RFQ 27FAC1270127 Move Services for office relocation of Department of Public Health bid version.docx
DOCX document 82 KB Posted
- Solicitation number
- BD-27-1031-ADMIN-ADM01-131470
- Issued by
- Suffolk County, Massachusetts
About this file
This Request for Quote (RFQ 27FAC1270127) is issued by the Commonwealth of Massachusetts Executive Office of Health and Human Services (EOHHS) on behalf of the Department of Public Health (DPH) for move services related to a phased office relocation. The primary relocation involves moving DPH operations from 250 Washington Street, Boston, MA 02108 to 100 Cambridge Street, Boston, MA 02114, with a secondary destination at 67 Forest Street, Marlborough, MA 01752. The scope includes office relocation inventory and surplus removal across three phases: Phase 1 (4th & 5th floors, July 27–August 10, 2026), Phase 2 (1st & 3rd floors, August 24, 2026), and Phase 3 (2nd floor and move to Cambridge Street, September 14–November 20, 2026). The relocation inventory consists of 482 chairs, 74 desks, 234 intact modular cubicles requiring decommissioning, 138 file cabinets, 54 bookcases, 20 coat trees, 92 tables, and numerous other office furnishings and equipment detailed in Addendums A, B, and C. The vendor site visit is scheduled for Monday, July 20, 2026, at 10:00 a.m. at 250 Washington Street, Boston. The Questions and Answers deadline is July 20, 2026, at 4:00 p.m., with all bids due via CommBUYS by Wednesday, July 22, 2026, at 1:00 p.m. The move must be completed within thirty days and conducted as a night move at the destination location after 5:00 p.m., with all work requiring coordination with landlord-controlled freight elevator availability.
Bidders must submit prevailing wage sheets as a mandatory requirement and provide a detailed cost estimate broken down by move day, junk runs, broom sweep services, travel time, vehicle quantities and types, moving supplies, moving materials, and miscellaneous costs including permits and disposal fees. The Commonwealth of Massachusetts is self-insured and does not purchase additional insurance. The vendor must be responsible for all permits and regulatory requirements, including a parking permit from the City of Boston for truck parking on Devonshire Street and hiring an electrician to remove forty-five electrical whips and make them safe. Broom sweep services are required at the origin location by 12:00 p.m. upon conclusion of surplus removal. The contract is placed under Statewide Contract FAC 127, with all terms and conditions of that contract incorporated into this RFQ. All quotes must be submitted as "not to exceed" amounts and are final. A certified payroll record must be submitted with invoices. EOHHS reserves the right to amend the scope of work with the awarded bidder prior to the actual move date, with the bidder agreeing to negotiate in good faith all amendments.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTE FOR MOVE SERVICES (RFQ)
THE COMMONWEALTH OF MASSACHUSETTS
Executive Office of Health and Human Services (EOHHS) EHS Facilities
This order is placed under Statewide Contract FAC 127. All the terms and conditions of the Statewide Contract FAC 127 are incorporated herein and made a part hereof. Conflicting or additional terms, conditions or agreements shall be superseded and void.
This move involves the office relocation for: DEPARTMENT OF PUBLIC HEALTH
Current Address: 250 Washington Street, Boston MA 02108 New Address: 100 Cambridge Street, Boston, MA 02114 Additional Address related to move Note: This is a phased move and the first of three phases
RFQ RFQ 27FAC1270127
Move Services for office relocation of Department of Public Health object code: JJ2 Bid number: BD-27-1031-ADMIN-ADM01-131470
Is a surplus removal required from the current address 250 Washington Street, Boston MA 02108? YES |_| / NO |_| Note:
A certified payroll record must be submitted with the invoice.
The Commonwealth of Massachusetts is self-insured and is not purchasing additional insurance.
Move Components Requested:
☐ Component #1: Office Relocation Inventory for DPH EHS - see Addendum A ☐ Component #2: Surplus removal Inventory - see Addendum B & C
CONTACT INFORMATION:
| EOHHS Project Manager: | Cory Thomas | |
| EHS Facilities | ||
| 617-256-7183 | ||
| cory.thomas@mass.gov |
Submission Deadline: Wednesday, July 22, 2026
All responses must be submitted via Commbuys by Wednesday, July 22, 2026 ON 1:00 p.m..
The bid process will be closed at that time and all bids received after that will not be considered.
· A vendor site visit for this move will be conducted on Monday, July 20th,2026 at 10:00 a.m..
· Q and A deadline is Monday, July 20th, 2026 at 4 pm.
Please remember to include the dollar amount of your bid on the “quote total” column of the header information page. Please be sure to attach the detailed breakdown of your bid using the attachment portion on the header page.
DETAILS:
The day(s) of the move are linked to contractual agreements, and a construction schedule is firm at the time of this quote. The vendor will agree to these dates, knowing there may be construction delays:
This move shall be completed in no more than thirty (30)
The vendor must be responsible for all permits and regulatory requirements.
The move must be conducted in a safe and secure manner.
General packing services are not requested.
The vendor will not be responsible to disconnect or unplug computers or equipment.
Origin:
Address/location: 250 Washington Street, Boston MA 02108
Passenger Elevator available
Masonite Sheets to be located
Loading dock available
| Note: |
| Freight elevator and loading dock available during specific times per the landlord; parking permit needed to park on Devonshire Street, Boston |
Destination 1:
Address/location: 100 Cambridge Street, Boston, MA 02114 Passenger Elevator available
Masonite Sheets to be located
Loading dock available
| Note: |
| Loading dock & freight elevator are only available after 5 p.m. at Destination location; NIGHT MOVE at DESTINATION |
Destination 2:
Address/location: 67 Forest Street, Marlborough, MA 0175267 Forest Street, Marlborough, MA 01752 Passenger Elevator available
Masonite Sheets to be located
Loading dock available
| Note: |
Destination 3:
Address/location:
Passenger Elevator available
Masonite Sheets to be located
Loading dock available
| Note: |
Special Handling Requirements:
Installer and tools:
Preparation Materials:
Moving vendor will not need to provide: Labels for this move are already with the agencies already the labels breakdown is detailed below:
Labels Location
Surplus removal at 250 Washington Street, Boston
Moving Crates/Computer Bags/Bubble Wrap
| Count | Note: No computer supplies will be needed for this phase of the move; surplus removal only in Phase I | |
| 20 | ||
| Commercial bins for miscellaneous trash/surplus removal |
· Please schedule to have the moving crates and the rest of the materials delivered to 250 Washington Street, Boston MA 02108, on . The crates and materials can be picked up at 100 Cambridge Street, Boston, MA 02114on for a day rental.
· Broom Swept Services are required at 250 Washington Street, Boston MA 02108 by the conclusion of the Surplus Removal (12:00 P.M.).
· Electrician to be hired by mover to remove forty-five (45 total for all phases) electrical whips & make safe.
· Modular decommissioning needed for 464 (total for all phases) cubicles (knockdown & removal).
· Tools needed to decomission modular and executive desks (five).
· THIS IS A NIGHT MOVE at destination, ALL WORK MUST BE COMPLETED AFTER 5:00 P.M.for the final phase of this move. The freight elevator schedule at 250 Washington Street is determined by the landlord.
· A Parking permit from the City of Boston is needed to park trucks on Devonshire Street (to access freight elevator to DPH Space).
· Phases of the move are as follows - dates to be negotiated with winning bidder & landlord approved elevator operation hours:
· Phase 1 - 4th & 5th floor removal - July 27, 2026 - August 10, 2026
· Phase 2 - 1st & 3rd floors - August 24, 2026
· Phase 3 - Phase 4 - 2nd floor & move to Cambridge Street - September 14, 2026-November 20, 2026
· Dates are subject to freight elevator availability provided by the landlord.
· Please include costs for all supplies & Move materials in your bid
Inventory:
Addendum A identifies the type and quantities of DPH office furnishings and equipment to be relocated to 100 Cambridge Street, Boston, MA 02114
Addendum B identifies the type and quantities of EHS office furnishings and equipment to be relocated to100 Cambridge Street, Boston, MA 02114 100 Cambridge Street, Boston, MA 02114
Addendum C identifies the type and quantities of DPH, EHS office furnishings and equipment to be relocated to Surplus
Vendor Shall Provide:
1. Prevailing Wage Sheets (to become part of the Scope of Work) Your bid will not be considered without the wage sheets.
2. Primary Contact Information for both working hours and after working hours
3. Cost Estimate 4.
Evaluation Criteria:
1. Mandatory requirements
1. Cost Evaluation
| 2.1 | Price broken out by each move day, junk run, broom sweep |
| services and settling crew (if applicable) | |
| 2.1.1 | Including Prevailing Wage Sheets |
| 2.1.2 | Breakout of travel time |
| 2.1.3 | Quantity, type, and cost of vehicles |
| 2.1.4 | Moving supplies (dollies, padding, etc.) |
| 2.1.5 | Moving materials requested (labels, crates, keyboard bags, special |
| equipment, etc.) | |
| 2.1.6 | Miscellaneous costs: permits, fees, disposal |
After the quotes have been received and reviewed, DPH &EHS will make their selection and notification notices will be emailed out. EOHHS reserves the right to amend the scope of work with the awarded bidder prior to the actual move date and the awarded bidder agrees to negotiate in good faith all amendments to the scope of work.
All quotes are to be “not to exceed” and are final.
Addendum A
Inventory count of equipment included in the relocation from 250 Washington Street, Boston surplus removal
250 Washington St, Boston to Surplus
Office Furniture
| CHAIRS |
| 482 |
| MAIL CARTS |
| 4 |
| DESKS |
| 74 |
| PEDS |
| 20 |
| Vertical file cabinets |
| 20 |
| Lateral file cabinets |
| 118 |
| Coat tree |
| 20 |
| Tables |
| 92 |
| BOOKCASE |
| 54 |
| Compute Table |
| 4 |
| Storage Cabinet |
| 18 |
| Large Fridge |
| 5 |
| Small fridge |
| 3 |
| C-Bins |
| 10 |
Other Items
| MODULAR CUBICLES (INTACT - NEEDS DECOMMISSIONING) |
| 234 |
| Desk Printer |
| 18 |
| two wheeler |
| 2 |
| microwave |
| 5 |
| TV |
| 8 |
| media cart |
| 4 |
| modular desks |
| 10 |
| shredder |
| 4 |
| projector |
| 2 |
| plastic storage totes |
| 8 |
| floor protectors |
| 12 |
| Note: |
Addendum B
Inventory count of equipment included in the relocation from 250 Washington Street to DPH Marlboro 67 Forest Street, Marlbrough, MA 01752
250 Washington to Marlborough, 67 Forest Street
Office Furniture
| sit & stands |
| 25 |
| boxes |
| 20 |
Other Items
| Note: |
Addendum C
Inventory count of equipment included in the relocation from to
Office Furniture
Other Items
| Note: |
Month: JULY Year: 2026
JULY
| Sun |
| Mon |
| Tue |
| Wed |
| Thu |
| Fri |
| Sat |
RFQ In CommBUYS
Vendor Site Visit 250 Washington St, Boston
BIDS DUE IN COMM-BUYS
DPH Washington St, Boston Phase 1
DPH Washington St, Boston Phase 1
NOTE:
Key Information
| Department #1 |
| DEPARTMENT OF PUBLIC HEALTH |
| Department #2 |
| Department #3 |
| Agency Acronym #1 |
| DPH |
| Agency Acronym #2 |
| EHS |
| Agency Acronym #3 |
| FAC |
| 127 |
| Current Address |
| 250 Washington Street, Boston MA 02108 |
| New Address |
| 100 Cambridge Street, Boston, MA 02114 |
| Additional Address |
| Destination #2 |
| 67 Forest Street, Marlborough, MA 01752 |
| Destination #3 |
| Move Start Date |
| July, 27, 2026 |
| Move End Date |
| November 20, 2026 |
| Time Start |
| 5:00 p.m. |
| Time End |
| 12:00 P.M. |
| COMMBUYS Submission Deadline |
| Wednesday, July 22, 2026 |
| COMMBUYS Submission Time |
| 1:00 p.m. |
| Site Visit Date |
| Monday, July 20th,2026 |
| Site Visit Time |
| 10:00 a.m. |
| Total Days to Complete Move |
| thirty (30) |
image1.png
File details come from the government source that posted it. Updated .