Request for Quote (RFQ) # W912DY-26-Q-A261

This RFQ issued by the Corps of Engineers, Huntsville Center, Furniture Team seeks quotes for recreational furnishings for UH Multi Installations. Quotes must be submitted no later than 10:00 AM Central Time on 8 July 2026 (33 days from issuance) and must remain valid for 120 days. Pre-award questions must be submitted by 10:00 AM Central Time on 15 June 2026 to the Contract Specialist, Cheryl C. Smith. All quotes shall be emailed to both Cheryl.C.Smith@usace.army.mil and CEHNC-FurnitureQuotes@usace.army.mil.

Quote submissions must include the following documents: completed Standard Form 1449 (SF1449) with company name and signature in Block 17a; Excel version of Attachment 1 with all line items priced (no blank items permitted; enter $0.00 if no charge); Word version of Attachment 8 (Technical Documents Checklist); technical data sheets for each item clearly identifying which line item is being met; FTP upload access information if applicable; and GSA contract number, Tax ID, Cage Code, and point-of-contact information. Pricing on SF1449 must match Attachment 1 pricing. Installation start and completion dates must be provided in the Instructions To Quoters section. Quotes may be submitted via email (up to 10MB each) or through an FTP site, with file names including the company name in the first position and submission date in the last position. Contractors are recommended to use the Procurement Integrated Enterprise Environment (PIEE) platform for submission, which supports attachment sizes up to 1.9 gigabytes.

View the file

Other files

File Type Posted
Amend 0001 - RFQ - W912DY26QA261 UH RECREATIONAL RPL MULTI LOCATIONS.pdf PDF
7. ATT 1 - Ft. Campbell 6753 Rec Furniture.xlsx XLSX spreadsheet
21. ATT 1 - Ft. Drum 10434 Rec Furniture.xlsx XLSX spreadsheet
17. ATT 1 - Ft. Carson Rolling Pin Barracks 1043 Rec Furniture.xlsx XLSX spreadsheet
36. ATT 1 - Ft. Lee 18023 Rec Furniture.xlsx XLSX spreadsheet
39. ATT 1 - Ft. Lee 18026 Rec Furniture.xlsx XLSX spreadsheet
31. ATT 1 - Presidio of Monterey 831 Rec Furniture.xlsx XLSX spreadsheet
8. ATT 1 - Ft. Campbell 6754 Rec Furniture.xlsx XLSX spreadsheet
27. ATT 1 - Ft. Polk 2450 Rec Furniture.xlsx XLSX spreadsheet
14. ATT 1 - Ft. Carson 1950 Rec Furniture.xlsx XLSX spreadsheet
5. ATT 1 - Ft. Bragg 3540 Rec Furniture.xlsx XLSX spreadsheet
6. ATT 1 - Ft. Bragg 5704 Rec Furniture.xlsx XLSX spreadsheet
3. ATT 1 - Ft. Bragg 3229 Rec Furniture.xlsx XLSX spreadsheet
37. ATT 1 - Ft. Lee 18024 Rec Furniture.xlsx XLSX spreadsheet
MASTER NON - GSA ATT8 - Contractor - UH Recreational Multi Locations.docx DOCX document
RFQ - W912DY26QA261 UH RECREATIONAL RPL MULTI LOCATIONS.pdf PDF
33. ATT 1 - Ft. Rucker 6041 Rec Furniture.xlsx XLSX spreadsheet
16. ATT 1 - Ft. Carson 7506 Rec Furniture.xlsx XLSX spreadsheet
24. ATT 1 - Ft. Drum 20332 Rec Furniture.xlsx XLSX spreadsheet
15. ATT 1 - Ft. Carson 1954 Rec Furniture.xlsx XLSX spreadsheet
28. ATT 1 - Ft. Polk 1566 Rec Furniture.xlsx XLSX spreadsheet
35. ATT 1 - Ft. Lee 18022 Rec Furniture.xlsx XLSX spreadsheet
13. ATT 1 - Ft. Carson 1554 Rec Furniture.xlsx XLSX spreadsheet
20. ATT 1 - Ft. Drum 10432 Rec Furniture.xlsx XLSX spreadsheet
38. ATT 1 - Ft. Lee 18025 Rec Furniture.xlsx XLSX spreadsheet
32. ATT 1 - Presidio of Monterey 630 Rec Furniture.xlsx XLSX spreadsheet
12. ATT 1 - Ft. Carson 1552 Rec Furniture.xlsx XLSX spreadsheet
11. ATT 1 - Ft. Campbell 7933 Rec Furniture.xlsx XLSX spreadsheet
29. ATT 1 - Ft. Polk 1631 Rec Furniture.xlsx XLSX spreadsheet
23. ATT 1 - Ft. Drum 11049 Rec Furniture.xlsx XLSX spreadsheet
10. ATT 1 - Ft. Campbell 7932 Rec Furniture.xlsx XLSX spreadsheet
2. ATT 1 - Ft. Bragg 1529 Rec Furniture.xlsx XLSX spreadsheet
9. ATT 1 - Ft. Campbell 6756 Rec Furniture.xlsx XLSX spreadsheet
34. ATT 1 - Ft. Lee 18021 Rec Furniture.xlsx XLSX spreadsheet
30. ATT 1 - Ft. Polk 1635 Rec Furniture.xlsx XLSX spreadsheet
18. ATT 1 - Ft. Drum 770 Rec Furniture.xlsx XLSX spreadsheet
26. ATT 1 - Ft. Polk 240 Rec Furniture.xlsx XLSX spreadsheet
22. ATT 1 - Ft. Drum 10508 Rec Furniture.xlsx XLSX spreadsheet
19. ATT 1 - Ft. Drum 10424 Rec Furniture.xlsx XLSX spreadsheet
25. ATT 1 - Ft. Drum 20358 Rec Furniture.xlsx XLSX spreadsheet
1. ATT 1 - Ft. Bragg 1331 Rec Furniture.xlsx XLSX spreadsheet
4. ATT 1 - Ft. Bragg 3233 Rec Furniture.xlsx XLSX spreadsheet
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Greetings from the Corps of Engineers, Huntsville Center, Furniture Team.

Please find the attached Request for Quote (RFQ) # W912DY-26-Q-A261, to procure recreational furnishings for UH Multi Installations.

This RFQ includes a Standard Form 1449 (SF1449), an Excel version of Attachment #1, and a Word version of Attachment #8.

QUOTES SHALL BE SUBMITTED ACCORDING TO THE FOLLOWING PROCEDURES

NO LATER THAN 10:00AM Central Time, 8 July 2026 (33 days). This closing date/time is mandatory despite anything potentially to the contrary in block 10 of the SF 1449 or on eBuy (if used).

Please submit quotes valid for 120 days.

PLEASE SUBMIT QUESTIONS in email NLT 10:00AM Central Time, 15 June 2026 to Cheryl.C.Smith@usace.army.mil.

To help you submit a complete quote for consideration, please follow all of the steps below:

1. Quotes shall be emailed to the Contract Specialist at Cheryl.C.Smith@usace.army.mil

AND CEHNC-FurnitureQuotes@usace.army.mil by the closing date and time.

2. Quotes shall include no less than the following documents:

A. SF1449, and amendments (if applicable) B. Excel version of Attachment 1 C. Word version of Attachment 8 D. Access information to an FTP upload (if applicable).

Note: When an FTP site is used to submit your quote, the vendor shall email the Contract Specialist. A password sent by/from an FTP site does not satisfy the vendor’s requirement to email the Contract Specialist the above documents.

3. The subject line of emailed quotes, and notifications of additional quote documents located on an FTP site, shall include:

A. Company name B. RFQ number C. Project name & building(s) D. Number of emails

Example: GreatFurniture_W912DY-18-T-0140_Ft. Bragg_Bldg 1500_Email 1 of 5

4. Complete the SF1449 with your Company name and signature in Block 17a.

mailto:Cheryl.C.Smith@usace.army.mil mailto:Cheryl.C.Smith@usace.army.mil mailto:CEHNC-FurnitureQuotes@usace.amy.mil

5. Complete the SF1449, Item NO. (CLINS) with Unit Prices and the Extended Amounts.

Pricing on SF1449 must match pricing on Attachment 1.

6. Complete the SF1449, Instructions To Quoters section to show installation start and completion dates.

7. Complete the SF1449, Instructions To Quoters section with your company GSA #, Tax

ID #, Cage Code and Point-of-Contact information.

8. Submit a Technical Data Sheet (spec sheet / cut sheet) for each item in your quote. Make clear on the Technical Data Sheet which line item is being met.

9. Submit Technical Data Sheets that are organized and sequential as described in the

SF1449, Instructions To Quoters section.

10. Pre-award questions shall be directed to the Contract Specialist. The contractor shall not discuss any aspect of the procurement, to include asking questions, with the onsite Technical Representative (TR) prior to contract award.

11. You may either email your quote (up to 10MB each) or use an FTP site to store your quote and email the Contract Specialist according to Items 2 and 3. In case of an error received during quote submission, first consider dividing a file into two parts and resending or posting. Also, you may contact the Contract Specialist for potential guidance. Huntsville Center’s inboxes automatically archive to keep free space available at all times; however, the capacity of servers varies depending on digital traffic. The vendor is responsible for delivering a complete and timely quote to the Contract Specialist under all circumstances.

12. It is recommended that Contractors use the Procurement Integrated Enterprise Environment (PIEE). A vendor portal for solicitations was introduced as an enterprise-level service for the Department of Defense (DoD) within the Procurement Integrated Enterprise Environment (PIEE) platform. This capability allows DoD to have a more automated and secure process for capturing solicitations and their attachments and responses from industry. To obtain additional information please visit:

https://piee.eb.mil/xhtml/unauth/web/homepage/vendorGettingStartedHelp.xhtml

i. PIEE Size Limit. Each uploaded attachment can be up to 1.9 gigabytes (GB) in size.

The application supports different file extensions.

ii. Notifications when an amendment to the solicitation is posted: Within a solicitation, click the checkbox next to ‘Please notify me of amendments to this solicitation’ on the top left corner of the screen. You will receive email and system notification when an amendment is posted.

iii. Upload Multiple Documents in PIEE, multiple attachments may be uploaded at one time. After you click ‘Choose File,’ highlight all the files you want to upload and click ‘Open.’ If the total size of all the attachments exceeds 1.9GB (see 4.A above), upload the multiple attachments in batches that keeps each batch under the 1.9GB limit. Please https://piee.eb.mil/xhtml/unauth/web/homepage/vendorGettingStartedHelp.xhtml contact your company’s Account Administrator for any account related issues. If you are experiencing technical problems with Procurement Integrated Enterprise Environment, please contact the DISA DECC Ogden Electronic Business Service Desk at link below:

https://piee.eb.mil/xhtml/unauth/web/homepage/vendorCustomerSupport.xhtml

13. Return Attachment 1 in Excel format. Fill-in ALL blank spaces and return the attached Excel Spreadsheet version of Attachment 1 – DO NOT LEAVE ANY LINE ITEMS BLANK. If you choose to not charge for an item, please enter $0.00 beside that item.

14. Return Attachment 8 in Word format. Complete Attachment 8, Technical Documents

Checklist, and return in Word format with your quote.

15. File names shall include your company name in the first position and the submission date in the last position, as shown in the following examples:

GreatFurniture_SF1449, Amend 1_20Feb18.pdf GreatFurniture_Attachment 1_20 Feb18.xls GreatFurniture_Attachment 8_20 Feb18.docx GreatFurniture_Tech Data 1-12_20 Feb18.pdf GreatFurniture_Tech Data 13-24_20 Feb18.pdf

We would like our RFQ process to be clear and helpful. If you have suggestions, please bring them to our attention. The responsibility of providing a complete, accurate, and timely quote is yours. These instructions should help to make your quote complete.

https://piee.eb.mil/xhtml/unauth/web/homepage/vendorCustomerSupport.xhtml

File details come from the government source that posted it. Updated .