This document is a Request for Quotation (RFQ) issued by the Idaho Department of Fish and Game (IDFG) for janitorial services for their Salmon Regional Office located in Lemhi County, Idaho. IDFG is seeking quotes from qualified vendors to provide cleaning and janitorial services for the Salmon office, including tasks such as cleaning and sanitizing restrooms, breakrooms, offices, and conference rooms; removing trash and recycling; sweeping and vacuuming floors; and dusting and sanitizing surfaces. The contract term is for three (3) years with an option to terminate. A pre-bid site inspection is scheduled for August 7, 2024, and the RFQ closing date is listed on the IPRO procurement system.
The RFQ outlines the general requirements for the janitorial services, including the use of green cleaning processes, equipment and supplies the contractor must provide, and the specific responsibilities of both IDFG and the contractor. Pricing must be fully burdened and firm for the contract term, except for potential adjustments during a planned facility remodel. The contractor must also provide a janitorial surety/business service bond. Invoicing and payment terms, as well as remedial actions and contract termination provisions, are also detailed in the RFQ.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IDAHO DEPARTMENT OF FISH & GAME
RFQ 589 – IDFG JANITORIAL SERVICES REGION 7 SALMON
ATTACHMENT 1 – SECTION 1
| RFQ Title: |
| Janitorial Services – IDFG Region 7 Salmon Office |
| RFQ Solicitation Contact: |
| Doug Peterson, Purchasing Agent |
Doug.Peterson@idfg.idaho.gov 208.287.2816
| Submit Electronically via IPRO: |
| Supplier Portal / Supplier Portal (inforgov.com) |
| Deadline to Receive Questions: |
| See IPRO |
| Pre-Bid Site Inspection: |
| 8/07/2024 (See Appendix A) |
| RFQ Closing Date: |
| See IPRO |
| Contract Term: |
| Three (3) year contract term with option to terminate |
A. Purpose & Overview The Idaho Department of Fish & Game (IDFG) is requesting quotes from qualified vendors for janitorial services (Services) for the Salmon Regional Office located at 99 Highway 93 North, Salmon, Idaho 83467.
IDFG’s goal is to provide cost effective, safe, and well-maintained office buildings for its employees by contracting for Services with a local vendor. Services will generally include cleaning and sanitizing restrooms, break rooms, offices, and conference rooms; removal of trash and recyclables; sweeping and vacuuming floors; dusting and sanitizing surfaces. Additional janitorial services may be requested on an as-needed basis. Further detail is provided below.
B. General Information & Solicitation Instructions This Solicitation is issued by IDFG via IPRO: Supplier Portal / Supplier Portal (inforgov.com) The RFQ Lead is the only contact for this solicitation. All correspondence regarding this RFQ must be in writing. In the event that it becomes necessary to revise any part of this RFQ, amendments will be posted on IPRO. It is the responsibility of the Bidder to monitor IPRO for any updates or amendments. Any oral interpretations or clarifications of this RFQ will not be relied upon. All changes to this RFQ must be in writing and posted in IPRO to be valid. Alternate Bids are not allowed.
C. Pre-Bid Site Inspection All interested parties are highly encouraged to attend the pre-bid site inspections, at their expense. Interested parties must notify the RFQ contact, in writing, of their intent to attend no later than one (1) business day prior to the date of the pre-bid site inspection. The written request must include the name(s) and title of each person who will be attending. A maximum of two (2) persons from each interested party will be allowed to attend. Please see Appendix A for additional details.
D. Submission Requirements Your response to this RFQ may be submitted electronically via IPRO or email (see below for additional details). IDFG will not be accepting manual submissions for this solicitation. Your submission must include the Required Submittals listed below and be received prior to the deadline established in IPRO. Failure to provide any of the documents or submission on a form different from those provided, may cause your submission to be found as non-responsive.
Electronic Submission:
IPRO – Enter your pricing in IPRO Supplier Portal / Supplier Portal (inforgov.com) and upload all Required Submittals.
When a Bidder has successfully submitted a response to IPRO, the Bidder should see a change in the system from “Draft Bid” (see Fig. 1) to “Submission confirmation email sent” (see Fig. 2). Bidders are encouraged to document notification of successful submission for their records. If you believe you have submitted your Bid, but have not received the “Bid Submitted” message, you are advised to contact the IPRO provider’s help desk (phone number available at https://purchasing.idaho.gov/ipro.html) and notify the solicitation lead prior to the solicitation End Time. Vendors are strongly encouraged to begin the process of submitting the response far enough in advance of the End Time to allow for resolution of technical difficulties. Be advised that the State is not responsible for a Vendor’s failure to timely submit a responsive submission due to any technical or technological difficulties. See IDAPA 38.05.01.61.02.
Fig. 1
Fig. 2
If submitting via IPRO, be advised that that the Offeror for Proposal evaluation and award purposes is the entity profile under which the Proposal is submitted in IPRO, which must be the same legal entity presented in the uploaded response materials. If the entity identified on the state supplied Signature Page differs from the entity under which you submit your Proposal in IPRO, the information provided on the Signature Page prevails.
While it is not mandatory to submit your Proposal electronically via IPRO, all Offerors participating in a Solicitation issued through IPRO must establish an account in the IPRO system (even if submitting a Proposal manually outside of IPRO) as it is necessary in order to process and/or award the resulting Contract(s). Establishing an account is free and only takes a few minutes.
Offerors are further advised to upload response materials with descriptive file names, organized and consolidated in a manner which allows evaluators to efficiently navigate the Offeror’s response; as the State will print uploaded documents for evaluation in the manner received via IPRO
Email:
Send an email to the Solicitation Contact (listed above) and attach all Required Submittals.
E. Required Submittals As part of your response to this RFQ, the following documents are required.
Attachment 2 – Price Sheet Attachment 3 – Signature Page Attachment 4 – Insurance
In addition to the Required Submittals identified above, the following information about your company must be provided with your response. Please utilize Attachment 5 – Contractor Company Information when providing this information.
Business Information:
· Provide a summary of your company explaining the size of your company, services provided, number of clients supported, list other government agencies supported.
· How many years has your company been in business performing similar services?
· Describe your company’s compliance and performance history for similar services.
· Provide reference information from three (3) clients other than IDFG (company name, contact name, contact phone number, contact email address) to support compliance history.
Staffing:
· Describe personnel stability and experience for those who will be working on this contract: i.e. how long they’ve been working for the company and job experience performing the scope of this RFQ.
F. Award Award will be made, all or none, to the responsive, responsible bidder whose submission is determined to be in the best interest of IDFG, as provided on Attachment 2 – Price Sheet.
G. Resulting Contract If IDFG awards a contract from this Solicitation, it will do so by issuing a Contract Purchase Order (CPO) document from the State’s eProcurement system (IPRO), which will be an acceptance of the successful bid. The CPO will be comprised of the following documents: this RFQ, including any incorporated documents; the successful bid, including any clarifications requested by IDFG; and an artifact formalizing any requirements agreed upon through Contract discussions or negotiations, if applicable.
The following documents are incorporated into this RFQ as if set out in their entirety, whether or not they are attached in IPRO:
| Solicitation Instructions for Vendors – |
| State of Idaho Standard Contract Terms and Conditions – July 2024 |
If not attached in IPRO, the documents may be found on the “Information for Vendors” page of the State’s Division of Purchasing (DOP) website (https://purchasing.idaho.gov/governing-laws-and-policies/ ). If multiple versions of any of these documents are available on the website, the version in effect on the day the RFQ is issued shall apply.
H. Records Maintenance Contractor must maintain or supervise the maintenance of all records necessary to properly account for all payments made to the Contractor pursuant to the Contract. These records must be retained by the Contractor for a period of no less than three (3) years after the Contract terminates, or until all audits initiated within the three (3) years have been completed, whichever is later.
I. Audit Rights Contractor agrees to allow State and Federal auditors and State purchasing staff access to all records relating to this Contract, for audit, inspections, and monitoring of services or performance. Such access will be during normal business hours or by appointment.
J. Debarment and Anti-Discrimination No contract shall be made to parties listed on the General Services Administration’s List of Parties Excluded from Federal Procurement or Non-procurement Programs in accordance with Executive Orders 12549 and 12689.
The prospective Contractor certifies, by submission of this proposal, that neither it nor its principals is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal Department or agency.
ANTI-DISCRIMINATION/EQUAL EMPLOYMENT OPPORTUNITY CLAUSE:
Acceptance of this Agreement binds the Contractor to the terms and conditions of Section 601, Title VI, Civil Rights Act of 1964, in that "No person in the United States shall, on the grounds of race, color, national origin, or sex, be excluded from participation in, be denied the benefits of, or be subject to discrimination under any program or activity receiving Federal financial assistance." In addition, "No otherwise qualified handicapped individual in the United States shall, solely by reason of his handicap, be excluded from the participation in, be denied the benefits of, or be subjected to discrimination under any program or activity receiving Federal financial assistance" (Section 504 and 508 as amended, of the Rehabilitation Act of 1973). Furthermore, for contracts involving federal funds, the applicable provisions and requirements of Executive Order 11246 as amended, Section 402 of the Vietnam Era Veterans Readjustment Assistance Act of 1974, Section 701 of Title VII of the Civil Rights Act of 1964, the Age Discrimination in Employment Act of 1967 (ADEA), 29 USC Sections 621, et seq., the Age Discrimination Act of 1975, Title IX of the Education Amendments of 1972, U.S. Department of Interior regulations at 43 CFR Part 17, and the Americans with Disabilities Act of 1990, are also incorporated into this Agreement. The Contractor shall comply with pertinent amendments to such laws made during the term of the Agreement and with all federal and state rules and regulations implementing such laws. The Contractor must include this provision in every subcontract relating to this Agreement.
By Signing The Signature page (Attachment 3) you comply with the Federal Regulations and Requirements relating to DEBARMENT AND CIVIL RIGHTS within this Request for Quotation.
K. Required Certifications.
A. Boycott of Israel. Pursuant to Idaho Code section 67-2346, if payments under the Contract exceed one hundred thousand dollars ($100,000) and Contractor employs ten (10) or more persons, Contractor certifies that it is not currently engaged in, and will not for the duration of the Contract engage in, a boycott of goods or services from Israel or territories under its control. The definitions in Idaho Code section 67-2346 shall apply to this provision.
B. Ownership or Operation by China. Pursuant to Idaho Code section 67-2359, Contractor certifies that it is not currently owned or operated by the government of China and will not for the duration of the Contract be owned or operated by the government of China. The definitions in Idaho Code section 67-2359 shall apply to this provision.
C. Boycott of Certain Industries. Pursuant to Idaho Code section 67-2347A, Contractor certifies that it is not currently engaged in, and will not for the duration of the Contract engage in, a boycott of any individual or company because the individual or company (1) engages in or supports the exploration, production, utilization, transportation, sale, or manufacture of fossil fuel-based energy, timber, minerals, hydroelectric power, nuclear energy, or agriculture; or (2) engages in or supports the manufacture, distribution, sale, or use of firearms, as defined in section 18-3302(2)(d), Idaho Code. The definitions in Idaho Code section 67-2347A shall apply to the terms in this provision.
ATTACHMENT 1 – SECTION 2
The following special terms and conditions are incorporated into the resulting Contract to supplement or add to the State of Idaho Standard Contract Terms and Conditions – July 2024.
A. General Requirements Contractor must provide adequate personnel to provide Services under this Contract in a safe, sanitary, clean manner, to the satisfaction of IDFG.
Contractor must provide Services to include, but not limited to, cleaning and sanitizing restrooms, break rooms, offices, lobby, and conference rooms; removal of trash and recyclable materials; sweeping and vacuuming of floors; and dusting and sanitizing of surfaces. Please see Appendix B – Scope of Work and Building Square Footage for further details.
Contractor agrees to utilize a green cleaning process when possible, intended to reduce the introduction of volatile organic compounds (VOC) in the Facility to maintain a high level of air quality. The successful Contractor must employ methods, procedures, and equipment that facilitate the use of less water and energy, thus reducing the overall carbon footprint of the IDFG Facility. The contractor must use micro-fiber cloth, as well as bio-cleansers or plant based organic cleansers whenever and wherever possible.
The contractor must provide, and maintain, a binder of Safety Data Sheets (SDS) for all applicable items used to provide the Services under this Contract. SDS binder must be stored in each janitorial closet located throughout the IDFG Facility and must be accessible to all Contractors and IDFG employees.
B. IDFG & Contractor Responsibilities IDFG agrees to provide the following items during the Contract Term:
· Dispensers – paper towel, toilet paper, soap (restroom & shower), hand sanitizer, sanitary napkin.
· Paper Products – paper towels, toilet paper.
· Soap – restroom, break room, and shower soaps.
· Can Liners – office, breakroom, restroom, 35-55 gallon trash can liners, and sanitary napkin liners.
The Contractor agrees to provide the following items during the Contract Term:
· Chemicals – all chemicals must be approved by the IDFG before they are used. When possible, the use of ready to dispense (RTD) chemicals are encouraged. No RTD dispensing stations/units will be allowed to be mounted to the walls. The use of quick-connect hoses is encouraged.
· Warning Signs – all signage, including but not limited to, slip/trip/fall, wet surface, closed restroom and/or closed area.
· Janitorial Equipment – all equipment needed to provide the Services under this Contract will be at the expense of the Contractor and approved by IDFG. This includes, but is not limited to, janitorial carts, 35–55-gallon trash cans/dollies, vacuums, cleaning rags/dusters, mop buckets/handles/heads, brooms, and dustpans.
· Miscellaneous – all other items needed to provide the Services under this Contract, not mentioned above, will be at the expense of the Contractor.
Upon completion of the Contract Term, or in the event that the Contract is terminated, Contractor will retain possession of all chemicals and equipment purchased to provide Services. Contractor is responsible for labeling all equipment, clearly identifying the Contractor as the owner.
Contractor agrees that from time-to-time, IDFG may need to utilize the equipment purchased by the Contractor and agrees to authorize the use of the equipment to IDFG. In the event that IDFG damages Contractor owned equipment during use, IDFG agrees to repair and/or replace the item.
C. Key Personnel The Contract Management Team (CMT) will consist of IDFG personnel who are responsible for activities such as monitoring performance, documentation, reviewing and approving invoices, requesting and approving minor changes (as defined within), and closing out the contract. The CMT will be the Contractor’s main contact for all day-to-day activities.
The Contract Administration Team (CAT) will consist of IDFG procurement personnel who are responsible for activities such as executing amendments to the Contract, renewing or extending the Contract, handing the formal dispute resolution process (including cure notices), assessing any remedies, and terminating the Contract.
The Contractor must designate a principal point of contact to serve as the Contractor’s Contract Manager. The Contractor’s Contract Manager will be responsible for overseeing the Services performed on the Contract, coordinating activities with the CMT, responding to notifications from the CMT and the CAT as appropriate.
All contact information will be provided during the Contract Kickoff Meeting.
D. Contract Meetings Contract Kickoff Meeting - The Contractor must attend a Contract Kickoff Meeting prior to performing any Services. This meeting will be used to introduce key personnel, review the Contract, review and approve schedule, and to address any questions or concerns.
Compliance Review Meeting - IDFG may require the Contractor’s Contract Manager to attend Compliance Review Meetings. These meetings are typically held when the Contractor continues to fail to meet the requirements of the Contract. This is a way for IDFG and the Contractor to meet in person or over the phone (at IDFG’s discretion) to discuss discrepancies together in a constructive environment. The Contractor’s attendance is mandatory when required by IDFG and are at no additional cost to IDFG when they are required.
E. Contractor’s Employees The Contractor must keep a record of the employees who work each shift. This information must be provided to IDFG as quickly as possible, within a maximum of twenty-four (24) hours, upon request. The contractor will be required to report to IDFG, in writing, any change in personnel within twenty-four (24).
The Contractor must have a minimum of one (1) employee on site during each work shift that is trained in blood borne pathogen clean up and must furnish and maintain clean up kits.
Contractor must provide sufficient personal protective equipment (PPE) to all its employees, at the Contractor’s expense. This includes, but is not limited to, gloves, protective eye wear, face protection, hearing loss prevention, and respiratory protection. Contractor’s employees will be required to maintain all PPE in good condition. The utilization of the PPE by the Contractor’s employees will be strictly enforced. Failure to adhere to this may result in remedial action.
Contractor’s employees must wear a uniform while on site, clearly identifying the person as an employee of the Contractor. Only bonded personnel are allowed inside the building, no minor children or pets will be allowed inside while services are provided. Access to the IDFG Facility will be by a code, issued by IDFG. Access to supply closets and other locations relevant to the Contract will be by key(s). Codes and keys issued to the Contractor will be the responsibility of the Contractor. At no time will the Contractor be permitted to allow any persons, other than those providing Services under this Contract, the ability to utilize a Code or key(s) to any persons not providing Services under this Contract. All outside doors are to be locked at all times while the contractor is inside the building.
IDFG reserves the right to request that the Contractor remove an employee(s) from the Facility, who endanger persons or property, or whose continued work under the Contract does not serve the best interest of IDFG or the State. In the event that the Contractor has an employee who quits or is removed from the Facility by the Contractor or at the request of IDFG, the Contractor will be responsible for retaining codes and key(s).
F. Work Schedule IDFG identifies a week as Sunday through Saturday. Services must be provided as follows (all times are listed as Mountain Standard Time):
Wednesday evenings – Between the hours of 6:00pm & 6:00am-. A full clean per the scope of work needs to be performed
Once between Friday – Sunday – Services must not start until 6:00pm Friday and must be completed by Sunday, at 11:59pm. A full clean per the scope of work needs to be performed.
In the event that the Services fall on a holiday, Contractor will not be required to provide Services for that day, and Services will resume on the next scheduled work day. State of Idaho holidays can be found at the following link: https://www.idaho.gov/government/state-holidays/ .
Any deviations to the Work Schedule requested by the Contractor, or IDFG, must be made in writing (email). Every effort to provide as much advanced notice as possible by either the Contractor or IDFG must be made.
G. Pricing All prices must be fully burdened and firm for the entire Contract Term except for the following condition. The regional office will be going thru a remodel at some point during this contract. We will need to work with the vendor for a reduced rate while the remodel happens as there will be less square footage to clean. After the remodel we will negotiate a new monthly price as the square footage will increase. Fully burdened is to include, but not be limited to, all operating and personnel expenses such as: overhead, salaries, administrative expenses, profit, insurance, bonding requirements, equipment, supplies, and any other expenses related to providing the Services under the Contract. Please utilize Attachment 2 – Price Sheet when providing this information.
H. Janitorial Service Bond In addition to the requirements per Attachment 4 – Insurance Requirements, the Contractor must furnish a Janitorial Surety/Business Service bond in the amount of the Contract within ten (10) business days of Award of the Contract. Services under the Contract will not begin until the above-mentioned documentation has been provided by the Contractor and approved by IDFG.
Note: The Bond must be registered and licensed with the Idaho Department of Insurance. Bonds not registered and licensed in the State of Idaho will not be accepted, and the Contract will not be executed by IDFG.
I. Invoicing & Payments Invoices – Invoices must be submitted on a monthly basis for each location separately, as further detailed below. Invoices submitted without the required information listed below, will be returned to the Contractor for correction and resubmission.
Invoices must include the following information:
· Contractor Company Name & Contact Information
· Contract Name & Number (CPO #)
· Invoice Number & Date
· Itemization of the purchased goods to include: description matching the contract, quantity, unit of measure, unit price, extended price, and total invoiced amount.
Payment – Payment for correctly submitted invoice will be made in accordance with Idaho Code 67-2302 (https://legislature.idaho.gov/statutesrules/idstat/Title67/T67CH23/SECT67-2302/).
IDFG has the right to withhold payment on monthly invoices until scheduled work has been satisfactorily completed.
J. Remedial Action In addition to any remedies available to the State under law or equity, the State may it its sole discretion require one (1) or more of the following remedial actions if any of the service does not conform to the Contract requirements: 1) require the Contractor to take corrective action to ensure that performance conforms to the Contract requirements, 2) require the Contractor to subcontract all or part of the Contract at no additional cost to IDFG, 3) withhold payment or require payment of actual damages caused by the discrepancy, 4) terminate the Contract pursuant to Section 1.4, Termination and Remedies, in addition to any remedies imposed by the State.
If IDFG must perform or hire a separate contractor to perform any of the Contract’s requirements, which is the responsibility of the Contractor under the terms of the Contract, IDFG may withhold the actual cost to IDFG from the Contractor’s payment(s).
K. Termination of Contract For Cause - See Section 1.4, Termination, of the State of Idaho Standard Contract Terms and Conditions – July 2024.
For Fiscal Necessity – See Section 1.18, Termination for Fiscal Necessity, of the State of Idaho Standard Contract Terms and Conditions – July 2024.
For Convenience – Either party may terminate this Contract for its convenience at any time upon providing its written notification at least ninety (90) calendar days prior to the desired termination date.
L. Transitioning Service Providers Prior to the end of the Contract term (including any extensions), the Contractor must provide all reasonable transition assistance to IDFG to ensure the orderly transfer of service to another service provider. In the event that there may be a potential gap in service, when transitioning to a new service provider, the Contractor must continue to provide service for a period up to six (6) months, or such lesser time as the parties may agree to in writing. The Contractor will be compensated for all services extended in writing beyond original term at the current pricing of the Contract prior to the extension.
M. Contract Closeout Upon completion of the Contract, either expiration or termination, the CMT will initiate its closeout procedures to ensure all obligations have been fulfilled, all disputes are resolved, and all payments have been completed.
Two (2) letters will be provided to the Contractor:
1) Initial Closure Letter – provided prior to expiration to serve as a reminder that the Contract is approaching its completion.
2) Final Closure Letter – provided after the expiration to confirm that all obligations have been met, disputes are resolved, all payments made, and the Contract is officially closed.
N. Additional Services From time to time, IDFG allows the citizens of the State of Idaho to utilize the Facility to host meetings, classes, and other events. After the completion of these events, Additional Services may be required by the Contractor if the event is held on a date in which Services are not scheduled to take place. Using Attachment 2 – Price Sheet, please provide an hourly rate for Additional Services.
The hourly rate entered will not be used for evaluation purposes. Actual use of Additional Services may vary, and no minimum or maximum use is guaranteed or implied. If IDFG elects to use the Additional Services, every effort will be made to notify the Contractor with as much advance notice as possible. If IDFG elects to utilize Additional Services, Contractor must submit a separate invoice.
APPENDIX A – PRE-BID SITE INSPECTION
RFQ – HQ Janitorial Services
All parties interested in submitting a response to this RFQ are highly encouraged to attend the Pre-Bid Site Inspection. Per Attachment 1, Section 1.C, attendees must notify the RFQ Contact declaring their intent to participate in the Pre-Bid Inspection. Further details are provided below.
DATE: 8/07/2024
TIME: 10:00 AM MST
LOCATION: IDFG Region 7 99 Highway 93 North, Salmon, Idaho 83467
The inspection will promptly begin at the time noted above. Those attendees who fail to arrive on time will not be included in the inspection walkthrough.
APPENDIX B – SCOPE OF WORK AND BUILDING SQUARE FOOTAGE
RFQ – JANITORIAL SERIVCES
The following Scope of Work (SOW) are the minimum Services the Contractor must provide under this Contract. The items listed in the SOW must be completed during each shift. IDFG reserves the right to revise the SOW, either by adding or removing Services.
LOBBY & ENTRYWAYS - DAILY
· Floors swept/mopped, carpets vacuumed, free of debris.
· Clean front entrance glass, free of streaks, water spots, cobwebs
· Cobwebs and dust removed from baseboards, ceiling, and animal mounts.
· Furniture dusted (if applicable)
· Dust/sanitize all ledges, frames/picture frames, flat surfaces.
· Empty all trash/recycle bins, replace liners, clean bins as needed.
· Dust air vent returns
BREAKROOMS - DAILY
· Countertops cleaned, sanitized, free of debris.
· Drinking fountains cleaned, sanitized, free of streaks and water spots.
· Sinks cleaned and disinfected, chrome shined, free of water spots.
· Refrigerator front/visible sides cleaned, to include door, door pulls, and fridge top.
· Microwave fronts(door) cleaned.
· Floors vacuumed and mopped, free of debris.
· Cobwebs and dust removed from baseboards and ceiling.
· Cabinet fronts and cabinet pulls cleaned and sanitized.
· Breakroom furniture (tables, chairs) cleaned and sanitized, free of debris.
· Doors and frames spot cleaned from fingerprints.
· Empty all trash/recycle bins, replace liners, clean bins as needed.
· Clean and polish all dispensers.
· Refill all paper and soap dispensers.
· Dust air vent returns
RESTROOMS & SHOWERS - DAILY
· Vanity tops cleaned and disinfected, free of debris.
· Sinks/faucets/shower heads cleaned and disinfected.
· Clean and polish all mirrors and bright work, free of streaks and water spots.
· Sweep and mop floors, free of debris.
· Clean and disinfect all toilets, urinals, showers, wash basins, walls, and partitions.
· Clean and disinfect all restroom & shower room entry doors.
· Empty all trash bins, replace liners, clean bins as needed.
· Clean and polish all dispensers.
· Refill all paper, soap and sanitary napkin dispensers.
· Dust air vent returns.
PERSONAL OFFICES, OPEN AREAS & CONFERENCE ROOMS - DAILY
· Empty all trash/recycle bins, replace liners, clean bins as needed
· Floors dusted/mopped, carpets vacuumed, free of debris
· Drinking fountains cleaned, sanitized, free of streaks and water spots
· Dust all flat surfaces, ledges, window sills, file cabinets, exposed office furniture (chairs, tables, desks) and animal mounts
· Clean and sanitize all doors and door pulls
· Countertops cleaned, sanitized, free of debris
· Sinks cleaned and disinfected, chrome shined, free of water spots
· Refrigerator front/visible sides cleaned, to include door, door pulls, and fridge top
· Stairwells swept/mopped, free of debris, handrails wiped down if applicable.
· All light covers must be cleaned inside and out two (2) times per year
HARD FLOOR CLEANING - QUARTERLY
On a quarterly basis, Contractor must deep clean all hard floors utilizing a commercial grade power floor scrubber. Contractor must provide and utilize the appropriate chemicals necessary to clean the floors according to industry standards. Contractor is not authorized to apply any waxes and/or sealants to the floors without prior written approval from the CMT. Contractor must coordinate with the CMT to establish a schedule.
CARPET CLEANING - ANNUAL
On an annual basis, Contractor must deep clean all open areas of carpet utilizing industry standard commercial grade equipment. Contractor must provide and utilize the appropriate chemicals necessary to clean the carpet according to industry standards.
Contractor may elect to establish a carpet cleaning schedule in writing, with the CMT, allowing the carpet to be cleaned over the course of the Contract year in lieu of cleaning the carpet within a shortened timeframe.
INTERIOR WINDOW & GLASS CLEANING - ANNUAL
On an annual basis, Contractor must clean all interior and exterior windows and glass surfaces (Glass). Contractor must provide and utilize the appropriate equipment and chemicals according to industry standards. Glass must be cleaned within a specified period, to be established in writing with the CMT. Cleaning of the Glass over the course of the Contract year will not be accepted. There are approximately 64 panes of glass.
Check lists will be provided to the janitorial staff to be filled out, signed and dated. The building supervisor will sign off at least once a month upon inspection of completed scope of work.
FRONT OFFICE BUILDING AREA INCLUDES:
Entire building, including all offices, conference room, kitchen, entry ways, mail room, lab, and restrooms.
· 5370 square feet Carpet
· 610 square feet Slate (lobby, lab, and restrooms)
· 9244 square feet Total Building Area
SCREEN SHOP AREA INCLUDES:
All offices including one in the shop, kitchen/conference room and restrooms.
· 1143 square feet Carpet
· 1143 square feet tile
· 2286 square feet Total Building Area
ENGINEERING MODULE AREA INCLUDES:
· 288 square feet tile
· 288 square feet Total Module Area Total area to be cleaned: 11,818 Square feet.