RFQ FA301623U0039 Camp Bullis Internet.pdf
PDF 327 KB Posted
- Solicitation number
- FA301623U0039
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMENDMENT 1 - RFQ FA301623U0039 Questions and Answers.pdf | ||
| Attachment 3 - Statement of Need (SON).pdf | ||
| Attachment 4 - Pass Request.docx | DOCX document | |
| Attachment 2 - Clauses and Provisions.pdf | ||
| Attachment 1 - Bid Schedule.xlsx | XLSX spreadsheet | |
| Attachment 5 - Camp Bullis Map.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
502d Contracting Squadron Combined Synopsis/Solicitation
Mission Training Complex, JBSA-Camp Bullis-High-Speed Internet Service
FA301623U0039
1. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6 and in conjunction with FAR Part 13 as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued.
2. This is a 100% small business set aside (SBSA) solicitation. Solicitation FA301623U0039 is being issued as a Request for Quote (RFQ). All responsible/capable sources are courage to participate.
3. NAICS: The North American Industrial Classification Systems (NAICS) Code for this requirement is NAICS 517111 - Wired Telecommunications Carriers, with a Size Standard of 1,500 Employees.
4. For this requirement the Contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, other items, and non-personal incidental services necessary to furnish, install, test, and provide commercial internet capability. In addition, the Contractor shall provide a proposed project schedule reflecting a timeline to complete all activities needed to provide the fully operational internet access circuit no later than (NLT) 30 days after date of contract (ADC) in accordance with the provided Statement of Need
(SON).
See Attachment 1 – “Bid Schedule” for line items and descriptions.
a. The Government intends to award a firm-fixed price contract for the commercial, one (1) Gbps, High-speed
Internet Install and Monthly Access on behalf of the MTC, Camp Bullis, TX.
b. Contractor shall complete the Bid Schedule (Attachment 1) and include the unit, extended and total prices for each CLIN in the schedule. The total price shall include quoted price unit and extended prices to include discounts for each CLIN. (Do not list shipping and delivery charges separately.)
c. Quote should include the quoter's best pricing, inclusive of all discounts, as there may not be another opportunity to offer further discounts.
5. Date(s) and place(s) of delivery and acceptance and FOB point:
a. FOB: Destination
b. Inspection & Acceptance: By the Government
c. Place of Delivery/Performance: Bldg. 6012 20620 Camp Bullis Road Camp Bullis, TX 78257.
d. Installation: complete 30 Days after date of contract (ADC)
e. Access Period: One (1) Base year plus four (4) Option Year periods. Access period will begin following the completion/acceptance of the installation.
6. The provision at FAR 52.212-1, Instructions to Offerors - Commercial Items, applies to this acquisition, in addition to the following:
a. Notice to the Quoter. In the event issues pertaining to this RFQ package cannot be resolved to the satisfaction of the Contracting Officer (CO), the CO reserves the right to withdraw or cancel this RFQ requirement at no additional cost to the Government. In the event the Government cancels this solicitation, the Government has no obligation to reimburse the quoter for any costs.
b. Quotation Preparation Instructions and Format Instructions. To assure the timely and equitable evaluation of quote, vendor must follow the instructions contained herein. Documents submitted in response to this RFQ must be fully responsive to and consistent with the requirements of this solicitation, SON and Government standards and regulations pertaining to the SON.
c. The Government will award a fixed-firm price contract resulting from this RFQ to the quoter whose quote conforms the solicitation and is the most advantageous (Best Value) to the Government for performance of all tasks required as identified in the SON, price and other factors considered. Factors to be considered are:
Factor 1: Price.
Factor 2: Installation Work Schedule.
d. Quoter agrees to hold the quoted pricing for 90 calendar days from the date specified in Section 15.
e. VOLUME PREPARATION: Quoters shall return a completed Attachment 1 consisting of three (3) Sections:
Section 1: Administrative. Contractor must have active registration in the System for Award Management (SAM). Quoters shall ensure that their quote reflects quoter's entity name, address, CAGE code, DUNS, UEI, points of contact (POCs) authorized to communicate with the Government on the quoter's behalf, name of person(s) quoting, email Addresses, phone numbers and the RFQ number. Please provide the same information for prospective subcontractor(s), if applicable. The subcontractor will then be validated as to their current SAM status.
Section 2: Pricing. Quoters shall complete the Bidding Schedule Worksheet provided as Attachment 2 to this RFQ. All prices in the Pricing Worksheet shall be rounded to two (2) decimal places, and all extended amounts must equal the unit price multiplied by the unit quantity.
Section 3: Installation Plan. Quoters shall provide a proposed plan to complete Installation. Include equipment to be installed and timeline. Be as detailed as possible.
f. All quotes must be in English and submitted electronically.
g. All information, except for document numbers, page number, etc., shall be provided in a page image area with no less than one (1) inch margin.
h. Text. Text type for the quote and volumes shall be Times New Roman or Arial 10-point font.
i. Tables and graphics can be a reduced size if they remain legible (All volumes).
j. It is the quoter's responsibility to check Sam.gov for amendments issued against this RFQ and respond accordingly.
k. Quoters are strongly advised to submit their quotes well in advance of the closing date and time to mitigate the risk of technical difficulty and ensure that the complete quote is timely received. Late submissions, modifications, revisions, and withdrawals of quoters will be handled in accordance with FAR 52.212-1(f).
Hard copies of the quote are not required and will not be accepted.
7. The provision at FAR 52.212-2, Evaluation - Commercial Items, applies to this acquisition, in addition to the following:
The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered.
The following factors shall be used to evaluate offers:
Factor 1 - Bid Schedule (Price).
The criteria for Factor 1 have been met when a complete bid schedule worksheet, Attachment 1, is received.
The Government may determine that a quote is unacceptable if option prices are significantly unbalanced.
Evaluation of options(s) shall not obligate the Government to exercise the option(s). The total price for evaluation consists of the base and all option periods.
Factor 2 - Installation Plan.
The criteria for Factor 2 have been met when the quote provides an installation plan that includes a proposed project completion date for the required one (1) Gbps commercial circuit. The schedule shall reflect a timeline to complete all activities needed to provide a fully operational internet access circuit as specified in the SON.
The technical factors and sub-factors will receive one of the ratings listed below:
Ratings. Acceptable - Factor meets the minimum requirements of the solicitation.
Not Acceptable - Factor does not meet the minimum requirements of the solicitation.
Only “Acceptable” ratings will be eligible for award.
NOTE: The Government will review quotes received to determine if they are complete and IAW the RFQ requirements. A complete quote is one that meets all the terms, conditions, and specifications in the RFQ. The quoter must provide all documents listed and comply with all RFQ instructions for their quote to be considered "complete". Incomplete quotes may be considered ineligible for award.
If three (3) or fewer quotes are received, the Government will consider all quotes for acceptability. If more than three (3) quotes are received, the Government will consider the three (3) lowest priced quotes for acceptability. However, the Government reserves the right to evaluate additional quotes for acceptability, if deemed to be in the best interest of the Government.
8. Basis for Award. IAW FAR 13.106-2(b)(3), the Government will conduct comparative evaluations of quotes and award a fixed-firm price contract resulting from the RFQ to the quoter whose quote conforms the solicitation for the Commercial, Hardwired, one (1) Gbps High-Speed Internet Installation and Monthly Access as identified in the SON, price and other factors considered, and represents the most advantageous (Best Value) to the Government.
10. The provision at FAR 52.212-3, Offeror Representations and Certifications - Commercial Items, applies to this acquisition.
11. The provisions in FAR 52.212-4, Contract Terms and Conditions - Commercial Items applies to this
12. In addition to the applicable clauses in FAR 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders - Commercial Items, applicable clauses and provisions are identified in Attachment 2 “Clauses and Provisions”.
13. There are NO contract financing arrangements requirements for this acquisition. Installed components will require standard product warranty.
14. The Defense Priorities and Allocations System (DPAS) and assigned rating, are not applicable to this
15. Contractor Quote is Due by 7:00am (CST), Monday, 6 March 2023. Quote and all required documentation shall be submitted to Contract Specialist Aja Lynch at aja.lynch@us.af.mil and Contracting Officer Gary Beck at gary.beck@us.af.mil.
16. All questions regarding this RFQ must be submitted electronically, via email, to the POCs listed above by
7:00am (CST), Monday, 27 February 2023. Questions received after this date will not be addressed.
17. SITE VISIT: A formal site visit will be held at 1:00pm (CST), Thursday, 23 February 2023. Prospective contractors without base passes are to provide their pass information (Attachment 4) to aja.lynch@us.af.mil and gary.beck@us.af.mil by 9:00am (CST), Wednesday, 15 February 2023 for base access processing.
The Camp Bullis entrance gate does not have a visitor’s center. Upon pass approval notification, the Contractor shall report to the Walters Road Visitors Control Center (Adjacent to the JBSA Fort Sam Houston Main Gate). To have enough time to obtain a visitors pass and drive to the project location, please pick up your pass at least three (3) hours before the site visit time (approximately 10am
CST).
The following documents are required for Visitor Pass processing:
Valid Driver’s License and/or Passport.
Copy of this RFQ, which identifies the location of the Site Visit.
MEETING POINT will be at the Camp Bullis Burger King / BX complex.
Please limit attendees to two persons.
18. The following attachments are included with this RFQ:
Attachments 1 Bid Schedule 2 Clauses and Provisions 3 Statement of Need (SON) 4 Pass Request 5 Map of Camp Bullis
(End of Solicitation)
File details come from the government source that posted it. Updated .