RFQ for HS Gymnasium Wood Flooring project.docx

DOCX document 69 KB Posted

Attached to
Emergency Towing Services
Solicitation number
S-KM2467-00003647
Issued by
Marion County, Moro City, Oregon

About this file

Falls City School District #57 - High School Gymnasium Wood Flooring Project RFQ

This is a Request for Quote (RFQ) issued by Falls City School District #57 in Falls City, Oregon for the High School Gymnasium Wood Flooring Project located at 177 Prospect Street. The project involves providing and installing approximately 7,450 square feet of Northern hard maple strip flooring (MFMA-RL Second and Better grade, 25/32 inch thick, 2-1/4 inch face width) along with a complete subfloor system, venting, sanding, sealing, striping, and finishing work. The RFQ was prepared on June 27, 2022, with a submission deadline of July 19, 2022 at 2:00 p.m. The project timeline establishes a work start date of August 1, 2022, with substantial completion required by January 15, 2023, and final completion by January 31, 2023. The gymnasium building will be available for the contractor from August 1, 2022 through January 31, 2023. Bidders must provide at least three references for similar flooring projects completed within the past five years. Proposals will be evaluated based on timeliness of submission, performance effectiveness, bidder performance history and ability to deliver qualified personnel, and overall cost effectiveness.

All bidders must be licensed with the Oregon Construction Contractors Board (CCB) and maintain current compliance with State of Oregon prevailing wage requirements under ORS 279C.800. Bidders are required to submit bid security in the amount of 10% of the total bid proposal in the form of a surety bond, irrevocable letter of credit, cashier's check, or certified check. The successful bidder must execute performance and payment bonds as detailed in ORS 279C.380 and file or maintain a current $30,000 public works bond with the CCB before work commences. Insurance requirements for the successful bidder include Workers Compensation coverage with $1,000,000 employers liability limits, Commercial General Liability with a combined single limit of not less than $2,000,000 and annual aggregate of $3,000,000, and Commercial Automobile Liability with combined single limits of not less than $1,000,000 per occurrence. Bidders must submit evidence of legal authority to conduct business in Oregon, their Federal Employee Identification Number, detailed cost breakdowns including all expected expenses, and a detailed list of any subcontractors with background materials and references. Falls City School District reserves the right to award the contract prior to the deadline, award to multiple bidders, or refuse any proposal without obligation.

View the file

Other files

File Type Posted
BID PROPOSAL rev 06222022.doc DOC document
Emergency Tow Specifications and Policy REV 06222022.doc DOC document
Invitation to Bid- Tow 2022.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FALLS CITY SCHOOL DISTRICT #57

111 N Main StreetBusiness Office Fax: 503-787-5805
Falls City, OR 97344High School Fax: 503-787-1507
Phone: 503-787-3521Elem. School Fax: 503-787-3239

“Falls City School District provides well-rounded opportunities for students to become productive positive citizens and life-long learners”

Cory Ellis Micke Kidd John Gilbert Superintendent High School Principal Facilities Manager

Falls City School District #57 Request for Quote (RFQ) High School Gymnasium Wood Flooring project located at:

177 Prospect Street Falls City, OR 97344

HIGH SCHOOL GYMNASIUM WOOD FLOORING PROJECT

Falls City School District #57 111 North Main Street Falls City, Oregon 97344 Phone: 503-787-3521 Ext.1207 Fax: 503-787-1507 John.gilbert@fallscityschools.org

RFQ ID: 0002

Prepared by: John W. Gilbert Date: June 27, 2022

REQUEST FOR PROPOSAL

High School Gymnasium Wood Flooring Project Falls City - Oregon

RFQ ID: 0002

SUBMISSION DEADLINE: July 19, 2022 at 2:00 p.m.

RFQ Contact Name:
Donna Creekmore

Business Manager

Contact Address:
111 North Main Street

Falls City, Oregon 97344

Telephone Number:
503-787-3521
Email Address:
Business.manager@fallscityschools.org

PROJECT MANAGER CONTACT INFORMATION

The following individual(s) are the assigned contacts for the following:

For questions or information regarding this project, contact:

Name:
John W. Gilbert
Title:
Facilities Manager
Phone:
503-910-4127
Fax:
503-787-1507
Email:
John.gilbert@fallscityschools.org

INTRODUCTION

Falls City School District #57 invites and welcomes proposals for their High School Gymnasium Wood Flooring Project. Please take the time to carefully read and become familiar with the proposal requirements. All proposals submitted for consideration must be received by the time as specified above under the "SUBMISSION DEADLINE."

BIDDERS SHOULD NOTE THAT ANY AND ALL WORK INTENDED TO BE SUBCONTRACTED AS PART OF THE BID SUBMITTAL MUST BE ACCOMPANIED BY BACKGROUND MATERIALS AND REFERENCES FOR PROPOSED SUBCONTRACTOR(S), WHETHER OR NOT THEY QUALIFY AS FIRST TIER SUBCONTRACTORS AS DEFINED IN ORS 279C.370 – NO EXCEPTIONS.

PROJECT AND LOCATION

The bid proposal is being requested for the High School Gymnasium Wood Flooring Project which is located at 177 Prospect Street, Falls City, Oregon 97344.

This project is subject to State of Oregon prevailing wage requirements in accordance with ORS 279C.800 and will require bidder to certify compliance with ORS 279C.838 and/or ORS 279C.840.

Bidders must include with their bid a statement verifying whether they are a Resident Bidder or not as defined in ORS 279A.120.

All bidders must be licensed to do business in the State of Oregon and have the necessary Construction Contractors Board (CCB) licenses and classification to perform the work. Falls City School District cannot accept bids from any entity not properly licensed with the CCB.

All bidders shall submit or post a surety bond, irrevocable letter of credit issued by an insured institution as defined in ORS 706.008, cashier’s check or certified check for all bids as bid security in the amount of 10% of the total bid proposal.

The successful bidder shall promptly execute and deliver to Falls City School District all necessary performance and payment bonds as detailed in ORS 279C.380

The successful bidder must file, or have on file, a current $30,000 public works bond with the (CCB). The bond must be filed before work starts.

PROJECT OBJECTIVE

The objective and ultimate goal for this project is to have a new gymnasium floor that provides the maximum available warranty period for the respective flooring product.

All project bid documents, including this document and any and all attachments are incorporated into the project requirements, whether included as a direct attachment or by reference. All manufacturers installation requirements are incorporated into the project requirements either by direct attachment or reference to ensure a complete system is provided per the applicable manufacturers recommendations and installation instructions. Proposed substitutions or exclusions to the manufacturers recommendations on any necessary component required by the manufacturer to provide a complete flooring system must be approved by the Owner prior to installation.

PROJECT SCOPE AND SPECIFICATIONS

Flooring Contractor Shall:

1. Provide and install, sand, seal, stripe, paint and finish approximately 7450 sf of new Maple flooring, subfloor system and venting to meet the following specifications, in addition to the attached specifications for the complete flooring system.

2. WOOD FLOORING

A. Strip Flooring: Northern hard maple (Acer saccharum), kiln dried, random length, tongue and groove, and end matched.

1. Grade: MFMA-RL Second and Better.

2. Thickness: 25/32 inch.

3. Face Width: 2-1/4 inches.

4. Provide continuous incremental expansion - factory milled.

5. Preservative Treatment: Clear, penetrating, water-repellent wood preservative that protects against mold, mildew, staining, and decay fungi; complying with MFMA's written recommendations and applied by immersion.

3. SUBFLOOR SYSTEM

A. Subfloor: Minimum 15/32-inch thick, CD face, Exposure I, APA rated plywood sheathing or as recommended by flooring manufacturer.

B. Resilient Pads: Manufacturer's recommended rubber, EPDM or polyurethane pads installed at manufacturer's standard spacing for product designation indicated above. PVC pads are not acceptable.

1. Material: Manufacturer's standard.

2. Thickness: As recommended by manufacturer.

a.

4. Provide at least 3 references of similar flooring projects completed within the past 5 years.

SCHEDULED TIMELINE

The following timeline has been established to ensure that our project objective is achieved; however, the following project timeline shall be subject to change when deemed necessary by management or availability of materials for job.

Work Start Date

Work End Date

August 1, 2022
Substantial completion date January 15, 2023 Final completion date January 31, 2023

Dates of building availability;

August 1, 2022 through January 31, 2023. The contractor will be given a security card for access to the gymnasium building during the project. The security card will be returned to the Project Manager upon early completion or by 5:00 on January 31, 2023. Any work performed on the project when students are on campus must be coordinated with the Facilities Manager to ensure proper student safety protocols are followed.

Tobacco, marijuana and alcohol use on district property is prohibited in any form, regardless of delivery method.

PROPOSAL BIDDING REQUIREMENTS

PROJECT PROPOSAL EXPECTATIONS

Falls City School District #57 shall award the contract to the proposal that best accommodates the various project requirements. Falls City School District #57 reserves the right to award any contract prior to the proposal deadline stated within the "Scheduled Timeline" or prior to the receipt of all proposals, award the contract to more than one Bidder, and refuse any proposal or contract without obligation to either Falls City School District #57 or to any Bidder offering or submitting a proposal.

DEADLINE TO SUBMIT PROPOSAL

All proposals must be received by Falls City School District #57 no later than 2:00 p.m. on July 19, 2022 for consideration in the project proposal selection process.

PROPOSAL SELECTION CRITERIA

Only those proposals received by the stated deadline will be considered. All proposals, submitted by the deadline, will be reviewed and evaluated based upon information provided in the submitted proposal. In addition, consideration will be given to cost and performance projections. Furthermore, the following criteria will be given considerable weight in the proposal selection process:

1. Proposals received by the stipulated deadline stated.

1. Bidder's alleged performance effectiveness of their proposal's solution regarding the Project Objective of Falls City School District #57.

1. Bidder's performance history and alleged ability to timely deliver proposed services.

1. Bidder's ability to provide and deliver qualified personnel having the knowledge and skills required to effectively and efficiently execute proposed services.

1. Overall cost effectiveness of the proposal.

Falls City School District #57 shall reserve the right to cancel, suspend, and/or discontinue any proposal at any time they deem necessary or fit without obligation or notice to the proposing bidder/contractor.

PROPOSAL SUBMISSION FORMAT

The following is a list of information that the Bidder should include in their proposal submission:

Summary of Bidder Background

· Bidder's Name(s)

· Bidder's Address

· Bidder's Contact Information (and preferred method of communication)

· Legal Form of Bidder (e.g. sole proprietor, partnership, corporation)

· Bidder's principal officers (e.g. Secretary, General Managers).

· Bidder's Federal Employee Identification Number (FEIN)

· Evidence of legal authority to conduct business in Oregon, CCB#, (e.g. business license number).

· Organization chart showing key personnel that would provide services to Falls City School District #57

Proposed Outcome

· Summary of timeline and work to be completed.

Cost Proposal Summary and Breakdown

· A detailed list of any and all expected costs or expenses related to the proposed project.

· Summary and explanation of any other contributing expenses to the total cost.

· Brief summary of the total cost of the proposal.

Licensing and Bonding

· Provide details of licenses and bonds for any proposed services that the bidder/contractor may plan on providing for this project.

Insurance

· Details of any liability or other insurance provided with regard to the staff or project.

· Insurance Requirements for successful bidder:

· Workers Compensation. As required by ORS 656.017, subject employers shall provide Workers Compensation coverage in accordance with ORS Chapter 656 for all subject workers. Contractor shall have this insurance unless exempt under ORS 656.027 or 656.126. Contractors that are statutory subject employers shall submit a certificate of insurance to TTSD showing proof of coverage and shall carry limits of $1,000,000 for Employers Liability under the workers compensation policy form. If Contractor is not a subject employer, does not have coverage, and claims to be exempt, Contractor shall complete a Workers’ Compensation Exemption Certificate in lieu of providing the above certificate of insurance.

· Commercial General Liability. Contractor shall maintain general liability insurance coverage on an occurrence basis with a combined single limit of not less than $2,000,000 for bodily/personal injury and property damage, with an annual aggregate $3,000,000. Contractor’s general liability insurance must include contractual liability insurance.

· Commercial Automobile Liability. Contractor shall maintain automobile liability insurance with a combined single limit, or the equivalent of not less than $1,000,000 each occurrence for Bodily Injury and Property Damage, including coverage for owned, hired or non-owned vehicles.

· Certificate(s) of Insurance. Prior to commencing any work on the project, successful bidder must provide a Certificate of Insurance sent directly from Contractors insurance carrier demonstrating Contractor meets all of the insurance requirements in this Section of the Agreement. Each provider of certificate or policy holder shall provide there shall be no cancellations, termination, material change or reduction of limits of the insurance without prior written notice to Falls City School District #57. For all general liability coverage, the certificate shall also provide an endorsement to this effect and name Falls City School District #57, its agents, officers, Board of Directors and employees as additional insured with respect to Contractor’s services provided related to the project.

Falls City School District does not discriminate on the basis of race, religion, color, national origin, disability, marital status, sexual orientation, sex or age in providing or access to benefits of education services, activities and programs in accordance with Title VI, Title VII, Title IX and other civil rights or discrimination issues; Section 504 of the Rehabilitation Act of 1973, as amended; and the American with Disabilities Act.

The following has been designated to coordinate compliance with these legal requirements and may be contacted at the Falls City School District office for additional information and/or compliance issues, Title II Coordinator, Title IX Coordinator and Section 504 Coordinator: Director of Special Programs, 111 N Main St., Falls City, OR 97344, 503-787-3521.

image1.png

File details come from the government source that posted it. Updated .