RFQ 36C25722Q0693.docx
DOCX document 242 KB Posted
- Solicitation number
- 36C25722Q0693
About this file
This is a request for quote (RFQ) from the Department of Veterans Affairs Network Contracting Office 17 soliciting offers for a firm-fixed price contract to provide comprehensive life safety fire alarm system and sprinkler suppression system repair, maintenance, inspection, testing, and modification/installation services for multiple facilities in the North Texas Veterans Health Care System. The services are required for buildings on the Dallas, Bonham, Garland, and Grand Prairie campuses, the Veteran Resource Center and surrounding buildings in Dallas, and transitional residences in Dallas. The period of performance is one base year with four optional one-year extensions. Technical questions must be submitted by July 28, 2022 and offers are due by the date and time specified in the solicitation. The solicitation is set aside for service-disabled veteran-owned small businesses and respondents must be verified in the Vendor Information Pages database.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30 36C25722Q0693 0002.pdf | ||
| 36C25722Q0693 0002_1.docx | DOCX document | |
| Attachment A Device Inventory.xlsx | XLSX spreadsheet | |
| Bonham Inspection Bldg 1.pdf | ||
| Garland Inspection.pdf | ||
| Grand Prairie Inspection.pdf | ||
| Dallas Inspection Bldg 1.pdf | ||
| SF30 36C25722Q0693 0001.pdf | ||
| 36C25722Q0693 0001_1.docx | DOCX document | |
| Bonham WD 2015-5273.pdf | ||
| Dallas _ Garland WD 2015-5227.pdf | ||
| Grand Prairie WD 2015-5231.pdf | ||
| 36C25722Q0693_1.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAGE 1 OF
1. REQUISITION NO.
2. CONTRACT NO.
3. AWARD/EFFECTIVE DATE
4. ORDER NO.
5. SOLICITATION NUMBER
6. SOLICITATION ISSUE DATE
a. NAME
b. TELEPHONE NO. (No Collect Calls)
8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY
CODE
10. THIS ACQUISITION IS
UNRESTRICTED OR
SET ASIDE:
% FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ
IFB
RFP
15. DELIVER TO
CODE
16. ADMINISTERED BY
CODE
17a. CONTRACTOR/OFFEROR
CODE
FACILITY CODE
18a. PAYMENT WILL BE MADE BY
CODE
TELEPHONE NO.
UEI:
EFT:
PHONE:
FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19.
20.
21.
22.
23.
24.
ITEM NO.
SCHEDULE OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________
29. AWARD OF CONTRACT: REF. ___________________________________ OFFER
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DATED ________________________________. YOUR OFFER ON SOLICITATION
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
(REV. NOV 2021)
PREVIOUS EDITION IS NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
549-22-2-5096-0177
36C25722Q0693 06-30-2022 Sherine Brooks Sherine.Brooks@va.gov 08-11-2022
1PM
CDT
36C257 Department of Veterans Affairs Network Contracting Office 17 5441 Babcock Rd., Suite 302
San Antonio TX 78240
X
561621 $22 Million
N/A
Department of Veterans Affairs 4500 S. Lancaster Road
Dallas TX 75216 36C257 Department of Veterans Affairs Network Contracting Office 17 5441 Babcock Rd Suite 302 San Antonio TX 78240
This is accomplished through the Tungsten Network located at:
http://www.fsc.va.gov/einvoice.asp This is mandatory and the sole method for submitting invoices.
(877) 353-9791
(512) 460-5540
See CONTINUATION Page Fire Alarm Sprinkler System IAW SOW Multiple Locations throughout NTX VHCS
Site Visit: See "Instructions to Offerors" POC: Mark Christian, Mark.Christian@va.gov, 214-857-4935 APOC: Melanie King, Melanie.King@va.gov, 214-857-1035 Questions due: July 28, 2022, 1PM, sherine.brooks@va.gov
Period of Performance:
Base: 09/26/2022 – 09/25/2023 Option Year 1: 09/26/2023 – 09/25/2024 Option Year 2: 09/26/2024 – 09/25/2025 Option Year 3: 09/26/2025 – 09/25/2026 Option Year 4: 09/26/2026 – 09/25/2027
See "Instructions to Offerors" and "Basis for Award" .
See CONTINUATION Page
Table of Contents
| SECTION A | 1 |
| A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES | 1 |
| SECTION B - CONTINUATION OF SF 1449 BLOCKS | 3 |
| B.1 CONTRACT ADMINISTRATION DATA | 3 |
| Statement of Work | 4 |
| B.2 PRICE/COST SCHEDULE | 12 |
| ITEM INFORMATION | 12 |
| SECTION C - CONTRACT CLAUSES | 25 |
| C.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 25 |
| C.2 SUPPLEMENTAL INSURANCE REQUIREMENTS | 25 |
| C.3 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (JAN 2022) (JUL 2020) (DEVIATION) | 26 |
| C.4 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999) | 33 |
| C.5 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) | 34 |
| C.6 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (OCT 2021) (DEVIATION) | 34 |
| C.7 VAAR 852.212-70 PROVISIONS AND CLAUSES APPLICABLE TO VA ACQUISITION OF COMMERCIAL ITEMS (APR 2020) | 35 |
| C.8 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND COMPLIANCE (JUL 2018) | 36 |
| C.9 VAAR 852.219-77 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (SEP 2021) (DEVIATION) | 37 |
| C.10 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) | 39 |
| SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS | 40 |
| SECTION E - SOLICITATION PROVISIONS | 41 |
| E.1 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 41 |
| Addendum to FAR 52.212-1 Instructions to Offerors – Commercial Items | 41 |
| Basis For Award | 43 |
| E.2 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021) (JUL 2020) (DEVIATION) | 44 |
| E.3 52.233-2 SERVICE OF PROTEST (SEP 2006) | 61 |
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
1. Contract Administration: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR:
b. GOVERNMENT: 36C257 Department of Veterans Affairs Network Contracting Office 17 5441 Babcock Rd., Suite 302 San Antonio TX 78240
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
| [X] |
| 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or |
3. INVOICES: Invoices shall be submitted in arrears:
| a. Semi-Annually | [X] |
| b. Other | [X] Monthly & As Needed |
4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.
ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:
| AMENDMENT NO |
| DATE |
Page 1 of
Statement of Work
Monitor, Maintenance, Repair and Modifications/Installations of Existing Fire Alarm/Sprinkler Systems Dallas, Bonham, Garland, Grand Prairie Campuses, Veteran Resource Center (Herzog and all surrounding building) and TR Houses in NTVHCS
1. Contract Purpose:
The purpose of this contract is to provide comprehensive life safety fire alarm system and sprinkler suppression systems repair, maintenance, inspection, testing and modification/installation for all building on the Dallas, Bonham, Garland, Grand Prairie campuses, Veteran Resource Center (Herzog and all surrounding buildings) and TR houses in the NTVHCS. This includes all correction of identified deficiencies found either through inadvertent alarms, malfunctions of either the alarms or sprinkler suppression systems and scheduled inspections or testing by other vendors. All work will be coordinated through the Contracting Officer Representative (COR) / Alternate Contracting Officer Representative (ACOR), but the Contractor must work closely with their sub-contractors to ensure expeditious resolution of all maintenance and repairs. The contractor shall perform one (1) semiannual and one (1) annual inspection during the term of the contract. Each deficiency will be given a unique identifier by the Fire Alarm (Notifier System) and Suppression Testing/Inspection contractor. This identifier will be included in all documentation submitted to verify correction along with pertinent device identifiers. All newly installed devices will be given unique identifiers following the same naming pattern as previous devices. Licensed Personnel performing maintenance repair and testing shall be factory trained on the systems they are working on. All work shall be in accordance with the VA Technical Information Library Management System Technical Information Library (TIL) - Office of Construction & Facilities Management (va.gov).
2. Examples of some of the most frequent repair items for NTVHCS include:
Fire Alarm Repairs
| 1 |
| Replace Addressable Smoke Detectors |
| 2 |
| Replace Addressable Heat Detectors |
| 3 |
| Replace Addressable Pull Stations |
| 4 |
| Replace 2-Wire Duct Detector |
| 5 |
| Replace 4-Wire Duct Detector |
| 6 |
| Replace Individual Addressable Module |
| 7 |
| Replace Addressable Relay Module |
| 8 |
| Replace Tamper Switch |
| 9 |
| Replace Remote Annunciator |
| 10 |
| Replace Speaker/Visual |
| 11 |
| Replace Visual Only |
| 12 |
| Replace Fiber Media Module |
| 13 |
| Replace Wired Media Module |
| 14 |
| Troubleshoot Earth Ground Fault trouble |
| 15 |
| Troubleshoot Short Circuit wiring trouble |
| 16 |
| Troubleshoot Open Circuit wiring trouble |
| 17 |
| Replace Panel CPU board |
| 18 |
| Replace Network Interface board |
| 19 |
| Replace System Power Supply board/with UPS |
Sprinkler Repairs
| 1 |
| Replace Control valves (PIV) |
| 2 |
| Replace Pre-action/deluge valves/ drain valves various sizes/test values |
| 3 |
| Replace Backflow prevention and components |
| 4 |
| Replace Gauges |
| 5 |
| Replace Sprinkler heads |
| 6 |
| Replace sprinkler pipe/ pipe sections |
| 7 |
| Replace waterflows and tampers |
| 8 |
| Replace electric bells/water gongs |
| 9 |
| Replace Ansul cylinders/linkages in kitchen and Manual Pull Stations |
| 10 |
| Replace sight glass |
3. Work Requirement/Equipment:
The contractor shall provide the necessary number of capable and licensed employees to properly perform and complete all work required under the terms of the contract. The contractor shall provide all labor, travel, equipment, supplies/ materials, wearable parts, technical and administrative support required to facilitate the overall operation objectives of the systems in accordance with the most current edition of the NFPA and all applicable publications and will be proficient in with The Joint Commissions standards and performance requirements. All tasks shall be performed in strict accordance with the statement of work. All work will be performed under the supervision of an on-site competent person for the system under work. Prior to performing any required work (Monitoring, Maintenance, Inspection, Repair and Modifications/Installations) of Existing Fire Alarm/Sprinkler Systems a maintenance schedule will be submitted to and coordinated with the Contracting Officer's Representative (COR, and/or the Alternate Contracting Officer’s Representative (ACOR) at the Engineering Department. Two (2) days prior to the approved scheduled inspection date for regular maintenance, programming, testing or repairs the contractor will contact the COR (or ACOR) for confirmation to ensure that the scheduled date is still acceptable.
4. Inspection Report:
The contractor shall perform one (1) semiannual and one (1) annual, Inspection during the term of the contract. The annual shall include all fire alarm/sprinkler system devices (smoke detectors, heat detectors, duct detector manual pull stations, relay modules, batteries audiovisual devices, strobe power supplies, speakers, water flows, tampers, and pressure switches. The semiannual/annual inspection shall also include fire pump, Backflow preventers, fire hydrants, exercise PIV’s, lubricate valves, test all associated components in accordance with applicable NFPA standards. As the inspection on each system or building is completed, a description of the system condition, description of corrective measures, and any other special notes (tests conducted and maintenance work performed) are annotated on an inspection form (for each building or system). The form will be signed by the service technician/inspector and turned into the COR or ACOR within (3) working days. The inspection report will also indicate the probable continuance of the condition of each system until the next inspection. The contractor will furnish inspection, testing/maintenance reports and recommendations with the COR/ACOR within three (3) working days upon completion of a building of Fire Alarm/ Sprinkler System. The semi-annual/annual inspection once completed per building, the contractor shall review the report and present corrective measures for any Red Taggable deficiencies with the COR/ACOR within three (3) working days. Once inspection is completed and report has been reviewed with the COR/ACOR, any red tag deficiencies shall be repaired within three (3) working days upon approval. Before submitting any report to the COR/ACOR, the reports shall be reviewed for any mistakes. The Contractor shall modify the Fire Alarm /Sprinkler system as needed per NFPA standards. The contractor shall provide 3rd party review of fire alarm and sprinkler renovation drawings as requested by facility construction project team to ensure all applicable standards are applied during contracted design.
5. Spare Parts, Wearable/Nonwearable Parts and Test Equipment:
A complete inventory of spare parts is to be maintained by the contractor for maintenance/repair of the Fire Alarm / Sprinkler systems. All spare parts maintained by the contractor will meet or exceed conformity with National Fire Code (NFPA) Standards. All equipment and material will be labeled and listed for compliance with appropriate standards. Service technicians/inspectors are to be equipped with all tools and test equipment necessary for preventive maintenance and field repair of fire protection systems and devices. The Contractor shall not proceed with any repairs without permission from the COR or the Contracting Officer. Contractor shall submit turnkey line-item prices to remove and replace the following fire alarm devices: Smoke detectors, Heat detectors, Duct detectors, Manuel Pull stations, Control modules, Monitor Modules and Relay Modules, Batteries, Audiovisual devices, and Strobe power supplies.
Wearable parts are parts that are designed to wear under normal operation. Nonwearable parts are effectively parts that are designed to last for the life of the system. All “non-wearable” parts which require replacement shall be invoiced against the Not-to-Exceed (NTE) Line Items within the contract schedule. The NTE amount is estimated and may increase/decrease as required. Prior performing work against this NTE line item, the contractor shall provide a written quote to the COR detailing the required work/modification, parts, and cost.
6. Places of Performance:
· NTVHCS Dallas Campus
· 4500 S. Lancaster Road, Dallas, Texas 75216
· TR Houses (Residential System (Fire alarm/Sprinkler)
· 2423 Cliff Teen Ct , Dallas, TX 75233
· 2435 Plaza Blvd, Dallas, TX 75241
· 2708 Jefferson Blvd, Dallas, TX 75211
· 2710 Jefferson Blvd, Dallas TX 75211
· Bonham Campus
· 1209 E. 9th St., Bonham TX 75418
· Garland
· 2300 Marie Curie Dr, Garland TX 75042
· Grand Prairie
· 2737 Sherman St, Grand Prairie TX 75051
· Veteran Resource Center (Herzog and all addition buildings)
· 4900 S. Lancaster Road, Dallas, TX 75216
7. Hours of Services:
Work will be conducted within the hours of 0800 until 1630, although evening and weekend work may be scheduled for the mutual benefit of the contractor and the government with advanced notice.
Federal Holidays: National holidays observed by the Federal Government are:
· New Year’s Day ------------------------------------------------------------- January 1
· Martin Luther King Day-----------------------------------------------------Third Monday in January
· Presidents’ Day---------------------------------------------------------------Third Monday in February
· Memorial Day ---------------------------------------------------------------- Last Monday in May
· Juneteenth Freedom Day--------------------------------------------------June 19
· Independence ----------------------------------------------------------------July 4
· Labor Day --------------------------------------------------------------------- First Monday in September
· Columbus Day --------------------------------------------------------------- Second Monday in October
· Veterans’ Day ---------------------------------------------------------------- November 11
· Thanksgiving Day ----------------------------------------------------------- Fourth Thursday in November
· Christmas Day --------------------------------------------------------------- December 25
8. Repairs:
Line Items 0013,1013, 2013, 3013 and 4013 are Not To Exceed (NTE) CLINs. Invoicing against these CLINs is authorized only after the COR/CO has reviewed and approved the quote. Upon notification of any issue by phone/email, the Contractor will provide a cost estimate (quote) that includes specific costs broken out for labor and materials: the cost estimate will include the deficiency identifier assigned to it by the Inspection Contractor if applicable. The COR/ACOR may verbally approve to order parts and schedule the repair, but the Contracting Officer shall give approval before proceeding with the work. All red tagged items will be investigated and quoted within 24 hours, work completed within 72 hours of being notified by COR/ACOR. The Contracting Officer will then need to approve the cost estimate to stay within the time perimeters. If the identification of the issue occurred during a fire alarm and sprinkler/suppression inspections. The contractor shall compile red tag issues, communicate to the COR/ACOR of all red tag issues, and provide a cost estimate for the repairs. Any troubles or impairments detected in the system; the contractor shall notify the COR/ACOR with a Corrective Action Plan. Once, COR/ACOR gives the approval work shall be completed within 3 working days. The contractor shall maintain and update the current fire alarm / sprinkler system program. The Contractor shall modify the Fire Alarm /Sprinkler system as needed per NFPA standards. The contractor shall provide 3rd party review of fire alarm and sprinkler renovation drawings as requested by facility construction project team to ensure all applicable standards are applied during contracted design.
9. ID Badges, Sign-In/Out, Parking and Smoking:
All contractor personnel are required to sign-in and wear identification badges during the entire time they are on VA grounds. All contractor personnel are required to sign-out. It is the responsibility of contractor personnel to park only in designated parking areas. Parking information is available from VA Police service. The VA will not validate nor make reimbursement for parking violations of the contractor’s personnel under any circumstances. Smoking, tobacco use, or e-cigarettes is not permitted within or around VA Healthcare System facilities. No individual is permitted to bring alcohol or firearms of any type onto a government installation.
10. Service Log:
The contractor shall ensure that the authorized service personnel representative logs include the start and completion times on the service ticket for the service performed. Contractor will provide the following information on the repair or work item: campus, building name or number, floor, type of work performed, parts replaced, hours worked and name of personnel performing the work. The Contractor will provide a service ticket of all work performed to include a basic diagram identifying the parts by device address label and room numbers. If identified during inspections/testing, the Contractor will identify each deficiency corrected by the number assigned by the Inspection Contractor. Corrections for no more than one building will be included in each service ticket. The service ticket will be provided electronically to the COR/ACOR the day the work is completed.
11. Maintenance/Repair of Fire Alarm and Suppression Systems:
Maintenance, Monitoring, Repair and Modifications/Installations of Existing Fire Alarm/Sprinkler Systems Contractor: Will need to coordinate any repairs, modification or anything covered in the contract for Dallas, Bonham, Garland, Grand Prairie Campuses, Veteran Resource Center (Herzog & all surrounding building) and TR Houses. Work shall be performed in accordance with National Fire Protection Association (NFPA 101, 72, 90A, 25, 17A and 13 required acceptable Fire Safety Standards, as they apply, and the following: Maintenance will be performed on a semi-annual (twice/year) basis and will be conducted in accordance with manufacturer’s standards. Contractor should estimate approximately 20 calls per year. The contractor shall maintain and update the current fire alarm / sprinkler system program. Contractor shall supply all devices and parts. (Based on GSA pricing scheduling) As a minimum, maintenance will consist of all fire alarm / Sprinkler systems will be thoroughly inspected and tested for proper operation. Fire Alarm / Sprinkler System will be always maintained in full operating condition and any defects and/or impairments noted will be reported to the COR (or ACOR) immediately with a corrective action plan for repairs. All detectors, manual pull station, strobes and sprinkler heads will be examined and cleaned. If the contractor accidentally or deliberately trips and expels agents, he will replace the agent at his own expense.
Maintenance Times to be determined (TBD) and coordinated with the following individuals.
Mark Christian (COR) Phone: 214-857-4935 Email: mark.christian@va.gov
Melanie King (ACOR) Phone: 214-857-1035 Email: melanies.king@va.gov
COR/ACOR: Will ensure repairs are jointly coordinated between all parties.
12. Response Timeliness:
The Contractor must be able to provide competent alarm, suppression, or sprinkler technicians to resolve emergent conditions within one hour of notification to the issue; response time for nonemergent conditions are eight hours for red tag deficiencies and 24 hours for all others. Emergent conditions are generally defined as alarms that cannot be silenced in an occupied space or sprinkler water flowing. The Contractor must be able to provide investigation/ correction to any red tag item within 72 hours and to any yellow tag item within 1 week.
13. On-Site Vendor Responsibility:
The Contractor shall be responsible all facilities in which the work will take place and to also be familiar with the conditions under which the work will be accomplished. The Contractor shall inspect existing conditions prior to commencing work, including elements subject to damage or movement during the project/ repair. The Contractor will provide adequate personnel to reset alarm panels. The Contractor will provide adequate staff to respond to repairs such that time frames are not impacted. Should the repair create dust, water or mud, the Contractor will be responsible for cleaning the floors and walls. The Contractor will also be responsible for adhering to NTVHCS Infection Control policies as advised by the COR and the IPC specialists.
14. Tagging Requirements:
The Contractor shall notify the COR or ACOR if panel alarm activation occurs unexpectedly during maintenance and immediately upon occurrence. Contractor will contact the Cor/ACOR or energy center for procedures to take monitoring systems offline during repair procedures. The Contractor will take all efforts to prevent this from occurring with any regularity. A panel must show a "no fault or no trouble" condition upon completion of test and/or repairs. After the repairs are completed, the Contractor will contact the COR prior to placing monitoring systems back online, and the appropriate tags will be attached indicating the system status. The Contractor will attach a "white" tag upon commencement of work indicating the work in progress and will remain on until the next inspection. The Contractor shall be responsible for any damage to the fire system during the work processes. The tagging and labeling system must clearly identify either a "blue" (operational condition) or "yellow" (troubled condition but functional) or "red" (Impaired or Fault but functional) or "red" (System Inoperable). This labeling system applies to all circuit boards, components in the control panels, annunciator panels, transponders, printers, keyboards, monitors, and peripheral devices (smoke detectors, pull stations, audible and visible units, door contacts, tampers, flows, etc.) associated with the fire alarm/ sprinkler system.
15. Qualifications of Personnel:
The Contractor and persons performing maintenance must be fully licensed from the State of Texas to perform fire alarm/sprinkler testing, maintenance, installation, and authorized repairs. Evidence of all required licenses, as well as documentation of the qualifications of personnel, shall be provided to the Contracting Officer prior to the award of the contract. The contractor shall ensure that all documentation, certificates of training and licenses, permit, bonds are current and valid. All proposals shall include documentation and proof of the above certifications and qualifications for each employee. Service personnel will be fully aware of the requirements and procedures of the (NFPA) National Fire Protection Association in their perspective capacity (fire alarm, sprinkler, or suppression). Failure to comply with these procedures will result in the Contractor returning at their own expense to provide the required services. The Contractor will supply all service personnel necessary to perform the services to include restoring fire alarm system to a normal state after alarm activation. The contractor shall always have enough capable and licensed employees to adequately and safely perform all work required under the contract. The contractor shall ensure that all personnel performing work on this contract shall have at minimum the following certifications.
1. At a minimum, the National Institute for Certification in Engineering Technologies (NICET), Level II is required.
2.Texas Department of Insurance State Licensure is required: Fire Alarm Technician (FAL).
3.All assigned technicians must have a minimum of three (3) years of experience in fire alarm/ fire sprinkler inspections, installation, service.
4.All inspectors shall be Notifier Factory trained to service and program Notifier 3030 fire alarm systems.
16. Contractor shall possess the following Texas state licenses / Registrations.
1. ACR (fire alarm)
2. ACR-SS (monitoring)
3. APS - fire alarm superintendent
4. SCR – fire sprinkler
5. SCR – U (sprinkler certificate of registration – underground)
6. RME - Responsible Managing Employee
17. Scheduling of Services:
Various repairs, maintenance, inspection, testing, install, modification services may need to be scheduled for the evening or night to prevent disruption of patient care. All work will be scheduled through the COR. Restoration of normal life safety services will be completed at the end of each shift.
E. Period of Performance:
One Base Period and four Option Years:
1.Base Period: 09/26/2022 – 09/25/2023 2.Option Year 1: 09/26/2023 – 09/25/2024 3.Option Year 2: 09/26/2024 – 09/25/2025 4.Option Year 3: 09/26/2025 – 09/25/2026 5.Option Year 4: 09/26/2026 – 09/25/2027
18. System Impairment:
If during maintenance or repair, any system or portion thereof is found to be impaired or if any device fails to pass testing criteria, the Contractor will immediately contact the COR via telephone or email notification and provide specific information as to the failed device. Following the phone call, (on the same day) an email will immediately be sent to the COR with all red or yellow deficiencies, specific location and description of the failed part, failure details, and impact.
19. Documentation Requirements:
1. The Contractor will provide an electronic service ticket identifying each repair corrected or device installed. The service ticket will note any pertinent (TJC) The Joint Commission standard and element of performance and the (NFPA) National Fire Protection Association criteria the correction addresses. The service ticket shall be signed by the POC, or the COR to verify the work is complete, and before the contractor leaves that day. The signed service ticket shall be submitted by the contractor, along with the invoice to the Tungsten portal to receive payment. The following laws, regulations, policies, and procedures in effect on date of contract issuance and all subsequent changes or updates apply:
a. Federal Acquisition Regulation
b. Veterans Administration Acquisition Regulation
c. Service Contract Act (SCA) Directory of Occupations (Fifth Edition) http://www.dol.gov/whd/contracts/sca.htm
d. ANSI: https://pdflakekxng.files.wordpress.com/2015/04/ansi-z133-safety-standard-pdf.pdf
e. VA Directive 0058- VA Green Purchasing Program
f. VA Directive 0057- VA Environmental Program
g. Master Construction Specification: https://www.cfm.va.gov/TIL/spec.asp#03
h. TIL Physical Security & Resiliency https://www.cfm.va.gov/til/spclRqmts.asp#PHS
i. VA North Texas Construction Safety Accident Prevention Plan Requirements
j. NARA records management Language for Contracts
B.2 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3.00 |
| JB |
| __________________ |
| __________________ |
Provide comprehensive Semi-Annual and Annual Inspection Services of life safety fire alarm system and sprinkler suppression systems services for North Texas Veteran Health Care System Dallas Campus located at: 4500 S. Lancaster Road, Dallas, Texas 75216 Contract Period: Base POP Begin: 09-26-2022 POP End: 09-25-2023
| 12.00 |
| MO |
| __________________ |
| __________________ |
Provide comprehensive Monitoring Services of life safety fire alarm system and sprinkler suppression systems for North Texas Veteran Health Care System Dallas Campus located at: 4500 S. Lancaster Road, Dallas, Texas 75216
| 3.00 |
| JB |
| __________________ |
| __________________ |
Provide comprehensive Semi-Annual and Annual Inspection Services of life safety fire alarm system and sprinkler suppression systems for North Texas Veteran Health Care System Dallas Campus TR Residential Houses located at:
2423 Cliff Teen Ct , Dallas, TX 75233 2435 Plaza Blvd, Dallas, TX 75241 2708 Jefferson Blvd, Dallas, TX 75211 2710 Jefferson Blvd, Dallas TX 75211 Contract Period: Base
| 12.00 |
| MO |
| __________________ |
| __________________ |
Provide comprehensive Monitoring Services of life safety fire alarm system and sprinkler suppression systems for North Texas Veteran Health Care System Dallas Campus TR Residential Houses located at:
2435 Plaza Blvd, Dallas, TX 75241 2708 Jefferson Blvd, Dallas, TX 75211 2710 Jefferson Blvd, Dallas TX 75211 Contract Period: Base
| 3.00 |
| JB |
| __________________ |
| __________________ |
Provide comprehensive Semi-Annual and Annual Inspection Services of life safety fire alarm system and sprinkler suppression systems for North Texas Veteran Health Care System Bonham Campus located at: 1209 E. 9th St., Bonham TX 75418
| 12.00 |
| MO |
| __________________ |
| __________________ |
Provide comprehensive Monitoring Services of life safety fire alarm system and sprinkler suppression systems for North Texas Veteran Health Care System Bonham Campus located at: 1209 E. 9th St., Bonham TX 75418
| 3.00 |
| JB |
| __________________ |
| __________________ |
Provide comprehensive Semi-Annual and Annual Inspection Services of life safety fire alarm system and sprinkler suppression systems services for North Texas Veteran Health Care System Garland Campus located at: 2300 Marie Curie Dr., Garland TX 75042
POP Begin: 09-26-2022 POP End: 09-25-2023 PRINCIPAL NAICS CODE: 561621 - Security Systems Services (except Locksmiths) PRODUCT/SERVICE CODE: J012 - Maintenance, Repair, and Rebuilding of Equipment - Fire Control Equipment
| 12.00 |
| MO |
| __________________ |
| __________________ |
Provide comprehensive Monitoring Services of life safety fire alarm system and sprinkler suppression systems for North Texas Veteran Health Care System Garland Campus located at: 2300 Marie Curie Dr., Garland TX 75042
| 3.00 |
| JB |
| __________________ |
| __________________ |
Provide comprehensive Semi-Annual and Annual Inspection Services of life safety fire alarm system and sprinkler suppression systems services for North Texas Veteran Health Care System Grand Prairie Campus located at: 2737 Sherman St, Grand Prairie TX 75051
| 12.00 |
| MO |
| __________________ |
| __________________ |
Provide comprehensive Monitoring Services of life safety fire alarm system and sprinkler suppression systems for North Texas Veteran Health Care System Grand Prairie Campus located at: 2737 Sherman St, Grand Prairie TX 75051
| 3.00 |
| JB |
| __________________ |
| __________________ |
Provide comprehensive Semi-Annual and Annual Inspection Services of life safety fire alarm system and sprinkler suppression systems services for North Texas Veteran Health Care System, Veteran Resource Center (Herzog and all addition buildings) located at: 4900 S. Lancaster Road, Dallas, TX 75216
| 12.00 |
| MO |
| __________________ |
| __________________ |
Provide comprehensive Monitoring Services of life safety fire alarm system and sprinkler suppression systems services for North Texas Veteran Health Care System, Veteran Resource Center (Herzog and all addition buildings) located at: 4900 S. Lancaster Road, Dallas, TX 75216
POP Begin: 09-26-2022 POP End: 09-25-2023
PRODUCT/SERVICE CODE: J012 - Maintenance, Repair, and Rebuilding of Equipment - Fire Control Equipment
| 1.00 |
| YR |
| __________________ |
| __________________ |
Provide comprehensive Maintenance and Repairs, Modification/Installation (minor redesigns/upgrades and future unforeseen work) of life safety fire alarm system and sprinkler suppression systems for all locations listed in section 6 of the SOW.
This is a Not-To-Exceed CLIN which an amount will be entered by the government upon award.
Contract Period: Base
| 3.00 |
| JB |
| __________________ |
| __________________ |
Provide comprehensive Semi-Annual and Annual Inspection Services of life safety fire alarm system and sprinkler suppression systems services for North Texas Veteran Health Care System Dallas Campus located at: 4500 S. Lancaster Road, Dallas, Texas 75216 Contract Period: Option 1 POP Begin: 09-26-2023 POP End: 09-25-2024
| 12.00 |
| MO |
| __________________ |
| __________________ |
Provide comprehensive Monitoring Services of life safety fire alarm system and sprinkler suppression systems for North Texas Veteran Health Care System Dallas Campus located at: 4500 S. Lancaster Road, Dallas, Texas 75216
| 3.00 |
| JB |
| __________________ |
| __________________ |
Provide comprehensive Semi-Annual and Annual Inspection Services of life safety fire alarm system and sprinkler suppression systems for North Texas Veteran Health Care System Dallas Campus TR Residential Houses located at:
2435 Plaza Blvd, Dallas, TX 75241 2708 Jefferson Blvd, Dallas, TX 75211 2710 Jefferson Blvd, Dallas TX 75211 Contract Period: Option 1
| 12.00 |
| MO |
| __________________ |
| __________________ |
Provide comprehensive Monitoring Services of life safety fire alarm system and sprinkler suppression systems for North Texas Veteran Health Care System Dallas Campus TR Residential Houses located at:
2435 Plaza Blvd, Dallas, TX 75241 2708 Jefferson Blvd, Dallas, TX 75211 2710 Jefferson Blvd, Dallas TX 75211 Contract Period: Option 1
| 3.00 |
| JB |
| __________________ |
| __________________ |
Provide comprehensive Semi-Annual and Annual Inspection Services of life safety fire alarm system and sprinkler suppression systems for North Texas Veteran Health Care System Bonham Campus located at: 1209 E. 9th St., Bonham TX 75418
| 12.00 |
| MO |
| __________________ |
| __________________ |
Provide comprehensive Monitoring Services of life safety fire alarm system and sprinkler suppression systems for North Texas Veteran Health Care System Bonham Campus located at: 1209 E. 9th St., Bonham TX 75418
| 3.00 |
| JB |
| __________________ |
| __________________ |
Provide comprehensive Semi-Annual and Annual Inspection Services of life safety fire alarm system and sprinkler suppression systems services for North Texas Veteran Health Care System Garland Campus located at: 2300 Marie Curie Dr., Garland TX 75042
| 12.00 |
| MO |
| __________________ |
| __________________ |
Provide comprehensive Monitoring Services of life safety fire alarm system and sprinkler suppression systems for North Texas Veteran Health Care System Garland Campus located at: 2300 Marie Curie Dr., Garland TX 75042
| 3.00 |
| JB |
| __________________ |
| __________________ |
Provide comprehensive Semi-Annual and Annual Inspection Services of life safety fire alarm system and sprinkler suppression systems services for North Texas Veteran Health Care System Grand Prairie Campus located at: 2737 Sherman St, Grand Prairie TX 75051
| 12.00 |
| MO |
| __________________ |
| __________________ |
Provide comprehensive Monitoring Services of life safety fire alarm system and sprinkler suppression systems for North Texas Veteran Health Care System Grand Prairie Campus located at: 2737 Sherman St, Grand Prairie TX 75051
| 3.00 |
| JB |
| __________________ |
| __________________ |
Provide comprehensive Semi-Annual and Annual Inspection Services of life safety fire alarm system and sprinkler suppression systems services for North Texas Veteran Health Care System, Veteran Resource Center (Herzog and all addition buildings) located at: 4900 S. Lancaster Road, Dallas, TX 75216
| 12.00 |
| MO |
| __________________ |
| __________________ |
Provide comprehensive Monitoring Services of life safety fire alarm system and sprinkler suppression systems services for North Texas Veteran Health Care System, Veteran Resource Center (Herzog and all addition buildings) located at: 4900 S. Lancaster Road, Dallas, TX 75216
| 1.00 |
| YR |
| __________________ |
| __________________ |
Provide comprehensive Maintenance and Repairs, Modification/Installation (minor redesigns/upgrades and future unforeseen work) of life safety fire alarm system and sprinkler suppression systems for all locations listed in section 6 of the SOW.
Contract Period: Option 1
| 3.00 |
| JB |
| __________________ |
| __________________ |
Provide comprehensive Semi-Annual and Annual Inspection Services of life safety fire alarm system and sprinkler suppression systems services for North Texas Veteran Health Care System Dallas Campus located at: 4500 S. Lancaster Road, Dallas, Texas 75216 Contract Period: Option 2 POP Begin: 09-26-2024 POP End: 09-25-2025
| 12.00 |
| MO |
| __________________ |
| __________________ |
Provide comprehensive Monitoring Services of life safety fire alarm system and sprinkler suppression systems for North Texas Veteran Health Care System Dallas Campus located at: 4500 S. Lancaster Road, Dallas, Texas 75216
| 3.00 |
| JB |
| __________________ |
| __________________ |
Provide comprehensive Semi-Annual and Annual Inspection Services of life safety fire alarm system and sprinkler suppression systems for North Texas Veteran Health Care System Dallas Campus TR Residential Houses located at:
2435 Plaza Blvd, Dallas, TX 75241 2708 Jefferson Blvd, Dallas, TX 75211 2710 Jefferson Blvd, Dallas TX 75211 Contract Period: Option 2
| 12.00 |
| MO |
| __________________ |
| __________________ |
Provide comprehensive Monitoring Services of life safety fire alarm system and sprinkler suppression systems for North Texas Veteran Health Care System Dallas Campus TR Residential Houses located at:
2435 Plaza Blvd, Dallas, TX 75241 2708 Jefferson Blvd, Dallas, TX 75211 2710 Jefferson Blvd, Dallas TX 75211 Contract Period: Option 2
| 3.00 |
| JB |
| __________________ |
| __________________ |
Provide comprehensive Semi-Annual and Annual Inspection Services of life safety fire alarm system and sprinkler suppression systems for North Texas Veteran Health Care System Bonham Campus located at: 1209 E. 9th St., Bonham TX 75418
| 12.00 |
| MO |
| __________________ |
| __________________ |
Provide comprehensive Monitoring Services of life safety fire alarm system and sprinkler suppression systems for North Texas Veteran Health Care System Bonham Campus located at: 1209 E. 9th St., Bonham TX 75418
POP Begin: 09-26-2024 POP End: 09-25-2025
PRODUCT/SERVICE CODE: J012 - Maintenance, Repair, and Rebuilding of Equipment - Fire Control Equipment
| 3.00 |
| JB |
| __________________ |
| __________________ |
Provide comprehensive Semi-Annual and Annual Inspection Services of life safety fire alarm system and sprinkler suppression systems services for North Texas Veteran Health Care System Garland Campus located at: 2300 Marie Curie Dr., Garland TX 75042
| 12.00 |
| MO |
| __________________ |
| __________________ |
Provide comprehensive Monitoring Services of life safety fire alarm system and sprinkler suppression systems for North Texas Veteran Health Care System Garland Campus located at: 2300 Marie Curie Dr., Garland TX 75042
| 3.00 |
| JB |
| __________________ |
| __________________ |
Provide comprehensive Semi-Annual and Annual Inspection Services of life safety fire alarm system and sprinkler suppression systems services for North Texas Veteran Health Care System Grand Prairie Campus located at: 2737 Sherman St, Grand Prairie TX 75051
| 12.00 |
| MO |
| __________________ |
| __________________ |
Provide comprehensive Monitoring Services of life safety fire alarm system and sprinkler suppression systems for North Texas Veteran Health Care System Grand Prairie Campus located at: 2737 Sherman St, Grand Prairie TX 75051
| 3.00 |
| JB |
| __________________ |
| __________________ |
Provide comprehensive Semi-Annual and Annual Inspection Services of life safety fire alarm system and sprinkler suppression systems services for North Texas Veteran Health Care System, Veteran Resource Center (Herzog and all addition buildings) located at: 4900 S. Lancaster Road, Dallas, TX 75216
| 12.00 |
| MO |
| __________________ |
| __________________ |
Provide comprehensive Monitoring Services of life safety fire alarm system and sprinkler suppression systems services for North Texas Veteran Health Care System, Veteran Resource Center (Herzog and all addition buildings) located at: 4900 S. Lancaster Road, Dallas, TX 75216
| 1.00 |
| YR |
| __________________ |
| __________________ |
Provide comprehensive Maintenance and Repairs, Modification/Installation (minor redesigns/upgrades and future unforeseen work) of life safety fire alarm system and sprinkler suppression systems for all locations listed in section 6 of the SOW.
Contract Period: Option 2
| 3.00 |
| JB |
| __________________ |
| __________________ |
Provide comprehensive Semi-Annual and Annual Inspection Services of life safety fire alarm system and sprinkler suppression systems services for North Texas Veteran Health Care System Dallas Campus located at: 4500 S. Lancaster Road, Dallas, Texas 75216 Contract Period: Option 3 POP Begin: 09-26-2025 POP End: 09-25-2026
| 12.00 |
| MO |
| __________________ |
| __________________ |
Provide comprehensive Monitoring Services of life safety fire alarm system and sprinkler suppression systems for North Texas Veteran Health Care System Dallas Campus located at: 4500 S. Lancaster Road, Dallas, Texas 75216
| 3.00 |
| JB |
| __________________ |
| __________________ |
Provide comprehensive Semi-Annual and Annual Inspection Services of life safety fire alarm system and sprinkler suppression systems for North Texas Veteran Health Care System Dallas Campus TR Residential Houses located at:
2435 Plaza Blvd, Dallas, TX 75241 2708 Jefferson Blvd, Dallas, TX 75211 2710 Jefferson Blvd, Dallas TX 75211 Contract Period: Option 3
| 12.00 |
| MO |
| __________________ |
| __________________ |
Provide comprehensive Monitoring Services of life safety fire alarm system and sprinkler suppression systems for North Texas Veteran Health Care System Dallas Campus TR Residential Houses located at:
2435 Plaza Blvd, Dallas, TX 75241 2708 Jefferson Blvd, Dallas, TX 75211 2710 Jefferson Blvd, Dallas TX 75211 Contract Period: Option 3
| 3.00 |
| JB |
| __________________ |
| __________________ |
Provide comprehensive Semi-Annual and Annual Inspection Services of life safety fire alarm system and sprinkler suppression systems for North Texas Veteran Health Care System Bonham Campus located at: 1209 E. 9th St., Bonham TX 75418
| 12.00 |
| MO |
| __________________ |
| __________________ |
Provide comprehensive Monitoring Services of life safety fire alarm system and sprinkler suppression systems for North Texas Veteran Health Care System Bonham Campus located at: 1209 E. 9th St., Bonham TX 75418
| 3.00 |
| JB |
| __________________ |
| __________________ |
Provide comprehensive Semi-Annual and Annual Inspection Services of life safety fire alarm system and sprinkler suppression systems services for North Texas Veteran Health Care System Garland Campus located at: 2300 Marie Curie Dr., Garland TX 75042
| 12.00 |
| MO |
| __________________ |
| __________________ |
Provide comprehensive Monitoring Services of life safety fire alarm system and sprinkler suppression systems for North Texas Veteran Health Care System Garland Campus located at: 2300 Marie Curie Dr., Garland TX 75042
| 3.00 |
| JB |
| __________________ |
| __________________ |
Provide comprehensive Semi-Annual and Annual Inspection Services of life safety fire alarm system and sprinkler suppression systems services for North Texas Veteran Health Care System Grand Prairie Campus located at: 2737 Sherman St, Grand Prairie TX 75051
| 12.00 |
| MO |
| __________________ |
| __________________ |
Provide comprehensive Monitoring Services of life safety fire alarm system and sprinkler suppression systems for North Texas Veteran Health Care System Grand Prairie Campus located at: 2737 Sherman St, Grand Prairie TX 75051
| 3.00 |
| JB |
| __________________ |
| __________________ |
Provide comprehensive Semi-Annual and Annual Inspection Services of life safety fire alarm system and sprinkler suppression systems services for North Texas Veteran Health Care System, Veteran Resource Center (Herzog and all addition buildings) located at: 4900 S. Lancaster Road, Dallas, TX 75216
| 12.00 |
| MO |
| __________________ |
| __________________ |
Provide comprehensive Monitoring Services of life safety fire alarm system and sprinkler suppression systems services for North Texas Veteran Health Care System, Veteran Resource Center (Herzog and all addition buildings) located at: 4900 S. Lancaster Road, Dallas, TX 75216
| 1.00 |
| YR |
| __________________ |
| __________________ |
Provide comprehensive Maintenance and Repairs, Modification/Installation (minor redesigns/upgrades and future unforeseen work) of life safety fire alarm system and sprinkler suppression systems for all locations listed in section 6 of the SOW.
Contract Period: Option 3
| 3.00 |
| JB |
| __________________ |
| __________________ |
Provide comprehensive Semi-Annual and Annual Inspection Services of life safety fire alarm system and sprinkler suppression systems services for North Texas Veteran Health Care System Dallas Campus located at: 4500 S. Lancaster Road, Dallas, Texas 75216 Contract Period: Option 4 POP Begin: 09-26-2026 POP End: 09-25-2027
| 12.00 |
| MO |
| __________________ |
| __________________ |
Provide comprehensive Monitoring Services of life safety fire alarm system and sprinkler suppression systems for North Texas Veteran Health Care System Dallas Campus located at: 4500 S. Lancaster Road, Dallas, Texas 75216
| 3.00 |
| JB |
| __________________ |
| __________________ |
Provide comprehensive Semi-Annual and Annual Inspection Services of life safety fire alarm system and sprinkler suppression systems for North Texas Veteran Health Care System Dallas Campus TR Residential Houses located at:
2435 Plaza Blvd, Dallas, TX 75241 2708 Jefferson Blvd, Dallas, TX 75211 2710 Jefferson Blvd, Dallas TX 75211 Contract Period: Option 4
| 12.00 |
| MO |
| __________________ |
| __________________ |
Provide comprehensive Monitoring Services of life safety fire alarm system and sprinkler suppression systems for North Texas Veteran Health Care System Dallas Campus TR Residential Houses located at:
2435 Plaza Blvd, Dallas, TX 75241 2708 Jefferson Blvd, Dallas, TX 75211 2710 Jefferson Blvd, Dallas TX 75211 Contract Period: Option 4
| 3.00 |
| JB |
| __________________ |
| __________________ |
Provide comprehensive Semi-Annual and Annual Inspection Services of life safety fire alarm system and sprinkler suppression systems for North Texas Veteran Health Care System Bonham Campus located at: 1209 E. 9th St., Bonham TX 75418
| 12.00 |
| MO |
| __________________ |
| __________________ |
Provide comprehensive Monitoring Services of life safety fire alarm system and sprinkler suppression systems for North Texas Veteran Health Care System Bonham Campus located at: 1209 E. 9th St., Bonham TX 75418
| 3.00 |
| JB |
| __________________ |
| __________________ |
Provide comprehensive Semi-Annual and Annual Inspection Services of life safety fire alarm system and sprinkler suppression systems services for North Texas Veteran Health Care System Garland Campus located at: 2300 Marie Curie Dr., Garland TX 75042
| 12.00 |
| MO |
| __________________ |
| __________________ |
Provide comprehensive Monitoring Services of life safety fire alarm system and sprinkler suppression systems for North Texas Veteran Health Care System Garland Campus located at: 2300 Marie Curie Dr., Garland TX 75042
| 3.00 |
| JB |
| __________________ |
| __________________ |
Provide comprehensive Semi-Annual and Annual Inspection Services of life safety fire alarm system and sprinkler suppression systems services for North Texas Veteran Health Care System Grand Prairie Campus located at: 2737 Sherman St, Grand Prairie TX 75051
| 12.00 |
| MO |
| __________________ |
| __________________ |
Provide comprehensive Monitoring Services of life safety fire alarm system and sprinkler suppression systems for North Texas Veteran Health Care System Grand Prairie Campus located at: 2737 Sherman St, Grand Prairie TX 75051
| 3.00 |
| JB |
| __________________ |
| __________________ |
Provide comprehensive Semi-Annual and Annual Inspection Services of life safety fire alarm system and sprinkler suppression systems services for North Texas Veteran Health Care System, Veteran Resource Center (Herzog and all addition buildings) located at: 4900 S. Lancaster Road, Dallas, TX 75216
| 12.00 |
| MO |
| __________________ |
| __________________ |
Provide comprehensive Monitoring Services of life safety fire alarm system and sprinkler suppression systems services for North Texas Veteran Health Care System, Veteran Resource Center (Herzog and all addition buildings) located at: 4900 S. Lancaster Road, Dallas, TX 75216
| 1.00 |
| YR |
| __________________ |
| __________________ |
Provide comprehensive Maintenance and Repairs, Modification/Installation (minor redesigns/upgrades and future unforeseen work) of life safety fire alarm system and sprinkler suppression systems for all locations listed in section 6 of the SOW.
Contract Period: Option 4
| GRAND TOTAL |
| __________________ |
SECTION C - CONTRACT CLAUSES
C.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://www.acquisition.gov/far/index.html http://www.va.gov/oal/library/vaar/
(End of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .