This is a Statement of Work (SOW) dated 12 February 2026 for the modification of an existing valve test stand located at X-31I Inside Machine Shop, Building A-48, Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC), US Naval Base Yokosuka. The contractor must furnish all labor, materials, equipment, transportation, and supervision necessary to accomplish the work. The existing equipment is a Yamamoto Suiatu Kogyosho Co., Ltd. Model 1TA-16-5010 valve test stand (Serial Number 1TA165010, manufactured in 2016). The modification scope includes replacing the existing air-driven water pump with a new Hydraulics International model 3L-SS-8 (or equivalent) with 8±1 pressure ratio and 1,100 psig outlet pressure. The contractor must also replace the air regulator (range 10–100 psig), relief valve (set to manufacturer-recommended pressure), and pressure gauge (0–150 psig, Φ100 mm indicator). Piping modifications include branching city water and compressed air inlet lines to create new outlet ports for an external unit and adding a 1/8-inch test media port rated for pressures greater than 3,500 psig.
The contractor must design and fabricate an external unit per the provided concept sketch, not exceeding 900 mm (W) x 700 mm (D) x 1,000 mm (H), that includes an air-driven pump (3L-SS-25 model or equivalent with 25±1 pressure ratio, maximum 3,500 psig), a lever-type hand pump (1,000 psig outlet), means to switch between pumps, pressure gauges, air and water depressurizing valves, check and relief valves, and silencers at air exhaust ports. The external unit must be fully enclosed, liftable by crane, and anchorable to the floor. The contractor must also reroute existing air piping to avoid running over an H steel beam and replace specified components (air cylinders, speed controllers, tube connectors, and plastic tubing per the parts list). Pre-work documents including work schedule, modification procedures, external unit drawings, and parts list must be submitted within 25 working days of contract award. Operational testing must verify air and water pressurization to specified levels, check for leakage, and confirm table tilting functionality. A completion report in English and Japanese must be submitted within 10 working days after modification completion, including mechanical drawings, connection diagrams, recommended maintenance dates, and Safety Data Sheets for hazardous materials. The Technical Point of Contact is KIMURA Kouroku at phone 046-816-4417 or kouroku.kimura.ln@us.navy.mil.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ Solicitation N6264926QB026 (SF1449).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12 Feb 2026
Statement of Work (SOW)
MODIFY VALVE TEST STAND, X-31I
1. General
a. The contractor shall conduct modification of an existing valve test stand (hereinafter referred to as “the equipment”) located at X-31I Inside Machine Shop, Bldg. A-48, Ship Repair
Facility and Japan Regional Maintenance Center (SRF-JRMC), US Naval Base Yokosuka in accordance with this SOW.
b. The modification is required to improve usability of the equipment. The scope also includes preventive maintenance.
c. Unless otherwise specified herein, the contractor shall furnish all labor, materials, equipment, transportation, and supervision necessary to accomplish the work.
d. Utilities that are connected to the equipment
(1) Compressed air, 100 psig
(2) City water
e. The contractor shall have a local Japanese dealer network that provides maintenance services after modification.
2. Reference
The contractor shall refer to the following standard documents to accomplish the work to the extent specified herein.
a. 29 CFR 1910- Occupational Safety and Health Standards
3. Enclosure
(1) Concept Sketch of External Unit
(2) Installation Site
(3) Existing Air Piping
4. Existing equipment
Valve test stand
Mfr: Yamamoto Suiatu Kogyosho Co., Ltd.
Model: 1TA-16-5010
Serial Number: 1TA165010
Year of manufacture: 2016
5. Minimum Requirements
a. Unless otherwise specified, stated values represent the minimum.
b. Surfaces in contact with the test water shall be oil-free.
c. The modification shall be conducted in accordance with technical instruction from the manufacturer.
5-1. Modification of the existing equipment
a. Replace an existing air-driven water pump (Model: 5L-SS-30, Mfr: Hydraulics
International) with a new one that meets the following specifications.
(1) Pressure ratio: 8±1
(2) Outlet pressure: 1,100 psig
(3) Volume displacement per cycle: 13 cm3
(4) Proposal model: 3L-SS-8 (Mfr: Hydraulics International, Inc.) or equivalent
b. Replace an existing air regulator (Model: SMC, Model: AR40-N04H-Y-B) installed at the primary-side of the air-driven water pump with new one.
Range: 10 psig to 100 psig
c. Replace an existing relief valve (Mfr: Butech, Model: 5RVHS, Set pressure: 3,500 psig) with new one set to an appropriate pressure as recommended by the pump manufacturer.
d. Replacement of pressure gauge and piping modification
(1) Replace an existing pressure gauge that indicates hydro test pressure with new one that meets the following specifications.
(a) Range: 0 to 150 psig
(b) Indicator size: Φ 100 mm
(2) Modify piping so that the new pressure gauge indicates pressure of the driving air of the new air-driven water pump.
(3) Label the new pressure gauge as “Driving Air Pressure”.
e. Branch an existing city water inlet piping in the enclosure of the equipment. Add a new city water outlet port to supply city water to the external unit.
f. Branch an existing air inlet piping in the enclosure of the equipment. Add a new air outlet port to supply air to the external unit.
g. Branch an existing test media piping in the enclosure of the equipment. Add a new test media port to receive pressurized water from the external unit. Nominal pipe size shall be 1/8 inch. Allowable pressure shall be greater than 3,500 psig.
5-2. Fabrication of External Unit
a. The contractor shall design and fabricate an external unit in accordance with Enclosure (1).
b. The external unit shall be connected to the equipment as follows.
(1) City water and compressed air shall be supplied from the new ports of the equipment fabricated in accordance with Paragraph 5-1.e and 5-1.f.
(2) Water pressurized by the external unit shall be returned to the new test media port of the equipment fabricated in accordance with Paragraph 5-1.g.
(3) Piping shall be designed to match with system pressure and flow rate.
(4) Piping shall be firmly fixed to the floor.
(5) Valves shall be installed at both ends of each piping.
c. The following air-driven pump shall be installed.
(1) Pressure ratio: 25±1
(2) Maximum allowable pressure: 3,500 psig
(3) Volume displacement per cycle: 4.0 cm3
(4) Proposal model: 3L-SS-25 (Mfr: Hydraulics International, Inc.) or equivalent
(5) The air-driven pump shall pressurize water supplied from the equipment.
(6) An air regulator shall be installed to adjust the outlet pressure within 500 to 3,500 psig.
(7) A speed controller shall be installed to adjust pumping speed.
(8) The following pressure gauge shall be installed between the air regulator and the pump.
(a) Range: 0 to 150 psig
(b) Indicator size: Φ 100 mm
(c) The gauge shall be labeled as “Drive Air Pressure”.
d. A lever-type hand pump shall be installed as follows.
(1) Outlet pressure: 1,000 psig
(2) The hand pump shall pressurize water supplied from the equipment.
(3) The installation height of the hand pump shall be determined so that a standing operator can operate it without difficulty.
(4) The hand pump shall be fixed firmly to a rigid steel frame.
e. A means shall be provided to switch the air-driven pump and the hand pump. Both pumps shall not be operated at the same time.
f. Check valves and relief valves shall be provided adequately to protect each component.
g. Depressurizing valves shall be provided for water and air systems. Water drain port shall be provided.
h. Components shall be fully enclosed.
i. Dimensions: 900 mm(W) x 700 mm(D) x 1,000 mm(H) or smaller
j. The external unit shall be able to be lifted by crane.
k. The external unit shall be able to be anchored on the floor.
l. Silencers shall be installed at all air exhaust ports.
5-3. Maintenance of air piping of the equipment
a. Reroute existing air piping so that it does not run over an existing H steel shown in
Enclosure (3). The contractor may make a hole or slit in the H steel.
b. Replace the following parts shown in Enclosure (3) with new ones. Equivalent products are acceptable.
# Nomenclature Mfr Model, description Qty
1 Air cylinder SMC MBB100TN-295+295Z-XC10+Y-10M, Double-headed
2 ea
2 Speed controller SMC SMCAS4201F-N04-13SA 8 ea
3 Tube connector Not specified Φ1/2”, elbow, swivel 8 ea
4 Plastic tube Not specified Φ1/2” 20 m
6. Work Procedure
a. The contractor shall conduct modification of the existing valve test stand in accordance with Paragraph 5-1.
b. Unless otherwise specified, the contractor shall deliver, unload, and position the external unit.
(1). When crane lifting operations are required, the contractor shall submit a lifting plan compliant with NAVFAC P-307 at least ten (10) working days prior to the lifting operation.
The lifting plan shall include, but not limited to, the following.
(a) Weight, shape, and dimensions of the lifted material(s)
(b) Safe Working Load (SWL) of eye bolts, if any. For a four-point suspension, the
SWL per point shall be at least 50% of the total weight.
(c) Sketch of lifting
(d) List of required lifting gears
(2) If the lifting plan submitted by the contractor is reviewed and approved by a weight handling POC, the Government can provide overhead crane and operator for unloading and positioning.
c. The contractor shall fix the external unit in accordance with Enclosure (2).
d. The contractor shall connect the external unit and the existing valve test stand.
e. The contractor shall conduct maintenance in accordance with Paragraph 5-3.
7. Operational test
After the completion of the modification, the contractor shall conduct operational test to check the equipment works as intended. The operational test shall include, but not limited to, the following.
a. Air pressurization up to supply air pressure.
b. Water pressurization up to 1,100 psig by the new air-driven water pump installed in the equipment
c. Water pressurization up to 2,400 psig by the new air-driven water pump installed in the external unit
d. Water pressurization up to 1,000 psig by the hand pump installed in the external unit
e. Leakage check
f. Table tilting
8. Document submission
The contractor shall submit the following documents. Unless otherwise specified, the document shall be written in Japanese or English.
a. Pre-work document
The contractor shall submit the following documents to the Technical Point of Contact
(TPOC) before the start of work, no later than twenty five (25) working days after contract award.
(1) Work schedule
(2) Items and procedure of the modification
(3) Drawings of the external unit
(4) Parts list
b. Completion report
The contractor shall submit the following completion report in English and Japanese within ten (10) working days from completion of the repair service.
(1) Description of modification
(2) List of items provided
(3) Mechanical drawing and connection diagram
(4) Recommended date and items of the next maintenance
(5) SDS for all hazardous materials
c. If any unforeseen situation or damaged parts are found, the contractor shall issue condition report to the TPOC.
9. TPOC
KIMURA Kouroku, SRF-JRMC Yokosuka, C981
Phone: 046-816-4417
E-mail: kouroku.kimura.ln@us.navy.mil
Kouroku.Kimura.ja Polygon
Kouroku.Kimura.ja Polygon
Kouroku.Kimura.ja Polygon
Kouroku.Kimura.ja Line
Kouroku.Kimura.ja Line
Kouroku.Kimura.ja Line
Kouroku.Kimura.ja Text Box Available Area
Kouroku.Kimura.ja Text Box Installation Site
Kouroku.Kimura.ja Text Box Enclosure (2)
Text Box Existing air piping to be rerouted (Paragraph 5-3.a)
Kouroku.Kimura.ja Text Box Enclosure (3)
Kouroku.Kimura.ja Text Box Existing Air Piping
Kouroku.Kimura.ja Polygon
Kouroku.Kimura.ja Line
Kouroku.Kimura.ja Text Box Air cylinders (#1, Paragraph 5-3.b)
Kouroku.Kimura.ja Line
Kouroku.Kimura.ja Line
Kouroku.Kimura.ja Text Box Speed controllers (#2, Paragraph 5-3.b)
Kouroku.Kimura.ja Line
Kouroku.Kimura.ja Line
Kouroku.Kimura.ja Line
Kouroku.Kimura.ja Line
Kouroku.Kimura.ja Text Box Tube connectors (#3, Paragraph 5-3.b)
Kouroku.Kimura.ja Line
Kouroku.Kimura.ja Polygon
Kouroku.Kimura.ja Text Box Plastic tubes (#4, Paragraph 5-3.b)
Kouroku.Kimura.ja Line
Kouroku.Kimura.ja Line
Kouroku.Kimura.ja Polygon
Line
| RFQ Attachment (1) Statement of Work 12 Feb 2026 |
| 1.03 SOW Enclosure 1-3 |
File details come from the government source that posted it. Updated .