This is a pricing worksheet template for the 985 Service Elevator Modernization project at the Energy Center under RFQ No. 47PE5626R0001. The worksheet is designed to capture a detailed divisional cost breakdown across 15 construction divisions, including General Conditions, Site Work (Asbestos and Lead Abatement), Concrete, Metals, Thermal and Moisture Protection, Doors and Windows, Finishes, Specialties, Conveying Equipment, Fire Suppression, Plumbing, HVAC, Electrical, and Electronic Safety & Security. The form also requires pricing for one year of maintenance after construction completion.
Contractors must populate the cost column for each division, calculate a subtotal, add overhead (O/H) as a percentage with dollar amount, and add profit as a percentage with dollar amount to arrive at the Total Base Offer. The worksheet then requires contractors to enter bonding costs separately to establish the Total Project Cost. The form includes fields for contractor information, including company name, authorized signature, and submission date. The statement of responsibility indicates that the contractor, having examined the scope of work, plans, specifications, and site conditions, commits to furnishing all materials, labor, supplies, and supervision to complete the project per contract documents for the stated total sum. This is a template document and does not contain specific pricing, response dates, award information, or other substantive solicitation details.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing Worksheet - Supplemental Divisional Breakdown for Total Quote
PROJECT TITLE: 985 Service Elevator Modernization - Energy Center RFQ No. 47PE5626R0001
PROJECT COST
DIVISION COST OPTIONAL NOTES
0001 - General Conditions
0002 - Site Work (Asbestos and Lead Abatement)
0003 - Concrete
0005 - Metals
0007 - Thermal and Moisture Protection
0008 - Doors and Windows
0009 - Finishes
0010 - Specialties
0014 - Conveying Equipment
0021 - Fire Suppression
0022 – Plumbing
0023 - HVAC
0026 - Electrical
0028 – Electronic Safety & Security
1 Year Maintenance after Construction Completion
The Contractor, having examined the scope of work, plans, specifications and site conditions of the proposed work, hereby proposes to
SUB-TOTAL $
O/H % $
Profit % $ furnish all materials, labor, supplies and supervision to complete the proposed project per contract documents for the total sum stated.
Total Base Offer $
Bonding $
Total Project Cost $
CONTRACTOR INFORMATION
Company Name:
Authorized Signature:
Date: