, you can selectively prune the stems where flowers appear, encouraging a uniform display.
1.9.3.2 BOUGAINVILLEAS
Bougainvillea are fast-growing, hardy plants that thrive in warm climates, and regular pruning helps to control their size and promote more flowers. Here are the steps to prune a Bougainvillea properly.
1. Inspect the Plant, start by removing any dead, diseased, or damaged branches. This helps the plant focus its energy on healthy growth and reduces the risk of pest infestation. In addition, check for any areas where the plant has become too thick or leggy and could use some thinning to improve airflow and sunlight penetration.
2. Prune for Shape and Size, Bougainvillea are often pruned to maintain a compact, bushy shape or to encourage them to climb if they are trained as vines. Cut back any long, leggy branches to a lateral branch or leaf node to encourage denser, more controlled growth. To control their size, prune back any overgrown or excessive branches, making sure not to remove too much at once. Remove no more than 1/3 of the plant at a time to avoid stress.
3. Encourage More Blooms, bougainvillea bloom on new growth, so pruning the plant will encourage the production of more flowers. After each bloom cycle, prune back the plant to encourage new growth where the flowers will appear. Cut the branches back to a healthy node (the point where a leaf or branch grows from the stem). This will encourage branching and lead to more blooms.
4. Remove Leggy or Overcrowded Growth, if Bougainvillea has become too dense, thin out the interior growth to allow sunlight and air to reach all parts of the plant. This also helps to reduce the risk of fungal diseases. Make sure to prune at an angle just above a bud or leaf node. This will help encourage new growth in the desired direction.
5. Prune Vines or Trailing bougainvillea, if Bougainvillea is growing as a vine, prune it back to encourage lateral growth along the support structure. You can remove longer stems or trim the tips of the branches to maintain its shape and encourage branching. For vines, regularly check that the plant is growing where you want it to, and redirect growth by pruning where necessary.
1.9.3.3 NOPALES
Pruning nopales (the pads of the prickly pear cactus) is an important practice to maintain the health, appearance, and productivity of the plant.
Pruning encourages the growth of new pads, removes damaged or diseased parts, and helps the plant retain a manageable size.
1. Inspect the Plant, start by looking for any pads that are dead, diseased, or damaged. These should be removed first to help prevent the spread of any infection. Examine the cactus for any pads that are too close together or growing in awkward directions. Pruning these will improve airflow and sunlight penetration, promoting better overall growth. Also, identify any pads that are growing too large or in unwanted directions, especially if the cactus is growing too wide or taking up more space than desired.
2. Prune the Nopales, use pruning shears or a sharp knife to cut away any dead or diseased pads at the base. Make clean, straight cuts as close to the main stem (or trunk) as possible. If the pad is dead or rotting, remove it entirely to prevent disease spread. To control the size and shape of the cactus, prune any pads that are overly large, growing in the wrong direction, or crowded. Make cuts just above the base of the pad, ensuring the remaining pad looks natural and balanced. When cutting pads for size or shape, try to make cuts that encourage new pads to grow in desirable locations. If you leave a flat cut, it may encourage new pads to grow from that spot.
3. Handling the Pruned Pads, always handle the cut pads carefully, using tongs or pincers to avoid direct contact with the spines. Use a towel or thick gloves to move them safely. After pruning, dispose of the cut pads away from the plant. In locations where the pads can root, replanting in the ground to propagate new plants is an option. Just ensure they are left to dry out for a few days to form a protective callus over the cut surface before planting.
4. Monitor for New Growth, pruning encourages new growth from the base of the cactus or where pads have been removed. If pruning for harvesting, start to see new, smaller pads grow from the main stem. After pruning, ensure the cactus is watered, especially if removing a large amount of growth. However, be careful not to overwater, as cacti are sensitive to excess moisture. Water lightly but consistently until the plant shows signs of new growth.
5. Pruning for Harvesting Nopales, if pruning the cactus to harvest nopales for cooking, choose mature pads (usually those that are about 6–8 inches long) and cut them off cleanly with a sharp knife. Leave the smaller, younger pads to grow for future harvesting. After harvesting the pads, make sure to leave enough healthy growth to ensure the plant continues to thrive and produce more pads in the future.
1.9.3.4 PENNISETUM SETACEUM (FOUNTAIN GRASS)
Fountain grass is a popular ornamental grass known for its graceful, arching stems and feathery flower heads. Pruning helps rejuvenate the plant and promotes lush new growth.
1. Remove Dead or Damaged Foliage, start by inspecting the grass for any dead, brown, or damaged foliage. These are best removed to keep the plant looking neat and healthy. If the plant is getting too large or out of shape, pruning will help control its size and maintain its natural arching form.
2. Cut Back Old Growth, cut the entire clump of grass back to about 4 to 6 inches above the ground. This allows for fresh growth while also removing the old, dry foliage that could hinder the plant’s new shoots. Make clean, sharp cuts to avoid damaging the plant and to ensure that new growth can easily emerge. Be careful not to cut into the crown of the plant (the base of the clump where the new growth emerges). Prune just above the crown to leave the healthy tissue intact.
3. Remove Dead or Diseased Foliage, as pruning, check for any signs of disease or pests, such as discolored or damaged leaves. Remove any affected foliage to improve plant health. If there are any damaged or broken stems, trim them back to the base to allow healthy growth.
4. Shape the Plant (If needed), to shape the grass or reduce its size, trim back any overly long or out-of-place stems to maintain a rounded, tidy appearance. For older, dense clumps, thinning out some of the older growth can help encourage fresh new shoots and improve air circulation.
1.9.4 LAWN CARE (SOD/BERMUDA GRASS)
Pruning sod (or turf grass) is not a common practice in the same way as pruning shrubs or trees. However, there are maintenance tasks that resemble pruning, such as mowing and edging, which are crucial for keeping your sod healthy and looking neat. Maintain turf in a healthy, growing condition by performing the following operation and other incidental work thereto.
1.9.4.1 GRASS CUTTING, EDGING, TRIMMING AND WEEDING
The Contractor shall maintain the height of turf grass between 2 and 3 inches (5-7.5 centimeters); shall edge all sidewalks, driveways, and curbs each time the adjacent grass is cut. However, shall always check the guidelines for your specific grass variety. The Contractor shall trim grass around trees, shrubs, cultivated areas, sprinkler heads, valves, fences, buildings, poles, and structures. The Contractor shall weed the grounds and gardens on a continuous basis to prevent the growth of weeds into lawn and landscapes.
The Contractor may use weed-killing chemicals (EPA approved) to prevent the growth of weeds to eliminate grass and weeds in the cracks and joints within or along sidewalks and curbs. The Contractor shall obtain approval of the COR for all applications of weed killers. The Contractor is responsible for all equipment and fuels needed to complete this task.
1.9.4.2 MOWING AND TRIMMING
Avoid Cutting Wet Grass: Avoid mowing sod when it's wet, as this can lead to clumping, uneven cuts, and stress on the grass.
1. Turf shall be mowed using a “reel type” mower, at least once every seven calendar days, it may be necessary to mow more often during periods of rapid growth or less during slow growth periods. Turf shall be mowed as otherwise necessary to maintain a neat, trim appearance. Rough cutting will not be permitted. Mowing schedules will be at the direction of Facilities Manager.
2. Mowing Height: Try to cut no more than 1/3 of the leaf length with each cut. Mowing height is to be measured with mower on a flat, paved surface. Mowing height for each site shall be confirmed with Facilities Manager.
3. Mowing shall be accomplished in such a manner so that no damage occurs to sculptures, trees, shrubs, perennials, signs, etc. Grass catching attachments shall be in place during mower operation. Sharp Blades: Ensure that the mower blades are sharp, as dull blades can tear the grass, causing it to turn brown or develop fungal diseases.
4. Clippings shall be immediately removed from any roadway, walkway, or parking area, curbing, drains, etc. after each mowing. Excessive clippings resulting from lush growth shall be removed from grass areas by the contractor after each mowing operation. Excessive clippings are typically defined as accumulated clippings that may inhibit the health of the underlying plants.
5. Trimming around trees, shrubs, utilities, signs, etc. shall be performed at each mowing using herbicides, hand labor, and/or machines. Trimming shall be done in such a manner as not to damage sculptures, trees, shrubs, signs, etc. Only Post approved herbicides may be used. Post will provide the herbicides recommendations to the Contractor.
1.9.4.3 EDGING
TURF: Trim all edges with every mowing. Grass along curbs and sidewalks shall be cut vertical with the turf side of the pavement and present an even height. Remove all debris, dirt and trimmings after each operation.
1.9.4.4 WEED CONTROL
Normally flower beds, lawns, and around trees and shrubs, will be weeded by hand or with a hoe. When herbicides are required, Contractor will notify a Consulate Building and Grounds representative. Only Post approved herbicides may be used. Post will provide the herbicides recommendations to the Contractor.
The preferred Anti-desiccant is “Wiltpruf,” current product appears to be Herbicide & not an anti-desiccant.
TURF: Pre-emergent herbicide shall be applied at the contractor’s discretion to control both annual and perennial grassy and broadleaf weeds in strict accordance with label directions. Only Post approved herbicides may be used. Post will provide the herbicides recommendations to the Contractor.
1.9.4.5 PAVED SURFACES
Use non-selective and/or pre-emergent herbicides as necessary for expansion joints and cracks in paved surfaces. It shall be the contractor’s responsibility to remove all annual grasses and weeds from expansion joints and cracks of hard surfaces once the grasses and weeds have been sprayed and died. Only Post approved herbicides may be used. Post will provide the herbicides recommendations to the Contractor.
1.9.4.6 TURF REPAIR AND RE-ESTABLISHMENT
The Contractor shall, whenever necessary, repair areas damaged by vehicular traffic, oil and gas, building repairs, and foot traffic. The damaged area shall be filled in and leveled and then seeded or sodded and maintained to conform to adjacent areas. Sod, labor and any other required materials shall be furnished by the Contractor at no additional expense to the Government up to the maximums defined in Sections below.
SECTION 1
PERFORMANCE WORK STATEMENT
Repair of areas ten square feet and smaller shall be accomplished by the contractor within the cost of this contract. Areas larger than ten square feet shall be repaired on a case-by-case basis as recommended by the contractor and approved by the Facilities Manager. The Facilities Manager may also task the contractor to accomplish repair. The cost for such repairs will be based on a “per square foot” basis. The contractor will be reimbursed accordingly.
The following provides minimum guidance for accomplishing such repairs. The contractor may deviate from the procedure upon approval by the Facilities Manager: Bare spots and/or ruts shall be prepared and seeded using turf species approved by the Facilities Manager or his representative. Rake and seed lightly loosened soil to provide shallow coverage without affecting the seed distribution pattern. Water as required until grass in the restored bare spot(s) is established. Upon complete coverage of bare area, the contractor is to notify the Facility Manager or his representative for acceptance. Topsoil shall be screened, friable, and free of debris.
1.9.4.7 OVERSEEDING
Overseed all turf areas with turf species as directed by the Facilities’ Manager or representative. Rates will be as recommended by Contracting Officer. Core aeration shall be performed prior to overseeding. Aerate each lawn at least once each year in late spring using garden forks or an aerator machine. The method, frequencies, and dates of turf repair shall be part of the Contractor's Plan.
1.9.4.8 PRUNING
The Contractor shall maintain trees, shrubs, hedges, bushes, vines, ground cover and flowers. The Contractor shall prune all shrubs, vines, bushes, ground cover and trees to direct and encourage plant growth in directions desired, remove dead and unsightly growth, and maintain a neat and attractive appearance. Prune back/deadhead flowering plants.
The Contractor shall prune according to the schedule in the Plan to ensure that all heavy pruning is accomplished during the proper season according to best horticultural practice. The Contractor shall prune all hedges and shaped shrubs to always maintain proper shape.
At no additional cost to the Government, the Contractor shall replace any tree, bush or shrub that is killed or rendered unusable for its intended purpose through negligent or irresponsible practices that are attributable to the Contractor.
The method, frequencies, and dates of pruning shall be part of the Contractor's Plan.
This image shows the correct angle to prune a stem or branch (typical).
1.9.4.9 LEAF REMOVAL
The Contractor shall, on a weekly basis, remove leaves and other plant littler from the property.
1.9.4.10 RECYCLED MATERIALS
The contractor shall adhere to the Consulate’s Recycling Plan as instructed by the COR. The Contractor shall promote recycled uses for lawn and tree debris in meeting other gardening needs, such as mulch and compost. Retain all trimmings/pruning for Post compost. These activities shall be performed as needed.
1.9.4.11 ORGANIC MULCH
Organic mulch is a layer of natural material, such as wood chips, leaves, straw, or grass clippings, placed on top of soil. It shall be used, when necessary, in coordination with the COR and without causing additional expenses. Here are some key properties and benefits of mulch.
Moisture Retention: Mulch helps soil retain moisture by reducing evaporation. This is crucial for plant health, especially in hot, dry climates.
Temperature Regulation: It insulates the soil, keeping it cooler in the summer and warmer in the winter.
Weed Suppression: Mulch creates a barrier that reduces the amount of sunlight reaching the soil, thereby inhibiting weed growth.
Soil Health: Organic mulch decomposes over time, adding nutrients to the soil and improving soil structure and fertility.
Erosion Control: Mulch helps prevent soil erosion by reducing the impact of rain and wind on the soil surface.
Aesthetic Appeal: It provides a neat, finished look to garden beds and landscapes.
On the rooftop, don’t use rock mulch because Carpobrotus, Malephoras, and Aptenias, which are present in those planters, need to breathe and make contact with the soil to expand and re-root. Rock mulch tends to be hotter on the surface and can interfere with the plants’ ability to re-root and spread. If mulch is necessary, a thin wood mulch is more suitable for ground-cover plants.
Organic mulch also provides several benefits for plants, including lowering soil temperatures, retaining moisture, reducing weed germination, minimizing dust pollution, and preventing soil erosion.
1.9.4.12 REMOVAL OF DEBRIS
The Contractor shall remove foreign material, cuttings, grass, leaves, bark, limbs, dead vegetation, paper, and trash from the maintained areas, gutters, drains, multi-purpose courts, including walkways, stairways, and curbs within or adjacent to the area. The Contractor shall remove all debris and equipment from the work site before the end of each workday. Debris removal shall prevent unsightly accumulation. The Contractor shall promptly remove collected debris to an authorized disposal site. The Contractor is responsible for all expenses incurred in the collection and disposal of debris.
The contractor shall always keep the service hallway behind the Consulate Compound, clean of any disposable or removable foreign material.
Place trash containers outside of the Consulate Compound gate for city trash removal and bring them inside when empty. Wash empty trash containers.
1.9.4.13 WATERING AND IRRIGATION SYSTEM
The Contractor shall water lawns, flowers, shrubs, and trees to provide for moisture penetration to a depth of 7 centimeters in areas covered with aspersion irrigation and to a depth of 4 to 6 inches for grasses. When natural precipitation is sufficient to fulfill this requirement, the Contractor may request the COR's permission to suspend watering to avoid too much water in the soil. In areas covered with drip irrigation, the Contractor will not attempt to maintain general water moisture penetration but will monitor moisture levels adjacent to the plants as well as general plant health and adjust watering schedules constantly to ensure these remain in proper, healthy condition. Any plant that is noticeably malnourished or dies because of an absence of adequate levels of water must be replaced at the Contractor’s expense.
The Contractor shall follow the method, frequencies, and dates of watering as per Attachment 2 Irrigation System. However, recommendations are acceptable considering kinds of vegetation, local soil conditions, and the seasonal variations in plant moisture requirements.
All of the turf and bedded areas located in the priority areas of the Post are watered by Post installed irrigation systems. The contractor shall maintain the systems in working order from the main supply line to the emitter. Plant materials not included within the areas covered by the irrigation systems shall be watered as necessary to maintain their health. Water plants, shrubs, lawn and trees so that they do not appear stressed or wilting.
This may require watering more than once each week. Watering schedules will be determined by the Facilities Manager or designated representative. The Government shall furnish the supply of water.
Contractor shall provide all hoses, spouts, portable sprinklers, drippers, connections and other similar irrigation accessories that could fail during period of performance of this service.
In case of failure of the following, a price shall be submitted to the COR to be attended separated from this contract: manual and solenoid shut-off valves, filters, decoders, level sensor, and water pumps.
For more information on irrigation maintenance instructions, please refer to Attachment 2 Irrigation System.
1.9.4.14 FERTILIZING
The Contractor shall fertilize and balance the pH of the soil to promote proper health, growth, color, and appearance of cultivated vegetation, following proper horticultural practice for the types of vegetation, soil, weather conditions, and seasons of the year. EPA approved products is a requirement. The Contractor shall present the method of application, fertilizer type, frequencies, and dates of fertilizing and liming in the Plan or 3 days before if needed.
The Contractor shall apply high potash fertilizer and compost around the bases of flowering plants, shrubs, and trees a minimum of two times per year, or more if the lawns are not healthy or in times of unusual plant stress (10:10:10 or close equivalent). The Contractor shall apply weed killer once a year. If weed killer is not required, the Contractor shall confirm with the COR by written. The Contractor shall fertilize trees, shrubs, bushes, hedges and plants a minimum of once a year.
SECTION 1
PERFORMANCE WORK STATEMENT
Turf shall be fertilized according to the predominant grass type. As needed, the contractor shall coordinate appropriate soil testing with Post personnel to determine the fertility of the soil. The contractor shall also coordinate with Facility Manager (FM)/Post Occupational Safety and Health Officer (POSHO) personnel the application of such fertilizers.
The turf areas are covered by common fertilizing plan. The contractor shall be responsible for maintaining the fertilizer levels in this system in accordance with instructions provided by POSHO. The contractor shall provide a proposed fertilizing plan for areas not covered (refer to site map) the Fertilizers O&M guide to the Facilities Manager for approval. The plan shall contain but not be limited to: Types of fertilizer and other treatments to be used, method, and schedule for use.
The method, frequencies, and dates of grass fertilizing shall be part of the Contractor's Plan.
Fertilizers recommended in spec are: “Ra-Pid-Gro” for non-ericaceous & Miracid for ericaceous plants. Before Landscape Architect can approve alternative, please confirm the N-P-K of “Quiver Calcio” Compost and fertilizers can change, or recommendations can be made by the Hermosillo Green Team. Contractor must consider Green Team recommendations.
1.9.4.15 PEST AND DISEASE CONTROL
As insect and disease problems occur, apply appropriate chemicals to shrubs in leaf, and groundcovers/perennials as directed to control all forms of pests and diseases. The Contractor shall maintain a program for controlling pests and plant disease to maintain flowers, shrubs, vines, trees and other planted areas in a healthy and vigorous condition. All chemicals used for control purposes shall be applied according to OBO SHEM Guidance and State and Local requirements. The Contractor shall obtain approval of the COR for all pesticides (SHEM/EPA), and when required, the Contractor will notify a Consulate Building and Grounds representative. Only Post approved insecticides may be used. The Post will provide recommendations for insecticides to the Contractor.
The Contractor shall present a plan for pest and disease control as a part of its Groundskeeping Plan. It is the Contractor's responsibility to ensure the safe handling, application, removal and environmentally sound disposal of all hazardous or potentially hazardous fertilizers, weed killers, and pest control products utilized in this requirement.
1.9.4.16 APPLICATION OF CHEMICALS
All chemicals used for control purposes, including, but not limited to, pesticides, shall be approved by Department of State (DOS) Overseas Building Operations (OBO) Safety Health and Environment Management (SHEM) and applied by, or under, the direct supervision of POSHO Certified Pesticide Applicator who holds a Commercial Pesticide Applicator’s Permit for ornamentals and turf pest control, or a Registered Technician.
The permit shall be current during the entire period of this contract and issued by the POSHO. Within ninety days after contract award, the contractor shall furnish Post with a copy of the Material Safety Data Sheet (MSDS) and Pesticide Applicator’s Permit valid for the duration of this contract. The contractor accepts total responsibility for the replacement of shrubs, trees, groundcovers, and turf grass, etc., whether owned by Post or others, which the FM judges to have been damaged or killed as a result of chemical application under this contract.
SECTION 1
PERFORMANCE WORK STATEMENT
The Contractor shall furnish labels of all chemicals being used in conjunction with this contract. Litter Control Unless otherwise specified litter control shall include but not be limited to: leaves and other organic materials, paper, plastic, glass & other debris materials. The emptying of Trash and Trash receptacles shall be included in litter control. Only Post approved insecticides may be used. The Post will provide recommendations for insecticides to the Contractor.
NO STORAGE OF CHEMICALS IS ALLOWED ON SITE BUT FOR THE AMOUNT IN THE BOTTLE OR PACKAGE IN USE.
It is the responsibility of the contractor to know and follow chemical safety guidelines to reduce the risks involved with using chemicals.
Anytime the staff manipulates chemical products, MSDS (material safety data sheet) shall be used and applied accordingly.
1.9.4.16.1 LABELING AND STORING OF CHEMICALS
The Contractor shall adhere to the Landscaping Chemical Products Guidelines instructed by the COR considering the following: Landscaping/chemical products such as fertilizers, herbicides, pesticides and fungicides, anti-desiccant, etc., shall be contained in labeled bottles/containers to include labelled dispensers.
Bottles/dispensers/containers shall be appropriate and approved for the product to be contained. Labels shall be of plastic material; prints must be readable despite contact with the liquid, and they shall comply with the Globally Harmonized System of Classification and Labeling of Chemicals (GHS). Bottles/containers damaged shall be reported to the COR and must be replaced.
1.9.4.17 OTHER GROUND COVER
The Contractor is responsible for maintenance of all planters. Contractor will maintain all landscape boulder, pebble, stone, and sand ground cover in an attractive and clean condition. Sidewalks and driveways will likewise be always maintained clean; power wash is required, and its frequency shall be indicated in the annual plan. All plant clippings, litter and other debris will be removed promptly. Contractor is responsible for replacing any ground cover materials that are damaged or lost due to use, wind damage or vehicular traffic, to include replacement of fine sand, crushed pebbles and stones, and the plastic sheeting underneath the stone ground cover.
Replacement of these materials may include an area up to 3,800 m² per year (contractor is not responsible for damages beyond this amount) and each time this is done, contractor shall send to COR the information in order to register the affected surface and reduce it from the 3,800m² total.
Courtyard leaves: with about 103 trees and 604 of shrubs planting in the garden, leaves need to be vacuumed up and not blown or pushed down into the “slot” drains, Organic material in the slot drain will eventually plug up this storm drain. Slot drains are to remain clear and open.
1.9.4.18 REPLACEMENT OF PLANTS
As part of the regular maintenance plan, the Contractor will be required to replace plants, shrubs or trees damaged, any dead or thin areas by routine use, poor care, or accidental/intentional destruction, such as vandalized green areas in the Main Arrival Court and Consular Arrival Court. This will also include the routine replacement of flowering annually. The total annual cost for this service may not exceed 10% of the total contract value for that year. Additional services above the 10% limit may be requested as temporary additional services. Contractor shall report these replacement events to COR before executing so a tracking could be performed during each option year of the contract and costs can be agreed.
REFERENCE PICTURE
Shown areas are main scope of this Groundskeeping Services. However, the site visit is a requirement to know all the areas to consider with the proposal. The exact measurement is subject to the independent measurements by the contractor.
1.9.4.5 PERFORMANCE WORK STATEMENT: GENERAL SERVICES
The Contractor shall clean and keep clean the garden, and sweep all paved, tiled, concrete areas and the parking lot including but not limited to, driveways, terraces, hallways, sidewalks, walkways, and those areas that are set on a special event.
1.9.4.5.1 CLEANING
Pressure wash or scrub clean all paved, tiled, and concrete…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .