RFQ Attachment 2 Addendum.pdf
PDF 166 KB Posted
- Attached to
- ICD 705 Training Course Federal contract opportunity
- Solicitation number
- FA282324Q0047
About this file
This document is an Addendum to the Request for Quote (RFQ) for the ICD 705 Training Course solicitation (FA282324Q0047) at Eglin Air Force Base, Florida.
The acquisition will utilize a Lowest Price Technically Acceptable (LPTA) approach, where award will be made to the offeror with a technically acceptable quote at the lowest overall total evaluated price. The evaluation will be based on two factors: Price and Technical Acceptability, which are equal in importance. The Government reserves the right to make an award without discussions but may conduct telephone discussions. The intended contract type is Firm-Fixed Price. The technical evaluation will be on a pass/fail basis, assessing the offeror's capability to meet the requirements of the Performance Work Statement, specifically the Quality Control Plan sub-factor. Award will be made to the responsible offeror whose technically acceptable quote is the lowest priced.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFQ Attachment Cover Sheet.pdf | ||
| RFQ Attachment 3 Addendum.pdf | ||
| Wage Determinations.pdf | ||
| Solicitation - FA282324Q0047.pdf | ||
| SOO.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA282324Q0047
Attachment 2 AD / ICD 705 Training Course Addendum to FAR 52.212-2 Eglin AFB, FL
ATTACHMENT 2
ADDENDUM TO FAR 52.212-2 – EVALUATION – COMMERCIAL ITEMS (Nov 2021)
*** THIS SECTION IS FOR SOLICITATION PURPOSES ONLY. THIS SECTION WILL BE
PHYSICALLY REMOVED FROM THE RESULTANT AWARD. ***
1. Methodology. This acquisition will utilize the Lowest Price Technically Acceptable (LPTA) approach, in which, the Government intends to award to an offeror with a technically acceptable quote at the lowest overall total evaluated price. The LPTA approach does not permit tradeoffs between price/cost and past performance, and will include an evaluation for technical acceptability.
2. Relative Importance. The Government’s evaluation will be based on the following factors and sub-factors:
a. Factor 1 – Price
b. Factor 2 – Technical Acceptability
Price and Technical, when combined, are equal when evaluated.
3. Offers which are unrealistic in terms of technical acceptability or price may be rejected at any time during the evaluation process. The Government reserves the right to make an award without discussions; however, discussions may be conducted with all, some, or none of the offerors. Offerors may be required to participate in telephone discussions.
4. The Government intends to award a Firm-Fixed Price (FFP) Contract as a result of this solicitation.
5. Offerors are cautioned to follow the detailed instructions in the Addendum to 52.212-1 and Addendum to 52.212-2 fully, as the Government reserves the right to make an award based on initial offers received, without discussion of such offers.
a. Total Evaluated Price (TEP). The Government will add the total price for all options to the total price for the basic requirement to arrive at a total evaluated price (TEP). The TEP will be calculated as:
(i) The sum of the extended prices (unit quantity multiplied by unit price) for Contract Line Items (CLINs) 0001; and
AD / ICD 705 Training Course
(ii) To account for any extension of services possible under the clause at FAR 52.217-8, Option to Extend Services, the Government will add 50% of the pricing proposed by the offeror for CLIN 0001 to the total sum of the extended prices for all CLINS. The award will not be made at the TEP, but only for the purposes for evaluating price.
b. Technical Evaluation. Offers shall be evaluated independently of the cost/price quote evaluation to determine the offerors’ compliance with the technical requirements of this solicitation. The Government may make a final determination as to the rating of an offer based on the quote as submitted without requesting any further information. The technical factor will receive an overall rating of either “Acceptable” or “Unacceptable” using the rating description in Table 1 below. The Government’s technical evaluation team shall evaluate the technical quotes on a pass/fail basis, assigning one of the ratings described below for any sub-factor. Any sub factor evaluated as “Unacceptable” will render the entire quote “Unacceptable”; therefore, un-awardable. Only those quotes determined to be technically “Acceptable”, either initially or as a result of discussions, will be considered for award. However, the offeror is cautioned that the Government reserves the right to award this effort based on the initial quote, as received, without discussion. Evaluators shall assign a rating, which fails within one of the following ranges according to the degree to which the offeror meets the minimum requirements described below in Table 1.
Table 1. Technical Ratings
Rating Description
ACCEPTABLE
Quote meets the requirements of the solicitation. The offeror’s documentation clearly demonstrates their capability and understanding of all aspects of performance in accordance with the Performance Work Statement and the technical sub-factors.
UNACCEPTABLE
Quote does not meet the requirements of the solicitation. The offeror’s documentation does not clearly demonstrate their capability and understanding of all aspects of performance in accordance with the Performance Work Statement and the technical subfactors.
AD / ICD 705 Training Course
The technical factor will be rated ACCEPTABLE when the offeror’s documentation clearly demonstrates their capability to accommodate all aspects of performance in accordance with the Performance Work Statement (PWS) and the technical sub-factors listed below:
Sub-Factor 1: Quality Control Plan - The offeror’s submitted documentation clearly demonstrates their capability to successfully implement and maintain a quality control program IAW attachment 1 of the SOO
The technical factor will be rated UNACCEPTABLE when the offeror’s documentation does not clearly demonstrate their capability and understanding of all aspects of performance in accordance with the PWS and the technical sub-factors listed above.
5.1. The Government will review the offer for technical acceptability and will conduct market research to determine price fair and reasonableness. Accordingly an award will be made after both metrics are met and the offer is determined to be both technically acceptable and providing the best value to the Government.
6. Basis for Contract Award. By submission of its quote, the offeror accedes to all solicitation requirements, including terms and conditions, representations and certifications. The Government intends to award a contract to the offeror deemed responsible in accordance with FAR 9.104, as supplemented, whose proposal conforms to the Request for Quote (RFQ) requirements including all stated terms, conditions, representations, certifications, and all other information required by the RFQ and is judged, based on the evaluation criteria, to represent the best value to the Government. The Government intends to award one contract to the offeror whose technically acceptable quote is the lowest priced of those quotes received.
(END OF ADDENDUM)
File details come from the government source that posted it. Updated .