RFQ Document MVDC- cabinets_9.9.25.docx
DOCX document 37 KB Posted
- Solicitation number
- SRC0000033908
- Issued by
- Lake County, Ohio
About this file
This is a Request for Quotes (RFQ) issued by the Ohio Department of Developmental Disabilities (DODD) for the Mount Vernon Developmental Center, solicitation number SRC0000033908. The project involves the installation of custom-built cabinetry, high-density polyethylene plastic base and wall-mount cabinets, quartz countertops, sinks, and associated hardware to match existing kitchen cabinets in Jefferson cottage. A mandatory site visit is scheduled for September 24, 2025, at 9:00 AM, where potential bidders will review the work area. Quotes are due on October 10, 2025, at 2:00 PM, with the initial contract estimated to become effective on October 17, 2025, and remain in effect through June 30, 2026. The contract will be awarded to the lowest responsive and responsible bidder.
The project is subject to Ohio Prevailing Wage Laws and requires contractors to comply with specific background check and conduct requirements, given the facility's status as a Medicaid-certified Intermediate Care Facility for Individuals with Intellectual Disabilities. Contractors must use trained personnel, maintain necessary licenses, and perform work between 7:00 AM and 3:30 PM, Monday through Friday. All inquiries must be submitted through the OhioBuys website during the designated inquiry period, with responses posted publicly. Bidders must complete an Item Grid, submit a Standard Affirmation and Disclosure Form, and a Contractor Information Form to be considered for the award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Mount Vernon Developmental Center – Cabinets for Lincoln
Solicitation: SRC0000033908
Purpose: This solicitation is for the Installation of new cabinets and sinks.
RTP#: N/A
RFQ Schedule:
· RFQ Issued: 9/12/25
· Inquiry Period Begins: 9/12/25
· Site Visit: 9/24/25 at 9:00 AM
· Inquiry Period Ends: 10/3/25 at 2:00 PM
· Quotes Due: 10/10/25 at 2:00 PM
Site Information:
Mount Vernon Developmental Center 1250 Vernonview Drive Mount Vernon, Oh 43050
Site Visit:
A site visit is required to view the exact scope of work, at which time potential bidders may review the area where the cabinets are going and the current cabinets that the agency would like to replicate.
The site visit will be conducted at the Mount Vernon Developmental Center Site Visit Date: 9/24/25 Site Visit Time: 9:00 AM Potential Bidders for the site visit shall check in at the Administration Building upon arrival and ask for Don Stotts.
Specifications:
Mount Vernon Developmental center is requesting custom built cabinetry, high density, polyethylene plastic base cabinets and upper wall mounts to match existing kitchen cabinets in Jefferson cottage in color and style. Please provide and install quartz countertops to match the Jefferson kitchen. Also match the sink, backsplash, and sink cutout. Door hardware, faucets to match existing Jefferson cottage.
Requirements:
No work on the equipment covered herein shall be done by subcontractors unless prior approval is obtained from Mount Vernon Developmental Center. Contractor must use trained and qualified personnel directly employed and supervised by him/her, preferably the same technician for each time of service. The bidder shall be regularly engaged in the business of construction/cabinetry work.
The contractor shall maintain all necessary licenses, certifications, and registrations throughout the term of the awarded contract. Contractor shall perform all services with reasonable care, skill and diligence as would normally be provided by an experienced consultant and in accordance with industry standards.
Mount Vernon Developmental Center is a Medicaid-certified Intermediate Care Facility for Individuals with Intellectual Disabilities (ICF/IID), operated by the Ohio Department of Developmental Disabilities (DODD), serving individuals with developmental and other disabilities. All individuals to be providing services on the grounds of any DODD Developmental Center shall have not been found guilty of, or pleaded guilty to, any offense set forth in Section 5123.08(1), (2), or (3) of the Ohio Revised Code; nor employ any person to provide services under this RFP who has been found guilty of, or pleaded guilty to any offense set forth in Section 5123.081(1), (2), or (3) of the Ohio Revised Code. The person(s) providing services under this contract will be subject to a criminal background check prior to performing any services at any DODD Developmental Center.
Awarded Contractor shall certify that all its employees, while working at any DODD Developmental Center, will not purchase, transfer, use, be under the influence of, or possess illegal drugs or alcohol, or abuse prescription drugs in any way. Contractor shall comply with all applicable provisions of the Rehabilitation Act of 1973 and the Americans with Disabilities Act (ADA), both in the provision of specified services and in its employment practices.
Contractor shall not be subject to an “unresolved” finding for recovery under Section 9.24 of the Ohio Revised Code. If there is a finding for recovery, the Contractor’s proposal will be rejected.
All contract work must be completed during the hours of 7:00 A.M. and 3:30 P.M., Monday through Friday, unless prior arrangements are made with the Developmental Center contact person. Contractor shall complete work for each specific job/task on consecutive days, this includes installation work.
The contractor must always keep the work area safe and must provide and use OSHA-approved barricades for any work that is exposed to the public. Contractor must always secure his tools and materials. Contractor must clean his work area of all refuse and scrap materials at the end of each workday.
The contractor must provide all parts, labor and fees associated with acquiring any necessary permits and associated engineering services as required to complete this project.
Inquiries:
From the issuance date of this solicitation, until a contract is awarded to an offeror, there may not be communications concerning the RFQ between any supplier who expects to submit a quote, and any employee of DODD involved in the issuing of the RFQ. The only exception is provided through the submission of written requests for clarification/interpretation via the RFQ through the OhioBuys website during the inquiry period.
Prospective offerors may make inquiries or seek clarifications regarding this RFQ any time during the inquiry period listed in the solicitation Calendar of Events. To make an inquiry, prospective offerors must use the Inquiry tab on the solicitation in OhioBuys to submit all inquiries or seek clarification.
Prospective offerors submitting inquiries will receive an immediate acknowledgement by e-mail that their inquiry has been received. The prospective offeror who submitted the inquiry will not receive an e-mail response to the question but will need to view the response on the OhioBuys website where it will be posted for viewing by all prospective offerors.
Attachments to an inquiry are not visible to DODD, so please include all questions in the inquiry description field.
DODD will try to respond to all properly posed inquiries within 48 hours, excluding weekends and state holidays. DODD will not respond to any inquiries received after the date and time indicated on the RFQ. Prospective offerors who attempt to seek information or clarifications verbally will be directed to reduce their questions to writing in accordance with the terms of this RFQ and state purchasing policy. No other form of communication is acceptable, and use of any other form of communication or any attempt to communicate with DODD staff or any other agency of the State to discuss this RFQ may result in the offeror being deemed ineligible.
Proposal Submittal: Bidders must complete the “Item Grid” and attach an electronic copy of their proposal within the solicitation in Ohio Buys. The cost proposal must include all parts, labor and fees associated with acquiring any necessary permits and associated engineering services as required to complete this project.
Prevailing Wages:
When the project exceeds the prevailing wage threshold levels, the contract is subject to Ohio Prevailing Wage Laws, Chapter 4115 of the Ohio Revised Code and the supplier shall comply with all provisions contained therein. By submitting a bid, the offeror guarantees that the prevailing wage scale to be paid to all labor employed on the contract shall be in accordance with the published schedule of the prevailing hourly wage and fringe benefits ascertained and determined by Ohio Department of Commerce, Wage and Hour Bureau for the county in which the work is being performed. The following links will provide information on prevailing wage requirements, rates, and laws.
Prevailing Wage Threshold Levels https://com.ohio.gov/divisions-and-programs/industrial-compliance/wage-and-hour/guides-and-resources/prevailing-wage-threshold-levels
Prevailing Wage Rates Supplier shall be responsible for verification of current classification rates for work location(s). Prevailing wage rates may change throughout the life of the project, and it is the responsibility of the supplier to be in line with current rates.
Offeror may access the Ohio Department of Commerce, Wage & Hour Bureau at its website, https://wagehour.com.ohio.gov/w3/webwh.nsf/wrlogin/?openform, to obtain the current wage rates.
Time of Performance:
The initial awarded contract is estimated to become effective on 10/17/25, and remain effective through June 30, 2026, or until terminated as provided in the contract.
Evaluation / Award: Bids will be evaluated, and the contract will be awarded to the lowest responsive and responsible bidder as determined by the agency.
Attachments:
The following attachments must be completed and submitted as part of the supplier’s quote in OhioBuys in order to be considered for award.
· Standard Affirmation and Disclosure Form The Standard Affirmation and Disclosure Form attached to the RFQ must be completed, signed by an authorized official of the offeror’s organization, and submitted with any proposal to be considered.
· Contractor Information Form The Contractor Information Form attached to the RFQ must be completed and submitted with any proposal to be considered.
Solicitation Process:
A site visit has been scheduled on Sept 24 at 9:00AM in order to view the exact scope of work of replacing cabinets/sinks at which time potential bidders may review current preventive maintenance schedules and additional requirements.
Bidder is required to complete the item grid and attach an electronic copy of their proposal within the solicitation in OhioBuys. Quotes must be valid for a minimum of 30 days.
Bids will be evaluated, and the contract for services will be awarded to the lowest responsive and responsible bidder as determined by the agency.
Solicitation Summary:
This solicitation is for the cabinet/sink replacement at Mount Vernon Developmental Center.