This Request for Quote (RFQ) document issued by the Fayette County Public Schools (FCPS) Purchasing Department solicits quotes for the provision and delivery of two (2) new Rinnai water heaters (Model TRS06CUIN, 6-unit interior free-standing rack, natural gas) to Sara Harp Minter Elementary and Fayette Life Academy. The solicitation was released on Thursday, June 22, 2023, with questions due by Monday, June 26, 2023, and potential addenda issued by Tuesday, June 27, 2023. Responses must be submitted by 10:00 AM EST on Wednesday, June 28, 2023, either electronically in PDF format, by mail, or hand-delivered to Facilities Services at 245 Booker Avenue, Fayetteville, Georgia 30215. The anticipated review date is Wednesday, June 28, 2023, with an anticipated purchase order date of Thursday, June 29, 2023, and an anticipated completion date of mid-July 2023. The awarded respondent will report to Beria Orr, Facilities Services Supervisor. The contract term extends from the award issuance date through December 31, 2023, with automatic annual renewal on January 1st unless a cost escalation process is initiated, and no renewal options are included beyond the annual automatic renewal provision.
Respondents must submit a Cost Proposal form with pricing for both units combined, including shipping and delivery as a total project cost, along with an estimated time of arrival (ETA). Freight terms are FOB destination with freight prepaid and allowed. Evaluation criteria will not be based on lowest price alone but will include price/cost, warranty, service guarantees, past performance, costs of ownership analysis, business capabilities analysis, delivery schedules and methods, and product-specific manufacturer/quality standards. Delivery is expected at the specified location without a loading dock and must be either tailgate delivery (driver moves pallets to truck bed edge) or inside delivery (driver delivers to facility interior). All pallets must be covered, shrink-wrapped, and constructed for four-way equipment entry. FCPS reserves the right to accept or reject any price escalation requests, which are limited to 10% single changes based solely on product cost increases and require 30-day written notice. The solicitation allows cooperative purchasing for other Fayette County government entities and local municipalities at quoted prices. There is no indication of set-asides, incumbents, or specific funding sources; however, the contract is contingent upon annual budget appropriation by the Fayette County Board of Education, and failure to appropriate funding will result in cancellation without fault or obligation beyond products already received and invoiced.
Text of this file
Request for Quote 24-006-075 Water Heater for Sara Harp Minter Elementary and Fayette Life Academy
The Fayette County Public Schools Purchasing Department (hereinafter FCPS) invites you to participate in a request for quote (RFQ). This RFQ will consist of providing and delivering two (2) new Rinnai water heaters, per this solicitation specification, within the school district. The most responsive and responsible respondent will provide the heaters only.
Responses to this request for quote are due no later than the date and time specified in the timeline of events either physically or electronically to the FCPS Purchasing Department located at Facilities Services, 245 Booker Avenue, Fayetteville, Georgia 30215. Quotes received after the specified date and time will not be considered.
Vendors are instructed to carefully read all items, conditions, terms, specifications, and attachments herein and referenced before completing their quote. Failure to comply with any requirements of the RFQ may be a cause for rejection.
Instructions to Respondents Schedule of Events
RFQ Released Thursday, June 22, 2023 Questions Due Monday, June 26, 2023 Addenda Issued (if applicable) Tuesday, June 27, 2023 Response Due Before 10:00AM (EST), Wednesday, June 28, 2023 Anticipated Review Date Wednesday, June 28, 2023 Anticipated Purchase Order Date Thursday, June 29, 2023 Anticipated Completion Date Mid July 2023
Respondent Registration Respondents are encouraged to register with the issuing agent, Jamie Marrero, by sending an email to marrero.jamie@fcboe.org after reviewing this solicitation.
Respondents who register will automatically receive an email update with additional documents such as addenda and be notified of award issuance, even if they choose not to submit a response.
Project Documents and Forms Documents and forms required for submission as part of this RFQ can be found on the FCPS Purchasing Department website. Failure to include required submissions listed herein may result in a rejection of the response. A list of required forms is contained herein and additional submissions may be required per the specifications contained herein.
mailto:marrero.jamie@fcboe.org
Response Delivery
1. Responses may be submitted electronically, by mail, or hand-delivered to Facilities
Services, 245 Booker Avenue, Fayetteville, Georgia 30215, Attention: Purchasing Department.
2. Quote openings will occur at the date and time specified at the address above.
No faxed or telephone responses will be accepted or considered.
3. Responses may be emailed to the issuing agent if meeting the following guidelines:
3.1. Emailed responses must be in a consistent, clear, and readable format and complete. (Adobe PDF format is preferred)
3.2. All response documents should be bound in one document. Multiple separate documents may result in evaluation score reductions.
Attachments
1. Any specification listed with “Must Include Attachment” should include a document within the response conforming to standards set forth.
2. All attachments must be marked and labeled using the following format: Attachment
#, Solicitation Reference, Respondent Name, Solicitation Title, and Number.
Response Format Requirements
1. The response should be typed and legible using a Sans-based font in 12 point size or greater as well as formatted to comply with accessibility standards (see ADA and Section 508 compliance below).
2. The solicitation document has been carefully organized. All sections, specifications, requirements, and appendices are numbered; therefore responses should be organized in the same manner referencing the solicitation document when necessary.
3. All pages should be numbered and contain page headings or footers with the respondent's name and the solicitation title and number.
4. Multiple Response from the Same Respondent
4.1. Respondents may submit more than one response when offering multiple alternatives.
4.2. Responses must be separate and each should conform to all terms and conditions within the solicitation.
4.3. Responses must be labeled separately to easily identify differing responses from the same respondent.
Scope of Work and Specifications Scope of Work
The purpose and intent of this request for quote is to secure firm prices to provide new Rinnai water heaters, per the solicitation specifications, only. The heaters will be delivered to our Facilities Services location; Attn. Beria Orr, 245 Booker Avenue, Fayetteville, Georgia 30215. Fayette County Public Schools Facilities Services will be installing the heaters.
Specifications
1. Rinnai Water Heater (Quantity: 2)
1.1. Manufacturer #: TRS06CUIN
1.2. Free standing, six (6) unit system
1.3. See attached manufacturer specifications sheets
General Terms and Conditions FCPS’s General Terms and Conditions are posted on the Purchasing Department website under the heading of Vendor Terms, Conditions, and Forms at https://www.fcboe.org/Page/2707. By submission of a response, the respondent acknowledges they have read and understood these General Terms and Conditions as well as any terms and conditions contained herein.
Special Terms and Conditions Quote Opening
1. Quotes will be opened at the date and time provided in the schedule of events. All results will be publicly posted on the FCSD website once an award recommendation is made.
2. Quote openings are open to the public.
3. Quotes must be marked with the RFQ number.
4. Electronically delivered quotes will utilize the timestamp generated on the email.
5. Quotes must conform to the guidelines listed herein.
6. Quotes received late will be marked “non-responsive” and may not be considered at the sole discretion of the FCPS Purchasing Department.
Questions
1. All questions concerning this solicitation must be submitted in writing by email to the issuing agent.
2. No questions other than written will be accepted and only answers provided via addenda shall be binding.
Award Oversight The awarded respondent will report to Beria Orr, Facilities Services Supervisor, or their designee.
Cooperative Purchasing This solicitation allows for other Fayette County, Georgia government entities, including local municipalities, to purchase from the awarded contract at the same prices quoted during the effective term pending an agreement between the awarded respondent(s) and the third party.
Quote Evaluations
1. According to the Fayette County Board of Education policy, DJE “lowest price alone will not be the sole determining criteria in the selection process”.
2. Factors that may be used in evaluating responses may include but are not limited to, the following: price/cost, warranty, service guarantees or past performance, costs of https://www.fcboe.org/Page/2707 ownership analysis, business capabilities analysis, delivery schedules and methods, and product-specific manufacturer/quality standards.
3. Respondents may inquire as to specific evaluation methods and may request in writing an explanation of evaluation methods used to determine an award. See General Terms and Conditions regarding award protests.
Delivery
1. Delivery is expected on or about the date requested ARO.
2. Freight is FOB destination, freight prepaid (allowed).
3. The respondent must contact the end-user listed on purchase orders at least 24 hours before delivery to confirm the delivery date and time.
4. FCPS standard hours of operation are 7:30 AM to 3:30 PM (EST), Monday through
Friday, except for school holidays.
5. The delivery location does not have a loading dock; therefore, all deliveries must be made as a tailgate or inside delivery as defined in the solicitation, any resulting purchase order, or resulting contract.
5.1. Tailgate delivery will be defined as follows: the driver will be required to move the pallets from the interior bed of the truck to the edge of the bed. The FCSD will use a forklift to move the pallets from the edge of the truck bed to the warehouse.
5.2. Inside-delivery will be defined as follows: the driver will be required to move the material from the interior bed of the truck to the interior of the facility.
6. Any pallets must be covered or shrink-wrapped to protect cartons from dirt and moisture during shipment and pallet construction should allow for four-way entry of handling equipment and surface/platform board approximately one inch apart minimizing carton damage.
7. Failure to deliver per the response could result in the awarded respondent being declared in default.
8. The awarded respondent shall be responsible for the delivery of items in good condition at the point of destination.
9. Respondent shall file with the carrier all claims for breakage, imperfections, and other losses, which will be deducted from invoices.
10. Back Orders: Back orders may be made only when specifically authorized to do so by the project administrator. The necessity to back-order may be deemed a breach of contract.
Cost Escalation/Price Change The Purchasing Department recognizes that independent market factors may result or necessitate the need for price changes. Through the submission of a quote, the respondent agrees to the following:
1. All price increases must be based upon product cost ONLY, and documentation of the price increase is required.
2. Quote prices must be held firm for the term of the solicitation or December 31st of the issuing year, after which an escalator can be invoked.
3. The awarded respondent must provide the FCPS Purchasing Department written notification at a minimum of 30 days before a price escalation change.
4. Single changes of no more than 10% are allowed. There are exceptions only when market conditions dictate a revised escalator for a particular commodity.
5. FCPS reserves the right to accept or reject any price escalation. A rejection of a price escalation may result in the termination of any agreement, contract, purchase order, or other agreement without fault or obligation.
Installation Respondent is not responsible for the installation of these water heaters. Heaters will be installed by the Fayette County Public Schools Facilities Services Plumbing Department.
Quantities Projects listed within this solicitation are not guaranteed. Purchase orders will be issued for specific projects, as needed, for the term of this solicitation. The Fayette County School District anticipates that these projects will be completed. But, the project approval will be determined by the available budget allotment.
Term
1. The term of this RFQ and resulting agreement is from the date of resulting award issuance until December 31, 2023, with no option to renew.
2. The RFQ and resulting agreement will automatically renew each year beginning
January 1st with the awarded pricing structure unless a cost escalation/price change process is initiated per the clause contained herein.
3. Per the FCPS General Terms & Conditions, should the Fayette County Board of Education fail to appropriate funding for each fiscal year beginning July 1st, this solicitation and resulting contract or purchase orders will be canceled with no-fault or obligation beyond products or services already received and properly invoiced.
3.1. FCPS may notify the awarded bidder in writing thirty (30) days prior to cancellation for non-appropriation.
Required Forms The forms listed below are required for submission and included as attachments. They may also be located on FCPS’s Purchasing Department website at https://www.fcboe.org/Page/2707.
1. Respondent Information Form
2. Reference Form
3. Cost Proposal (Include ETA)
4. Failure to include any form may result in a reduction in evaluation scoring or the submitted quote being declared non-responsive at the sole discretion of the FCPS Purchasing Department.
Contract Incorporation This request for quote, any addenda, and the awarded quote will be incorporated into any resulting contract and/or purchase order.
https://www.fcboe.org/Page/2707
Cost Proposal
Manufacturer: Rinnai
Item Description: Water Heater, 6-Unit interior free standing rack, NG
Manufacturer Part No.: TRS06CUIN
Cost per Unit: $______________
Quantity: 2
Cost for Units Combined: $________________
Total Project Cost: $___________________
(Including Shipping and Delivery)
Company Name Date
Name Signature
Rinnai Tankless Rack System Specification Sheet
Part No.* Rack type Configuration Illustration
TRS02CUiN 2-unit interior free-standing rack, NG
Back to Back
TRS02CUeN 2-unit exterior free-standing rack, NG
TRS02CUiP 2-unit interior free-standing rack, LP
TRS02CUeP 2-unit exterior free-standing rack, LP
TRS02ILCUiN 2-unit INLINE interior free-standing rack, NG
TRS02ILCUeN 2-unit INLINE exterior free-standing rack, NG
TRS02ILCUiP 2-unit INLINE interior free-standing rack, LP
TRS02ILCUeP 2-unit INLINE exterior free-standing rack, LP
TRS23ILCUiN 2-unit INLINE interior free-standing rack, NG
TRS23ILCUeN 2-unit INLINE exterior free-standing rack, NG
TRS23ILCUiP 2-unit INLINE interior free-standing rack, LP
TRS23ILCUeP 2-unit INLINE exterior free-standing rack, LP
TRS03ILCUiN 3-unit INLINE interior free-standing rack, NG
TRS03ILCUeN 3-unit INLINE exterior free-standing rack, NG
TRS03ILCUiP 3-unit INLINE interior free-standing rack, LP
TRS03ILCUeP 3-unit INLINE exterior free-standing rack, LP
TRS03CUiN 3-unit interior free-standing rack, NG
TRS03CUeN 3-unit exterior free-standing rack, NG
TRS03CUiP 3-unit interior free-standing rack, LP
TRS03CUeP 3-unit exterior free-standing rack, LP
TRS36CUiN 3-unit interior free-standing rack, NG
TRS36CUeN 3-unit exterior free-standing rack, NG
TRS36CUiP 3-unit interior free-standing rack, LP
TRS36CUeP 3-unit exterior free-standing rack, LP
TRS04CUiN 4-unit interior free-standing rack, NG
TRS04CUeN 4-unit exterior free-standing rack, NG
TRS04CUiP 4-unit interior free-standing rack, LP
TRS04CUeP 4-unit exterior free-standing rack, LP
TRS46CUiN 4-unit interior free-standing rack, NG
TRS46CUeN 4-unit exterior free-standing rack, NG
TRS46CUiP 4-unit interior free-standing rack, LP
TRS46CUeP 4-unit exterior free-standing rack, LP
TRS05CUiN 5-unit interior free-standing rack, NG
TRS05CUeN 5-unit exterior free-standing rack, NG
TRS05CUiP 5-unit interior free-standing rack, LP
TRS05CUeP 5-unit exterior free-standing rack, LP
TRS06CUiN 6-unit interior free-standing rack, NG
TRS06CUeN 6-unit exterior free-standing rack, NG
TRS06CUiP 6-unit interior free-standing rack, LP
TRS06CUeP 6-unit exterior free-standing rack, LP
FREE-STANDING RACKS
* Part No. Legend: TR = Tankless Rack; W = Wall Hanging; S = Stand Alone; IL = Inline; ILW = Inline Wall Mount;
2/3/4/5/6 = Number of Water Heaters; i/e = Interior/Exterior; NG/LP = Natural Gas/Liquid Propane
Configuration Model Illustration
TRS06CU
TRS05CU
TRS03ILCU
Configuration Model Illustration
TRS36CU
TRS46CU
TRS23ILCU
FRONT LEFT
BOTTOM
6 - U n i t F re e - S ta n d i n g F ra me
Rack Frame - Specifications
Frame Rail Type Sheet Metal
Frame Material Aluminum (0.090 5052-H32)
Frame Finish Powder Coat
Color Gray
Water & Gas Connections
Hot Water Trunk Line Diameter 2-1/2" 2”
Cold Water Trunk Line Diameter 2-1/2" 2”
Hot Water Trunk Line Material Rigid Copper
Cold Water Trunk Line Material Rigid Copper
Water Trunk Connection Type 2-1/2” PIPE 2” PIPE
Gas Trunk Line Diameter 1-1/2" 1-1/4”
Gas Trunk Connection Type 1-1/2” MNPT 1-1/4”MNPT
Gas Trunk Line Material Sch 40 Steel
Gas Branch Line Material PVC Over CSST
BTU and Flow Rates for CU199i, CU199e (NG/LP)
Number of Tankless Water Heaters 6 5 3 4 2
Flow rate @ 70°F rise (gpm) 32.4 27.0 16.2 21.6 10.8
Flow rate @ 100°F rise (gpm) 22.8 19.0 11.4 15.1 7.6
Minimum input rate (Btuh) 15,200
Maximum input rate (Btuh) 1,194,000 995,000 597,000 796,000 398,000
TRS06CU TRS05CU TRS03ILCU
Electric Requirements
Prewired Electrical Assembly N/A Yes (Indoor Models Only)
Voltage AC 120 Volts—60 Hz
Max Current (Amperes) 24 20 16 12 12 8
TRS36CU TRS46CU TRS23ILCU
Condensate Trunk Line Diameter 3/4” N/A
Condensate Trunk Line Material Sch-40 PVC N/A
Condensate Trunk Connection Type 3/4” Pipe N/A
6-Unit Free-Standing Frame (Continued)
Respondent Information Form Place this form on top of your response.
Water Heater for Sara Harp Minter Elementary and Fayette Life Academy (RFQ 24-006-075)
Company Name:
Point of Contact:
Street Address:
City:
State:
Zip Code:
Telephone:
Email:
Website:
Authority to Act The undersigned states that he/she has the requisite authority to act on behalf of his/her employer in these matters and has offered to provide the products/services in accordance with the terms and conditions herein.
Terms, Conditions, and Specifications Through the submission of response and signature below, the respondent verifies that their solution, if applicable, complies fully, or complies with an exception, to all stated general and special terms, conditions, and specifications. See the FCSD General Terms and Conditions for further information and directions on notating exceptions to stated specifications.
Addenda Through the submission of response and signature below the respondent verifies that they have read and understood any addenda issued for this solicitation if issued.
Signature: _____________________________________Date: _______________________
Reference Form
Water Heater for Sara Harp Minter Elementary and Fayette Life Academy (RFQ 24-006-075)
Requested Information Response
Reference Name
Contact for Reference
Street Address
City, State, Zip
Phone Number
Requested Information Response
Reference Name
Contact for Reference
Street Address
City, State, Zip
Phone Number
Requested Information Response
Reference Name
Contact for Reference
Street Address
City, State, Zip
Phone Number
| Water Heater for Sara Harp Minter Elementary and Fayette Life Academy (RFQ 24-006-075) |
| Rack-System-Submittal-Sheet-(Free-standing) |
| Respondent Information Form_ RFQ 24-006-075 |
| Reference Form_ RFQ 24-006-075 |
| Check Box51: Off |
| Check Box60: Off |
| Check Box61: Off |
| Check Box62: Off |
| Check Box63: Off |
| Check Box64: Off |
| Check Box65: Off |
| Check Box68: Off |
| Check Box73: Off |
| Check Box74: Off |
| Check Box75: Off |
| Check Box76: Off |
| Check Box77: Off |
| Check Box78: Off |
| Check Box79: Off |
| Check Box80: Off |
| Check Box81: Off |
| Check Box82: Off |
| Check Box83: Off |
| Check Box84: Off |
| Check Box85: Off |
| Check Box86: Off |
| Check Box87: Off |
| Check Box88: Off |
| Check Box89: Off |
| Check Box90: Off |
| Check Box91: Off |
| Check Box92: Off |
| Check Box93: Off |
| Check Box94: Off |
| Check Box95: Off |
| Check Box96: Off |
| Check Box97: Off |
| Check Box98: Off |
| Check Box99: Off |
| Check Box100: Off |
| Check Box101: Yes |
| Check Box102: Off |
| Check Box103: Off |
| Check Box104: Off |
| Check Box105: Yes |
| Check Box106: Off |
| Check Box107: Off |
| Check Box108: Off |
| Check Box109: Off |
| Check Box110: Off |
| Check Box111: Off |
| Check Box112: Off |
| Check Box113: Off |
| Check Box114: Off |
| Check Box115: Off |
Other files
| File | Type | Posted |
|---|---|---|
| Award Information | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .