RFQ ATT.2 - Repair Boiler at WWTP Statement of Need.pdf

PDF 429 KB Posted

Attached to
Waste Water Treatment Plant Boiler Repair @ Scott AFB, IL
Solicitation number
F3S3523115A001
Issued by

About this file

This statement of need document outlines requirements for repairing a boiler at a wastewater treatment plant on Scott Air Force Base in Illinois. The wastewater treatment plant serves all of Scott AFB housing areas and must keep sludge temperatures within certain ranges according to its EPA permit. The contractor will repair the boiler circulating the waste sludge to maintain these temperatures, demonstrating ability to repair the boiler to manufacturer specifications. Work must be completed between July 15th and August 15th, 2023 unless otherwise agreed. The contractor will coordinate vehicle and driver access and be subject to searches, with personnel possibly requiring preliminary background checks. The work will be performed on site at the wastewater treatment plant boiler room in building 3296.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF NEED

REPAIR BOILER WASTEWATER TREATMENT PLANT

375 CES SCOTT AIR FORCE BASE, ILLINOIS

12 APRIL 2023

1. Overview: The wastewater treatment plant serves all of Scott AFB to include Patriots landing, Lincoln’s Landing and Shiloh East/West housing areas. In order to meet the parameters of the Illinois EPA Permit requirements, the sludge in the digesters must be kept within certain temperatures. The boiler in need of repairs circulates the waste sludge to maintain these temperatures. The contractor must demonstrate the ability to repair the boiler to within manufacturer specifications.

2. Summary of Services: Please see statement of work for requirements and quantities needed.

3. Period of Service: Due to the temperature sensitivity, it’s desired this work be accomplished between 15 July 2023 and 15 August 2023, unless otherwise agreed upon by the government.

4. Unique Requirements: Access to SAFB is required by coordinating delivery, servicing and removal vehicles and drivers with the Civil Engineering (CE) Point of Contact (POC).

Personnel requiring base access may be required to pass a preliminary background check and are subject to search upon arrival or departure from SAFB.

5. CE POC: Information will be provided at contract award.

6. Placement: Work shall be performed on site at the wastewater treatment plant boiler room;

building 3296.