RFQ 36C25726Q0480.pdf
PDF 890 KB Posted
- Attached to
- 6550--NEW - VISN 17 Urinalysis CPRR IDIQ
- Solicitation number
- 36C25726Q0480
About this file
This is a Request for Quotation (RFQ) for an Indefinite Delivery Indefinite Quantity (IDIQ) contract to provide urinalysis testing services and equipment to Veterans Integrated Service Network (VISN) 17 facilities across Texas. The Department of Veterans Affairs seeks a single award contractor to supply all equipment, reagents, controls, calibrators, consumable supplies, maintenance services, labor, training, and ancillary items necessary for urinalysis operations at nine primary locations including facilities in San Antonio, Amarillo, Dallas, Bonham, Fort Worth, Temple, Austin, Waco, Big Spring, Harlingen, McAllen, Corpus Christi, and El Paso. The contract is structured as a firm fixed-price cost-per-reportable-result (CPRR) basis with a guaranteed minimum award of $75,000 and maximum aggregate value of $7,500,000 across five one-year ordering periods from February 1, 2027 through January 31, 2032. Estimated annual testing volumes total 749,620 tests across all locations, broken down by urine chemistry macroscopic (442,400 tests), microscopic (306,736 tests), and body fluid analysis (884 tests).
Offerors must submit quotations by June 30, 2026 at 3:00 p.m. EDT electronically to delphia.schoenfeld@va.gov. The solicitation is unrestricted, though Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) and Veteran-Owned Small Businesses (VOSBs) are encouraged to respond. Evaluation criteria include technical acceptability (FDA-cleared equipment meeting all testing and instrumentation requirements, reliable service delivery, and compliance with accreditation standards) and price reasonableness. All equipment must be fully automated with specified sample throughput capabilities (80 samples/hour for microscopy, 210 samples/hour for chemistry), include redundant analyzers, and support comprehensive urinalysis parameters per CLSI guidelines. The contractor must provide 24/7/365 telephonic hotline support, Monday-Friday 8 a.m. to 5 p.m. Central Time on-site service, installation within 60 days of award, offsite and onsite operator training, quarterly sales reports, preventative maintenance per manufacturer specifications with 24-hour response time for emergency repairs, and complete system validation studies at no additional cost to the Government. Invoices must be submitted electronically monthly through the VA's Tungsten Network system at http://www.fsc.va.gov/einvoice.asp.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 36C25726Q0480 0005.pdf | ||
| 36C25726Q0480 0005_1.docx | DOCX document | |
| Amendment 36C25726Q0480 0004.pdf | ||
| Statement of Work Urinalysis v3.pdf | ||
| 36C25726Q0480 0004_1.docx | DOCX document | |
| Amendment 36C25726Q0480 0003.pdf | ||
| 36C25726Q0480 0003_1.docx | DOCX document | |
| Amendment 36C25726Q0480 0002.pdf | ||
| 36C25726Q0480 0002_1.docx | DOCX document | |
| Statement of Work Urinalysis.pdf | ||
| Amendment 36C25726Q0480 0001.pdf | ||
| 36C25726Q0480 0001_1.docx | DOCX document | |
| 36C25726Q0480_1.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAGE 1 OF 1. REQUISITION NO.
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NO. 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
a. NAME b. TELEPHONE NO. (No Collect Calls) 8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY CODE 10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ IFB RFP
15. DELIVER TO CODE 16. ADMINISTERED BY CODE
17a. CONTRACTOR/OFFEROR CODE FACILITY CODE 18a. PAYMENT WILL BE MADE BY CODE
TELEPHONE NO. UEI: EFT:
PHONE: FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19. 20. 21. 22. 23. 24.
ITEM NO. SCHEDULE OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________ 29. AWARD OF CONTRACT: REF. ___________________________________ OFFER
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DATED ________________________________. YOUR OFFER ON SOLICITATION
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION (REV. NOV 2021)
PREVIOUS EDITION IS NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
36C25726Q0480 05-01-2026
Delphia Schoenfeld 210-417-7495 06-30-2026
15:00 EDT
36C671
Department Of Veterans Affairs
Network Contracting Office 17
5441 Babcock Road Ste. 302
San Antonio TX 78240
X
334516
1000 Employees
N/A
Department of Veterans Affairs
Veterans Integrated Service Network 17
Laboratory
2301 E. Lamar Blvd.
Alington TX 76006
36C671
Network Contracting Office 17
5441 Babcock Road Ste. 302
San Antonio TX 78240
This is accomplished through the
Tungsten Network located at:
http://www.fsc.va.gov/einvoice.asp
This is mandatory and the sole method for submitting invoices.
(877) 353-9791 (512) 460-5540
See CONTINUATION Page
This solicitation is for all equipment, supplies, and services required to perform urinalysis testing at multiple locations within VISN 17.
Any questions concerning this solicitation are to be submitted in writing to the POC, Delphia Schoenfeld, at delphia.schoenfeld@va.gov no later than 6/1/2026, 10:00AM ET.
See Continuation Pages for Statement of Work, Addendum to
52.212-1, and evaluation criteria under 52.212-2.
See CONTINUATION Page
C 1
Delphia Schoenfeld
36C25726Q0480
Table of Contents
SECTION A
A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL
SERVICES
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
B.2 STATEMENT OF WORK
B.3 PRICE/COST SCHEDULE
ITEM INFORMATION
B.4 DELIVERY SCHEDULE
SECTION C - CONTRACT CLAUSES
C.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
C.2 SUPPLEMENTAL INSURANCE REQUIREMENTS
C.3 52.216-18 ORDERING (AUG 2020)
C.4 52.216-19 ORDER LIMITATIONS (OCT 1995)
C.5 52.216-22 INDEFINITE QUANTITY (NOV 2025) (DEVIATION)
C.6 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
C.7 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS (APR 2026) (DEVIATION) . 73
C.8 52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS (NOV 2025) (DEVIATION)
C.9 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)
C.10 VAAR 852.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 2022)
C.12 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)
C.12 VAAR 852.212-71 GRAY MARKET AND COUNTERFEIT ITEMS (FEB 2023)
C.13 VAAR 852.219-70 VA SMALL BUSINESS SUBCONTRACTING PLAN MINIMUM REQUIREMENTS (JAN
2023) (DEVIATION)
C.14 VAAR 852.222-71 COMPLIANCE WITH EXECUTIVE ORDER 13899 (DEVIATION)(APR 2025)
C.15 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)
C.16 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020)
C.17 VAAR 852.246-71 REJECTED GOODS (OCT 2018)
C.18 VAAR 852.247-73 PACKING FOR DOMESTIC SHIPMENT (OCT 2018)
C.19 MANDATORY WRITTEN DISCLOSURES
SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS
SECTION E - SOLICITATION PROVISIONS
E.1 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
E.2 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)
E.3 52.212-2 EVALUATION—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021)
E.4 52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (NOV 2025) (DEVIATION)
E.5 52.225-6 TRADE AGREEMENTS CERTIFICATE (FEB 2021)
E.6 52.233-2 SERVICE OF PROTEST (SEP 2006)
E.7 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS AND CERTIFICATIONS (NOV
2025) (DEVIATION)
E.8 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)
E.9 VAAR 852.215-72 NOTICE OF INTENT TO RE-SOLICIT (OCT 2019)
E.10 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018)
E.11 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)
E.12 VAAR 852.273-70 LATE OFFERS (NOV 2021)
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
1. Contract Administration: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR:
b. GOVERNMENT: Contracting Officer 36C257
Network Contracting Office 17
5441 Babcock Road Ste. 302
San Antonio TX 78240
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
[X] 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or [] 52.232-36, Payment by Third Party
3. INVOICES: Invoices shall be submitted in arrears:
a. Quarterly []
b. Semi-Annually []
c. Other [X] Monthly
4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.
http://www.fsc.va.gov/einvoice.asp
This is mandatory and the sole method for submitting invoices.
ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:
AMENDMENT NO DATE
B.2 STATEMENT OF WORK
1. Background
a. Veterans Integrated Service Network (VISN) 17 has a continuous need for urinalysis testing. The purpose of the CPRR contract will be to continue to provide urinalysis testing to patients and medical staff throughout VISN 17.
2. Scope of Required Specifications:
a. VISN 17 requires urinalysis testing to accommodate in-house patient testing. Contractor shall provide urinalysis testing supplies and services on cost per reportable result (CPRR) basis. The
CPRR includes all equipment, reagents, controls, calibrators, consumable supplies, shipping costs, maintenance services, labor, travel, training, replacement parts, and any ancillary items necessary for laboratories in VISN 17 to operate the systems and printers.
b. The contractor shall provide urinalysis testing on leased equipment that meets all the following requirements:
i. Primary analyzer(s)-
A. Analyzer offered that shall fully support the scope of operations. Depending upon the technical functionality and the capabilities of the individual manufacturer’s instrumentation, one analyzer or multiple analyzers may be required to meet the productivity specifications defined herein at each location in VISN 17. In those instances, the additional analyzer(s) shall, likewise, be considered primary instrumentation and shall meet all the technical specifications of this solicitation.
B. Due to efficient and reliable operational needs, the 2nd analyzer must be completely redundant to the primary analyzer (provide chemistry and microscopic urinalysis).
C. The desired instrumentation shall have the capability of performing or reporting the clinical parameters as defined herein for all urinalysis related testing. The instrument shall be capable of reflex testing from macroscopic to microscopic evaluations.
D. The instrument shall be capable of simultaneously performing the complete profile as described below, meeting the performance characteristics for accuracy and precision as defined by the 1988 Clinical Laboratory Improvement
Act (CLIA) and the Clinical and Laboratory Standards Institute (CLSI). The contractor shall identify if their test and specimen types are FDA cleared. All reagents, software and equipment/medical devices must be FDA cleared at the time of the solicitation.
ii. Industry Standards: Unless otherwise stated, all equipment shall be held to current industry standards for such equipment is present in the current marketplace for Clinical urinalysis equipment, supplies, and related services.
iii. Contractor must follow all applicable state, federal and local laws, and regulations related to laboratory testing.
iv. All assays and equipment must be FDA cleared at the time of contract award.
3. General Requirements
a. Period of Performance:
Ordering Period Period Start Period End
1 2/1/2027 1/31/2028
2 2/1/2028 1/31/2029
3 2/1/2029 1/31/2030
4 2/1/2030 1/31/2031
5 2/1/2031 1/31/2032
4. Type of Contract:
a. VISN 17 requires an Indefinite Delivery Indefinite Quantity (IDIQ) contract for five (5) one-year ordering periods.
Please Note: Not all facilities listed in the “Primary Locations” section below are not guaranteed to require the supplies and services provided under this IDIQ for the entire contract period. Locations may be added or removed after award, as necessary, through bilateral modification, dependent upon the needs of the
Government.
Primary Locations:
South Texas Veterans Healthcare System (STX) Amarillo VA Healthcare System (AMA)
Audie L. Murphy VA Hospital Thomas E. Creek VA Medical Center
Pathology & Laboratory Medicine Service Pathology & Laboratory Medicine Service
7400 Merton Minter Blvd. 6010 Amarillo Blvd.
San Antonio, TX 78229 Amarillo, TX 79106
Amarillo VA Healthcare System (AMA) VA North Texas Healthcare System (NTX)
Lubbock VA Clinic Dallas VA Medical Center
Laboratory Pathology & Laboratory Medicine Service
6104 Avenue Q South Dr. 4500 S. Lancaster Rd.
Lubbock, TX 79412 Dallas, TX 75216
VA North Texas Healthcare System (NTX) VA North Texas Healthcare System (NTX)
Sam Rayburn Memorial Veterans Center Fort Worth VA Clinic
Laboratory Laboratory
1201 E. 9th St. 2201 Southeast Loop 820
Bonham, TX 75418 Fort Worth, TX 76119
Valley Coastal Bend VA Healthcare System (VCB) Valley Coastal Bend VA Healthcare System
VA Health Care Center (HCC) at Harlingen (VCB)
Pathology & Laboratory Medicine Service McAllen VA Clinic
2601 Veterans Dr. Laboratory
Harlingen, TX 78550 901 East Hackberry Ave.
McAllen, TX 78501
Central Texas Veterans Healthcare System (CTX) Central Texas Veterans Healthcare System
Olin E. Teague Veterans’ Center (CTX)
1901 Veterans Memorial Dr. Doris Miller Department of Veterans Affairs
Temple, TX 76504 Medical Center
4800 Memorial Drive
Waco, TX 76711
Central Texas Veterans Healthcare System (CTX) VA West Texas Healthcare System (WTX)
Austin VA Clinic George H. O’Brien, Jr., VA Medical Center
7901 Metropolis Drive 300 Veterans Blvd.
Austin, TX 78744 Big Spring, TX 79720
VA El Paso Healthcare System (ELP)
El Paso VA Clinic
5001 N. Piedras St.
El Paso, TX 79930
5. Annual Estimated Test Volumes:
Location Estimated Urinalysis Estimated Microscopic Estimated Body Fluid
All STX Locations 84,000 84,000 1,536
All AMA Locations 35,236 18,624 0
All NTX Locations 143,004 74,712 756
All VCB Locations 37,500 13,500 0
All CTX Locations 126,000 63,000 0
All WTX Locations 16,700 8,900 0
All ELP Locations 44,000 44,000 0
Total Annual Estimated Testing 442,400 306,736 884
6. Testing Requirements:
a. Urinalysis analyzers must be capable of performing urine chemistry to include the following:
Urine color, appearance, glucose, bilirubin, ketones, specific gravity, blood pH, protein, urobilinogen, nitrite, leukocyte esterase, and clarity.
b. Microscopic analysis to recognize and identify 13 urine sediment particles: RBC, WBC, WBC clumps, squamous epithelial cells, non-squamous epithelial cells, hyaline casts, unclassified casts, crystals, bacteria, yeast, sperm, and mucus.
i. In addition, microscopic analysis must be able to subclassify unclassified casts: granular, cellular, waxy, broad, RBC, WBC, epithelial cells and fatty cast, crystals (calcium phosphate, uric acid, calcium carbonate, leucine, cystine, tyrosine, amorphous calcium oxalate, triple phosphate) and place other particles as questionable for the technician to identify and quantify to complete reports.
c. Perform automated body fluid cell count analysis to include cerebrospinal, pleural, peritoneal, peritoneal dialysate, peritoneal lavage, pericardial, general serous fluids, synovial fluids, and bronchoalveolar lavage specimens. Instrument must be able to differentiate between white and red blood cells.
7. Instrumentation Requirements:
a. Analyzer(s) –Contractor shall provide Clinical Urinalysis analyzers that meet the following requirements:
i. Equipment must be fully automated with the ability to continuously load patient samples.
ii. Sample throughput for urine microscopy must be up to 80 samples per hour.
iii. Sample throughput for urine chemistry must be up to 210 samples per hour.
iv. System should be either cap piercing or provide a decapper as part o the walkaway integrated system.
v. The system must have the capability to be directly plumbed for analyzer waste.
vi. Measurement technology for urine chemistry must auto-classify microscopic urine elements.
vii. The system must be capable of producing a specific gravity result, color, and clarity.
viii. System must hold up to 300 test strips.
ix. Specimen volume for urine microscopy must be a minimum of 2.0 mL of unspun urine with aspiration of approximately 1.3mls.
x. Specimen volume for urine chemistry must be a minimum: 2.0 mL of un-spun urine, 40mm
xi. Operating environment temperature should be 64-82°F (18-28°C) with a humidity of 20- 80%, non-condensing. All reagents storage should also fall within this range for room temperature.
xii. Electrical power requirement for Microscopy module must be 90-240 VAC, 50-60 Hz;
Chemistry module must be 100-240 VAC, 50-60 Hz.
xiii. Sample capacity must be a 10-tube rack system with up to six racks for 10-tube rack system.
xiv. The chemistry urinalysis analyzer and the microscopic analyzer should be integrated into one system for true walk away abilities. System must have walk away capacity with up to six sample rack sampling.
xv. Preferred (not required and will not be evaluated) use of fluorescent flow cytometry methodology in identifying and quantifying cells. Utilizing side scatter detection technology to differentiate similarly sized crystals and RBC.
xvi. Both primary and secondary (back-up) instruments are required to be validated to demonstrate that chlorhexidine present in our current BD VACUTAINER PLUS UA
Preservative tubes will not have any adverse effect on the routine urinalysis parameters.
Both instruments should have excellent agreement within one grade (ex-
Negative/Rare).
xvii. Instrument must not introduce additional chemicals or other fluids to a sample that would contaminate the sample which would preclude additional testing if needed.
xviii. Ability to detect when manual review of automated microscopic is required.
xix. Analyzer must be able to bypass microscopic testing when urine strip is negative or as defined/ programmed by the user.
xx. Ability to track/inventory reagent and consumables (i.e., lot numbers, expiration dates) using bar code technology or other technology eliminating the need to manual enter reagent/consumable information.
xxi. Analyzer must be able to accurately monitor reagent use and alert operator of low reagent and consumable levels.
xxii. Contractor must provide installation of all equipment at no additional cost to the Government.
b. Other Primary Hardware Features: Contractor shall provide Clinical urinalysis equipment that meets the following requirements:
i. Analyzer(s) that is fully capable of performing macroscopic analysis as defined in section
6(a).
ii. Analyzer(s) that is fully capable of performing microscopic analysis as defined in section
6(b).
iii. Analyzer that is fully capable of performing body fluid testing as defined in section 6(c).
iv. The contractor shall provide a laboratory grade bench or instrument cart if the installation of the instrument is not freestanding.
v. Provide a digital and hard copy of the operations manual for all equipment provided.
vi. Capable of accepting both conical (i.e., KOVA and various style tubes) and round-bottom sample tubes (including varying sizes of evacuated tubes). Requirement can be met by use of different carriers or inserts, supplied by the Contractor at no additional charge.
vii. Preferred (not required and will not be evaluated) use of fluorescent flow cytometry methodology in identifying and quantifying cells. Utilizing side scatter detection technology to differentiate similarly sized crystals and RBC.
viii. Preferred (not required and will not be evaluated) use of an on board warmer that dissipates urates and phosphate material thus eliminating an additional step to reduce amorphous interference. The on board warmer will reduce manual technical intervention and improve workflow.
c. Barcoding – Contractor shall provide barcoding stations located at user monitoring stations along the line or track system and must have the following capabilities:
i. The accuracy of the barcode reading must have less than a 1.0 % failure rate.
ii. Equipment must be able to support multiple barcode formats (Code 39, Code 128) that may be enabled concurrently.
iii. Equipment shall accept, at minimum, 10 characters in specimen identifier that is alpha and/or numeric.
iv. Sample identification must have auto-ID barcode and keyboard entry for sample identification.
d. Printers and Other Support Items (Support Items): Contractor shall provide printer and other support equipment that meets the following requirements:
i. Printers that have the capability of printing a patient report with patient demographic information that includes the patient’s name, medical record number (SSN) and accession or unique identifier number (UID).
ii. An uninterruptible power supply (UPS) with line conditioner for each instrument provided. (This includes UPS units for sites with automation lines, specimen management systems, data management systems, refrigerated storage, etc. Each UPS must provide electrical power for a minimum of 15 minutes after electrical power fails and the system must allow for an automatic controlled shutdown to prevent damage to the instrument and data records.
iii. If there are upgrades/repairs/maintenance to the printer during the life of the contract, the Contractor is responsible for seeing that the printers are repaired or replaced to avoid disturbance in workflow at no additional cost to the Government.
e. Software, Connectivity and Conformance Standards: The instrument software shall have capability to connect to other equipment and software systems that meet the following requirements:
i. Instrument Software – Internal testing instrumentation software that provides/maintains the following:
A. Ability to monitor instrument performance.
B. Continuous monitoring of vital functions with immediate operator notification of failure(s) and on-board storage of these records.
C. Capability to detect and alert operator of out-of-range quality control results via flagged results on QC printout and visual alerts on display monitor.
D. System shall have a data management system capable of storing quality control
(QC) results and performing QC statistical analysis.
E. On-board quality control (QC) data management system which includes Levy-
Jennings graphs and Gaussian statistical analysis. The analyzer must have the ability to transfer QC data to external media.
F. Ability to store and retransmit patient records to the VA Laboratory
Information system for a minimum 72 hours in case of interface outage.
G. Capability to record, store, and print the following information in accordance with current CLSI guidelines and related documents, College of American
Pathologists (CAP) Standards, The Joint Commission, and federal regulations.
1. Quality control, calibration, and instrument maintenance information.
2. Patient demographic information and specimen results.
H. The capability to program a test as a repeat with interfacing of results to overlay initial result.
I. Ability to retransmit patient records to the Laboratory Information System
(including contractor provided middleware) in case of interface outage.
ii. Customization
A. Contractor shall provide equipment with technology to automatically direct additional specimen testing based on customer-configurable testing criteria
(reflex technology).
B. Contractor shall collaborate with each lab to write/develop protocols to establish customer configurable rules to enhance workflow management and productivity.
iii. Interface
A. Interface Requirements:
1. The Contractor shall provide all necessary software support for ensuring that successful interfacing has been established. Specific requirements for the communication of the data streams will be unique to the instrument system involved and dictated by the manufacturer itself.
2. The Contractor hardware and software proposed solution meets all
VA Information Security, Hardware, Software and Network requirements (VA 6500). Any wireless equipment must be FIPS
140-2 compliant with certificate of compliance.
3. The Contractor supplies responses to required documents to add systems to the VA network including but not limited to the VA
Form 6550, Ports Protocols Services, MSD2, network Topological diagram and Equipment Inventory hardware/software list.
4. Communication interface must be bidirectional with host query.
B. If there are software upgrades in the instrument during its life, the Contractor is responsible for seeing that the interface can accommodate any changes in the data stream going to the VA Laboratory Interface Middleware.
C. If the Operating System (OS) and/or Firmware is updated or the OS reaches end of life during the contract period, the Contractor shall update OS and/or
Firmware at no additional cost. Additionally, if the hardware requires an update or replacement to support the OS/Firmware, the Contractor shall update/provide the needed hardware at no additional cost.
D. Sufficient memory to store patient information and test records with downloading capability to an external medium for long term storage of patient records and other information.
1. Data onboard storage must be up to 10,000 patient results.
2. Data Storage patient sample results and the ability to export results to external storage media for acceptable review by regulatory agencies.
E. Patient status display for technologist review and workflow management for all integrated (linked) testing instrumentation.
F. Ability to retransmit patient records to universal interface system in case of interface outage.
G. Technology to automatically repeat testing based on customer configurable testing criteria (repeat testing).
H. Technology to automatically direct additional specimen testing based on customer-configurable testing criteria (reflex technology).
I. Technology must interface to VA licensed Data Innovations Instrument
Manager sending all appropriate information to complete auto verification rules processing within the VA licensed IM. Preferred, but not required, that no additional middleware be necessary to connect instruments beyond the VA licensed DI IM.
J. Contractor shall collaborate with each lab to write/develop protocols to establish customer configurable rules to enhance workflow management and productivity.
K. Contractor shall assist customer with optimizing operation and utilization of the data management system to fully integrate desired testing instrumentation enhancing productivity and management of workflow. This shall include sending personnel back on site to optimize the analyzer, automation and data management work flows six months and twelve months after the system has gone live.
L. Contractor must have existing VA MOU/ISA or agrees to establish an MOU/ISA upon award to provide remote monitoring and support meeting all VA Security
Requirements. Contractor should use remote monitoring to prevent instrument or testing issues as possible in addition to troubleshooting and support. The
Contractor shall include a copy of the MOU/ISA as part of their quote with the file named “VA MOU/ISA”. The Contractor shall provide all hardware and software to implement the remote support system.
iv. Connectivity and Conformance
A. Contractor must have a Memorandum of Understanding/Information Security
Agreement (MOU/ISA) with the VA in sufficient time to meet the installation timeframes in section 3.
B. Contractor shall meet VA OI&T information security requirements IAW VA
Directive 6500.
C. Contractor shall provide remote monitoring and support of the urinalysis system while the manufacturer’s warranty is active. Contractor shall use remote monitoring to prevent instrument or testing issues, when possible, in addition to troubleshooting and support. The Contractor shall provide all hardware and software to implement the remote support system.
D. The urinalysis system’s operating software version must be approved for use on the VA network (Windows 10 and Server 2012/2016).
E. The urinalysis system must be capable of connecting to an HL7 interface and must comply with the VHA Lab HL7 Interface Specifications Document.
1. https://www.va.gov/vdl/application.asp?appid=71
2. https://www.va.gov/vdl/application.asp?appid=75 https://www.va.gov/vdl/application.asp?appid=71 https://www.va.gov/vdl/application.asp?appid=75 https://www.va.gov/vdl/application.asp?appid=75
F. Any software and hardware solutions supplied and installed on VA workstations by the contractor must appear as an approved technology on the most current VA Technical Reference Model (TRM) or must appear on a TRM that is within 2 lifecycles of the most recent TRM approved version. For software or hardware solutions that do not meet these requirements at the time of contract award, Contractor shall obtain the required TRM approval without impacting installation timeframes.
1. https://www.oit.va.gov/Services/TRM/TRMHomePage.aspx.
v. Support Features
A. Training
1. Training. The Contractor shall provide an instrument off site training program that is coordinated with and timely to the equipment installation, sufficient to the size and scope of the facility’s services and minimally equivalent to the terms and conditions for training. This shall include training on the operation of the system, data manipulation, and basic trouble shooting and repair. Offsite training should be for minimally one operator per facility at the discretion of the Government for each model of instrumentation placed. Utilization of the training slots shall be mutually agreed upon between the VA and the Contractor.
2. The contractor shall provide operator training on-site for all operators on all shifts.
3. Additional onsite training shall be provided 60-90 days after instrumentation’s go live date.
B. Contractor shall provide example policies and procedures such as standard operating procedure templates.
vi. Waste
A. The Contractor shall provide documentation demonstrating that it has characterized the hazardous nature of all wastes produced by all equipment, devices, reagents, and discharges Contractor provides in accordance with the requirements of the Code of Federal Regulations Title 40 “Protection of the
Environment” Part 261 et seq. and applicable state and local requirements.
Documentation shall include a description of the characteristics of the hazardous waste produced as a byproduct of the instrument operations, Safety
Data Sheets (SDS) meeting the requirements of the Occupational Safety and
Health Administration (OSHA) and Environmental Protection Agency (EPA), the analytical process used to determine the hazardous nature and characteristics of the waste, and the analytical test results. Testing of hazardous waste is to be done in accordance with testing protocol specified for each individual waste as described in the Code of Federal Regulations Title 40 to decide if the waste is a hazardous waste or otherwise regulated. The determination and description shall address the following:
1. Waste toxicity (Reference 40 CFR §261.11 and 40 CFR §261.24)
2. Waste ignitability (Reference 40 CFR §261.21)
3. Waste corrosivity (Reference 40 CFR §261.22) https://www.oit.va.gov/Services/TRM/TRMHomePage.aspx https://www.oit.va.gov/Services/TRM/TRMHomePage.aspx
4. Waste reactivity (Reference 40 CFR §261.23)
5. Hazardous waste from non-specific sources (F-listed) (Reference
40 CFR §261.31)
6. Discarded commercial products (acutely toxic or P-listed and toxic or U-listed) (Reference 40 CFR §261.33)
7. Solid Waste (Reference 40 CFR §261.2)
8. Exclusions (Reference 40 CFR §261.4)
B. The contractor will provide written instructions and training material to ensure
VHA laboratory staff are trained as needed to properly operate devices with special emphasis to managing and disposing of hazardous waste in accordance with EPA and state requirements. Additionally, the training provided by the contractor must fulfill Resource Conservation and Recovery Act (RCRA) requirements for training as applicable to devices.
C. Contractor shall provide a description of all wastes the equipment or process may discharge so that the facility can determine whether the discharge meets
Local Publicly Owned Treatment Works (POTW), State and Federal discharge requirements. At a minimum the characteristics of ignitability, corrosivity, reactivity and toxicity as defined in 40 CFR §261 must be determined and documented. Any mercury containing reagents must be identified in any concentrations. All test results shall be provided. All listed chemicals (F, U, K and P) found in 40 CFR §261 shall be provided in product information and their concentrations documented. For those materials with a positive hazardous waste determination, a mechanism for the laboratory to meet local discharge requirements (i.e., mercury, thimerosal and formaldehyde) must be developed and SDS sheets must be provided in advance for review.
D. The documentation the contractor provides will be used to work with the medical center, CBOCs, and the public or private organization (e.g., POTW) to determine whether the waste from each device can legally be disposed of via the sewerage system.
E. Ability to separate alcohol waste from other waste for appropriate environmental disposal.
8. PACKAGING & MARKING
a. Packaging
i. All equipment shall be adequately packaged to prevent damage during shipping, handling, and storage. Bags or packages shall be whole, intact, and not otherwise torn or damaged. Upon delivery, the Government shall examine all packages. The Contractor shall be required to replace unacceptable or damaged products at the Contractor’s expense.
b. Marking
i. All items shall be marked clearly with the Contract Number, Obligation number, and delivery location within the facility, i.e., Pathology & Laboratory Services.
9. INSPECTION AND ACCEPTANCE / DELIVERIES & PERFORMANCE
a. Installation/Implementation
i. Implementation/transition timeframe: All sites shall have complete installation and go live of their system within 60 days from award of this contract.
ii. Contractor shall execute an implementation plan which includes:
A. Installation - Contractor shall make every effort to conduct a concurrent implementation at all sites with weekly collaborative meeting. Contractor shall provide a dedicated project manager throughout the entire implementation.
Installation shall also include conversion of all current data minimally including operator profiles.
B. Testing- Shall include at minimum a test of all analytes in addition through all testing phases (pre- analytical, analytical, and post-analytical). In addition, training must be provided to all sites.
C. Acceptance must meet the approval requirements of accrediting agencies and
VA Pathology & Laboratory Medicine Services (P&LMS) approval at each facility to meet accreditation standards.
D. Post Go-Live follow-up thirty day after go-live date.
E. Start-Up Reagents. The Contractor shall provide all reagents, calibrators, consumable/disposable items, parts, accessories, and any other item required to establish instruments for operation for performance of acceptance testing.
This applies to equipment as well as additional or replacement equipment placed under the terms and conditions of this contract. The Contractor shall perform all validation studies including precision, method comparison with current analyzer, accuracy (recovery), linearity (reportable range), calibration verification, verification of reference interval, and determination of sensitivity and specificity at no cost to the Government. The Contractor shall perform all statistical analysis as stated in the Method Performance/Validation section below and provide a hard copy of data in an organized, clearly comprehensible format.
F. Onsite Go live Instrument, Automation and technical support Requirements shall consist of 48 hours of continuous support. Daily onsite support for a total of five business days for each phase of implementation.
iii. Method Performance / Validation
A. Method performance/comparison shall be at the expense of the Contractor, shall include linearity material and reagents as required or recommended based on manufacturer’s specifications, and be consistent with current CLSI guidelines and related documents, College of American Pathologists (CAP) standards and Federal regulations. The Method Validation will include the following
1. Correlation studies for each analyte. A minimum of 20 samples spanning the reportable range, shall be run by the present and the proposed method. Contractor shall analyze results and provide statistical data to support acceptance of the new method.
Statistics shall meet current standards defined by CLSI.
2. Precision study using normal and abnormal control material. This shall consist of a within run precision study of 10 normal and 10 abnormal controls and a day-to-day precision study of normal controls and abnormal controls for 10 days (may be run twice a day) for a total of 20 values per level of control. Where applicable, intra-VISN facility variations should be kept at an absolute minimum.
3. Carryover Studies. Successful carryover studies shall be completed on all analyzers during installation. These studies shall be performed using either Contractor developed program(s) or program(s) developed by a third party (CAP/CLSI, formerly
NCCLS). The program(s) shall be provided to each laboratory at no charge.
B. Analytical Measurement Range (AMR) validation shall be performed on proposed instrument(s) for each analyte to validate the reportable range. The material must have values, which are near the low, mid, and high values of the
AMR and be of appropriate matrix for the clinical specimens assayed by that method. A minimum 5-point linearity analysis that adheres to the Beer-
Lambert Law and spans the entire range shall be performed as a minimum. This linearity analysis shall be performed for each measured test parameter provided.
C. Sensitivity may be validated concurrently with the linearity verifications.
D. Specificity Studies. A review of product literature and assay inserts to determine any adverse effects for increased bilirubin, hemolysis, lipemia, or other interfering substances.
E. A verification of the manufacturer’s suggested reference range may be performed if the suggested range is based on a comparable population of test subjects with medical director approval. The manufacturer shall provide specific information defining how the suggested range was determined. A minimum of 20 reference individuals shall be used to verify the manufacturer’s range. Any apparent outliers should be discarded, and new specimens obtained to provide a statistically valid verification.
F. If the suggested manufacturer’s range is not appropriate for the patient population, a reference range shall be established. Establishing a reference must follow CLSI guidelines. This requires a minimum of 120 reference individuals to be used to establish a reference range. The reference interval should be determined using the nonparametric method.
G. If a laboratory is currently using the proposed instrument/reagent system, the
“in-use” reference range can be transferred to the “new” system if a method comparison study between the two systems proves to be acceptable. If comparison studies are not acceptable, one of the two above items must be performed.
b. Delivery: The Contractor shall deliver all urinalysis analyzers to participating VA medical facilities and CBOCs.
i. The delivery location is subject to change as required by the designated authority or authorized personnel at the receiving facility. The Point of Contact (POC) will notify the
Contractor when delivery locations have been changed.
ii. All deliveries shall be made from 8:00 a.m. to 4:00 p.m., Monday through Friday, and a copy of the packing list/slip shall be provided at time of delivery. The packages packing list/slip shall contain the complete contract number, purchase order number, shipping address, delivery location, items/quantity ordered, and items/quantity shipped.
Standard orders shall be delivered no more than 30 working days after receipt or placement of order.
iii. Contractor must provide replacement reagents/supplies/consumables at no additional cost to the Government due to improper handling (i.e., items do not arrive at proper temperature for storage/ use).
iv. Any shortages causing delay in delivery of reagents to the Government shall be provided to the COR, POCs, and Contracting Officer as soon as the shortage is identified. If testing is required to be sent to a third party, the Contractor shall reimburse the Government through credits or invoicing discounts.
c. Reports- The Contractor shall provide to the designated individuals (designated post-award) a copy of a quarterly report of sales, by ordering facility, within 30 calendar days after the close of each quarter’s business. Reports are to reflect, at a minimum, total net sales amounts before discount, and discount amounts by ordering facility as well as the raw data used to develop these reports. These reports shall be used to monitor the commitment of each facility, reporting the savings realized and shall be shared with each participating facility, personnel associated with acquiring the products, and respective laboratory personnel. Additional invoice charges associated with reagent and/or supply wastage or repair parts included at no charge shall not be accepted. There will be no additional charges for any reports required as part of the IDIQ.
d. Equipment Preventative Maintenance/Repair Service-
i. Equipment Preventative Maintenance/Repair Service. The Contractor shall be able to provide emergency equipment repair and preventative maintenance on all primary and back-up instrumentation and any incremental support equipment, e.g., water system, offered according to the following terms:
A. Service Requirements-
B. A technical assistance center shall be available by telephone 24 hours per day, 7 days per week with a maximum callback response time of 2 hours.
C. Once a service call is placed to the contractor for equipment repair, primary field-based engineer must be onsite within 24 hours of service call.
D. Equipment repair services shall be provided during core business hours. Certain circumstances may dictate the need for repair service to be conducted outside routine business hours. All such arrangements shall be coordinated between the Contractor and VA laboratory personnel.
E. Equipment repair response time shall be no more than 24 hours.
F. Preventative maintenance will be performed as frequently as published in manufacturer’s operator’s manual and within 2 weeks of the scheduled due date.
G. A malfunction incident report shall be furnished to the Laboratory upon completion of each repair call. The report shall include, as a minimum, the following:
1. Date and time notified
2. Date and time of arrival
3. Serial number, type and model number of equipment
4. Time spent for repair, and
5. Proof of repair that includes documentation of a sample run of quality control verifying acceptable performance.
H. Each notification for an emergency repair service call shall be treated as a separate and new service call.
ii. Upgrades - The Contractor shall provide upgrades to both the equipment hardware and software in order to maintain the integrity of the system and the state-of –the art technology, at no additional charge to the Government. These shall be provided as they become commercially available and at the same time as they are being provided to commercial customers. This requirement only applies to “system upgrades” that enhance the model of equipment being offered, i.e., new version of software, correction of hardware defect, upgrade offered to commercial customers at no additional charge, upgrade to replace model of equipment no longer Contractor supported, etc. This does not refer to replacing the original piece of equipment provided under the IDIQ;
however, it does refer to significant changes in the hardware operational capability.
iii. Ancillary support equipment - The Contractor shall provide, install and maintain through the life of the IDIQ, as indicated, any and all ancillary support equipment to fully operate the analyzer as defined in these specifications, e.g., cabinetry to support/house the analyzer (if necessary), water systems (including consumable polishers, filters, etc.), and universal interface equipment, etc. In addition, the Contractor shall include all ancillary components that are customarily sold or provided with the model of equipment proposed, e.g., starter kits, tables/stands, etc.
iv. Commercial offerings - The Contractor shall provide any additional support material that is routinely provided to equivalent commercial customers and assists in regulatory compliance, e.g., Computer disc containing their procedure manual in CLSI format or an on-line procedure manual in the instrument software.
v. Characterization of waste – The Contractor shall provide documentation that it has characterized the hazardous nature of all wastes produced by all equipment, devices, reagents, and discharges in accordance with the requirements of the Code of Federal
Regulations Title 40 “Protection of the Environment” Part 261 et seq. and applicable state and local requirements. Documentation shall include a description of the characteristics of the hazardous waste produced as a byproduct of the instrument operations, Safety Data Sheets (SDS) meeting the requirements of the Occupational
Safety and Health Administration (OSHA) and Environmental Protection Agency (EPA), the analytical process used to determine the hazardous nature and characteristics of the waste, and the analytical test results. Testing of hazardous waste is to be done in accordance with testing protocol specified for each individual waste as described in the
Code of Federal Regulations Title 40 to make a determination if the waste is a hazardous waste or otherwise regulated.
A. The determination and description shall address the following:
1. Waste toxicity (Reference 40 CFR §261.11 and 40 CFR §261.24)
2. Waste ignitability (Reference 40 CFR §261.21)
3. Waste corrosivity (Reference 40 CFR §261.22)
4. Waste reactivity (Reference 40 CFR §261.23)
5. Hazardous waste from non-specific sources (F-listed) (Reference
40 CFR §261.31)
6. Discarded commercial products (acutely toxic or P-listed and toxic or U-listed) (Reference 40 CFR §261.33)
7. Solid Waste (Reference 40 CFR §261.2)
8. Exclusions (Reference 40 CFR §261.4)
B. The Contractor will provide written instructions and training material to ensure
VHA laboratory staff are trained as needed to properly operate devices with special emphasis to managing and disposing of hazardous waste in accordance with EPA and state requirements. Additionally, the training provided by the
Contractor must fulfill Resource Conservation and Recovery Act (RCRA) requirements for training as applicable to devices.
C. Contractor shall provide a description of all wastes the process or equipment may discharge so that the facility can determine whether the discharge meets
Local Publicly Owned Treatment Works (POTW), State and Federal discharge requirements. At a minimum the characteristics of ignitability, corrosivity, reactivity and toxicity as defined in 40 CFR §261 must be determined and documented. Any mercury containing reagents must be identified in any concentrations. All test results shall be provided. All listed chemicals (F, U, K and P) found in 40 CFR §261 shall be provided in product information and their concentrations documented. For those materials with a positive hazardous waste determination, a mechanism for the laboratory to meet local discharge requirements (i.e., mercury, thimerosal and formaldehyde) must be developed and SDS sheets must be provided in advance for review. At a minimum, documentation shall include, but not be limited to the concentration/measures of the elements and parameters listed below and must be included with
Contractor response:
1. Barium (Total)
2. Cadmium (Total)
3. Chromium (Total)
4. Copper (Total)
5. Cyanide (Total)
6. Lead (Total)
7. Mercury (Total)
8. Nickel (Total)
9. Silver (Total)
10. Zinc (Total)
11. Arsenic (Total)
12. Selenium (Total)
13. Tin (Total)
14. pH
15. Flash point(to higher than 200F)
16. BOD; biochemical oxygen demand
vi. The documentation the Contractor provides will be used to work with the VAMC and the public and/or private organization (e.g., POTW) to determine whether the waste from each device can legally be disposed of via the sewerage system.
10. CONTRACT ADMINISTRATION DATA
a. Contractor Program Manager
i. The Contractor shall provide a program manager who shall be responsible for the installation and go live of the work under the contract. In addition, the program manager shall act as the main focal point of communication between the Contracting
Officer and the Contractor. The name of this person shall be designated in writing to the
Contracting Officer. The program manager shall have full authority to act on behalf of the Contractor on all contract matters relating under the contract.
b. Hours of work
i. Contractor shall provide on-site repair services for all Contractor-provided equipment while the equipment is under standard manufacturer’s warranty. Contractor shall also provide technical support via phone seven (7) days a week, twenty-four (24) hours a day. Contractor shall provide these services at no additional charge to the Government as they are included with standard manufacturer’s warranty.
ii. Holidays: Only emergency service shall be provided on National Holidays and only if authorized by the POC in advance:
New Year’s Day January 1st
Martin Luther King’s Birthday Third Monday in January
President’s Day Third Monday in February
Memorial Day Last Monday in May
Juneteenth June 19th
Independence Day July 4th
Labor Day First Monday in September
Columbus Day Second Monday in October
Veteran’s Day November 11th
Thanksgiving Day Fourth Thursday in November
Christmas Day December 25th
iii. When a National Holiday falls on a Sunday, the following Monday shall be observed as a
National Holiday. When a National Holiday falls on a Saturday, the proceeding Friday is observed as a National Holiday by U.S. Government agencies. Also included in the definition of “Holidays” would be any other day, specifically declared by the President of the United States of America to be a National Holiday
11. SPECIAL REQUIREMENTS
a. Physical Security and Facility Considerations
i. Identification, Parking, Smoking and VA Regulations (For any onsite services): The
Contractor employees and/or Subcontractors (collectively “Contractor personnel”) shall always wear visible identification while on the premises of the facilities within the VISN.
Identification shall include a company identification card, which shall include the company name, employee name, title, and a photograph of the employee. Contractor personnel shall maintain a professional appearance commensurate to their industry.
A. Contractor personnel shall park in the appropriate designated parking areas.
Information on parking is available from the VA Police Section. The VA is not liable for parking violations of Contractor personnel under any conditions.
B. Any interior or exterior doors that are unlocked to gain access shall be kept locked during the performance of work unless it results in the creation of a safety hazard. In those instances, the Contractor is responsible to take necessary actions to maintain the same level of security prior to gaining access/performing work. Should any other devices need to be unlocked like an entry gate, those devices shall be locked immediately upon entry or exit. At no time shall the Contractor allow any person into a locked area or loan keys/access cards to another person.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .