This request for quotations (RFQ) from the U.S. Food and Drug Administration (FDA) solicits an atomic force microscope (AFM) coupled with photothermal infrared imaging capabilities for nanoscale infrared imaging. Quotes are due by March 1, 2021. The FDA seeks to procure this system to physically and chemically characterize nanomaterials in drug products at the nanoscale level. The RFQ specifies technical requirements for the AFM and infrared laser source. Installation must be completed within 180 days of award. The acquisition will be set aside for small businesses and awarded on a lowest-price technically acceptable basis to the responsible offeror providing the lowest total price meeting the technical requirements. Pricing must include delivery, installation, training, and a one-year warranty. The contract type will be firm-fixed price.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOL QR. Questions and Answers.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Subject: Request for Quotations: RFQ-FDA-2021-1238670 AFM Coupled Photothermal IR for Nanoscopic IR Imaging
Request for Quotations: RFQ-FDA-2021-1238670-Procurement of an AFM Coupled Photothermal IR for Nanoscopic IR Imaging.
Section 1 – General This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation. Quotes are being requested and a written solicitation will not be issued.
Solicitation Number # FDA-RFQ-2021-1238670: is being issued as a Request for Quotations (RFQ). The solicitation and incorporated provisions and clauses are those in effect through Federal Acquisition Circular FAC 2021-04. This requirement is being solicited as a total small business set-aside 100% (for small businesses only) FAR 52.219-6, Notice of Total Small Business Set-Aside, using the Simplified Acquisition Procedures per FAR Subpart 13.5.
The U. S. Food & Drug Administration, (FDA) Office of Acquisition and Grants Services (OAGS) has a requirement to procure an AFM Coupled Photothermal IR for Nanoscopic IR Imaging.
Section 2 - Contract Type The Government intends to award a Firm Fixed-Price contract to procure the requested system.
The NAICS Code for this procurement is: 34516 Laboratory analytical instruments (except optical) manufacturing.
Section 3 - Description/Specifications, salient characteristics and Statement of Work
3.1. Project Background
The number of new drug applications (NDA), abbreviated new drug applications (ANDA) and investigational new drugs (IND) with nanoscale components has rapidly increased in the last decade. To analyse and review nanomaterial containing drugs, physiochemical properties such as nanoparticle size distributions, morphology, chemical and elemental composition may need to be measured. With current methods, there are several challenges in characterization of nanomaterial containing drugs. Electron microscopy (EM) is an imaging technique commonly employed in revealing the structure of objects on the nanoscale. It has tremendous resolving power (resolution as low as 1 nm) that is not achievable with more conventional optical microscopes due to the diffraction limit of light (resolution higher than several hundred nanometres). EM techniques can identify atomic species through energy dispersive X-ray analysis, however this offers little help for identification of molecular species. Well established optical spectroscopy techniques such as Raman and Infrared are ideal for identification of molecular species, however due to being optical approaches, their spatial resolutions are governed by the diffraction limit and thus fall short of the needs for characterizing nanomaterial containing drug products.
Atomic force microscopy (AFM) is a very-high-resolution type of scanning probe microscopy with resolution comparable to that of EM (as low as 1 nm or less) that also, like EM, allows for nanoscopic imaging by scanning the surface with a mechanical probe and incorporating piezoelectric elements to allow for tiny but accurate and precise movements. An additional advantage is that AFM can be coupled with IR in a technique known as photo-induced force microscopy (PiFM) which allows for the diffraction limited to be overcome and therefore molecular information to be obtained from nanoscale components which can provide valuable and critical information for in vitro characterization.
As pointed out by the U.S. Food and Drug Administration (FDA) Advisory Committee for Pharmaceutical Science and Clinical Pharmacology in 2012, assessing the structural and physiochemical properties of drug products with nanoscale components requires new methods to be developed and new techniques to be used in pharmaceutical analysis. High-resolution imaging techniques such as EM and AFM are currently being evaluated and utilized for structural characterization of nanocomponents in complex drug products such as ocular emulsions, ophthalmics, albumin-bound nanoparticles and liposomes. By coupling AFM with a spectroscopic approach that allows for molecular information to be obtained such as PiFM, this allows for physicochemical information to be obtained on top of the structural information for the nanoscale components. To assess critical quality attributes of complex drug products is essential not only in approval of innovator drug applications but also in assessing in vitro equivalence of generic drugs. Consistent with these ongoing developments in physiochemical characterization of nanomaterial containing pharmaceuticals, the FDA Division of Complex Drug Analysis (DCDA) is constantly seeking to develop and improve scientific approaches that aid in evaluating the safety and efficacy of new, as well as existing, pharmaceuticals. These goals are in coherence with Center for Drug Evaluation and Research (CDER) regulatory science research goals:
i. Streamline and improve the process for predicting drug's toxicity
ii. Reduce the time needed to identify the benefits of a new drug over an existing treatment
iii. Identify more precisely who will benefit from a drug
iv. Improve product quality and reduce the threat of drug shortages
v. Develop new tools and capabilities to respond quickly to threats to public health
vi. Advance scientific knowledge and reduce duplication of effort by making electronic data more useable and accessible to researchers and developers
vii. Improve surveillance of marketed drugs to protect the public health
viii. Develop new methods to support generic drug approval decisions and ensure safety and effectiveness after those drugs are marketed Specifically; advancing scientific knowledge and developing new methods to support generic drug approval decisions in regards to complex drug products are consistent with DCDA’s efforts.
Currently, a JEOL IT3000 Scanning Electron Microscope for EM analysis of nanomaterials in complex drug products is used at the DCDA. Throughout the development of new scientific methods to assess the critical quality attributes and to characterize nanomaterial containing pharmaceuticals (such as ophthalmic nanoemulsions and intravenous albumin nanoparticle containing drugs), identification of the observed nanoscale features has consistently been a limiting factor. AFM coupled photothermal IR will allow for molecular identification of the observed nanscale features. With the increasing number of pharmaceuticals that contain nano-scale drug products being developed and marketed, this instrument is critical for continued support of advanced domestic manufacturing. Based on this concern, it has been proposed that the DCDA adapt AFM coupled photothermal IR for nanoscale IR imaging.
3.2. Objective
The objective is to purchase an AFM coupled photothermal IR for nanoscale IR imaging for physiochemical characterization of nanomaterial containing drug products. Complex drug products that contain nanomaterials, specifically complex ophthalmics and intravenous drugs, can only be assessed for their critical attributes while in their native state and not transformed for measurement (such as dilution, chemical tagging, etc.). Therefore, adopting a method for physicochemical characterization that will allow for both morphology and molecular identity to be assessed is essential.
A. Requirements and Specifications: At a minimum, the requested instrument (“AFM Coupled Photothermal IR for Nanoscopic IR Imaging), shall have the salient/functional characteristics and specifications here below described:
1. Shall be a newly manufactured unit, not used and refurbished or previously used for demonstration.
2. Shall provide technical support services during its lifecycle.
| 3. | Shall include an active vibrational isolation table with a load capacity that cover the weight of the instrumentation with automatic load adjustment, an isolation performance with a minimum of 25 dB at 5 Hz, 40 dB beyond 10 Hz and an active bandwidth of 0.6 – 200 Hz |
| 4. | Shall include a temperature controlled acoustic chamber to cover the instrument to ensure low thermal drift with a front door with gas lifts that opens upward (so that no extra space to side or front is required) and is temperature controlled to +/- 0.2 °C |
| 5. | Shall provide a dry air generator and filter. |
6. Shall provide an atomic force microscope (AFM) with the following minimum specifications:
i. Offer both dynamic and contact mode for standard AFM
ii. A minimum scan range (XY) of 80 µm x 80 µm
iii. A scanner that operates in a closed loop with capacitive sensors
iv. Sensor noise for XY scan sensors of ≤ 0.4 nm rms @ 1 kHz bandwidth
v. XY-Scanner linearity of ≤ 1% of range
vi. Coarse positioning range of tip in Z that is ≥ 10 mm
vii. XY positioning range (tip vs sample) of 3 mm x 3 mm
viii. XY sample positioning repeatability of ≤ 1 µm
ix. Sensor resolution for position sensor of ≤ 100 nm rms
x. AC beam deflection detector noise of ≤ 50 fm/ (root Hz) above 200 kHz on NHCR cantilever
xi. System z-noise floor of ≤ 100 pm rms
7. Shall provide as the IR source a tuneable quantum cascade laser (QCL) capable of covering at a minimum the following specifications:
i. spectral tuning range 780 – 1850 cm-1
ii. spectral tuning speed of ≤ 25 cm-1/msec
iii. spectral line width ≤ 2 cm-1
iv. spectral accuracy of ≤ 2 cm-1 and spectral repeatability of ≤ 0.5 cm-1
v. average laser power of 1 – 15 mW over entire tuning range
vi. power stability of ≤ 5% pulse-to-pulse
8. All items supplied by the vendor shall be covered for a one (1) year manufacturer’s warranty starting only after install and system verification is complete.
9. The instrument shall be supplied with a computer workstation, including monitor, and software to enable all aforementioned requirements. The instrument, and all items included with purchase order, shall further be installed and verified working by either the vendor or original instrument manufacturer, to a standard that confirms that all above salient requirements are met. Installation and operational qualification (IQ/OQ) certification shall be provided. The proposal should contain example IQ/OQ testing specifications/methods for review by qualified government personnel.
B. Delivery:
| Deliverable |
| Description |
| Qty |
| Date Completion |
| 1 |
| AFM Coupled Photothermal IR System and accessories as outlined in “Minimum Salient Requirements” |
| 1 |
| 180 days after contract award. |
| 2 |
| Installation, instrument qualification and training |
| 1 |
180 days after contract award.
Upon contract award, the company contracted to deliver the product shall do so in a timely fashion (180 days). The install, verification and training are expected to be completed within the 180 days delivery period and to take no more than 5 working days. Equipment required for install (e.g. hand tools) of the AFM coupled photothermal IR instrument and additional consumables that may be required for instrument qualifications including IQ/OQ, are expected to be provided by the contracted company upon delivery of instrumentation (end product) or provided by the install engineer.
3.3. Other Considerations
3.3.1 Inspection and Acceptance:
All items shall be confirmed working upon installation by a qualified engineer with appropriate qualification certificates. The newly furnished property should be demonstrated prior to contract approval of being capable of performing all tasks outlined within the objectives section above. Government Acceptance will be made upon contractor’s completion of all deliverables (including services).
3.3.2. Government Furnished Property:
A laboratory/room for the AFM coupled photothermal IR instrument allowing adequate lab/bench space for instrument installation will be provided.
3.3.3. Security Considerations:
Supervision of install engineer upon arrival at DCDA will be required.
3.4. Period of Performance:
All items shall be delivered and confirmed working upon installation by a qualified engineer no later than 180 days after contract award. Training for 3 government users shall be completed within 30 days-after installation. Performance of this contract shall begin on 07/15/2021 THRU 07/14/2026 (12-Months for the Base Year):
| LIN |
| Description |
| Period of Performance |
| Qty |
| 0001 |
| Instrument/Warranty/Installation and Training |
| 07/15/2021 THRU 07/14/2022 |
| 1 |
3.4.1. Packing, Marking, Delivery and Shipping:
The Contractor shall deliver the items and quantities ordered, all or none. All deliverables required under this contract shall be packaged, marked and shipped in accordance with Government specifications. At a minimum, all deliverables shall be marked with the contract number and Contractor’s name. All required materials shall be delivered in immediate new, usable and acceptable condition, at the U. S. Food and Drug Administration (FDA) facility/address listed below:
3.4.2. Place of Performance:
Food and Drug Administration 645 S. Newstead St Louis, MO 63110
3.5. The Contracting Officer’s Representative (COR) or Technical Point of Contact (TPOC).
The COR or TPOC is responsible for the acceptance of the items or services requested.
3.6. Technical Direction
A. Performance of the work under the resultant contract shall be subject to the technical direction of the COR or TPOC. The term "technical direction" is defined to include the following:
i). Technical directions to the Contractor which shift work emphasis between work areas or tasks, require pursuit of certain lines of inquiry, fill in details or otherwise serve to accomplish the contractual scope of work;
ii). Providing information to the Contractor for assistance in the interpretation of specifications, or technical portions of the work description, and iii). Reviewing and, where required by the contract, approving of technical reports, specifications, and technical information to be delivered by the Contractor to the Government under the requirement.
B. Technical direction shall be within the general scope of work stated in the contract. The COR or TPOC does not have the authority to, and may not, issue any technical direction which (1) constitutes an assignment of additional work outside the general scope of the contract; (2) constitutes a change as defined in the contract clause entitled "Changes, FAR 52.212 – 4 (c)." (3) in any manner causes an increase or decrease in the total contract price; or (4) changes any of the expressed terms, conditions, or specifications of the contract.
C. All technical directions shall be issued in writing by the COR or TPOC or shall be confirmed by him/her in writing within five (5) working days.
D. The Contractor shall proceed promptly with the performance of technical directions duly issued by the COR or TPOC in the manner prescribed by this clause and within his/her authority under the provisions of this clause.
E. If, in the opinion of the Contractor, any instruction or direction issued by the COR or TPOC is within one of the categories as defined in B. (1) through B. (4) above, the Contractor shall not proceed but shall notify the Contracting Officer, in writing, within five (5) working days after the receipt of any such instruction or direction and shall request the Contracting Officer to modify the Contract accordingly. Upon receiving such notification from the Contractor, the Contracting Officer shall issue an appropriate contract modification or advise the Contractor, in writing, that, in his/her opinion, the technical directions are within the scope of this clause and do not constitute a change under the "Changes" clause of the contract. The Contractor shall thereupon proceed immediately with the direction given. Any failure of the parties to agree upon the nature of the instruction or direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the contract clause entitled "Disputes."
3.7. Contracting Officer’s Authority
The Contracting Officer (CO) is the only person authorized to approve changes in any of the requirements of the statement of work. In the event the Contractor effects any changes at the direction of any person other than the CO or the COR/TPOC, the changes shall be considered to have been made without authority and no adjustment shall be made in the contract price to cover any increase in costs incurred as a result thereof. The CO shall be the only individual authorized to accept nonconforming work, waive any requirement of the contract and modify any term or condition of the contract. The Contracting Officer is the only individual who can legally obligate Government funds.
The Contracting Officer is the only person with authority to act as agent of the Government under the Contract. Only the Contracting Officer has authority to: (1) direct or negotiate any changes in the statement of work; (2) modify or extend the period of performance; (3) change the delivery schedule; (4) authorize reimbursement to the Contractor for any costs incurred during the performance of the Contract; or (5) otherwise change any terms and conditions of the Contract.
Section 4 - Contract Clauses
4.1. FAR 52.212-4 - Contract Terms and Conditions – Commercial – Items (Oct 2018).
4.2. FAR 52.252-2 - Clauses Incorporated by Reference (Feb 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses: www.acquisition.gov/far/index.html and http://www.hhs.gov/policies/hhsar/subpart301- 1.html.
| FAR Clause |
| Title |
| Date |
| Reference |
| 52.203-3 |
| Gratuities |
| Apr 1984 |
| 3.202 |
| 52.203-17 |
| Contractor Employee Whistleblower Rights and Requirement to Inform Employees of Whistleblower Rights. |
| Jun 2020 |
| 3.908-9 |
| 52.204-7 |
| System for Award Management. |
| Oct 2018 |
| 4.1105(a)(1) |
| 52.204-14 |
| Service Contract Reporting |
| Oct 2016 |
| 4.1705(a) |
| HHSAR |
| Title |
| Date |
| Date |
| 352.211-3 |
| Paperwork Reduction Act. |
| Dec, 2015 |
| 311.7301 |
| 352.222-70 |
| Contractor Cooperation in Equal Employment Opportunity Investigations |
| Dec, 2015 |
| 322.810(h) |
| 352.239-74 |
| Electronic Information and Technology Accessibility Notice. |
| Dec 2015 |
| 339.203-70(b) |
4.3. Health and Human Services Acquisition Regulation (HHSAR) Clauses can be viewed in full text at: http://www.hhs.gov/policies/hhsar/subpart352.html#Subpart352.1- InstructionsforUsingProvisionsandClauses.
4.4. FAR 52.217-8 - Option to Extend Services. (Nov 1999)
The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor any time before the contract expires.
4.5. Security and Privacy
Contractor personnel performing work under the Contract shall satisfy all requirements for appropriate security eligibility in dealing with access to sensitive information and information systems. The contractor agrees that Contractor personnel will not divulge, or release data or information developed or obtained in connection with the performance of the contract, unless made public by FDA or upon written approval from the Government. Except as may otherwise be permitted by a data owner, the Contractor’s personnel agree not to use, disclose or reproduce proprietary data, other than as required in performance of the contact; provided, however, that nothing herein shall be construed as precluding the use of any data independently acquired by the contractor without such limitation.
The Contractor shall submit a roster, by name, position and responsibility, of all staff (including subcontractor staff) working under the requirement that will develop, have the ability to access, or host and/or maintain a Federal information system(s). The roster shall be submitted to the COR, with a copy to the Contracting Officer, within 14 calendar days of the effective date of the Contract. Any revisions to the roster as a result of staffing changes shall be submitted within 15 calendar days of the change. Each Contractor/Subcontractor employee who may have access to non-public Department information and/or sensitive information under the Contract may be required to sign a Confidentiality form and/or an FDA Form 3398: Contractor’s Commitment to Protect Non-Public Information (NPI) Agreement available upon request from the FDA Intranet site. A copy of each signed and witnessed Non- Disclosure agreement shall be submitted to the COR or designee prior to performing any work under the Contract. The COR or designee will inform the Contractor of the forms and training that are required. However, it is the responsibility of the Contractor to assure that such forms have been signed.
4.6. Contractor Performance Evaluation(s)
In accordance with Federal Acquisition Regulation (FAR) 42.15, FDA will complete annual and final contractor performance evaluations. Annual evaluations will be prepared to coincide with the anniversary date of the contract. Additional interim performance evaluations may be prepared at Contracting Officer discretion, as necessary. Final performance evaluations will be completed upon contract expiration.
FDA will utilize the Contractor Performance Assessment Reporting System (CPARS) in order to execute annual and final contractor performance evaluations. CPARS is a secure Internet website located at http://www.cpars.csd.disa.mil/cparsmain.htm. FDA will register the contractor in CPARS upon receipt of the name and email address of two (2) individuals who will be responsible for serving as the Contractor’s primary and alternate CPARS contacts. Once FDA registers the contractor in CPARS, the Contractor will receive an automated CPARS email message which contains User IDs and instructions for creating a password.
Once a performance evaluation is issued, the Contractor’s primary and alternate CPARS contact will receive an email instructing them to logon to CPARS in order to review the performance evaluation. The Contractor has 30 days from the date of performance evaluation issuance in which to review the evaluation. If the Contractor is in agreement with the performance evaluation outcome, the evaluation becomes final. Should the Contractor be in disagreement with the performance evaluation outcome, rebuttal comments must be submitted via the CPARS within 30 days from date the evaluation was issued by FDA. Any disagreement between the Contracting Officer and the Contractor will be referred to a contracting official one level above the Contracting Officer, whose decision will be final.
Copies of each performance evaluation and contractor responses, if any, will be retained as part of the official contract file and will be used to support future award decisions. Evaluations will also be stored for a 3 years period in the Past Performance Information Retrieval System (PPIRS) at www.ppirs.gov.
Contractors may obtain CPARS training material and register for on-line training at http://www.cpars.csd.disa.mil/allapps/cpcbtdlf.htm. There is no fee for registration or use of the CPARS.
4.7. Holidays
FDA personnel observe the FDA following days as holidays:
i) New Year's Day
ii) Columbus Day
iii) Washington's Birthday
iv) Veterans' Day
v) Memorial Day
vi) Thanksgiving Day
vii) Independence Day
viii) Christmas Day
ix) Labor Day
x) Martin Luther King's Birthday
xi) Any other day designated by Federal statue
xii) Any other day designated by Executive Order
xiii) Any other day designated by the President's
Observance of such days by Government personnel shall not be cause for an extension to the delivery schedule or period of performance or adjustment to the price, estimated cost, or fee(s), if any, except as set forth in the Contract.
Except for designated around-the-clock or emergency operations, Contractor personnel shall not be able to perform on-site under the Contract with FDA on holidays set forth above. The Contractor shall not charge any holiday as direct charge to the Contract In the event Contractor personnel work during a holiday observed by the Contractor other than those above, no form of holiday or other premium compensation will be reimbursed as either a direct or indirect cost. However, this does not preclude reimbursement for authorized overtime work.
In the event the FDA grants administrative leave to its Government employees at the site, on-site Contractor personnel shall also be dismissed if the site is being closed. However, the Contractor shall continue to provide sufficient personnel to perform around-the-clock requirements of critical efforts already in progress or scheduled and shall be guided by the instructions issued by the Contracting Officer or her/his duly appointed representative. In each instance when the site is closed to Contractor personnel as a result of inclement weather, potentially hazardous conditions, explosions, or other special circumstances, the Contractor shall direct its staff as necessary to take actions such as reporting to its own site(s) or taking appropriate leave consistent with its policies. The cost of salaries and wages to the Contractor for the period of any such site closure shall be a reimbursable item of direct cost under the Contract for employees whose regular time is normally a direct charge if they continue to perform on the work; otherwise, the costs are reimbursable as indirect costs in accordance with the Contractor's established accounting policy.
4.8. Disclosure of Information. Contractors are reminded that information furnished under the solicitation and contract may be subject to disclosure under the Freedom of Information Act (FOIA). Therefore, all items that are confidential to business, or contain trade secrets, proprietary, or personnel information shall be clearly marked. Marking of items will not necessarily preclude disclosure when the U.S. Office of Personnel Management (OPM or The Government) determines disclosure is warranted by FOIA. However, if such items are not marked, all information contained within the submitted documents will be deemed to be releasable.
Any information made available to the Contractor by the Government shall be used only for the purpose of carrying out the provisions of the contract and shall not be divulged or made known in any manner to any person except as may be necessary in the performance of the contract.
In performance of the contract, the Contractor assumes responsibility for protection of the confidentiality of Government records and shall ensure that all work performed by its subcontractors shall be under the supervision of the Contractor or the Contractor's responsible employees.
Each officer or employee of the Contractor or any of its subcontractors to whom any Government record may be made available or disclosed shall be notified in writing by the Contractor that information disclosed to such officer or employee can be used only for a purpose and to the extent authorized herein, and that further disclosure of any such information, by any means, for a purpose or to an extent unauthorized herein, may subject the offender to criminal sanctions imposed by 19 U.S.C. § 641. That section provides, in pertinent part, that whoever knowingly converts to their use or the use of another, or without authority, sells, conveys, or disposes of any record of the United States or whoever receives the same with intent to convert it to their use or gain, knowing it to have been converted, shall be guilty of a crime punishable by a fine of up to $10,000, or imprisoned up to ten years, or both.
4.9. Inspection and Acceptance:
The performance criteria for this contract shall be timely delivery and closure of all activities and deliverables listed in this RFQ and within the established period of performance. The Government will accept goods and services only if they conform to all terms and conditions of the contract and satisfy the performance standards detailed. The Government will provide written notification of acceptance or rejection within ten (10) business days of receiving the delivery. The Government will reject non‐conforming products and services. The Contractor shall correct any deficiencies within thirty (30) days of when the Government issues the rejections notice. If the Contractor cannot correct the deficiencies within this time frame, the Contractor shall immediately notify the COR/TPOC of the reason for the delay and provide a proposed corrective action plan within ten (10) business days.
4.10. The COR/TPOC shall perform inspection and acceptance of materials and services to be provided. Invoices shall be submitted for review and approval by the COR (See invoicing instructions). For the purpose of this section, the COR is the authorized representative of the Contracting Officer. Inspection and acceptance will be performed at: the locations identified in this RFQ.
4.11. The COR will be responsible for determining the acceptance of the work that is completed. Acceptance is communicated in writing unless otherwise indicated by the Contracting Officer or COR within 30 days of receipt.
4.12. FAR 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders—Commercial Items. (Nov 2020)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).
(2) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004)(Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
[Contracting Officer check as appropriate.]
(1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).
(2) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509)).
(3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
_x_ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2016) (Pub. L. 109-282) (31 U.S.C. 6101 note).
(5) [Reserved].
(6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111- 117, section 743 of Div. C).
(7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
x (8) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Oct 2015) (31 U.S.C. 6101 note).
(9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Jul 2013) (41 U.S.C. 2313).
(10) [Reserved].
(11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Nov 2011) (15 U.S.C. 657a).
(ii) Alternate I (Nov 2011) of 52.219-3.
(12)(i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
(ii) Alternate I (JAN 2011) of 52.219-4.
(13) [Reserved] _x_ (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2011) (15 U.S.C.
644).
(ii) Alternate I (Nov 2011).
(iii) Alternate II (Nov 2011).
(15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C.
644).
(ii) Alternate I (Oct 1995) of 52.219-7.
(iii) Alternate II (Mar 2004) of 52.219-7.
(16) 52.219-8, Utilization of Small Business Concerns (Nov 2016) (15 U.S.C.
637(d)(2) and (3)).
(17)(i) 52.219-9, Small Business Subcontracting Plan (Nov 2016) (15 U.S.C.
637(d)(4)).
(ii) Alternate I (Nov 2016) of 52.219-9.
(iii) Alternate II (Nov 2016) of 52.219-9.
(iv) Alternate III (Nov 2016) of 52.219-9.
(v) Alternate IV (Nov 2016) of 52.219-9.
(18) 52.219-13, Notice of Set-Aside of Orders (Nov 2011) (15 U.S.C. 644(r)).
(19) 52.219-14, Limitations on Subcontracting (Jan 2017) (15 U.S.C. 637(a)(14)).
(20) 52.219-16, Liquidated Damages—Subcontracting Plan (Jan 1999) (15 U.S.C.
637(d)(4)(F)(i)).
(21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set- Aside (Nov 2011) (15 U.S.C. 657 f).
x (22) 52.219-28, Post Award Small Business Program Re-representation (Jul 2013) (15 U.S.C. 632(a)(2)).
(23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (Dec 2015) (15 U.S.C. 637(m)).
(24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (Dec 2015) (15 U.S.C. 637(m)).
_x_ (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755).
_x_ (26) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (Oct 2016) (E.O. 13126).
_x_ (27) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
_x_ (28) 52.222-26, Equal Opportunity (Sept 2016) (E.O. 11246).
(29) 52.222-35, Equal Opportunity for Veterans (Oct 2015)(38 U.S.C. 4212).
_x_ (30) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).
(31) 52.222-37, Employment Reports on Veterans (FEB 2016) (38 U.S.C. 4212).
_x_ (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).
_x_ (33)(i) 52.222-50, Combating Trafficking in Persons (Mar 2015) (22 U.S.C. chapter 78 and E.O. 13627).
(ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
(34) 52.222-54, Employment Eligibility Verification (OCT 2015). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)
(35) 52.222-59, Compliance with Labor Laws (Executive Order 13673) (OCT 2016). (Applies at $50 million for solicitations and resultant contracts issued from October 25, 2016 through April 24, 2017; applies at $500,000 for solicitations and resultant contracts issued after April 24, 2017).
Note to paragraph (b)(35): By a court order issued on October 24, 2016, 52.222-59 is enjoined indefinitely as of the date of the order. The enjoined paragraph will become effective immediately if the court terminates the injunction. At that time, GSA, DoD and NASA will publish a document in the Federal Register advising the public of the termination of the injunction.
(36) 52.222-60, Paycheck Transparency (Executive Order 13673) (OCT 2016).
(37)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA– Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
(ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
(38) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (JUN 2016) (E.O. 13693).
(39) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (JUN 2016) (E.O. 13693).
(40)(i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (JUN 2014) (E.O.s 13423 and 13514).
(ii) Alternate I (Oct 2015) of 52.223-13.
(41)(i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (JUN 2014) (E.O.s 13423 and 13514).
(ii) Alternate I (Jun 2014) of 52.223-14.
(42) 52.223-15, Energy Efficiency in Energy-Consuming Products (DEC 2007) (42 U.S.C. 8259b).
(43) (i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT 2015) (E.O.s 13423 and 13514).
(ii) Alternate I (Jun 2014) of 52.223-16.
_x_(44) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011) (E.O. 13513).
(45) 52.223-20, Aerosols (JUN 2016) (E.O. 13693).
(46) 52.223-21, Foams (JUN 2016) (E.O. 13693).
(47) 52.225-1, Buy American—Supplies (May 2014) (41 U.S.C. chapter 83).
(48)(i) 52.225-3, Buy American—Free Trade Agreements—Israeli Trade Act (May 2014) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.
(ii) Alternate I (May 2014) of 52.225-3.
(iii) Alternate II (May 2014) of 52.225-3.
(iv) Alternate III (May 2014) of 52.225-3.
(49) 52.225-5, Trade Agreements (OCT 2016) (19 U.S.C. 2501, et seq., 19 U.S.C.
3301 note).
_x_ (50) 52.225-13, Restrictions on Certain Foreign Purchases (June 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
(51) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
(52) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).
(53) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150).
(54) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).
(55) 52.232-30, Installment Payments for Commercial Items (Jan 2017) (41 U.S.C.
4505, 10 U.S.C. 2307(f)).
_x_ (56) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (Jul 2013) (31 U.S.C. 3332).
(57) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management (Jul 2013) (31 U.S.C. 3332).
(58) 52.232-36, Payment by Third Party (May 2014) (31 U.S.C. 3332).
(59) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).
(60)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631).
(ii) Alternate I (Apr 2003) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
[Contracting Officer check as appropriate.]
(1) 52.222-17, Non-displacement of Qualified Workers (May 2014)(E.O. 13495).
(2) 52.222-41, Service Contract Labor Standards (May 2014) (41 U.S.C. chapter 67).
(3) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
(4) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (Multiple Year and Option Contracts) (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
(5) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards— Price Adjustment (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
(6) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment—Requirements (May 2014) (41 U.S.C. chapter 67).
(7) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services—Requirements (May 2014) (41 U.S.C. chapter 67).
(8) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2015).
(9) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O.
13706).
(10) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (May 2014) (42 U.S.C. 1792).
(11) 52.237-11, Accepting and Dispensing of $1 Coin (Sept 2008) (31 U.S.C.
5112(p)(1)).
(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records—Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes’ clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(e)(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1) in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—
(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C.
3509).
(ii) 52.219-8, Utilization of Small Business Concerns (Nov 2016) (15 U.S.C.
637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $700,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(iii) 52.222-17, Non-displacement of Qualified Workers (May 2014) (E.O. 13495). Flow down required in accordance with paragraph (l) of FAR clause 52.222-17.
(iv) 52.222-21, Prohibition of Segregated Facilities (Apr 2015) (v) 52.222-26, Equal Opportunity (Sept 2016) (E.O. 11246).
(vi) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).
(vii) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).
(viii) 52.222-37, Employment Reports on Veterans (Feb 2016) (38 U.S.C. 4212)
(ix) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.
(x) 52.222-41, Service Contract Labor Standards (May 2014) (41 U.S.C. chapter 67). (xi) 52.222-50, Combating Trafficking in Persons (Mar 2015) (22 U.S.C. chapter 78 and E.O 13627). Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O 13627).
(xii) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) (41 U.S.C. chapter 67).
(xiii) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (May 2014) (41 U.S.C. chapter 67).
(xiv) 52.222-54, Employment Eligibility Verification (OCT 2015) (E.O. 12989).
(xv) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2015).
(xvi) 52.222-59, Compliance with Labor Laws (Executive Order 13673) (OCT 2016) (Applies at $50 million for solicitations and resultant contracts issued from October 25, 2016 through April 24, 2017; applies at $500,000 for solicitations and resultant contracts issued after April 24, 2017).
Note to paragraph (e)(1)(xvi): By a court order issued on October 24, 2016, 52.222-59 is enjoined indefinitely as of the date of the order. The enjoined paragraph will become effective immediately if the court terminates the injunction. At that time, GSA, DoD and NASA will publish a document in the Federal Register advising the public of the termination of the injunction.
(xvii) 52.222-60, Paycheck Transparency (Executive Order 13673) (OCT 2016)).
(xviii) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706).
(xix) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
(xx) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (May 2014) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.
(xxi) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.
(2) While not required, the Contractor may include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.
4.13. FAR 52.247-34 -F.O.B Destination (Nov 1991)
4.14. Order of Precedence
The Contractor shall follow the terms and conditions of this solicitation. Should the contractor include any additional terms and conditions resulting in conflicts between this document and the contractor’s document, the Order of Precedence shall be as specified in FAR Clause 52.212-4. Any additional terms and conditions shall not be prohibited by applicable laws and regulations.
4.15. FAR 52.223-15 ENERGY EFFICIENCY IN ENERGY-CONSUMING PRODUCTS (MAY 2020)
(a) Definition. As used in this clause- “Energy-efficient product”-
(1) Means a product that-
(i) Meets Department of Energy and Environmental Protection Agency criteria for use of the Energy Star trademark label; or
(ii) Is in the upper 25 percent of efficiency for all similar products as designated by the Department of Energy’s Federal Energy Management Program.
(2) The term “product” does not include any energy-consuming product or system designed or procured for combat or combat-related missions (42 U.S.C. 8259b).
(b) The Contractor shall ensure that energy-consuming products are energy efficient products (i.e., ENERGY STAR® products or FEMP-designated products) at the time of contract award, for products that are-
(1) Delivered;
(2) Acquired by the Contractor for use in performing services at a Federally-controlled facility;
(3) Furnished by the Contractor for use by the Government; or
(4) Specified in the design of a building or work, or incorporated during its construction, renovation, or maintenance.
(c) The requirements of paragraph (b) apply to the Contractor (including any subcontractor) unless-
(1) The energy-consuming product is not listed in the ENERGY STAR® Program or FEMP; or
(2) Otherwise approved in writing by the Contracting Officer.
(d) Information about these products is available for-
(1) ENERGY STAR® at http://www.energystar.gov/products; and
(2) FEMP at http://www1.eere.energy.gov/femp/procurement/eep_requirements.html.
4.16. FAR 52.223-16-ACQUISITION OF EPEAT®-REGISTERED PERSONAL COMPUTER
PRODUCTS (OCT 2015)
4.17. FAR 52.204-23-PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE,
AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES (JUL 2018).
4.18. FAR 52.232-40-Providing Accelerated Payments to Small Business Subcontractors (Dec 2013)
(a) Upon receipt of accelerated payments from the Government, the Contractor shall make accelerated payments to its small business subcontractors under this contract, to the maximum extent practicable and prior to when such payment is otherwise required under the applicable contract or subcontract, after receipt of a proper invoice and all other required documentation from the small business subcontractor.
(b) The acceleration of payments under this clause does not provide any new rights under the Prompt Payment Act. I Include the substance of this clause, including this paragraph I, in all subcontracts with small business concerns, including subcontracts with small business concerns for the acquisition of commercial items.
4.19. FDA and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of FDA or destroyed except for in accordance with the provisions of the Agency Records Control Schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, Contractor must report to FDA.
4.20. Government-Provided Quality Assurance
The Government will use all materials deemed necessary to ensure that the Contractor’s employees are in constant state of awareness and readiness. These methods may include surveys of building tenants regarding the contractor’s performance, including professionalism, courtesy, and knowledge of their assigned duties. In the event a serious breach of assigned duty by the contractor’s employee(s) is identified during a quality control exercise, the Contracting Officer and/or Contracting Officer’s Technical Representative shall immediately contact the Contractor to discuss the Government’s findings and the steps the Contractor will take to correct the problem(s).
4.21.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .