This Request for Qualifications (RFQ) from the City of College Park, Maryland seeks a qualified professional consulting firm or multidisciplinary team to develop a City-wide Comprehensive Safety Action Plan (CSAP) and provide associated planning and demonstration project support funded through the U.S. Department of Transportation Fiscal Year 2024 Safe Streets and Roads for All (SS4A) Program. The CSAP will establish Vision Zero objectives, identify evidence-based safety strategies across all transportation modes, and advance actions consistent with the Safe System Approach. The selected consultant will provide professional planning, engineering, and technical services across two phases: Phase I encompasses CSAP development and demonstration planning, while Phase II includes demonstration project evaluation support. Key deliverables include data collection and safety analysis, stakeholder and public engagement activities, safety goals and strategies development, demonstration project planning and evaluation support, performance measurement and reporting frameworks, and comprehensive CSAP documentation. Requests for information are due August 18, 2026, with Statements of Qualifications due September 11, 2026 at 12:00 p.m. to the Finance Department at 7401 Baltimore Avenue, College Park, Maryland. Critical milestone dates include a planned NEPA completion date of April 1, 2027, demonstration project substantial completion by October 31, 2028, and a final action plan publicly available by May 1, 2030. The contact for the solicitation is Rakhmel Rafi, Grants and Development Coordinator, at 240-487-3542 or VisionZero@collegeparkmd.gov.
The total SS4A funding awarded is $675,000, with $450,959.00 dedicated to CSAP development and planning-level activities and $218,750.00 reserved for future demonstration project implementation activities through a separately procured construction contract. Compensation will be structured as a task-based, not-to-exceed cost reimbursement agreement based on negotiated labor classifications, hourly billing rates, direct expenses, and subconsultant costs, with cost-plus-a-percentage-of-cost methods prohibited. Minimum qualifications require demonstrated experience completing at least two transportation safety planning projects of similar scope within the past five years, experience with federally funded projects subject to 2 CFR Part 200, and availability of a designated Project Manager with relevant transportation safety planning experience. Respondents will be evaluated on responsiveness and completeness (10%), firm qualifications and key personnel (20%), method of approach (25%), demonstrated experience and past performance (25%), federal experience and compliance (10%), and project schedule and availability (10%). All services must comply with applicable federal, state, and local requirements, including the SS4A Notice of Funding Opportunity, Federal Highway Administration guidance, the executed Grant Agreement, and 2 CFR Part 200. The City reserves the right to shortlist firms for interviews, request additional information, conduct reference checks, and reject any submissions, with the highest-ranked firm invited to submit a detailed cost proposal and enter contract negotiations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Vision Zero RFQ CP-27-01 RFIs.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUALIFICATIONS
CITY OF COLLEGE PARK, MARYLAND
RFQ NO. CP-27-01
Vision Zero College Park
ISSUE DATE: JULY 23, 2026
REQUESTS FOR INFORMATION DUE AUGUST 18, 2026
SUBMITTAL DUE DATE: SEPTEMBER 11, 2026
CONTACT:
Project Manager: Rakhmel Rafi, Grants & Development Coordinator
PHONE: 240-487-3542
EMAIL: VisionZero@collegeparkmd.gov mailto:VisionZero@collegeparkmd.gov
City of College Park, Maryland
RFQ CP-27-01
Request for Qualifications for
Contents
A. PROJECT BACKGROUND
B. PROJECT BUDGET
C. DEPARTMENT BACKGROUND
D. SCOPE OF SERVICES
E. SUBMITTAL REQUIREMENTS
F. REVIEW OF QUALIFICATIONS
EXHIBIT 1 – GRANT APPLICATION
EXHIBIT 2 – GRANT AGREEMENT
EXHIBIT 3 – ADDITIONAL FEDERAL CONTRACT PROVISIONS
A. PROJECT BACKGROUND
The City of College Park (“the City”) seeks a qualified professional consulting firm or multidisciplinary team to serve as its Safety Action Plan Consultant for development of a City-wide Comprehensive Safety Action Plan (CSAP) under the United States Department of Transportation Fiscal Year 2024 Safe Streets and Roads for All (SS4A) Program.
The CSAP will serve as the City’s principal framework for reducing roadway fatalities and serious injuries across all transportation modes while functioning as an implementation-oriented roadmap for measurable safety improvements. The plan will establish Vision Zero objectives; identify, prioritize, and recommend evidence-based safety strategies for pedestrians, bicyclists, transit riders, motorists, and micromobility users; and advance actions consistent with the Safe System Approach.1
The CSAP will define actionable priorities, support near-term safety interventions through demonstration projects, and position the City to compete for future federal and state implementation funding opportunities. The selected consultant will function as a project steward to assist the City in developing a practical, data-driven plan that can be maintained and advanced by City staff beyond completion of the SS4A grant period. The CSAP will evaluate safety conditions across the entire City, including corridors under shared or adjacent jurisdiction, with coordination led by the City in partnership with the State of Maryland, Prince George’s County, Washington Metropolitan Area Transit Authority (WMATA), and the University of Maryland, and supported by the consultant for technical analysis, interagency coordination, and documentation activities.
Respondents should demonstrate experience developing federally compliant safety action plans, conducting data-driven roadway safety analysis, supporting environmental screening documentation, facilitating public and stakeholder engagement, and managing multi-phase planning efforts under federal grant programs. Familiarity with federal requirements applicable to SS4A-funded planning activities, including 2 CFR Part 200 and applicable conflict-of-interest provisions, is expected. Consultants involved in preparation of planning or environmental documentation must disclose any actual or potential organizational conflicts of interest, which will be reviewed by the City in accordance with applicable federal guidance.
1 What Is a Safe System Approach? | US Department of Transportation https://www.transportation.gov/safe-system-approach
B. PROJECT BUDGET
A total of $675,000 in SS4A funding was awarded, as shown in Exhibit 2- Grant Agreement. Of this amount, $450,959.00 is dedicated to development of the CSAP and associated planning-level activities, and $218,750.00 is reserved for future demonstration project implementation activities, including construction, installation, and material procurement to be performed under a separately procured construction contract.
This solicitation consists solely of professional planning, analytical, engineering-support, environmental documentation support, and administrative services associated with CSAP development and demonstration project planning and evaluation – see Exhibit 1 – Grant Narrative. Construction, installation, and material procurement are expressly excluded from this procurement and will be performed under a separate contract.
C. DEPARTMENT BACKGROUND
The City is a small municipal government with limited internal staffing capacity dedicated to long-range planning, transportation safety, and federal grant administration. The Planning and Community Development Department consists of four professional staff responsible for planning, community development, and grant coordination functions. Engineering oversight is provided by two staff responsible for coordination of Complete Streets2 projects and external engineering consultants.
Accordingly, the City relies on qualified professional consultants to provide specialized technical expertise necessary to implement federally funded safety initiatives in compliance with federal and local regulations.
D. SCOPE OF SERVICES
To be considered responsive, respondents must meet the following minimum qualifications:
• Demonstrated experience completing at least two (2) transportation safety planning projects of similar scope and complexity within the past five (5) years.
• Experience working on federally funded projects subject to 2 CFR Part 200 requirements.
• Availability of a designated Project Manager with relevant experience in transportation safety planning and project delivery.
2 Complete & Green Streets Projects | City of College Park, Maryland https://www.collegeparkmd.gov/318/Complete-Green-Streets
Firms that do not meet these minimum qualifications may be deemed non-responsive and may not be considered for further evaluation.
Qualified respondents shall provide professional planning, engineering, and technical services necessary to support development of the City of College Park Comprehensive Safety Action Plan (CSAP) and associated demonstration project evaluation activities funded through the FY24 Safe Streets and Roads for All (SS4A) Program. The precise scope, sequencing, and level of effort will be refined through contract negotiation and shall be consistent with the SS4A Grant Agreement.
The City anticipates entering into a professional services agreement covering:
• Phase I: Comprehensive Safety Action Plan development and demonstration planning
• Phase II: Demonstration project evaluation support
Activities shall follow the timelines in the grant agreement, and as further referenced in Tables 1 and 2. Respondents shall provide a preliminary project schedule as part of their submission that aligns with the milestone dates identified herein and demonstrates the proposed sequencing and duration of major tasks, unless otherwise specified under Project Management and Coordination.
Table 1. Action Plan Schedule
Milestone Schedule Date
Planned Final Plan Publicly Available Date 05/01/2030
Planned SS4A Final Report Date 07/01/2030
Table 2. Demonstration Activity Schedule
Milestone Schedule Date Planned NEPA Completion Date 04/01/2027
Planned Construction Substantial Completion and Open to Public Use Date 10/31/2028 Planned SS4A Final Report Date 07/01/2030
All services shall comply with applicable federal, state, and local requirements, including the SS4A Notice of Funding Opportunity, Federal Highway Administration guidance, the executed Grant Agreement (EXHIBIT 2), the Additional Federal Contract Provisions (EXHIBIT 3) and 2 CFR Part 200. The selected Consultant shall be responsible for coordination and performance of all subconsultants. The Consultant shall maintain all records and supporting documentation related to this contract in accordance with 2 CFR Part 200.334 and shall provide access to such records to the City and authorized federal and state representatives for audit and compliance review purposes.
1. Project Management and Coordination Provide overall project management, coordination, and quality control necessary to deliver required CSAP products within federal performance periods. Services shall include:
• Coordination with City staff and partner agencies,
• Schedule management, progress reporting, and integration of multidisciplinary technical work.
2. Stakeholder and Public Engagement Develop and implement a stakeholder and public engagement program that informs CSAP priorities and demonstration project selection. Engagement activities shall include:
• Outreach to vulnerable roadway users and communities experiencing elevated crash risk and document how input informs plan recommendations.
3. Data Collection and Safety Analysis Compile and evaluate available crash data, roadway characteristics, demographic information, and relevant adopted plans and policies to establish baseline safety conditions. Services shall include:
• Development of a transparent methodology for identifying high-injury locations and systemic safety risks and analysis of crash patterns and contributing factors.
4. Safety Goals, Strategies, and Prioritization Support development of measurable safety goals consistent with the Safe System Approach and Vision Zero principles. Identify evidence-based safety strategies and candidate projects and develop a prioritization framework to guide implementation and future funding applications.
https://www.transportation.gov/grants/ss4a/fy24-nofo https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200
5. Demonstration Project Planning and Evaluation Support Assist the City in identifying and refining temporary safety demonstration projects funded under the SS4A award. Services shall include:
• Plans, Specifications, and Estimates
• Evaluation methodologies, and
• Preparation of technical documentation supporting City-led environmental review.
*Construction and installation services are excluded from this procurement.
6. Performance Measurement and Reporting The selected firm will be expected to collaborate with the City to develop a performance measurement framework to monitor schedule, quality compliance, and outcomes aligned with adopted safety goals and prepare materials supporting federal reporting requirements and public transparency.
7. Comprehensive Safety Action Plan Deliverables Prepare draft and final versions of the CSAP suitable for City review and public release.
Deliverables shall include:
• All data, analyses, and supporting documentation developed under this contract shall be provided in formats suitable for submission to the City and for ongoing City use and future updates. Deliverables shall include supporting technical documentation, data files, GIS materials, and tools, as well as associated metadata, data dictionaries, methodologies, assumptions, and version information sufficient to support replication, evaluation, and future updates. Deliverables shall also be provided in formats suitable for submission to the U.S. Department of Transportation or other federal agencies, as required for grant reporting, compliance, and program evaluation, and shall be prepared in a manner consistent with the data-rights, public-access, and record-use provisions of 2 CFR § 200.315.
All records and data shall be maintained in a manner that allows them to be made available, upon request, to the Federal awarding agency, consistent with the Federal Government’s data-use rights under 2 CFR § 200.315(d).
E. SUBMITTAL REQUIREMENTS
To be considered for this project, the consultant must submit an informative Statement of Qualifications (SOQs) to the City, which includes the following information, organized in the following manner to facilitate review:
https://urldefense.proofpoint.com/v2/url?u=https-3A__www.ecfr.gov_current_title-2D2_subtitle-2DA_chapter-2DII_part-2D200_subpart-2DD_subject-2Dgroup-2DECFR8feb98c2e3e5ad2_section-2D200.315&d=DwMGaQ&c=euGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM&r=dpvLB_dwEYQnf-oXaswtOGXimNz-MIw6musjTPaAllQ&m=nihdHOxvDOrXrJRvFCQrzlVVi85mC4Tx6llpoeCOxozhC2I_l4pP_HbfV1BumXdn&s=qKLXP-sqO7DgpEVUPN-KamdLPZu8CNscpcmg16gdMWc&e= https://urldefense.proofpoint.com/v2/url?u=https-3A__www.ecfr.gov_current_title-2D2_part-2D200_section-2D200.315-23p-2D200.315-28d-29&d=DwMGaQ&c=euGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM&r=dpvLB_dwEYQnf-oXaswtOGXimNz-MIw6musjTPaAllQ&m=nihdHOxvDOrXrJRvFCQrzlVVi85mC4Tx6llpoeCOxozhC2I_l4pP_HbfV1BumXdn&s=wR0WpRy71Q_Avd3dyariOXpZ_pG5bm3wuJ3PHlmn-BQ&e=
1. Letter of interest signed by an Authorized Representative – The consultant will provide a cover letter summarizing the experience and qualifications of the firm or firms to be involved in the project.
2. Firm qualifications and key personnel – A profile of the firm or firms submitting the proposal, including all contact information, firm size, history, and areas of expertise relevant to this solicitation. Provide a summary of experience delivering comparable projects and working under federal funding requirements. Identify the proposed Project Manager and key team members, including an organizational chart illustrating roles and responsibilities. Include resumes of individuals proposed for the project demonstrating relevant credentials and past project experience, as well as the anticipated level of effort, availability, and percentage of time each key team member will dedicate to the project.
3. Recommended Approach to Project – The consultant will describe the proposer’s understanding of the project’s objectives and challenges, and its methodology or technical approach to accomplish the scope of services within the required schedule.
Proposer’s should describe how they will work with the City to develop and refine performance measures and reporting frameworks. The project approach may include a preliminary or notional work plan with major tasks and any innovative approaches or ideas to add value.
4. Examples of Similar Work – The consultant will provide examples of at least three other similar projects that it has completed, including references.
5. Disclosures and Certifications – Be registered with the Maryland State Department of Assessments and Taxation (SDAT). Provide a statement disclosing any past or pending litigation, claims, or contract disputes involving the firm or any proposed subconsultants within the past five (5) years. Include disclosure of any actual or potential conflicts of interest related to this project. Respondents shall also confirm that the firm is properly registered to conduct business in the State of Maryland and possesses all required licenses and insurance coverage necessary to perform the services described herein. Documentation will be requested by the City prior to contract award.
Copies of the RFQ package, including the full scope description, submittal instructions, and required affidavits, are available from the Finance Department, 7401 Baltimore Avenue, College Park, Maryland 20740, Monday through Friday, 9:00 a.m. to 5:00 p.m., or may be downloaded from the City’s website at https://www.collegeparkmd.gov/bids.aspx.
https://www.collegeparkmd.gov/bids.aspx
Two physical copies of the Statements of Qualifications (SOQs) shall be delivered to the Finance Department, City of College Park, 7401 Baltimore Avenue, College Park, Maryland no later than September 11, 2026, by 12:00 p.m. Submissions shall be clearly marked: Vision Zero College Park – RFQ No. CP-27-01.
The City of College Park is an Equal Opportunity Employer. Discrimination based on race, religion, sex, age, ethnicity, ancestry, national origin, physical or mental disability, color, marital status, sexual orientation, gender identity, genetic information, political affiliation, or any other factor not related to the ability to perform the work is expressly prohibited. The City reserves the right to reject any or all Statements of Qualifications when determined to be in the best interest of the City.
The contact person for this solicitation is:
Rakhmel Rafi, Grants and Development Coordinator
Phone: 240-487-3542 Email: VisionZero@collegeparkmd.gov
All questions regarding this solicitation shall be submitted in writing to the designated contact person identified herein. Any interpretations, clarifications, or revisions to this solicitation shall be issued by written addendum issued by the City. Oral statements, interpretations, or instructions shall not be binding.
F. REVIEW OF QUALIFICATIONS
City staff will review all Statements of Qualifications (SOQs) for responsiveness to the requirements of this RFQ. Submissions may be provided by individual firms or multidisciplinary teams. The evaluation will be based on the information requested in Section E – Submittal Requirements and the firm’s demonstrated ability to perform the Scope of Services.
The review will consider the qualifications of the firm and key personnel, demonstrated experience and past performance on comparable projects, and the proposer’s understanding of and approach to the project. Emphasis will be placed on experience delivering transportation safety planning and engineering services, including data-driven safety analysis, stakeholder engagement, development of safety strategies, preparation of implementation-ready design documents (PS&E or equivalent), and experience with federally funded programs and environmental compliance processes.
The City may shortlist the highest-ranked firms for interviews prior to final selection. The highest-ranked firm may be invited to submit a detailed cost proposal and enter into contract negotiations with the City regarding final scope, schedule, and fee. If the City is unable to negotiate a fair and reasonable agreement with the highest-ranked firm, the City reserves the right to terminate negotiations and proceed to the next highest-ranked firm.
mailto:VisionZero@collegeparkmd.gov
The City further reserves the right to request additional information, conduct reference checks, or reject any or all submissions when determined to be in the best interest of the City.
Respondents will be evaluated based on the following Criteria:
1. Responsiveness and Completeness (10%) Evaluation will consider the overall quality, clarity, organization, and completeness of the Statement of Qualifications (SOQ), including adherence to all RFQ requirements and submission instructions.
2. Firm Qualifications and Key Personnel (20%) Evaluation will consider the firm’s experience delivering similar services, areas of technical expertise, organizational structure, and the qualifications, roles, and demonstrated capabilities of proposed key personnel.
3. Method of Approach (25%)
Evaluation will consider the respondent’s understanding of the project, including identification of risks and challenges, and the proposed methodology to complete the work. Emphasis will be placed on the firm’s ability to conduct data-driven safety analysis, perform stakeholder engagement, develop evidence-based safety strategies, prepare implementation-ready deliverables, and establish performance measurement and reporting processes.
4. Demonstrated Experience and Past Performance (25%)
Evaluation will consider the relevance and quality of past projects, including Comprehensive Safety Action Plans, Vision Zero initiatives, and similar safety studies. Consideration will also be given to demonstrated outcomes and client references.
5. Federal Experience and Compliance (10%)
Evaluation will consider the firm’s experience with federally funded projects, including familiarity with SS4A or similar programs, compliance with federal requirements (e.g., 2 CFR Part 200), environmental review processes (e.g., NEPA), and reporting standards.
6. Project Schedule and Availability (10%)
Evaluation will consider the firm’s ability to meet the project schedule, including availability and commitment of key personnel and alignment with anticipated milestones.
Table 3: Scoring Card
Evaluation Category Max Points Score (1–5) Weighted
Score Responsiveness and Completeness 10
Firm Qualifications and Key Personnel 20
Method of Approach 25
Demonstrated Experience and Past Performance 25
Federal Experience and Compliance 10
Project Schedule and Availability 10
Total 100
Table 4: Scoring Rubric Score Rating and Definition
5 Fully exceeds requirements; submission is clear, comprehensive, and demonstrates exceptional understanding and capability with no identified weaknesses.
4 Meets requirements with strong qualifications; demonstrates solid understanding and capability with only minor weaknesses.
3 Meets basic requirements; demonstrates acceptable understanding and capability, but includes notable gaps or limited detail.
2 Partially meets requirements; lacks clarity, detail, or demonstrated capability;
multiple weaknesses identified.
1 Fails to meet requirements; submission is incomplete, unclear, or demonstrates insufficient capability.
*Each evaluator shall assign a score of 1–5 for each evaluation category.
Scores will be converted to weighted points using the following formula:
(Score ÷ 5) × Maximum Category Points The sum of all category scores will determine the respondent’s total score out of 100 points.
Individual evaluator scoring sheets, numerical scores, and weighted scores are for the City's internal evaluation purposes only and will not be provided to respondents. The City may, at its sole discretion, provide a debriefing to unsuccessful respondents following contract award consistent with applicable law.
[EXHIBIT 1 – GRANT APPLICATION]
Final May 9, 2024
TO:
FROM:
Vision Zero College Park Phase I
OUTLINE
Key Information – to enter into Valid Eval, complete when jurisdiction question has been decided
Title Instructions Lead Applicant Name City of College Park, MD Lead Applicant Unique Entity Identifier (UEI)
See Section D.3 below for more information about obtaining a UEI from SAM.gov.
Eligible Entity Type See Section C.1.
Total Applicant Jurisdiction Population
34,747
Total Count Motor Vehicle- Involved Roadway Fatalities that includes the last 5 years of data made available in the Fatality Analysis Reporting System (FARS) during the NOFO period
Total Average Annual Fatality Rate (per 100,000 population)
Total Percent of Population in Underserved Communities Census Tract(s)
20.4% (Census 2020 population 7,100 [TractID = 24033806400])
Project Title Vision Zero College Park Phase I: Planning and Demonstration
Application Type (select all that apply)
Develop a new Action Plan;
Conduct Demonstration Activities to inform development of an Action Plan.
Description of Supplemental Planning and Demonstration Activities (if relevant)
See Section A.2.i. – Demonstration activities to pilot and evaluate expansion of College Park’s local street traffic calming and major street speed management toolbox to inform the systemic countermeasures in the College Park Comprehensive Safety Action Plan.
Total Federal Funding Request $540,000
Total Non-Federal Share $135,000 Total SS4A Funds Requested $540,000
Total Other Federal Funds Used $0 Total Project Cost $675,000 Coordination Questions on your application in relation to overlapping jurisdictions that received an award in FY 2022/FY 2023 or are applying for a grant in FY 2024.
Required for those requesting funding to develop a new Action Plan only.
VISION ZERO COLLEGE PARK PHASE 1:
PROJECT NARRATIVE
College Park, Maryland is a growing hub of activity in the Washington D.C. metropolitan area. Our population has grown nearly 30 percent since 2000. The more than 55,735 students and employees at the flagship campus of University of Maryland (UMD) grow our permanent population daily, although more are choosing to live in College Park and walk, bike, and roll to get where they need to go. The arrival of the Purple Line light rail will entail further changes and opportunities to achieve our vision of being a vibrant, forward-thinking city with a welcoming community that celebrates our history and diversity and strives for innovation, connectivity, and sustainability.
While FARS data indicate that College Park did not experience a traffic death between 2017 and 2021, Maryland State Police, however, reported seven fatal crashes between 2019 and 2023, with most occurring in the last two years, resulting in an annual average of four fatal crashes per 100,000 residents. To meet our community’s changing needs and safeguard against further loss of life, the City of College Park requests federal funds from the SS4A program to develop a comprehensive safety action plan (CSAP) and demonstration activities to inform the safety countermeasures in the CSAP. Together, these projects will enable College Park to proactively take a Safe System approach to ensure that no one is killed or seriously injured on our streets.
CREATING A COMPREHENSIVE SAFETY ACTION PLAN FOR EVERYONE IN
COLLEGE PARK
College Park seeks to initiate an integrated, comprehensive, stakeholder- and community-driven process that takes a holistic and proactive approach to street safety. Our efforts will be informed by the Vision Zero Action Plan developed by Prince George’s County but will enable College Park to look more deeply at the safety challenges, countermeasures, and systemic strategies that are most applicable in our community. We will conduct a robust community engagement process to shape the CSAP with special focus on those most impacted by severe traffic crashes and historically underrepresented in our planning processes. Finally, the CSAP will enable College Park to integrate findings and recommendations from recent plans with crash analysis to prioritize projects and actions around safety.
College Park is in an excellent position to develop a CSAP. With the expansion of UMD, new mixed-use development near campus and along US 1, and the arrival of the Purple Line, College Park is working to shape itself into a more walkable and bikeable urban place for people of all ages and abilities. The City completed a Complete Streets Policy and Implementation Plan and Bike Boulevards Phasing and Implementation Plan in 2016 as well as the College Park Age Friendly Action Plan in 2022 and started a Bicycle and Pedestrian Advisory Committee (BPAC) in 2023. Through convening an implementation committee, analyzing severe crash data, https://www.collegeparkmd.gov/DocumentCenter/View/2513/CP_Complete__Streets_TLC__Final_Report-2?bidId= https://www.collegeparkmd.gov/DocumentCenter/View/5385/Bike_Boulevards_Phasing_and_Implementation_Report_Final_6-10-2016?bidId= https://www.mncppcapps.org/planning/publications/PDFs/411/College_Park_Age_Friendly_Action_Plan.pdf https://www.mncppcapps.org/planning/publications/PDFs/411/College_Park_Age_Friendly_Action_Plan.pdf engaging people throughout College Park, evaluating our policies and processes, and using these inputs along with national and peer best practices, we will be better able to grow our safety culture and identify and address severe crash risk.
DEMONSTRATION PROJECTS TO CREATE SAFE STREETS FOR ALL USERS
Alongside the development of the College Park CSAP, we propose two types of demonstration activities that will inform the low-cost systemic safety toolbox included in the CSAP, provide our staff the opportunity to learn more about the Safe System approach, and enable College Park residents and stakeholders to gain familiarity with new safety tools and provide feedback.
The Local Street Traffic Toolbox Expansion demonstration project will deploy new traffic calming treatments on neighborhood streets throughout College Park to adapt our efforts to evolving safety needs. These are anticipated to include temporary traffic circles, speed reduction markings, and intersection daylighting at up to 10 locations.
Through the Major Street Speed Management demonstration project, we will pilot quick-build treatments on arterial and collector streets across College Park for future systemic deployment.
We anticipate utilizing lane narrowing, intersection daylighting, intersection reconfiguration, and temporary pedestrian refuge islands to reduce conflicts and dangerous driving behaviors, slow speeds, and create safer crossings for people walking and rolling at up to 10 locations.
Through the parallel College Park CSAP development process, we will engage and inform College Park residents and stakeholders about the demonstration projects. We will evaluate all demonstration activities using crash data, multi-modal before- and after- counts, qualitative surveys, as well as speed studies for the Major Street Speed Management projects. Analysis findings will be appended to the CSAP during plan implementation.
PROJECT SCHEDULE
Upon award, College Park will work with USDOT to achieve the schedule outlined below:
Year 1 Year 2 Year 3 Year 4-5 Comprehensive Safety Action Plan
CSAP
development
CSAP
development and adoption; plan implementation
Plan implementation;
append demonstration findings to
CSAP
Plan implementation
Local Street Traffic Toolbox Expansion
Engagement;
location selection;
before counts;
design; NEPA
Installation After counts;
incorporate analysis into CSAP; maintain improvements
Crash data analysis with up to 2 years of data; maintain improvements
Major Street Speed Management
Engagement;
location selection;
before counts;
design; NEPA
Installation After counts;
incorporate analysis into CSAP; maintain improvements
Crash data analysis with up to 2 years of data; maintain improvements
PLANNING AND DEMONSTRATION GRANT
SUPPLEMENTAL ESTIMATED BUDGET
To execute the above activities, the City of College Park requests $540,000.00 in federal funding from the SS4A program exclusively, constituting 80 percent of the overall project budget. The City will provide 20 percent of funds as local match for each activity, for a total of $135,000.00.
Activity SS4A Funding Request Total Project Cost
Itemized Estimated Costs to Develop an Action Plan
Subtotal Budget to Develop an Action Plan
$240,000.00 $300,000.00
Itemized Estimated Costs to Conduct Supplemental Planning
Subtotal Budget to Conduct Supplemental Planning
$0.00 $0.00
Itemized Estimated Costs to Carry Out Demonstration Activities
Local Street Traffic Toolbox Expansion
$207,200.00 $259,000.00
Major Street Speed Management
$92,800.00 $116,000.00
Subtotal Budget to Carry Out Demonstration Activities
$300,000.00 $375,000.00
COLLEGE PARK, MD ROADWAY JURISDICTION MAP
UNDERSERVED COMMUNITIES – CEJST SCREENSHOTS
[EXHIBIT 2 – GRANT AGREEMENT]
[EXHIBIT 3 – ADDITIONAL FEDERAL CONTRACT PROVISIONS]
EXHIBIT 3
The City anticipates entering into a negotiated professional services agreement with the selected Consultant utilizing a task-based, not-to-exceed, cost reimbursement structure (cost reimbursement for actual labor and direct expenses). Compensation shall be based upon negotiated labor classifications, hourly billing rates, direct expenses, and subconsultant costs associated with completion of the Scope of Services.
The final agreement will include a detailed Schedule of Values (SOV), or task-based fee schedule, identifying budget allocations for major project tasks, deliverables, and phases.
Invoices shall be supported by appropriate documentation of labor hours, expenses, and progress completed.
The City reserves the right to negotiate the final scope, level of effort, fee structure, and contract terms with the highest-ranked firm. Cost-plus-a-percentage-of-cost methods of contracting are prohibited and shall not be used.
This project is funded, in whole or in part, with federal financial assistance. Accordingly, the selected Consultant shall comply with all applicable federal requirements, including but not limited to 2 CFR Part 200 and Appendix II thereto.
Respondents shall certify that neither the firm nor any proposed subconsultants are debarred, suspended, or otherwise ineligible to participate in federally funded projects.
Required certifications shall be executed prior to contract award.
All applicable federal provisions shall be incorporated into the final contract agreement and shall apply to the Consultant and all subconsultants. The Consultant shall be responsible for ensuring compliance with these requirements and for including applicable provisions in all subcontracts and lower-tier agreements.
1. Debarment and Suspension (Executive Orders 12549 and 12689)
The Consultant certifies that it and its principals are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency.
The Consultant shall not knowingly enter into any lower-tier covered transaction with a person who is debarred or suspended. The Consultant shall include this requirement in all subcontracts and shall require all subconsultants to comply with these provisions.
This certification is a material representation of fact upon which reliance was placed when this transaction was entered into.
2. Equal Employment Opportunity (41 CFR Part 60; Executive Order 11246)
The Consultant shall comply with all applicable provisions of Executive Order 11246, as amended, and implement regulations at 41 CFR Part 60.
The Consultant shall not discriminate against any employee or applicant for employment because of race, color, religion, sex, sexual orientation, gender identity, or national origin.
The Consultant shall take affirmative action to ensure that applicants are employed and that employees are treated during employment without regard to these characteristics.
Such action shall include, but not be limited to:
• Employment
• Upgrading
• Demotion or transfer
• Recruitment or recruitment advertising
• Layoff or termination
• Rates of pay or other forms of compensation
• Selection for training, including apprenticeship
The Consultant shall post in conspicuous places available to employees and applicants for employment notices setting forth the provisions of this nondiscrimination clause.
3. Byrd Anti-Lobbying Amendment (31 U.S.C. 1352)
Contractors that apply or bid for an award exceeding $100,000 shall file the required certification.
The Consultant certifies that no Federal appropriated funds have been paid or will be paid, by or on behalf of the Consultant, to any person or organization for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract.
The Consultant shall require that the language of this certification be included in all subcontracts at all tiers.
4. Access to Records (2 CFR § 200.337)
The Consultant agrees to provide the City, the Federal awarding agency, the Comptroller General of the United States, and any of their authorized representatives access to any books, documents, papers, and records of the Consultant which are directly pertinent to this contract for the purposes of audit, examination, excerpts, and transcription.
The Consultant shall maintain all such records in accordance with 2 CFR Part 200 and shall ensure that this requirement is included in all subcontracts.
5. Compliance with Federal Requirements
The Consultant shall comply with all applicable federal statutes, regulations, executive orders, and guidance governing the use of federal funds, including but not limited to 2 CFR Part 200, the SS4A Notice of Funding Opportunity, and applicable Federal Highway Administration guidance.
In the event of any conflict between federal requirements and other contract provisions, federal requirements shall govern.
The Consultant shall be responsible for ensuring that all subconsultants and lower-tier entities comply with applicable federal requirements.
| FNL 7.23.26 SS4A RFQ Draft |
| A. PROJECT BACKGROUND |
| B. PROJECT BUDGET |
| C. DEPARTMENT BACKGROUND |
| D. SCOPE OF SERVICES |
| E. SUBMITTAL REQUIREMENTS |
| F. REVIEW OF QUALIFICATIONS |
| [EXHIBIT 1 – GRANT APPLICATION] |
| Exhibit 1 GRANT NARRATIVE College Park_SS4A FY24 Narrative COMPLETE |
| Outline |
| Vision Zero College Park Phase 1: |
| PROJECT Narrative |
| Creating a Comprehensive Safety Action Plan for Everyone in College Park |
| Demonstration Projects to Create Safe Streets for All Users |
| Project Schedule |
| Vision Zero College Park Phase 1: |
| Planning and Demonstration Grant Supplemental Estimated Budget |
| Vision Zero College Park Phase 1: |
| College Park, MD Roadway Jurisdiction Map |
| Vision Zero College Park Phase 1: |
| Underserved Communities – CEJST Screenshots |
| FNL 7.23.26 SS4A RFQ Draft |
| [EXHIBIT 2 – GRANT AGREEMENT] |
| Exhibit 2 GRANT AGREEMENT |
| FNL 7.23.26 SS4A RFQ Draft |
| [EXHIBIT 3 – ADDITIONAL FEDERAL CONTRACT PROVISIONS] |
File details come from the government source that posted it. Updated .