This is a Request for Qualifications (RFQ) issued by the Southwest Region Planning Commission (SWRPC) in New Hampshire for technical services to develop a watershed management plan for Laurel Lake in the Town of Fitzwilliam, NH. The project involves developing an EPA nine-element watershed-based management plan to identify pollution sources, determine load estimates, and calculate reductions needed to improve water quality, with specific concerns including decreasing transparency, elevated chloride levels, and low pH levels. The RFQ was issued on February 24, 2025, with submissions due by March 21, 2025, at 5:00 p.m. EST. The project is expected to begin in spring 2025 and be completed by September 30, 2026. The selection process includes evaluation of qualifications packages, followed by potential interviews with top candidates, with final selection anticipated by April 11, 2025.
The project is funded under Section 604(b) of the Federal Clean Water Act and is administered by the New Hampshire Department of Environmental Services (NHDES). Cost proposals are not to be included with initial qualification submissions; rather, SWRPC will request a task-based cost proposal from the highest-ranked consultant after qualifications-based selection. If negotiations with the top-ranked firm are unsuccessful, SWRPC will proceed with the next highest-ranked firm. Firms must demonstrate eligibility to receive Federal funding and certify compliance with State and Federal rules related to grant-funded projects.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| rfq-des-2025-05-0.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request For Qualifications For Technical Services Laurel Lake Watershed Management Plan For Southwest Region Planning Commission
Contact:
Date of Issue:
Deadline:
Jason Cooper, (603) 357-0557, jcooper@swrpc.org February 24, 2025 March 21, 2025, at 5:00 p.m. (EST)
I. Project Description
The intent of this project is to develop a watershed-based management plan to identify the contributing factors in the current water quality status of Laurel Lake located in the Town of Fitzwilliam, NH. The Laurel Lake Watershed Management Plan will be an EPA nine-element (a-i) watershed-based management plan. Activities will include targeted investigations of critical priority areas to identify pollution sources, determine load estimates, and calculate reductions needed to improve the water quality of the lake. Specific concerns include decreasing transparency over time, elevated chloride levels, and low pH levels. Sub-watershed assessments will be conducted to determine sites requiring mitigation for stormwater, erosion, infiltration, culvert upgrades, etc.
The project is funded under Section 604( b) of the Federal Clean Water Act and is administered by the New Hampshire Department of Environmental Services (NHDES ).
II. Scope of Work
The selected contractor will complete tasks to assist Southwest Region Planning Commission (SWRPC in the development of the Laurel Lake Watershed Management Plan. The tasks to be completed by the contractor represent a portion of the overall project. The contractor will work collaboratively with SWRPC by providing technical services to complete tasks, or portions of tasks, as described in the proposal entitled Laurel Lake Watershed Management Plan. Below is a description of the tasks that are to be completed by the contractor.
Please note that the Task number sequence presented below corresponds to the Grant Agreement between NHDES and SWRPC. Objectives and Tasks not included below are intentionally omitted as they will be completed by SWRPC or others.
Contractor Tasks
Objective 1: Preliminary project planning.
Tasks 1-4: SWRPC tasks.
Task 5: Participate in a project kick-off meeting.
Objective 2: Develop a Site-Specific Project Plan (SSPP for the Laurel Lake Watershed Management Plan.
https://orgswrpc.sharepoint.com/sites/SWRPCFileShare/Shared Documents/Data/Environment/604/2023 Laurel Lake/Consultant/Laurel Lake RFQ.docx tel:+16033570557 mailto:jcooper@swrpc.org
Deliverable: A signed SSPP by NHDES that addresses assimilative capacity, watershed load modeling and best management practice (BMP nonpoint source pollution (NPS load reductions.
Task 6: Coordinate with SWRPC and the steering committee to develop a SSPP covering all data collection and data manipulation tasks included in this project following NHDES guidance for developing SSPPs; submit the draft SSPP to NHDES for review.
Task 7: Address the draft SSPP comments and submit the final document for approval by NHDES.
Share the approved and signed SSPP with the full project team.
Objective 3: Determine assimilative capacity for each water quality parameter associated with designated use attainment within Laurel Lake.
Deliverable: A memo describing the calculation of the current in-lake water quality criteria for TP, and confirmation of the designated use support or non-support for Laurel Lake.
Task 8: Gather existing lake and tributary data from the NHDES Environmental Monitoring Database (EMD and Volunteer Lake Assessment Program (VLAP and determine if it is acceptable for use in assimilative capacity analyses.
Task 9: Determine the historic and current median Total Phosphorus (TP ), Dissolved Oxygen (DO ), and Chlorophyll-a (Chl-a) levels for Laurel Lake.
Task 10: Calculate assimilative capacity for Laurel Lake and review figure with work group.
Task 11: Collaborate with stakeholders to update the existing water quality monitoring program as needed to gather additional data required to inform model inputs.
Objective 4: Identify current and future pollution sources within the Laurel Lake watershed.
Deliverable: Watershed and lake response model outputs and defined pollution source loads based on site specific knowledge using ground-truthing methods. Watershed and shoreline survey summary memos are provided to NHDES.
Task 12: Review and provide feedback on GIS analysis of parameters such as land use coverages or orthophotos to determine watershed characteristics to the level of detail necessary to inform modeling and pollutant loading analysis.
Task 13: Develop watershed buildout analysis. This will provide sufficient information to be used with watershed modeling scenarios.
Task 14: Review and provide feedback on the results from the watershed loading models for estimated total phosphorus load to the lake and in-lake TP concentration, Chlorophyll-a, Secchi disk transparency, and algal bloom probability. Using results from the current load model, run model scenarios for pre-development, existing, and future build-out of the watershed.
Task 15: Develop watershed and shoreline survey forms and parcel-based GIS map of the Laurel Lake watershed to assess the watershed. Coordinate with the Town of Fitzwilliam to gather parcel data. Provide notice to watershed residents of survey dates.
Task 16: In collaboration with the work group, conduct a watershed survey along all participating roads and properties, including agricultural properties as applicable.
Task 17: In collaboration with the work group, complete shoreline survey.
Task 18: Develop database and summary memos for both the watershed survey and shoreline survey. Share drafts with the steering committee. Submit the final memos to NHDES. Gather additional information from the steering committee that will help with the prioritization of BMPs.
https://orgswrpc.sharepoint.com/sites/SWRPCFileShare/Shared Documents/Data/Environment/604/2023 Laurel Lake/Consultant/Laurel Lake RFQ.docx https://orgswrpc.sharepoint.com/sites/SWRPCFileShare/SharedDocuments/Data/Environment/604/2023LaurelLake/Consultant/LaurelLakeRFQ.docx
Objective 5: Establish the water quality goal for phosphorus in Laurel Lake.
Deliverable: Watershed and lake response model outputs paired with identification summaries of current and future pollution source loads by land use type and source by subwatershed for each parameter. Refined pollution source loads for each subwatershed based upon site specific knowledge using ground-truthing methods are documented and provided to NHDES.
Task 19: In coordination with stakeholders, including NHDES, develop a process to establish the water quality goal for Laurel Lake.
Task 20: Revise determined water quality goal based on stakeholder feedback. Share the final goal and processes with NHDES and work group.
Objective 6: Estimate the pollution reductions necessary to maintain the water quality goal and expected watershed conditions.
Deliverable: Interim technical memo from the consultant with pollution load reductions presented to the steering committee and provided to NHDES.
Task 21: Develop target total phosphorous reductions needed to achieve the in-lake phosphorous goal, or associated water quality goals, for current and predicted watershed build-out conditions. Coordinate with work group to review target.
Task 22: Develop load reduction estimates needed to meet the identified water quality goals as informed by project activities, such as watershed and shoreline surveys. Coordinate with work group regarding these estimates.
Objective 7: Engage the community in nonpoint source management.
Deliverable: Workshop summaries and copies of press releases are provided to NHDES.
Task 23: Assist with educational workshops in coordination with SWRPC that are aimed at improving property owner and municipal awareness for key water quality issues identified through project data collection and analysis.
Task 24: SWRPC task.
Task 25: Participate in at least three steering committee meetings with project partners to discuss project progress, review deliverables, and coordinate next steps in the project. Meetings will occur when key deliverables (water quality goal, monitoring plan, watershed BMP prioritization, action plan, draft management plan, etc. are ready for committee review. SWRPC will take the lead in scheduling and organizing.
Objective 8: Incorporate the EPA key elements (a-i) into the draft Laurel Lake Watershed Management Plan.
Deliverable: Draft Laurel Lake Watershed Management Plan.
Task 26: Assist and advise SWRPC-led efforts to complete a review of relevant land use, zoning, and natural resource protection ordinances that affect Laurel Lake. Provide feedback on recommendations for new ordinances.
Task 27: Develop action plan which will include components of education and outreach, monitoring, BMP needs, and securing funding necessary to achieve the established water quality goal for Laurel Lake. The plan will also include cost estimates and expected level of technical assistance needed to implement each action.
Task 28: Coordinate with work group to review current capacity of watershed stakeholders to engage in restoration plan implementation initiatives. Develop a realistic BMP implementation schedule that https://orgswrpc.sharepoint.com/sites/SWRPCFileShare/Shared Documents/Data/Environment/604/2023 Laurel Lake/Consultant/Laurel Lake RFQ.docx accounts for property access, funding, grant cycles, and priority.
Task 29: Prepare milestone schedule to assess whether implementation of the watershed management plan is occurring successfully.
Task 30: Develop draft Laurel Lake Watershed Management Plan and maps in coordination with work group.
Task 31: Incorporate feedback from work group and stakeholders on initial draft.
Task 32: Work with stakeholders to organize a public meeting to share the results of the draft Laurel Lake Watershed Management Plan. Incorporate activities to collect public feedback at the meeting for consideration to be incorporated in the Plan. Invite watershed residents and municipal representatives from the Town of Fitzwilliam.
Objective 9: Publish the final Laurel Lake Watershed Management Plan
Deliverable: Final Laurel Lake Watershed Management Plan.
Task 33: Implement feedback gathered from the draft watershed management plan into final version.
Task 34: Present the final Laurel Lake Watershed Management Plan to the public and relevant stakeholders, including those representing the Town of Fitzwilliam. Encourage that the Town adopt the plan for unified restoration efforts throughout the watershed.
Task 35: Publish the final Laurel Lake Watershed Management Plan on the SWRPC and LLA websites. Share with project stakeholders for their use. Submit the final Laurel Lake Watershed Management Plan to NHDES in accordance with the NHDES Publication Standards.
Objective 10: Conduct project management and submit all required reports to NHDES.
Deliverable: Financial documentation, semi-annual progress reports, and final report are submitted to NHDES.
Tasks 36-38: SWRPC only.
III. Project Schedule
Qualifications packages should include a generalized schedule for conducting and completing the activities described in the Scope of Work. It is expected that work on this project will begin during the spring of 2025 and should be completed by September 30, 2026.
IV. Required Qualifications and Submissions
Qualification packages shall include the following components as described below.
1. Name, address, brief history, and description of the firm.
2. Description of the project team, including project team organization, team member resumes, special qualifications or certifications, and their anticipated level of involvement in the project as described in the Scope of Work.
3. Related projects, areas of expertise, and experience:
a. Include a description of other projects the firm has completed that are similar in nature.
b. Provide a list of references including names, titles, and contact information.
4. Description of the firm’s approach to performing the tasks detailed in the Scope of Work, including a timeline and discussion of the relative effort anticipated to be expended on each objective and task.
https://orgswrpc.sharepoint.com/sites/SWRPCFileShare/Shared Documents/Data/Environment/604/2023 Laurel Lake/Consultant/Laurel Lake RFQ.docx
Responses should demonstrate and document that the individual/firm has the professional experience to proceed with the work tasks as described in the Scope of Work in this RFQ. A complete and timely submittal as described in this RFQ is required for the submittals to be considered.
V. Selection Criteria
Selection will be based on the assessment of the qualifications package to meet the following criteria.
1. Specialized Experience of the Project Team
a. Overall experience directly related to the successful completion of similar watershed planning projects that include incorporation of EPA’s Nine Elements (“a - i” ), data analysis, monitoring, outreach, and working with diverse stakeholders to achieve project goals;
b. Demonstrated ability to identify structural and non-structural BMPs and generate pollutant load analyses for BMPs;
c. Demonstrated ability to complete work within the available budget and schedule (do NOT provide a cost estimate at this time) ; and
d. Demonstrated ability to work with NHDES to develop Quality Assurance documents.
2. Project Personnel
a. Principal team members’ roles and participation levels, availability, qualifications and experience (see detail in Section IV, 2 .
3. Project Approach
a. Demonstrated strong understanding of the Scope of Work, project schedule, and expected deliverables outlined in the RFQ.
After the qualifications-based ranking and selection process is complete, SWRPC will request from the highest ranked consultant a task-based cost proposal. SWRPC will proceed with contract negotiations with that consultant. If the parties cannot come to terms, SWRPC will request from the second ranked consultant a task-based cost proposal and follow the same procedure, working with each of the next ranked qualified candidate( s in order of their scores, until a contract has been successfully negotiated.
VI. Request for Qualifications Questions
Any questions about this RFQ raised by an individual/firm will be answered in a summary digest. The summary digest will be provided to those who contact Southwest Region Planning Commission and request to be put on an e-mail list to receive the digest. The cut-off date for questions and requests to be put on the e-mail list to receive the summary of questions and answers is 2/28/25. Please e-mail Jason Cooper of SWRPC at jcooper@swrpc.org to ask a question or to be put on the e-mail list to receive the summary digest. The summary digest will be provided via e-mail on
3/7/25 to all consultants on the response list.
VII. Anticipated Time Line The following dates reflect the anticipated procurement timeline. SWRPC reserves the right to deviate from the dates listed below. Any changes will be posted at https://www.swrpc.org/about/jobs-rfps/.
February 24, 2025 Request for Qualifications release February 28, 2025 Deadline for submittal of questions on this RFQ 5:00 p.m.
March 7, 2025 Questions and answers summary digest distributed to contractors and posted online.
March 21, 2025 Deadline for receipt of qualification packages to this RFQ 5:00 p.m.
April 11, 2025 Anticipated final selection of contractor and notification to all firms. SWRPC reserves the right to conduct interviews with top candidates prior to selection.
https://orgswrpc.sharepoint.com/sites/SWRPCFileShare/Shared Documents/Data/Environment/604/2023 Laurel Lake/Consultant/Laurel Lake RFQ.docx
Due Date: Complete submittals are required to be emailed or postmarked by 5:00 p.m. EST on 3/21/25 and should be emailed in pdf. format to Jason Cooper, Planner, at jcooper@swrpc.org or sent by mail to:
Southwest Region Planning Commission Attn: Jason Cooper, Planner 37 Ashuelot Street Keene, NH 03431
VIII. Disclaimer
This RFQ does not commit SWRPC to award a contract or pay any costs incurred during the preparation of any submittal. SWRPC reserves the right to reject any or all of the submittals while adhering to applicable laws. To participate in the project and receive payment, the selected firm will be required to enter into a contract which stipulates that the contractor is eligible to receive Federal funding and certifies compliance with State and Federal rules related to grant funded projects.