RFQ_950 - Cattle Guard Footers.pdf
PDF 157 KB Posted
- Attached to
- REQUEST FOR QUOTE
- Solicitation number
- 950
- Issued by
- Idaho
About this file
This is a Request for Quotation (RFQ) issued by the Idaho Military Division for precast cattle guard footers required at the Orchard Combat Training Center located 18 miles south of Boise, Idaho. The project scope involves fabrication and delivery of precast reinforced cattle guard footers with rebar and 2-inch by 2-inch by 1/4-inch angle iron edge protection, designed to support military vehicle crossings. Vendors are required to attend a mandatory field measurement verification meeting on-site on Wednesday, May 19, 2025, at 3:00 p.m. MT, with quotes due by 3:00 p.m. MT on Wednesday, May 21, 2025. The Idaho Military Division will handle removal of existing cattle guard components, base material compaction, and installation of new footers, while the contractor is responsible for taking measurements, fabricating the precast footers, and delivering them FOB Destination to the Ammo Supply Point and Range Road Intersection at Orchard Combat Training Center. Award will be made to the responsive, responsible vendor offering the lowest total cost.
Quotes must be submitted through Idaho eProcurement System (IPRO) or manually submitted with a signed State of Idaho Signature Page, and must include all required submittal items: specifications, price sheet, warranty information, and product/engineer's specifications. The price sheet requires vendors to provide a fully burdened total cost covering all expenses associated with providing the cattle guard footers meeting minimum specifications, including delivery. Vendors must confirm attendance at the mandatory May 19th measurement meeting, with non-attendance potentially resulting in disqualification. Vendors should provide their approximate delivery timeframe in days after receipt of order. The primary contact for the RFQ is Erin Waller at the Idaho Military Division, with SFC Robert Bales serving as the Construction and Facilities Maintenance contact for delivery coordination.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ_950 - Cattle Guard Footers - AMDT #1.pdf | ||
| Insurance Requirements 2023.docx | DOCX document | |
| State of Idaho Contract Terms and Conditions_2024.docx | DOCX document | |
| 202503313_16A25 CATTLLE GUARD REPAIR WP.pdf | ||
| RFQ_0950 - Cattle Guard Footers - AMDT #2.pdf | ||
| Signature-Page-RFQ.pdf | ||
| Site location - google maps.png | PNG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Idaho Military Division Request for Quotation
Event # 950 Cattle Guard Footers
1. Purpose The Idaho Military Division is requesting quotes for precast cattle guard footers, as further detailed below.
The contact for this RFQ is:
Erin Waller, Idaho Military Division Office: 208-801-4257 Cell: 208-801-3905 ewaller@imd.idaho.gov
2. Background The Orchard Combat Training Center is a premier joint combined arms training site located 18 miles south of Boise, Idaho.
The current footers that the cattle guard grate sits on is failing. The purpose of this project is to repair the cattle guard components to include the footers and angle iron for edge protection.
3. Time lines
Verify field measurements on site at 3:00 p.m. MT WEDNESDAY, 19 May 2025
Quotes Due by 3:00 p.m. MT Wednesday, 21 May 2025
4. Specifications:
See Exhibit A
Following award, the Contractor will deliver precast footers, FOB Destination, to the Ammo Supply Point and Range Road Intersection as coordinated with the Construction and Facilities Maintenance (“CFMO”) contact.
CFMO contact for delivery is:
SFC Robert Bales:
Cell: 208 – 859 - 8676 Robert.r.bales2.mil@army.mil
5. Award Basis:
Award will be made to the responsive responsible vendor with the lowest Total Cost, as provided on Exhibit B, Price Sheet.
6. Response
Enter your Total Cost on Exhibit B, Price Sheet, and fax, e-mail, mail, hand-deliver/courier or submit your quote via IPRO (IPRO LOGIN) so that it is received at Idaho Military Division Purchasing and Contracting Gowen Field Building 600, 4040 W Guard Street, Boise Idaho 83705, prior to the deadline established above.
https://solutions.sciquest.com/apps/Router/SupplierLogin?CustOrg=StateofIdaho%20
Quotes submitted by any means other than IPRO must be accompanied by a signed State of Idaho Signature Page.
Quotes must include all Required Submittal Items (See below).
If submitting via IPRO enter your Total Cost on Exhibit B AND in IPRO, and UPLOAD all Required Submittal Items.
List of Attachments Required Submittal Items
Exhibit A – Specifications Exhibit B – Price Sheet State of Idaho Signature Page CFMO Work Package
Exhibit B – Price Sheet State of Idaho Signature Page – (for manual submissions) Warranty Information Product/Engineer’s Specifications
Exhibit A
Event # 950 Specifications for Cattle Guard Footers
Work Items Completed by Contractor:
a. Take and verify field measurements – on site: May 19th at 3:00 pm MT
b. Fabricate precast reinforced cattle guard footers with rebar and 2in x 2in x 1/4in angle iron edge protection
c. Deliver precast footers to the Orchard Combat Training Center
Work Items Completed by IMD Personnel:
a. Be on site with the contractor for measurements
b. Remove cattle guard and old cattle guard footers
c. Compact footer base material
d. Place new cattle guard footers
e. Place cattle guard
Cattle guard note:
Footers/angle iron edge reinforced to allow for military vehicles crossing cattle guard
Exhibit B
Event # 950 Cattle Guard Footers
Price Sheet
This Price Sheet must be submitted with your quote, whether the submission is manual or electronic through the Idaho eProcurement System (IPRO).
Name of Vendor:
Provide your fully burdened TOTAL COST, meeting the specifications outlined in Exhibit A. Your TOTAL COST must be fully burdened to include all costs associated with providing the cattle guard footers, meeting the required minimum specifications, including delivery FOB Destination to Orchard Combat Training Center Boise, Idaho 83716.
TOTAL COST for Cattle Guard Footers: $
Did you attend the mandatory meeting to verify field measurements on May 19th, 2025 at 3:00pm MT?
YES *NO
*A ‘NO’ response may disqualify you from consideration for award.
Provide your approximate delivery: days ARO
Company Name:
Contact Name/Phone:
Contact E-mail:
| 1. Purpose |
| 2. Background |
| 3. Time lines |
| 4. Specifications: |
| 5. Award Basis: |
| 6. Response |
File details come from the government source that posted it. Updated .