RFQ 47PE5626R0001 PWS.pdf

PDF 206 KB Posted

Attached to
985 Service Elevator Modernization - Energy Center | Rosa Parks Federal Building | Detroit, Michigan
Solicitation number
47PE5626R0001
Issued by
Not on record

About this file

This is a pricing worksheet template for the 985 Service Elevator Modernization project at the Energy Center under RFQ No. 47PE5626R0001. The worksheet is designed to capture a detailed divisional cost breakdown across 15 construction divisions, including General Conditions, Site Work (Asbestos and Lead Abatement), Concrete, Metals, Thermal and Moisture Protection, Doors and Windows, Finishes, Specialties, Conveying Equipment, Fire Suppression, Plumbing, HVAC, Electrical, and Electronic Safety & Security. The form also requires pricing for one year of maintenance after construction completion.

Contractors must populate the cost column for each division, calculate a subtotal, add overhead (O/H) as a percentage with dollar amount, and add profit as a percentage with dollar amount to arrive at the Total Base Offer. The worksheet then requires contractors to enter bonding costs separately to establish the Total Project Cost. The form includes fields for contractor information, including company name, authorized signature, and submission date. The statement of responsibility indicates that the contractor, having examined the scope of work, plans, specifications, and site conditions, commits to furnishing all materials, labor, supplies, and supervision to complete the project per contract documents for the stated total sum. This is a template document and does not contain specific pricing, response dates, award information, or other substantive solicitation details.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pricing Worksheet - Supplemental Divisional Breakdown for Total Quote

PROJECT TITLE: 985 Service Elevator Modernization - Energy Center RFQ No. 47PE5626R0001

PROJECT COST

DIVISION COST OPTIONAL NOTES

0001 - General Conditions

0002 - Site Work (Asbestos and Lead Abatement)

0003 - Concrete

0005 - Metals

0007 - Thermal and Moisture Protection

0008 - Doors and Windows

0009 - Finishes

0010 - Specialties

0014 - Conveying Equipment

0021 - Fire Suppression

0022 – Plumbing

0023 - HVAC

0026 - Electrical

0028 – Electronic Safety & Security

1 Year Maintenance after Construction Completion

The Contractor, having examined the scope of work, plans, specifications and site conditions of the proposed work, hereby proposes to

SUB-TOTAL $

O/H % $

Profit % $ furnish all materials, labor, supplies and supervision to complete the proposed project per contract documents for the total sum stated.

Total Base Offer $

Bonding $

Total Project Cost $

CONTRACTOR INFORMATION

Company Name:

Authorized Signature:

Date:

File details come from the government source that posted it. Updated .