RFQ 75D30126Q79234_____.pdf
PDF 848 KB Posted
- Attached to
- Laboratory Mining Equipment
- Solicitation number
- 75D30126Q79234
About this file
This is a Request for Quotation (RFQ) for rock cutting and testing equipment to support the Centers for Disease Control and Prevention's Pittsburgh Mining Research Division (PMRD). The RFQ number is 75D301-26-Q-79234, issued by CDC's Chamblee Campus facility in Atlanta, Georgia. This is not a small business set-aside. Quotations are due by September 14, 2026, at 10:00 AM EST to Sandra Adams at ab41@cdc.gov. The Government intends to make award without discussions based on acceptability of the quotation, reasonableness of price, and ability to demonstrate compliance with the Statement of Work. No trade-offs will be conducted. The period of performance is on or before September 30, 2026, with delivery to the NIOSH PMRD Pittsburgh facility.
The requirement encompasses four major integrated laboratory systems totaling 60 line items: (1) a complete rock specimen cutting system (MULTISAW 77-PV47006) with diamond blade, core holding jig, and PVC tube; (2) a computerized grinding machine (55-C0203/Z) with US plug, specimen cradles of various sizes, lever clamps, and spare grinding wheel; (3) a creep test apparatus (300 kN capacity load frame 55-C0235/A) with strain gauges, compensation devices, load cell, datalogger, and touch-screen display; and (4) a fully assembled triaxial testing system including servohydraulic control consoles (ADVANTEST9 ROCK and SERCOMP7 ROCK), 3000 kN compression frame, pedestal, upgrades, distance pieces, Hoek triaxial cell with accessories, specimen extruder, displacement transducers, and related instrumentation. All equipment must be new, delivered in manufacturer's original packaging, manufactured in accordance with ASTM standards, and include insured shipping from Italy to Pennsylvania. The contractor's responsibilities are limited to packaging, crating, and delivery; no installation, setup, calibration, or onsite services are required. Pricing is firm fixed-price, and all applicable federal, state, and local taxes are included in the contract price. Payment will be made electronically via the Invoice Processing Platform (IPP). Standard commercial FAR clauses apply, including Buy American Certificate, Trade Agreements Certificate, and various compliance and safety requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Item List_.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR
QUOTATIONS
(THIS IS NOT AN ORDER)
THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE.
PAGE OF PAGES
1 333
1. REQUEST NO.
75D301-26-Q-79234
2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST
NO.
000HCCRK-2026-98764
4. CERT. FOR NAT. DEF.
UNDER BDSA REG. 2
AND/OR DMS REG. 1
RATING
5a. ISSUED BY
Centers for Disease Control and Prevention
Chamblee Campus Building 102, MS S102-4
4770 Buford Hwy
Atlanta GA 303413717
6. DELIVERY BY (Date)
5b. FOR INFORMATION CALL (No collect calls)
NAME TELEPHONE NUMBER
AREA CODE NUMBER
Sandra Adams (770) 488-5543 x
8. TO: 9. DESTINATION
a. NAME b. COMPANY a. NAME OF CONSIGNEE
c. STREET ADDRESS b. STREET ADDRESS
c. CITY
d. CITY e. STATE f. ZIP CODE d. STATE e. ZIP CODE
10. PLEASE FURNISH QUOTATIONS TO
THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS (Date)
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be
11. SCHEDULE (Include applicable Federal, State and local taxes)
ITEM NO.
(a)
SUPPLIES/SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT
PRICE
AMOUNT
(f)
This requirement is for Rock Cutting
Equipment. Request for Quotation
(RFQ) for the Centers for Disease
Control and Prevention CDC)in support of the Office of Public
Health Data, Surveillance, and
Technology OPHDST)
Quote due: Monday, September 14, 2026, at 10:00 AM EST to Sandra Adams at ab41@cdc.gov.
12.DISCOUNT FOR PROMPT PAYMENT
a. 10 CALENDAR DAYS
b. 20 CALENDAR DAYS
c. 30 CALENDAR DAYS
d. CALENDAR DAYS
NUMBER PERCENTAGE
NOTE: Additional provisions and representations are are not attached.
13. NAME AND ADDRESS OF QUOTER 14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
15. DATE OF
QUOTATION
a. NAME OF QUOTER
b. STREET ADDRESS 16. SIGNER
a. NAME (Type or print) b. TELEPHONE
c. COUNTY AREA CODE
d. CITY e. STATE f. ZIP CODE c. TITLE (Type or print) NUMBER
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)
Previous edition not usable Prescribed by GSA
FAR (48 CFR) 53.215-1(a)
7. DELIVERY
FOB
DESTINATION
OTHER
(See Schedule)
Section B: Supplies or services and prices/costs
Period of Performance: On or before 30 September 2026
ITEM SUPPLIES / SERVICES QTY / UNIT UNIT PRICE EXTENDED PRICE
0001 ADVANTEST9 ROCK-
servohydraulic control console for triaxial testing on rock.
Part# 32-C9844/RCK
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
1 Each
0002 Cabinet PC-cabinet for testing systems
Part # 50-2999
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
1 Each
0003 Compression frame-3000 kN cap.
compression frame
Part #50-C56Z00
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
1 Each
0004 Pedestal-Pedestal for frames and testing machines
Part# 50-C59/B
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
1 Each
0005 Compression
Upgrading of the 50-C46xx and 50-
C56xx series compression
Part # 50-Q0050/HRD
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
1 Each
0006 Compression
Upgrading of the 50-C57xxx and 50-
C56xxx series compression
Part #-50-C59/FGH
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
1 Each
0007 Distance piece
Distance piece dia.200x30mm
Part#50-C9080/30
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
3 Each
0008 Distance piece
Distance piece dia.200x50mm
Part# 50-C9080/50
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
3 Each
0009 Steel plates
Steel plates to fix the bottom compression platen
Part#50-C9080/F
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
1 Each
0010 Readout unit
Special calibration of load digital readout unit
Part#50-C0050CAL
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
SERCOMP7 ROCK, servohydraulic console for la- teral pressure
32-C7024/RCK
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
1 Each
0012 Compression device
Compression device for rock core specimens with dia
Part# 32-D9035
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
1 Each
0013 Triaxial cell-Hoek triaxial cell NX
Part #: 32-D0556/HC
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
1 Each
0014 Load spreader
Pair of load spreader
Part#: 32-D0556/A
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
1 Each
0015 Sealing sleeve
Spare sealing sleeve for NX Hoek cell
Part #: 32-D0556/1
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
3 Each
0016 Compensation device-
Compensation device for up to 4
Wheatstone bridges
Part #: 82-P0398
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
0017 Strain gauge
Strain gauge application kit
Part #: 82-P0399/C
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
1 Each
0018 Connecting terminals
50 pairs sheet
Part #: 82-P0399/1
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
1 Each
0019 Strain guage
30 mm gauge length
Part#: 82-P0392
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
1 Each
0020 Specimen extruder
Specimen extruder for Hoek cells
Part#: 32-D0577/B
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
1 Each
0021 Extruder Adapter
Extruder Adapter set for specimen NX
Part#: 32-D0577/4
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
0022 Displacement transducer
High precision displacement transducer
LDT type 10mm travel
Part #: 82-P0340/10
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
3 Each
0023 Electric mean device
Electric mean device for 2 or 3 LDT displacement transducers
Part#: 82-P0340/A
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
1 Each
0024 Magnetic holder
Magnetic holder for dial gauges
Part#: 82-D1260
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
3 Each
0025 Data sheet
Excel data sheet for stress strain analysis and elastic modulus
Part# 32-P0070/3
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
1 Each
0028 Packing
Packing of the triaxial testing machine
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
1 Each
0029 Installation
Installation of the triaxial testing
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
0030 Shipping
Insured shipping, please see Offer nr
001094 (quote for triaxial machine)
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
1 Each
0031 Grinding machine
=please see the quote for the Grinding machine 55 - C0203/Z:
Grinding machine
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
1 Each
0032 Plug- US plug 5A 250V
# Part No.-86 - P3001
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
1 2 Each
0033 Cradle
55 - C0203/1: Cradle for up to 3 cylinders
50-100mm of diameter
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
1 Each
0034 Cradle
55 - C0203/2: Cradle for up to 5 cylinders
38-50mm of diameter
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
1 Each
0035 Cradle
55 - C0203/3: Cradle for up to 3 cubes
100mm and up to 2 cubes 150mm
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
1 Each
0036 Clamp
55 - C0203/6: Additional Lever clamp
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
0037 Grinding wheel
55 - C0203/8: Circlular spare grinding wheel
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
1 Each
0038 Clamp
55 - C0203/6S: Extension for lever clamp
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
1 Each
0039 Packing
Packaging of the grinding machine, please see the quote of the grinding machine
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
1 Each
0040 Shipping
Shipping of the Grinding machine, please see the quote of the grinding machine quotation ESUS-003273
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
1 Each
0042 Multisaw
Please see the quote for the cutting saw
77-PV47006:
MULTISAW asphalt saw complete with asphalt multi-slab jig. Blade not included.
220V/60Hz/3ph+N Ideal for cutting: -prisms and slabs to be used in Four Point
Beam Bending tests according to EN
12697-24D and 26B and AASHTO T321 trapezoidal specimens to be used in TWO
Point Bending tests according to EN
12697-24A and 26A -AMPT cylindrical specimens round cores. (Cutting saw)
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
0043 Blade
77- PV47000/C1 Diamond blade 650mm dia. for asphalt suitable for Autosaw II and Multisaw
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
1 Each
0044 Jig
77- PV47014 Jig for round cores from 38 to 200 mm dia for Manual cut of samples from 10 to 300 mm length
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
1 Each
0045 PVC tube
77 - PV47000/2 PVC tube for 100mm dia. cores
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
1 Each
0046 Packing
Packing for the cutting saw, please see the quote of the cutting saw
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
1 Each
0047 Shipping
Shipping cost to deliver machine to facility, please see the quote for cutting saw quotation ESUS-003433
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
1 Each
0049 Creep testing machine
= Please see the quote for the creep testing machine 55-
C0235/A: 300KN capacity load frame
(creep machine)
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
0050 Strain gauge
82-P0396: Strain gauge 120 mm gauge length (pack of 10)
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
1 Each
0051 Strain gauge
82-P0393: Strain gauge 60 mm gauge length (pack of 10)
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
1 Each
0052 Strain gauge
82-P0399/C: Strain gauge application kit
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
1 Each
0053 Compensation device
82-P0398: Compensation device for up to
4 wheatstone bridges
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
1 Each
0054 Connecting terminals
82-P0399/1: Connecting terminals. 50 pairs sheet
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
1 Each
0055 Cables
82-P9008/ELT: Set of 4 cables for connecting load cells presure tansducers starain gauges
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
1 Each
0056 Load cell
55-C0235/LC: Load cell
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
0057 Datalogger
30-WF6008: 8 channel multipurpose datalogger
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
1 Each
0058 Screen display
30-WF6008/T: 6 in touch screen display
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
1 Each
0059 Packing
Packing for the creep testing machine
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
1 Each
0060 Shipping
Shipping of the creep testing machine, please see the quote for creep testing machine quotation ESUS-003432
Custodial Account #: 00467
Firm Fixed Price
Period of Performance:
On or before 09/30/2026
1 Each
SECTION C-STATEMENT OF WORK
Statement of Work
Title: Purchase of Rock Sample Cutting Machine MULTISAW 77- PV47006, Computerized grinding machine, Creep Test Apparatus, and Triaxial testing machine from
SECTION 1 – BACKGROUND
The Pittsburgh Mining Research Division (PMRD) conducts laboratory testing on rock, coal, concrete, and other geological materials to support research in mine safety and ground control, and many of these tests require specimens with flat, smooth, and dimensionally consistent surfaces to ensure accurate and repeatable strength measurements. To meet these preparation needs, PMRD requires reliable cutting and grinding systems capable of producing uniform, perpendicular cuts on various specimen types, thereby improving preparation consistency, reducing variability from manual cutting, and supporting efficient laboratory operations. Rock sample cutting and computerized grinding machines are needed to prepare coal, rock, and concrete specimens by generating flat, smooth surfaces prior to strength testing, without which fundamental tests such as uniaxial and triaxial compression cannot be performed; the rock sample cutting machine
MULTISAW 77- PV47006 and the fully automatic XTRIM grinding system provides repeatable preparation for specimens of multiple shapes and sizes while maintaining safety and a clean environment.
Weak, time-dependent (creep behavior) geological materials such as claystone, clay shale, and other creeping rocks play a major role in roof falls, rib failures, and large-scale collapses in underground mines, making it essential to characterize their mechanical and time-dependent properties for mine design and numerical modeling. Currently, NIOSH does not have an in-house apparatus to conduct time-dependent tests (creep).
The creep test apparatus is a user-friendly system designed to perform creep testing on a wide range of materials, including coal, clay, salt, and others. In addition, PMRD requires a triaxial testing machine to determine the triaxial strength properties of geological materials, parameters that govern fracture and failure behavior and serve as essential inputs for simulations of pillar response in coal and stone mines. Since NIOSH currently lacks an in-house triaxial system and must rely on costly and time-consuming external laboratories, acquiring the automated, user-friendly triaxial machine will significantly improve testing efficiency and enable the development of a comprehensive database of strength properties that supports efforts to reduce injuries and fatalities associated with shear failure in U.S. mines.
SECTION 2 – PURPOSE/OBJECTIVE
The purpose of this acquisition is to obtain the specialized laboratory equipment necessary to support PMRD’s ongoing rock-mechanics and ground-control research by ensuring the consistent preparation and testing of geological specimens aligned with rock preparations and testing standards. This includes acquiring a complete rock-specimen cutting system capable of producing accurate, repeatable cuts on rock, coal, concrete, asphalt, and core samples; a computerized grinding machine that will significantly reduce specimen preparation labor while supporting major research projects such as seismic potential forecasting and panel-well optimization; a creep test apparatus to provide essential time-dependent rock-property data for numerical modeling in coal and stone mines; and a triaxial testing machine required to determine cohesion and friction angle parameters for specimens collected from mine sites. Together, these systems will improve specimen quality, enhance laboratory efficiency, reduce the costs and delays associated with external testing, and provide high-quality mechanical data needed to support advanced modeling, pillar-design evaluations, roof-stability assessments, and the development of comprehensive databases for U.S. coal and stone mines. All equipment will be delivered to the Pittsburgh Mining Research Division facility within the established period of performance, ensuring PMRD has the necessary capabilities to meet current and future research demands.
SECTION 3 – SCOPE OF WORK
The contractor shall furnish all equipment, accessories, documentation, packaging, and shipping necessary to deliver four fully configured laboratory systems to the Government’s designated receiving location. The contractor shall provide one complete rock specimen cutting system, including the primary cutting unit and all standard accessories—650 mm diamond blade, round core holding jig, and 100 mm PVC sacrificial tube— delivered new, fully compatible, and in the manufacturer’s original packaging. The contractor shall supply a computerized grinding machine with all required components, including a US plug (5A 250 V), cradles for cylindrical and cubic specimens of various dimensions, a lever-clamp assembly and extension, a spare grinding wheel, and all required packaging, shipping, and with all items manufactured in accordance with ASTM standards and requiring no Government-furnished equipment. The contractor shall also deliver a complete creep test apparatus for evaluating time-dependent rock behavior, consisting of a 300 kN load frame, strain gauges of multiple gauge lengths, a strain-gauge application kit, a compensation device for up to four Wheatstone bridges, connecting terminals, cables, a load cell, a datalogger, and a 6-inch touch-screen display, with all components supplied new and compliant with
ASTM standards. In addition, the contractor shall supply a fully assembled triaxial testing system, including the ADVANTEST9 ROCK servo hydraulic control console, the SERCOMP7 ROCK lateral-pressure console, a 3000 kN compression frame, pedestal, frame upgrades, distance pieces, steel platen fixtures, Hoek triaxial cell (NX size) with accessories and spare sealing sleeve, load spreaders, specimen extruder and NX adaptors, displacement transducers, electronic readout devices, magnetic holders, stress-strain analysis spreadsheet, and insured shipping from Italy to Pennsylvania. The contractor’s responsibilities are limited to packaging, crating, and delivery only; no installation, setup, calibration, or onsite services are required. No Government-furnished property will be provided, and no tasks other than delivery of the specified equipment are included in this contract.
SECTION 4 – TASKS TO BE PERFORMED
Task 1 — Provide Equipment The contractor shall furnish the following:
Task Provide Equipment Qty Part No#
Task 1 One complete rock specimen cutting system, including the following components:
Task 1 MULTISAW cutting machine 1 PV47006
Task 1 650 mm diamond blade 1 PV47000/1
Task 1 Round core holding jig 1 PV47014
Task 1 100 mm PVC sacrificial tube 1 PV47000/2
Task 1 All standard manufacturer documentation, including user manuals and safety instructions
Task 1 A computerized grinding machine and its accessories which include the following:
Task 1 Computerized grinding machine 1 55-C0203/Z
Task 1 US plug 5A 250 V (suitable for single phase machine 1 86 - P3001
Task 1 Craddle for up to 3 cylinders 50-100 mm diameter 1 55 - C0203/1
Task 1 Cradle for up to 5 cylinders 38-50mm of diameter, to be used with C0203 and C0203/Z grinding machine
C0203/2
Task 1 Craddle for up to 3 cubes 100 mm and upto 2 cubes 150 mm 1 55 - C0203/3
Task 1 Additional lever clamp for clamping additional specimens 1 55-0203/6
Task 1 Circular spare grinding wheel 1 55-C0203/8
Task 1 Extension for lever clamp used for samples with lengths 50-
76 mm
55 - C0203/6S
Task 1 Creep test apparatus which include the following:
Task 1 300KN capacity load frame 1 55 - C0235/A
Task 1 Strain gauge 120 mm gauge length (pack of 10) 1 82 - P0396
Task 1 Strain gauge 60 mm gauge length (pack of 10) 1 82 - P0393
Task 1 Strain gauge application kit 1 82 - P0399/C
Task 1 Compensation device for up to 4 wheatstone bridges 1 82 - P0398
Task 1 Connecting terminals. 50 pairs sheet 1 82 - P0399/1
Task 1 Set of 4 cables 1 82 - P9008/ELT
Task 1 Load cell 1 55 - C0235/LC
Task 1 Datalogger 1 30 - WF6008
Task 1 6 in touch screen display 1 30 - WF6008/T
Task 1 Triaxial testing machine which include the following:
Task 1 ADVANTEST9 ROCK-ROCK servohydraulic control console suitable for triaxial testing on rock [hoek cell method]. In combination with the unit SERCOMP7 ROCK performs the stress-path test fully automatically. Controls up to 4 test frames. Software included for compression flexure indirect tensile tests Elastic modulus determination Rock testing
[uniaxial and triaxial]. Allows load displacement and strain control. PC and printer included. 110V/60Hz/1ph
1 32 C9844/RCK
Task 1 US plug 5A 250V [suitable for single-phase machines] 1 86 P3001
Task 1 PC cabinet for testing systems. 110-230V 50-60Hz 1 Ph. – To house PC and printer - Three extractable shelves to hold keyboard printer and mouse - Airborne contamination protected by two vented filters in the cabinet housing the PC 1 50 D2999
Task 1 3000 kN cap. compression frame for testing cylinders up to
160 x 320 mm and cubes up to 200mm. Conforming to EN
12390-4. - High-stiffness 4-welded-columns frame - Heavy duty spherical seat - Compression platens 300mm diameter x 50mm thickness - Dayligths 1 50 C56Z00
Task 1 Pedestal for frames and testing machines model 0-C56xxx
50- C57xxx and 50-A52xxx 1 50 C59/B
Task 1 Upgrading of the 50-C46xx and 50-C56xx series compression frames with upper and botton platen dia 300mm min.
hardness 58 HRC with metallic perforated front door instead of standard trasparent one 1 50 Q0050/HRD
Task 1 Upgrading of the 50-C57xxx and 50-C56xxx series compression frames with metallic perforated front door instead of standard trasparent one 1 50 C59/FGH
Task 1 Distance piece dia.200x30mm complete with both central centering pin for simple stacking up and two screws for solid fixing. 3 50 C9080/30
Task 1 Distance piece dia.200x30mm complete with both central centering pin for simple stacking up and two screws for solid fixing. 3 50 C9080/50
Task 1 Steel plates to fix the bottom compression platen Steel plates to fix the bottom compression platen [except dia.
250mm and dia.220mm] to the distance pieces model
C9080/xx 1 50 C9080/F
Task 1 Special calibration of load digital readout unit Special calibration of load digital readout unit assuring class 1 from
1% of testing machine full scale [maximum load] 1 50 C0050/CAL
Task 1 Sercomp 7, servohydraulic control console for la- teral pressure to perform triaxial rock testing. 110V, 60Hz, 1ph. 1 32 C7024/RCK
Task 1 US plug 5A 250V[suitable for single-phase machines] 1 86 P3001
Task 1 Compression device for rock core specimens with dia. from
54.7 mm [NX] to 63.5 mm [HQ] conforming to ASTM D7012 1 32 D9035
Task 1 Hoek triaxial cell NX [54.74 mm dia. sample] one rubber sealing 1 32 D0556/HC
Task 1 Pair of load spreader 1 32 D0556/A
Task 1 Spare sealing sleeve for NX Hoek cell 32-D0556 3 32 D0556/1
Task 1 Compensation device for up to 4 Wheatstone bridges 1 82 P0398
Task 1 Strain gauge application kit including: conditioner neutralizer acetone tweezer adhesive with catalyst agent
100 m of bipolar cable solder soldering iron scalpels scissors duct tape sellotape sandpaper and carrying case. 1 82 P0399/C
Task 1 Connecting terminals.50 pairs sheet 1 82 P0399/1
Task 1 Strain gauge 30 mm gauge length [pack of 10] 1 82 P0392
Task 1 Specimen extruder for Hoek cells series 45-D055x. 1 32 D0577/B
Task 1 Extruder adaptor set for specimen NX 1 32 D0577/4
Task 1 High precision displacement transducer LDT type 10mm travel output 2mv/v 3 82 P0340/10
Task 1 Electric mean device for 2 or 3 LDT displacement transducers series 82-P0340/xx or CLIP gauge models 82-P0331/E and /F 1 82 P0340/A
Task 1 Magnetic holder for dial gauges 3 82 D1260
Task 1
Excel data sheet for stress strain analysis and elastic modulus 1 32 P0070/3
Task 2 — Prepare Equipment for Shipment The contractor shall package and crate all components in accordance with industry standards to ensure safe transport. Packaging shall protect the requested items and accessories from damage due to moisture, vibration, shock, and handling during transit.
Task 3 — Deliver Equipment The contractor shall deliver all items listed under Task 1 to the Government’s designated receiving location. Delivery shall occur within the established period of performance and shall include all shipping, handling, freight, and associated logistics required to complete delivery.
Task 4 — Provide Warranty Documentation The contractor shall provide manufacturer warranty documentation covering all supplied components. Warranty documentation shall specify coverage terms, start date, claim procedures, and points of contact for warranty service.
SECTION 5 – GOVERNMENT FURNISHED PROPERTY
No government provided items will be required in completion of the purchase.
SECTION 6 – PLACE OF PERFORMANCE AND CONTRACT SUPPORT HOURS
SUBSECTION A – PLACE OF PERFORMANCE
Purchase will be conducted entirely offsite with the exception of delivery of the rock sample cutting, computerized grinding machine, creep test apparatus, and triaxial testing machine by a shipping service such as FedEx TO NIOSH PMRD Pittsburgh facility.
SUBSECTION B – CONTRACT SUPPORT HOURS
Specific support hours are not applicable.
SECTION 7 – TRAVEL
N/A
SECTION 8 – DELIVERABLES/REPORTING SCHEDULE
Deliverables included in the following list will be deemed fulfilled upon receipt of said product.
Task Deliverable Quantity/ Format Due Date Deliver To
1 Provide Equipment 1 09/30/2026 Khaled Mohamed
2 Prepare shipment 1 09/30/2026 Khaled Mohamed
3 Equipment delivered 1 09/30/2026 Khaled Mohamed
4 Provide warranty documentation 1 09/30/2026 Khaled Mohamed
SECTION 9 – REFERENCE MATERIALS
Not applicable
SECTION 10 – MINIMUM VENDOR QUALIFICATIONS
Not applicable
SECTION 11 – ADDITIONAL REQUIREMENTS
Information Security and Privacy
Information Security and/or Physical Access Security does not apply
Human Subjects Protections in Research
STARS Determination is not required
Paperwork Reduction Act (PRA)
Paperwork Reduction Act does not apply
Section 508 Compliance
Section 508 and Accessibility Requirements
Part A – Provision
Reference HHSAR 352.239-73[8] Electronic Information and [Communication]
Technology Accessibility Notice.
[(Deviation)]
[(a) Any offeror responding to this solicitation must comply with established HHS Information and Communication Technology (ICT) accessibility standards. Information about Section 508 is available at https://www.hhs.gov/web/section-508/index.html.
(b) The Section 508 accessibility standards applicable to this solicitation are stated in the clause at
352.239-79 Information and Communication Technology Accessibility. In order to facilitate the
Government’s determination whether proposed ICT supplies, products, platforms, information, and documentation meet applicable Section 508 accessibility standards, offerors must submit an appropriate HHS Section 508 Accessibility Conformance Checklist (see https://www.hhs.gov/web/section-508/accessibility-checklists/index.html) or an Accessibility
Conformance Report (ACR) (based on the Voluntary Product Accessibility Template (VPAT) see https://www.itic.org/policy/accessibility/vpat), in accordance with the completion instructions. The purpose of the checklists and conformance reports are to assist HHS acquisition and program officials in determining whether proposed ICT supplies, products, platforms, information, and documentation conform to applicable Section 508 accessibility standards. Checklists and ACRs evaluate—in detail—whether the ICT conforms to specific Section 508 accessibility standards and identifies remediation efforts needed to address conformance issues.
(c) If an offeror claims its supplies or services meet applicable Section 508 accessibility standards, and it is later determined by the Government, i.e., after award of a contract or order, that supplies, products, platforms, information, documentation, or services support delivered do not conform to the described accessibility standards, remediation of the supplies, products, platforms, information, documentation, or services support to the level of conformance specified in the contract will be the responsibility of the Contractor at its expense.
(d) In order to facilitate the Government's determination whether proposed ICT supplies meet applicable Section 508 accessibility standards, offerors must submit an Accessibility
Conformance Report, in accordance with its completion instructions and tailored to the requirements in the solicitation. The purpose of the Report is to assist HHS acquisition and program officials in determining whether proposed ICT supplies conform to applicable Section
508 accessibility standards. The template allows offerors or developers to self-evaluate their supplies and document, in detail, whether they conform to a specific Section 508 accessibility standard, and any underway remediation efforts addressing conformance issues. Instructions for preparing the Template are available at https://www.section508.gov/.
(e) Additionally, offerors must provide enough information to assist the Government in determining that the ICT services conform to Section 508 accessibility standards, including any underway remediation efforts addressing conformance issues.
(f) Respondents to this solicitation must identify any inability to conform to Section 508 requirements. If an offeror claims its supplies or services meet applicable Section 508 accessibility standards, and it is later determined by the Government, i.e., after award of a contract or order, that supplies or services delivered do not conform to the described accessibility standards, remediation of the supplies or services to the level of conformance specified in the contract will be the responsibility of the Contractor at its expense.
(g) Items delivered as electronic content must be accessible to HHS acceptance criteria. Checklist for various formats are available at http://508.hhs.gov/.
Materials, other than items incidental to contract management, that are final items for delivery should be accompanied by the appropriate checklist, except upon approval of the Contracting
Officer or Contracting Officer’s Representative.
(End of provision)
SECTION G-CONTRACT ADMINISTRATION DATA
352.239-79 Information and Communication Technology Accessibility. (Deviation)
As prescribed in 339.203-70(b), insert the following clause:
INFORMATION AND COMMUNICATION TECHNOLOGY ACCESSIBILITY (FEB 2024)
(DEVIATION)
(a) Pursuant to Section 508 of the Rehabilitation Act of 1973 (29 U.S.C. 794d), as amended bythe Workforce
Investment Act of 1998, all information and communication technology (ICT) supplies, products, platforms, information, documentation, and services support developed, acquired, maintained or delivered under this contract or order must comply with the Revised 508 Standards, which are located at 36 C.F.R. 1194.1 and
Appendices A, B, and C, and are available at https://www.access-board.gov/ict/. Information about Section
508 is available at https://www.hhs.gov/web/section-508/index.html.
(b) Additional Section 508 accessibility standards applicable to this contract or order may be identified in the specification, statement of work, or performance work statement. If it is determined by the Government that
ICT supplies, products, platforms, information, documentation, and services support provided by the Contractor do not conform to the described accessibility standards in the contract, remediation of the supplies, products, platforms, information, documentation, or services support to the level of conformance specified in the contract will be the responsibility of the
Contractor at its own expense.
(c) In the event of a modification(s) to this contract or order, which adds new ICT supplies or services or revises the type of, or specifications for, supplies, products, platforms, information, documentation, or services support, the Contracting Officer shall require that the Contractor submit a completed HHS Section 508
Accessibility Conformance Checklist (see https://www.hhs.gov/web/section-508/accessibility-checklists/index.html) or an Accessibility Conformance Report (ACR) (based on the
Voluntary Product Accessibility Template (VPAT) see https://www.itic.org/policy/accessibility/vpat), and any other additional information necessary to assist the Government in determining that the ICT supplies or services conform to Section 508 accessibility standards. If it is determined by the Government that ICT supplies, products, platforms, information, documentation, and services support provided by the Contractor do not conform to the described accessibility standards in the contract, remediation of the supplies, products, platforms, information, documentation, or services support to the level of conformance specified in the contract will be the responsibility of the Contractor at its own expense.
(d) If this is an Indefinite-Delivery type contract, a Blanket Purchase Agreement or a Basic Ordering
Agreement, the task/delivery order requests that include ICT supplies, products, platforms, information, documentation, or services support will define the specifications and accessibility standards for the order. In those cases, the Contractor shall be required to provide a completed HHS Section 508 Accessibility
Conformance Checklist (see https://www.hhs.gov/web/section-508/accessibility-checklists/index.html) or an
ACR (based on the VPAT see https://www.itic.org/policy/accessibility/vpat), and any other additional information necessary to assist the Government in determining that the ICT supplies, products, platforms, information, documentation, or services support conform to Section 508 accessibility standards. If it is determined by the Government that ICT supplies and services provided by the Contractor do not conform to the described accessibility standards in the provided documentation, remediation of the supplies, products, platforms, information, documentation, or services support to the level of conformance specified in the contract will be the responsibility of the Contractor at its own expense.
(e) The contractor shall identify to the Contracting Officer any perceived exception or exemption to Section
508 requirements.
(End of clause)
CDCG.02 Contracting Officer’s Representative (COR) (Jul 2017)
Performance of the work hereunder shall be subject to the technical directions of the designated COR for this contract. As used herein, technical directions are directions to the
Contractor which fill in details, suggests possible lines of inquiry, or otherwise completes the general scope of work set forth herein. These technical directions must be within the general scope of work and may not alter the scope of work or cause changes of such a nature as to justify an adjustment in the stated contract price/cost, or any stated limitation thereof.
In the event that the Contractor believes full implementation of any of these irections may exceed the scope of the contract, he or she shall notify the originator of the technical direction and the Contracting
Officer, immediately or as soon as possible, in a letter or email separate of any required report(s). No technical direction, nor its fulfillment, shall alter or abrogate the rights and obligations fixed in this contract.
The Government COR is not authorized to change any of the terms and conditions of this contract. Contract changes shall be made only by the Contracting Officer through properly written modification(s) to the contract.
The Government will provide the Contractor with a copy of the COR delegation memorandum upon request.
CDCG.03 Contracting Officer (Jul 1999)
(a) The Contracting Officer is the only individual who can legally commit the Government to the expenditure of public funds. No person other than the Contracting Officer can make any changes to the terms, conditions, general provisions, or other stipulations of this contract.
(b) No information, other than that contained in an authorized modification to this contract, duly issued by the Contracting Officer, received from any person employed by the United
States Government, or otherwise, shall be considered grounds for deviation from any stipulation of this contract.
CDCG.04 Contract Communications/Correspondence (Jul 1999)
The Contractor shall identify all correspondence, reports, and other data pertinent to this contract or order by imprinting thereon the contract (and order number if applicable) from Page 1 of the contract.
CDCG.07 Payment by Electronic Funds Transfer (Feb 2018)
(a) The Government shall use electronic funds transfer to the maximum extent possible when making payments under this contract. FAR 52.232-33, Payment by Electronic Funds Transfer –
System for Award Management, requires the contractor to designate in writing a financial institution for receipt of electronic funds transfer payments.
(b) In the case that EFT information is not within the System of Award Management, FAR
52.232-34, Payment by Electronic Funds Transfer-Other than System for Award Management, requires mandatory submission of Contractor’s EFT information directly to the office designated in this contract to receive that information (hereafter: “designated office”); see below. The contractor shall submit the EFT information within the form titled “ACH Vendor/Miscellaneous
Payment Enrollment Form” to the address indicated below. Note: The form is either attached to this contract (see Section J, List of Attachments) or may be obtained from the CDC Office of
Financial Resources at 678-475-4500 or cpbapinv@cdc.gov.
(c) In cases where the contractor has previously provided such information, i.e., pursuant to a prior contract/order, and been enrolled in the program, the form is not required unless the designated financial institution has changed.
(d) The completed form shall be mailed or sent via facsimile after award, but no later than 15 calendar days before an invoice is submitted, to the following address:
The Centers for Disease Control and Prevention Office of Financial Resources (OFR)
P.O. Box 15580 Atlanta, GA 30333
Section H – Special Contract Requirements
CDCH.10 Artificial Intelligence Compliance and Risk Management Plan (May 2026)
The use of Artificial Intelligence (AI), including GenAI, is prohibited without an approved AI
Compliance and Risk Management Plan. The contractor is responsible for updating the AI
Compliance and Risk Management Plan throughout the life of the contract as changes occur. If a change to AI use, AI functionality, AI model, or deployment configuration is anticipated, the contractor must notify the contracting officer and Contracting Officer’s Representative (COR) immediately and provide a revised plan. The government will issue approval or disapproval before AI can be incorporated. The offeror must identify whether the planned or potential AI use may involve a high-impact AI use case (as defined in defined in Appendix A of OMB-M-25-21) and must provide sufficient descriptive information for the Government to complete any required
AI impact or high-impact assessment.
The AI Compliance and Risk Management Plan must:
1. Identify the specific tasks or functions where AI will be used.
2. Explain how logs, audits, or other forms of AI generated data will be stored, used, retained, or deleted.
3. State whether the AI technologies are open-source, proprietary, or any other type.
4. Include applicable model cards or system documentation describing the AI technologies used.
5. Describe how bias in AI models and outputs will be identified, monitored, and mitigated, including the origin, quality, and weighting of data.
6. Explain the AI safeguards in place, including compliance and risk management practices, protections against unauthorized data access, and steps taken to manage bias and reduce risk in alignment with applicable AI policies and directives.
7. Describe internal policies governing AI use, including transparency, accountability, data integrity, accuracy, protection of sensitive or proprietary information, foreseeable risks, and potential social impacts.
8. Explain how the contractor will assess and prevent unfair or disparate impacts, address privacy, civil rights, and civil liberties concerns, and prevent misuse, unauthorized use, or corruption of AI systems.
9. Confirm that the AI solution will not make or support decisions based on unlawful discrimination in violation of federal civil rights laws, including Title VII of the Civil
Rights Act, the Americans with Disabilities Act (ADA), and the Age Discrimination in
Employment Act (ADEA).
10. Describe how applicable technological or voluntary consensus standards will be incorporated to reduce acquisition and operational risk
11. The plan must describe how Government data, outputs, prompts, logs, and outputs be accessed, used, protected, retained, deleted, and transferred, and identify any proposed limitations on Government rights, access, or reuse.
12. The AI Compliance and Risk Management Plan will be reviewed by the Government and an approval or disapproval issued.
H.6 CDCH.12 Observance of Legal Holidays and Unscheduled Facility Closures (on-site
Performance) (Jan 2026)
(a) Holidays – The Government observes the holidays as listed by the Office of Personnel
Management, as well as:
Any other day designated by Federal Statute
Any other day designated by Executive Order
Any other day designated by Presidential proclamation
Washington's Birthday
Memorial Day
Juneteenth
Independence Day
Labor Day
Veterans' Day Thanksgiving Day
Christmas Day
New Year's Day
Columbus Day
Martin Luther King Day
For purposes of contract performance, the Contractor shall observe the above holidays on the date observed by the Government. Observance of such days shall not be cause for an additional period of performance or entitlement to compensation except as otherwise set forth in the contract. No form of holiday or other premium compensation will be reimbursed; however authorized in advance and in writing by the Contracting Officer.
(b) Unscheduled Facility Closures
In the event Government facilities are closed due to inclement weather, potentially hazardous or unsafe conditions, or other special circumstances, contractor personnel assigned to work within those facilities are automatically dismissed. Notwithstanding the terms herein, the contractor shall comply with any specific contract terms that require a level of ongoing support for critical operations during times of facility closure. The contractor may also continue to provide support under a scheduled telework arrangement in accordance with the terms of the contract if the contract expressly authorizes telework in writing.
(c) Cost Impact
Accounting for costs associated with an unscheduled facility closure is unique to each contract, but the contractor shall mitigate costs to the degree it is reasonably possible.
CDCH.16 Non-Disclosure Agreement for Contractor and Contractor Employees (Jun 2020)
(a) The contractor and contractor employees shall prepare and submit Non-Disclosure Agreements (NDA) to the Contracting Officer prior to access of government information or the commencement of work at
CDC.
(b) The NDAs, at Exhibit I and II, are required in service contracts where contractor’s employees will have access to non-public and procurement-sensitive information while performing functions in support of the Government. The NDA also requires contractor’s employees properly identify themselves as employees of a contractor when communicating or interacting with CDC employees, employees of other governmental entities, and members of the public (when communication or interaction relates to the contractor’s work with the CDC). The Federal Acquisition Regulation
(FAR) 37.114 (c), states “All contractor personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public or Congress that they are Government officials, unless, in the judgment of the agency, no harm can come from failing to identify themselves. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.”
(c) The contractor shall inform contractor employees of the identification requirements by which they must abide and monitor employee compliance with the identification requirements.
(d) During the contract performance period, the contractor is responsible to ensure that all additional or replacement contractors’ employees sign an NDA and it is submitted to the Contracting Officer prior to commencement of their work with the CDC.
(e) Contractor employees in designated positions or functions that have not signed the appropriate NDA shall not have access to any non-public, procurement sensitive information or participate in government meetings where sensitive information may be discussed.
(f) The Contractor shall prepare and maintain a current list of employees working under NDAs and submit to the Contracting Officer upon request during the contract period of performance. The list shouldat a minimum include: contract number, employee’s name, position, date of hire and NDA requirement.
EXHIBIT I
Centers for Disease Control and Prevention (CDC)
Contractor Non-Disclosure Agreement
I. Non-public Information
[Name of contractor] understands that in order to fulfill the responsibilities pursuant to [contract name and number] between the Centers for Disease Control and Prevention and [Name of CDC contractor] dated [date], employees of [contractor] will have access to non-public information, including confidential and privileged information contained in government-owned information technology systems.
For purposes of this agreement, confidential information means government information that is not or will not be generally available to the public. Privileged information means information which cannot be disclosed without the prior written consent of the CDC.
In order to properly safeguard non-public information, [contractor] agrees to ensure that prior to being granted access to government information or the commencement of work for the CDC, whichever is applicable, all contractor employees will sign a Non-Disclosure Agreement (NDA) provided by the CDC prior to beginning work for the CDC. Contractor agrees to submit to the Contracting Officer the original signed copies of NDAs signed by the contractor’s employees in accordance with the instructions provided by the Contracting Officer. Failure to provide signed NDAs in accordance with this agreement and instructions provided by the Contracting Officer could delay or prevent the employee from commencing or continuing work at the CDC until such agreement is signed and returned to the Contracting Officer.
Contractor further agrees that it will not cause or encourage any employee to disclose, publish, divulge, release, or make known in any manner or to any extent, to any individual other than an authorized
Government employee any non-public information that the employee may obtain in connection with the performance of the employee’s responsibilities to the CDC.
II. Procurement-Sensitive Information
Contractor further agrees that it will not cause or encourage any employee to disclose, publish, divulge, release, or make known in any manner or to any extent, to any individual, other than an authorized
Government employee, any procurement-sensitive information gained while in connection with fulfilling the employee’s responsibilities at the CDC. For purposes of this agreement, procurement-sensitive information includes, but is not limited to, all information in Statements of Work (SOW), Procurement
Requests (PR), and Requests for Proposal (RFP); Responses to RFPs, including proposals, questions from potential offerors; non-public information regarding procurements; all documents, conversations, discussions, data, correspondence, electronic mail (e-mail), presentations, or any other written or verbal communications relating to, concerning, or affecting proposed or pending solicitations or awards;
procurement data; contract information plans; strategies; source selection information and documentation;
offerors’ identities; technical and cost data; the identity of government personnel involved in the solicitation; the schedule of key technical and procurement events in the award determination process;
and any other information that may provide an unfair competitive advantage to a contractor or potential contractor if improperly disclosed to them, or any of their employees.
Contractor understands and agrees that employee access to any procurement-sensitive information may create a conflict of interest which will preclude contractor from becoming a competitor for any acquisition(s) resulting from this information. Therefore, if an employee participates in any discussions relating to procurement-sensitive information, assists in developing any procurement-sensitive information, or otherwise obtains any procurement-sensitive information while performing duties at the
CDC, contractor understands and agrees that contractor may be excluded from competing for any acquisition(s) resulting from this information.
III. Identification of Non-Government Employees
Contractor understands that its employees are not agents of the Government. Therefore, unless otherwise directed in writing by the CDC, contractor agrees to assist and monitor employee compliance with the following identification procedures:
A. At the beginning of interactions with CDC employees, employees of other governmental entities, and members of the public (when such communication or interaction relates to the contractor’s work with the CDC), contractors’ employees will identify themselves as an employee of a contractor.
B. Contractors’ employees will include the following disclosures in all written communications, including…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .