RFQ 8326 LTIS4 Attch 4 PQT draft.xlsx

XLSX spreadsheet 62 KB Posted

Attached to
DRAFT RFQ 8326 LONG TERM INTEGRATION SUPPORT 4 (LTIS 4)
Solicitation number
RFQ1703117
Issued by

About this file

This document is a pricing template and instructions for contractors to respond to Request for Quotation (RFQ) 8326 for Long Term Integration Support 4 (LTIS 4). The pricing template contains a summary of the pricing elements, including Firm-Fixed-Price (FFP) and Labor Hour (LH) CLINs for various tasks over a base period and four option periods. Key tasks include program/project management, IMF modernization support, architecture/engineering, solution engineering, testing, development integration, cybersecurity, and environments integration. Travel is also included as a separate CLIN. The pricing template provides instructions for contractors to map their proposed labor categories to the solicitation labor categories. This is a draft RFQ, and no quotations will be accepted at this time. All questions regarding the draft RFQ must be submitted using the provided Question Submission Template. The official solicitation and attachments will be posted at a later date. This requirement is set aside for Small Disadvantaged Businesses.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

DRAFT
RFQ 8326 Long Term Integration Support 4 (LTIS 4) 1) UTILIZE THIS PRICING TEMPLATE TO SHOW PRICING BASED ON YOUR TECHNICAL QUOTE. FORMULAS HAVE NOT BEEN PROVIDED HOWEVER FORMULAS ARE REQUIRED TO SHOW CALCULATIONS OF THE PRICING PROVIDED. ENSURE THAT ALL FORMULAS ARE CORRECT AND OPERABLE. FAILURE TO DO SO WILL RESULT IN YOUR COST SUBMISSION BEING DEEMED NON-RESPONSIVE AND INELIGIBLE FOR FURTHER CONSIDERATION. 2) Prime Contractor is responsible for providing adequate information to allow the Government to make a complete and thorough evaluation of its price quotation and determine that its proposed price is fair and reasonable. 3) All labor categories proposed for each task must be provided for each Contract Year, including the Base and all Option Periods. 4) Associated fully loaded labor rates, discounted rates, and discount percentage must also be provided, corresponding to each proposed labor category for each contract period. 5) The pricing template/worksheets are only a suggestion. The contractor has the flexibility to propose labor rates and costs as necessary to meet the Government's Need.

Offerors who do not have the labor categories stated in the solicitation must map the proposed GSA Alliant 2 schedule labor categories to the solicitation labor categories. Note: Failure to map their proposed labor category rates to their current GSA Alliant 2 schedule labor category rates may result in Offeror ineligibility for award.

Summary

DRAFT
Grand Summary - LTIS 4
FFP PriceLH PriceTravelCAFTotal Price
PeriodHoursPriceHoursPricePricePriceHoursPrice
Base Period$ 50,000.00- 0$ 50,000.00
Option Period 1$ 50,000.00- 0$ 50,000.00
Option Period 2$ 50,000.00- 0$ 50,000.00
Option Period 3$ 50,000.00- 0$ 50,000.00
Option Period 4$ 50,000.00- 0$ 50,000.00
Grand Total- 0$ - 0- 0$ - 0$ 250,000.00$ - 0- 0$ 250,000.00
Grand Summary - LTIS 4
FFP PriceLH PriceTravelCAFTotal Price
PeriodHoursPriceHoursPricePricePriceHoursPrice
Base Period$ 50,000.00- 0$ 50,000.00
Option Period 1$ 50,000.00- 0$ 50,000.00
Option Period 2$ 50,000.00- 0$ 50,000.00
Option Period 3$ 50,000.00- 0$ 50,000.00
Option Period 4$ 50,000.00- 0$ 50,000.00
52.217-8, 6 month option$ 25,000.00$ 25,000.00
Grand Total- 0$ - 0- 0$ - 0$ 275,000.00$ - 0- 0$ 275,000.00

CLIN Stucture

Draft
LTIS4 - PRICE QUOTE TEMPLATE
CLINDESCRIPTIONCLIN TYPEQTYTOTAL / NTE PRICE
BASE PERIOD
0001Transition-In: Task 2 Program, Project, and Release Management, Task 3 IMF Modernization Executive Support, Task 4 Architecture and Engineering Support, Task 5 Solution Engineering Support, Task 6 IMF Modernization Testing Support, Task 7: Subtask 3.7A Development Integration, Task 8 Cybersecurity, Task 9 Environments Integration, Task 11 Project Scheduling **POP: 12/01/2024 – 02/28/2025FFP1$0.00
0002Task 2 Program, Project, and Release Management, Task 3 IMF Modernization Executive Support, Task 4 Architecture and Engineering Support, Task 5 Solution Engineering Support, Task 6 IMF Modernization Testing Support, Task 7: Subtask 3.7A Development Integration, Task 8 Cybersecurity, Task 9 Environments Integration, Task 11 Project Scheduling
**POP: 3/1/2025 – 11/30/2025FFP
0003Task 2 Program, Project, and Release Management, Task 3 IMF Modernization Executive Support, Task 4 Architecture and Engineering Support, Task 5 Solution Engineering Support, Task 6 IMF Modernization Testing Support, Task 7: Subtask 3.7A Development Integration, Task 7: Subtask 3.7B Vendor Built/Driven Development Support, Task 8 Cybersecurity, Task 9 Environments Integration, Task 10 Business Tools and Technologies, Tasks 11 Project Scheduling - Optional POP: 12/1/2024 – 11/30/2025LH1$0.00
0004Travel - NTE POP: 12/1/2024 – 11/30/2025COST1$50,000.00
GRAND TOTAL FOR BASE PERIOD$0.00
1002Task 2 Program, Project, and Release Management, Task 3 IMF Modernization Executive Support, Task 4 Architecture and Engineering Support, Task 5 Solution Engineering Support, Task 6 IMF Modernization Testing Support, Task 7: Subtask 3.7A Development Integration, Task 8 Cybersecurity, Task 9 Environments Integration, Task 11 Project Scheduling POP: 12/1/2025 – 11/30/2026FFP1$0.00
1003Task 2 Program, Project, and Release Management, Task 3 IMF Modernization Executive Support, Task 4 Architecture and Engineering Support, Task 5 Solution Engineering Support, Task 6 IMF Modernization Testing Support, Task 7: Subtask 3.7A Development Integration, Task 7: Subtask 3.7B Vendor Built/Driven Development Support, Task 8 Cybersecurity, Task 9 Environments Integration, Task 10 Business Tools and Technologies, Tasks 11 Project Scheduling - Optional POP: 12/1/2025 – 11/30/2026LH1$0.00
1004Travel - NTE POP: 12/1/2025 – 11/30/2026COST1$50,000.00
GRAND TOTAL FOR OPTION PERIOD 1$0.00
OPTION PERIOD 2
2002Task 2 Program, Project, and Release Management, Task 3 IMF Modernization Executive Support, Task 4 Architecture and Engineering Support, Task 5 Solution Engineering Support, Task 6 IMF Modernization Testing Support, Task 7: Subtask 3.7A Development Integration, Task 8 Cybersecurity, Task 9 Environments Integration, Task 11 Project Scheduling POP: 12/1/2026 – 11/30/2027FFP1$0.00
2003Task 2 Program, Project, and Release Management, Task 3 IMF Modernization Executive Support, Task 4 Architecture and Engineering Support, Task 5 Solution Engineering Support, Task 6 IMF Modernization Testing Support, Task 7: Subtask 3.7A Development Integration, Task 7: Subtask 3.7B Vendor Built/Driven Development Support, Task 8 Cybersecurity, Task 9 Environments Integration, Task 10 Business Tools and Technologies, Tasks 11 Project Scheduling - Optional POP: 12/1/2026 – 11/30/2027LH1$0.00
2004Travel - NTE POP: 12/1/2026 – 11/30/2027COST1$50,000.00
GRAND TOTAL FOR OPTION PERIOD 2$0.00
OPTION PERIOD 3
3002Task 2 Program, Project, and Release Management, Task 3 IMF Modernization Executive Support, Task 4 Architecture and Engineering Support, Task 5 Solution Engineering Support, Task 6 IMF Modernization Testing Support, Task 7: Subtask 3.7A Development Integration, Task 8 Cybersecurity, Task 9 Environments Integration, Task 11 Project Scheduling POP: 12/1/2027 – 11/30/2028FFP1$0.00
3003Task 2 Program, Project, and Release Management, Task 3 IMF Modernization Executive Support, Task 4 Architecture and Engineering Support, Task 5 Solution Engineering Support, Task 6 IMF Modernization Testing Support, Task 7: Subtask 3.7A Development Integration, Task 7: Subtask 3.7B Vendor Built/Driven Development Support, Task 8 Cybersecurity, Task 9 Environments Integration, Task 10 Business Tools and Technologies, Tasks 11 Project Scheduling - Optional POP: 12/1/2027 – 11/30/2028LH1$0.00
3004Travel - NTE POP: 12/1/2027 – 11/30/2028COST1$50,000.00
GRAND TOTAL CEILING for OPTION PERIOD 3$0.00
4002Task 2 Program, Project, and Release Management, Task 3 IMF Modernization Executive Support, Task 4 Architecture and Engineering Support, Task 5 Solution Engineering Support, Task 6 IMF Modernization Testing Support, Task 7: Subtask 3.7A Development Integration, Task 8 Cybersecurity, Task 9 Environments Integration, Task 11 Project Scheduling POP: 12/1/2028 – 11/30/2029FFP1$0.00
4003Task 2 Program, Project, and Release Management, Task 3 IMF Modernization Executive Support, Task 4 Architecture and Engineering Support, Task 5 Solution Engineering Support, Task 6 IMF Modernization Testing Support, Task 7: Subtask 3.7A Development Integration, Task 7: Subtask 3.7B Vendor Built/Driven Development Support, Task 8 Cybersecurity, Task 9 Environments Integration, Task 10 Business Tools and Technologies, Tasks 11 Project Scheduling - Optional POP: 12/1/2028 – 11/30/2029LH1$0.00
4004Travel - NTE POP: 12/1/2028 – 11/30/2029COST1$50,000.00
GRAND TOTAL FOR OPTION PERIOD 4$0.00
6-MONTH OPTION (FAR 52.217-8)
x002Task 2 Program, Project, and Release Management, Task 3 IMF Modernization Executive Support, Task 4 Architecture and Engineering Support, Task 5 Solution Engineering Support, Task 6 IMF Modernization Testing Support, Task 7: Subtask 3.7A Development Integration, Task 8 Cybersecurity, Task 9 Environments Integration, Task 11 Project Scheduling POP: 12/1/2029 – 5/31/2030FFP1$0.00
x003Task 2 Program, Project, and Release Management, Task 3 IMF Modernization Executive Support, Task 4 Architecture and Engineering Support, Task 5 Solution Engineering Support, Task 6 IMF Modernization Testing Support, Task 7: Subtask 3.7A Development Integration, Task 7: Subtask 3.7B Vendor Built/Driven Development Support, Task 8 Cybersecurity, Task 9 Environments Integration, Task 10 Business Tools and Technologies, Tasks 11 Project Scheduling - Optional POP: 12/1/2029 – 5/31/2030LH1$0.00
x004Travel - NTE OP: 12/1/2029 – 5/31/2030COST1$25,000.00
GRAND TOTAL FOR 6-MONTH OPTION (FAR 52.217-8)$0.00
TOTAL CONTRACT VALUE$0.00

Labor By Tasks Period of Performance: Transition In Period CLIN 0001 December 1, 2024 - February 28, 2025 Base Period: December 1, 2024 - November 30, 2025 Option Period 1: December 1, 2025 - November 30, 2026 Option Period 2: December 1, 2026 - November 30, 2027 Option Period 3: December 1, 2027 - November 30, 2028 Option Period 4: December 1, 2028 - November 30, 2029 52.217-8 (6-Month Extensions): December 1, 2029 - May 31, 2030 RFQ 8326 Long Term Integration Support 4 (LTIS 4)

DRAFT
Contract PeriodAlliant 2 Labor CategoryTask 1 Transition In (3-Months) - (FFP)Task 2 Program, Project, and Release Management (FFP)Task 2 Program, Project, and Release Management - Optional (LH)Task 3 IMF Modernization Executive Support (FFP)Task 3 IMF Modernization Executive Support Optional (LH)Task 4 Architecture and Engineering Support (FFP)Task 4 Architecture and Engineering Support - Optional (LH)Task 5 Solution Engineering Support (FFP)Task 5 Solution Engineering Support - Optional (LH)Task 6 IMF Modernization Testing Support (FFP)Task 6 IMF Modernization Testing Support - Optional (LH)Task 7: Subtask 3.7A Development Integration (FFP)Task 7: Subtask 3.7A Development Integration - Optional (LH)Task 7: Subtask 3.7B Vendor Built/Driven Development Support (LH)Task 8 Cybersecurity (FFP)Task 8 Cybersecurity - Optional (LH)
HoursRatePriceHoursRatePriceHoursRatePriceHoursRatePriceHoursRatePriceHoursRatePriceHoursRatePriceHoursRatePriceHoursRatePriceHoursRatePriceHoursRatePriceHoursRatePriceHoursRatePriceHoursRatePriceHoursRatePriceHoursRatePrice
Base Period
Base Period
Base Period
Base Period
Base Period
Base Period
Base Period
Base Period
Base Period
Base Period
Base Period
Base Period
Base Period
Base Period
Base Period
Base Period
Base Period
Base Period
Base Period
Base Period
Base Period
Base Period
TOTAL PRICE
TOTAL HOURS
Option Period 1N/AN/AN/A
Option Period 1N/AN/AN/A
Option Period 1N/AN/AN/A
Option Period 1N/AN/AN/A
Option Period 1N/AN/AN/A
Option Period 1N/AN/AN/A
Option Period 1N/AN/AN/A
Option Period 1N/AN/AN/A
Option Period 1N/AN/AN/A
Option Period 1N/AN/AN/A
Option Period 1N/AN/AN/A
Option Period 1N/AN/AN/A
Option Period 1N/AN/AN/A
Option Period 1N/AN/AN/A
Option Period 1N/AN/AN/A
Option Period 1N/AN/AN/A
Option Period 1N/AN/AN/A
Option Period 1N/AN/AN/A
Option Period 1N/AN/AN/A
Option Period 1N/AN/AN/A
Option Period 1N/AN/AN/A
Option Period 1N/AN/AN/A
TOTAL PRICE
TOTAL HOURS
Option Period 2N/AN/AN/A
Option Period 2N/AN/AN/A
Option Period 2N/AN/AN/A
Option Period 2N/AN/AN/A
Option Period 2N/AN/AN/A
Option Period 2N/AN/AN/A
Option Period 2N/AN/AN/A
Option Period 2N/AN/AN/A
Option Period 2N/AN/AN/A
Option Period 2N/AN/AN/A
Option Period 2N/AN/AN/A
Option Period 2N/AN/AN/A
Option Period 2N/AN/AN/A
Option Period 2N/AN/AN/A
Option Period 2N/AN/AN/A
Option Period 2N/AN/AN/A
Option Period 2N/AN/AN/A
Option Period 2N/AN/AN/A
Option Period 2N/AN/AN/A
Option Period 2N/AN/AN/A
Option Period 2N/AN/AN/A
Option Period 2N/AN/AN/A
TOTAL PRICE
TOTAL HOURS
Option Period 3N/AN/AN/A
Option Period 3N/AN/AN/A
Option Period 3N/AN/AN/A
Option Period 3N/AN/AN/A
Option Period 3N/AN/AN/A
Option Period 3N/AN/AN/A
Option Period 3N/AN/AN/A
Option Period 3N/AN/AN/A
Option Period 3N/AN/AN/A
Option Period 3N/AN/AN/A
Option Period 3N/AN/AN/A
Option Period 3N/AN/AN/A
Option Period 3N/AN/AN/A
Option Period 3N/AN/AN/A
Option Period 3N/AN/AN/A
Option Period 3N/AN/AN/A
Option Period 3N/AN/AN/A
Option Period 3N/AN/AN/A
Option Period 3N/AN/AN/A
Option Period 3N/AN/AN/A
Option Period 3N/AN/AN/A
Option Period 3N/AN/AN/A
TOTAL PRICE
TOTAL HOURS
Option Period 4N/AN/AN/A
Option Period 4N/AN/AN/A
Option Period 4N/AN/AN/A
Option Period 4N/AN/AN/A
Option Period 4N/AN/AN/A
Option Period 4N/AN/AN/A
Option Period 4N/AN/AN/A
Option Period 4N/AN/AN/A
Option Period 4N/AN/AN/A
Option Period 4N/AN/AN/A
Option Period 4N/AN/AN/A
Option Period 4N/AN/AN/A
Option Period 4N/AN/AN/A
Option Period 4N/AN/AN/A
Option Period 4N/AN/AN/A
Option Period 4N/AN/AN/A
Option Period 4N/AN/AN/A
Option Period 4N/AN/AN/A
Option Period 4N/AN/AN/A
Option Period 4N/AN/AN/A
Option Period 4N/AN/AN/A
Option Period 4N/AN/AN/A
TOTAL PRICE
TOTAL HOURS
52.217-8 6-Month ExtensionN/AN/AN/A
52.217-8 6-Month ExtensionN/AN/AN/A
52.217-8 6-Month ExtensionN/AN/AN/A
52.217-8 6-Month ExtensionN/AN/AN/A
52.217-8 6-Month ExtensionN/AN/AN/A
52.217-8 6-Month ExtensionN/AN/AN/A
52.217-8 6-Month ExtensionN/AN/AN/A
52.217-8 6-Month ExtensionN/AN/AN/A
52.217-8 6-Month ExtensionN/AN/AN/A
52.217-8 6-Month ExtensionN/AN/AN/A
52.217-8 6-Month ExtensionN/AN/AN/A
52.217-8 6-Month ExtensionN/AN/AN/A
52.217-8 6-Month ExtensionN/AN/AN/A
52.217-8 6-Month ExtensionN/AN/AN/A
52.217-8 6-Month ExtensionN/AN/AN/A
52.217-8 6-Month ExtensionN/AN/AN/A
52.217-8 6-Month ExtensionN/AN/AN/A
52.217-8 6-Month ExtensionN/AN/AN/A
52.217-8 6-Month ExtensionN/AN/AN/A
52.217-8 6-Month ExtensionN/AN/AN/A
52.217-8 6-Month ExtensionN/AN/AN/A
52.217-8 6-Month ExtensionN/AN/AN/A
TOTAL PRICE
TOTAL HOURS
Grand Total Hours
Grant Total Price
*Pricing in this spreadsheet does not include Travel or Contract Acces Fee (CAF)

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .