About this file
This is an addendum to RFQ 40758 issued by the St. Johns River Water Management District (SJRWMD) for Water Control Structure Underwater Inspections. The addendum confirms the response due date remains January 15, 2025, at 2:00 p.m. and clarifies that the project involves inspecting 113 total culverts across 56 structures, with culverts being a mix of concrete, CMP, and HDPE-lined materials. The smallest culvert diameter is 30 inches, and all structures are accessible by land vehicle. The project completion date is set for July 31, 2025, and a District representative will be onsite to provide access to all structures during inspections.
The addendum clarifies that as an RFQ, wage discussions will only occur during negotiations with the top-ranked respondent. Professional requirements specify that pipe inspections must be conducted under the direction of or by a qualified registered professional engineer, who must sign and seal the final deliverable reports. While the District does not maintain a list of animal control services, they can provide contact information during the negotiation phase. The District contact for questions regarding this addendum is Breanna Pierce, available at (386) 643-1168 or bpierce@sjrwmd.com.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ 40758_Water_Control_Underwater_Inspection.pdf | ||
| RFQ 40758_Water_Control_Underwater_Inspection.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATE: January 10, 2025
TO: Interested Firms
FROM: Breanna Pierce, Procurement Specialist
SUBJECT: Addendum 1 to Request for Qualifications 40758 – Water Control Structure Underwater Inspections
As a result of questions received from potential Respondents, please be advised of the following changes to the subject Request for Qualifications:
1. The time and date for the submittal of responses remains the same: 2:00 p.m., Wednesday, January 15, 2025
2. Question: What is the total structure count?
There are 113 total culverts, but 56 structures.
3. Question: Arer the culverts concrete and/or steel?
Yes, it is a mix of concrete, CMP and some have been slipped lined with HDPE.
4. Question: Is the measurement of each culvert listed?
Yes, the footage and diameter are listed for each culvert to be inspected.
5. Question: Are there any accessed by boat only?
No, all should be accessed by land and vehicle.
6. Question: What is the minimum diameter for the culverts?
The smallest listed is 30 inches in diameter.
7. Question: Will there be District representative onsite during the inspection?
The District will provide access and someone will be onsite.
8. Question: What is the timeframe of the project?
The completion date is July 31, 2025.
9. Question: Does the consultant’s engineer need to be onsite during every phase of the inspection or can the engineer visit the site at set stop points to review findings?
No. the only requirement is that individuals carrying out inspection of pipes should be working under the direction or be qualified as a registered professional engineer. The engineer must sign and seal the final deliverable report(s) certifying their professional opinion regarding the inspection results
10. Question: Does the District has a list of Animal Control services for this project or is there a bidders list that has some listed?
The District does not have list of animal control services but could provide contact information in the negotiation phase.
11. Question: Why are wages not listed for project?
This is an RFQ, not a bid, so we would only discuss wages in the negotiation phase with the respond-ent that was ranked number one in the review period.
12. Question: Will we have access as needed to each structure; gates open…etc.?
A District staff member will be on site to provide access to all structures.
NOTE: Please acknowledge receipt of this Addendum in your submittal.
If you have any questions regarding this addendum, contact Breanna Pierce at (386) 643-1168 or via email at bpierce@sjrwmd.com.