RFQ _27_01 Widening of CR 511 Brown Bridge Ja.pdf
PDF 458 KB Posted
- Solicitation number
- PE-70700-NONST-2027-000000069
- Issued by
- Newton County, Georgia
About this file
This Request for Qualifications (RFQ #27-01) issued by Newton County Board of Commissioners in Georgia solicits qualified engineering firms to provide consultant services for the widening of CR 511/Brown Bridge Road from Jack Neely Road to Crowell Road (PI #0021218). The project involves widening the roadway from two travel lanes to three travel lanes and includes curb and gutter, storm drainage, and sidewalk improvements. Statements of Qualifications are due by August 25, 2026 at 2:00 pm at Newton County Board of Commissioners, 1113 Usher Street, Covington, Georgia 30014. The selection process is two-phased: Phase I evaluates qualifications based on submitted SOQs, with three to five finalist firms shortlisted; Phase II requests technical approaches and past performance from finalists, with possible presentations/interviews. The County anticipates awarding one multi-phase, project-specific contract to a single firm. Preliminary engineering is scheduled to commence in FY 2026, with a limited scope concept report due FY 2027, preliminary field plan review in FY 2028, final field plan review in FY 2029, and construction contract letting in FY 2030. The contract will remain in effect until successful completion of the transportation planning phase.
The contract amount will be determined through negotiations with the County using payment methods that may include lump sum, cost plus fixed fee, cost per unit of work, or specific rates of compensation. A 15% Disadvantaged Business Enterprise (DBE) participation goal is assigned to the project's Preliminary Engineering activities. The prime consultant must be prequalified by GDOT in area classes 3.02 (Two-Lane or Multi-lane Urban Roadway Design) and 3.13 (Facilities for Bicycles and Pedestrians), while the overall team must demonstrate prequalification in numerous additional specialized areas including NEPA, surveying, traffic analysis, utility coordination, and construction engineering. The County will monitor DBE participation in accordance with the Georgia Department of Transportation DBE Program Plan. A restriction of communication is in effect from the advertisement date until award announcement; firms are prohibited from contacting County officials except through the designated contact or during the question submission period. The County reserves the right to reject any or all SOQs, waive technicalities, and terminate negotiations with the highest-ranked firm if a satisfactory agreement cannot be reached, proceeding to negotiate with the next highest-ranked finalist.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ #27-01
July 2026
Newton County Board of Commissioners
Request for Qualifications
To Provide
Engineering Design Services
PI#0021218
Widening of CR 511/Brown Bridge Road Jack Neely Road to Crowell Road
RFQ #27-01
Qualifications Due: August 25, 2026 @
2:00 pm
Newton County Board of Commissioners 1113 Usher St.
Covington, GA 30014
REQUEST FOR QUALIFICATIONS
PI 0021218
Engineering Design Services
I. General Project Information
A. Overview
Newton County (the Community) is soliciting Statement of Qualifications (SOQs) from qualified firm(s) or organization(s) to provide consultant services for the widening of CR511/Brown Bridge Road from Jack Neely Road to Crowell Road.
This Request for Qualifications (RFQ) seeks to identify potential providers for the Scope of Services for the project/contract listed in Exhibit I. Firms that respond to this RFQ and are determined by the Community to be sufficiently qualified, may be deemed eligible, and invited to offer a technical approach and/or possibly present and/or interview for these services. All respondents to this RFQ are subject to instructions communicated in this document and are cautioned to completely review the entire RFQ and follow instructions carefully. The Community reserves the right to reject any or all SOQs or Technical Approach, and to waive technicalities and informalities at the discretion of the Community.
B. IMPORTANT- A RESTRICTION OF COMMUNICATION IS IN EFFECT FOR THIS PROJECT.
From the advertisement date of this solicitation until successful respondents are selected and the award is made official and announced, firms are not allowed to communicate about this solicitation or scope with any staff of the Community including the Chairman or Commissioners, except for the submission of questions as instructed in the RFQ, or with the contact designated in RFQ Section VIII.C., or as provided by any existing work agreement(s). For violation of this provision, the Community reserves the right to reject the submittal of the offending respondent.
C. The County has a Disadvantaged Business Enterprise (DBE) participation goal assigned to this scope of services.
A Disadvantaged Business Enterprise (DBE) goal of 15% is assigned to this project’s Preliminary Engineering (PE) activities. The County encourages DBE participation. The County will monitor and assess each consultant services submittals for their DBE participation and/or good faith effort in promoting equity and opportunity in accordance with the state of Georgia, Department of Transportation DBE Program Plan.
For more information on the GDOT DBE Program please contact:
Georgia Department of Transportation Equal Opportunity Division One Georgia Center, 7th Floor 600 West Peachtree Street, NW Atlanta, Georgia 30308 Phone: (404) 631-1972
D. Scope of Services
Under the terms of the resulting Agreement, the selected consultant will provide Transportation Planning services, for the Project identified. The anticipated scope of work for the project/contract is included in Exhibit I.
In addition, the County desires that the Consultant has the ability to provide, either with its own forces or through a sub-consultant team member, comprehensive services necessary to fulfill all preliminary transportation planning services which may arise during the project cycle.
E. Contract Term and Type
The County anticipates one (1) Multi-Phase, Project Specific contract to be awarded to one (1) firm, for the project/contract identified. The County anticipates that the payment method may be Lump Sum, Cost Plus Fixed Fee, cost per Unit of Work, or Specific Rates of Compensation. As a Project Specific contract, it is the County’s intention that the Agreement will remain in effect until successful completion of the transportation planning phase of the projects. These items may be included in the contract scope.
F. Contract Amount
The Multi-Phase, Project Specific contract amount will be determined via negotiations with the County. If the County is unable to reach a satisfactory agreement and at reasonable rates to be paid for the services to be provided, the County reserves the right to terminate negotiations with the highest scoring finalist and begin negotiations with the next highest scoring finalist.
II. Selection Method
A. Method of Communication
All general communication of relevant information regarding this solicitation will be made via the Georgia Procurement Registry (GPR) under RFQ- 25-04. All firms are responsible for checking the GPR on a regular basis for updates, clarifications, and announcements. The County reserves the right to communicate via electronic- mail with the primary contact listed in the SOQ. Other specific communications will be made as indicated in the remainder of this RFQ.
B. Phase I - Selection of Finalists
Based on the SOQ submitted in response to the projects/contracts listed in this RFQ, the Selection Committee will review the Experience and Qualifications and Resources and Workload Capacity listed in Section IV.
Selection Criteria for Phase I. The Selection Committee will discuss the top submittals and the final rankings of the top submittals will be determined. From the final rankings of the top submittals, the Selection Committee will identify three (3) to five (5) firms which will be shortlisted.
All firms must meet the minimum requirements as listed in Section IV.A. below.
C. Finalist Notification for Phase II
Firms selected and shortlisted as finalists will receive notification and final instructions from the County regarding the Phase II – Technical Approach response.
D. Phase II - Finalists Response on Technical Approach and Past Performance
The County will request a Technical Approach of the three (3) to five (5) finalist firms for the project/contract. The County reserves the right to request a presentation/interview on any project/contract as determined in its best interests; however, this additional requirement shall typically be reserved for the most complex projects. Each finalist firm shall be notified in writing and informed of the Technical Approach due date. Any additional detailed Technical Approach instructions and requirements, beyond that provided in Section V. Selection Criteria for Phase II, for the finalists will be provided in the Finalist Notification. All members of the Selection Committee will review the Technical Approach (and will attend the presentation/interview if so chosen). Firms shall not address any questions, prior to the award announcement, to anyone other than the designated contact.
E. Final Selection
Final selection will be determined by carrying the scores from Phase I forward for each Finalist and by evaluating the Technical Approach and Past Performance criteria for Phase II. The Selection Committee will discuss the Finalist’s Phase II Responses and the final rankings will be determined.
Negotiations will then be initiated with the top-ranked firm(s) to finalize the terms and conditions of the contract(s), including the fees to be paid. In the event a satisfactory agreement cannot be reached with the highest-ranking firm(s), The County will formally terminate the negotiations and possibly enter into negotiations with the second highest-ranking firm, and so on in turn until a mutual agreement is established and the County awards a contract.
The final form of the contract shall be developed by the County.
III. Schedule of Events
The following Schedule of Events represents the Community’s best estimate of the Schedule that will be followed. All times indicated are prevailing times in Atlanta, Georgia. The Community reserves the right to adjust the Schedule as deemed necessary.
IV. Selection Criteria for Phase I - Criteria for Evaluation of Statements of Qualifications
A. Area Class Requirements and Certification
Presented teams must be prequalified in the indicated Area Class(es) in order to be evaluated. Required proof of prequalification shall be submitted as indicated in Section VI.B.4. below. All Submittals will be pre-screened to verify that the Prime consultant has the required Area Class(es) and that the overall team has the required Area Class(es). Any submittal in which the Prime consultant or the overall team area class requirements are not met will be disqualified from further consideration.
Each submittal will require a certification to allow the County to analyze risks in determining if any firm should be ineligible for award. The certification shall cover a wide variety of information. Any firm which responds in any potentially concerning manner must provide additional information as directed herein for consideration by the County to determine if Firm is eligible for award.
B. Project Manager, Key Team Leader(s) and Prime’s Experience, and Qualifications – 30%
The Selection Committee will evaluate all firms on their Experience and Qualifications, which shall account for a total of thirty (30%) percent of the total evaluation. The following criteria for scoring Phase I of the evaluation will be utilized to determine which firms are shortlisted:
PHASE I DATE TIME
a. Issue of public advertisement of RFQ- 26-20 07/26/2026 TBD
b. Deadline for submission of written questions and requests for clarification 08/06/2026 5:00 PM
c. Last day for addendum publication 08/18/2026 5:00 PM
d. Deadline for submission of Statements of Qualifications 08/25/2026 2:00 PM
e. Complete evaluation and issue notification and other information to finalist firms TBD TBD
PHASE II
f. Deadline for submission of written questions from finalists TBD TBD
g. Phase II Response of Finalist firms due TBD TBD
1. Project Manager education, registration, relevant engineering experience, relevant project management experience, experience in utilizing GDOT specific processes, manuals, or guidance.
2. Key Team Leaders’ education, registration, relevant technical experience, and relevant experience in utilizing GDOT specific processes, manuals, or guidance.
3. Prime Consultant’s experience in delivering projects of similar complexity, size, scope, and function.
C. Project Manager, Key Team Leader(s) and Prime’s Resources, and Workload Capacity – 20%
The Selection Committee will evaluate all firms on their Resources availability and Workload Capacity which shall account for a total of twenty (20%) percent of the total evaluation. The following criteria for scoring the Resources and Workload Capacity will be utilized to determine which firms are shortlisted:
1. Project Manager Workload
2. Workload capacity of Key Team Leader(s)
3. Resources dedicated to delivering project
4. Ability to Meet Project Schedule
V. Selection Criteria for Phase II - Criteria for Evaluation of Technical Approach, Past Performance
A. Technical Approach – 40%
The Selection Committee will evaluate the shortlisted firms (Finalists) on their Technical Approach, which shall account for a total of forty (40%) percent. The Selection Committee shall utilize the following additional criteria for scoring Phase II of the evaluation to determine the highest ranked/most qualified (NOTE: Scores from Phase I will be carried forward and combined with the scores from the Phase II to determine the final ranking of Finalists):
1. Provide any unique technical approaches your firm offers relative to addressing anticipated design concepts, use of any alternative methods for delivery (if applicable), and/or management of the project.
2. Identify any unique challenges of the project and how your firm intends to mitigate these challenges, including quality control, quality assurance procedures.
3. Provide any specific qualifications, skills, knowledge of the project and project area which may uniquely benefit the firm and project, and your ability and willingness to meet time requirements.
B. Past Performance – 10%
The Selection Committee may consider information provided via references provided for relevant projects, knowledge any selection committee member has of performance on relevant projects, and performance evaluations or knowledge presented on GDOT projects. The Selection Committee will consider all factors in their totality and score from 0 to 10 when arriving at a final score for the Past Performance.
VI. Instructions for Content and Preparation of Statements of Qualifications – Phase I Response
The Statements of Qualifications submittal must be submitted in accordance with the instructions provided in Section VIII, and must be organized, categorized using the same headings (in red), and numbered and lettered exactly as outlined below, and must be responsive to all requested information.
For the sections in which page number limits are stated, each section with a stated limit must begin on a new page and end on the last page allowed for the section. It is not allowed to begin new sections on a page allowed for a previous section, if applicable. This will enable the Community to ensure compliance with the page limitations.
Cover page – Each project/contract submittal must have a separate cover page for each copy of each submittal for each project/contract and each must list the RFQ#, RFQ Title, proposing firm’s full legal name and the specific project contract being submitted on to include the PI Number, Newton County, and Description.
A. Administrative Requirements
It is required to submit the information below for each copy of each submittal. This is general information and will not be scored but may be used to determine eligibility for selection. Under Administrative Requirements section, only submit the information requested; additional information will be subject to disqualification of your firm.
1. Basic company information:
a. Company name.
b. Company Headquarter Address.
c. Contact Information - Name and all contact information (telephone number(s) and e-mail address) of primary proposing contact (this will be the individual who will receive all communications).
d. Company website (if available).
e. Georgia Address(es)
f. Staff - List the number and disciplines of staff members employed in each office in the State of Georgia.
g. Ownership - Provide form of ownership, including state of residency or incorporation, and number of years in business. Is the Offeror a sole proprietorship, partnership, corporation, limited liability Corporation, or other structure?
2. Certification Form - Complete the Certification Form (Exhibit “II” enclosed with RFQ), and provide a notarized original within the firm’s Statement of Qualifications. This is to be submitted for the Prime ONLY.
3. Georgia Security and Immigration Compliance Act Affidavit – Complete the form (Exhibit “III” enclosed with RFQ), and provide a notarized original within the firm’s Statement of Qualifications. This is to be submitted for the Prime
ONLY.
4. Addenda - Signed cover page of any Addenda issued for the Prime ONLY.
B. Experience and Qualifications
1. Project Manager - Provide information pertaining to the project manager, including but not limited to:
a. Education
b. Registration (if necessary and applicable)
c. Relevant transportation planning experience
d. Relevant project management experience for projects of similar complexity, size, scope, and function.
e. Relevant experience utilizing all applicable processes, manuals, or guidance.
This information is limited to two (2) pages maximum.
2. Key Team Leaders - Provide experience of Key Team Leaders (defined as those individuals who oversee project areas determined as particularly important to each specific project. Refer to the Project Description in Exhibit I. For each Key Team Leader identified provide:
a. Education
b. Registration (if necessary and applicable.)
c. Relevant experience in the applicable resource area of the most relevant projects.
d. Relevant experience utilizing all applicable processes, manuals, or guidance.
This information is limited to one (1) page maximum for each Key Team Leader
3. Prime Experience - Provide information on the prime’s experience and ability in delivering effective services for projects of similar complexity, size, scope, and function, which demonstrate the firm's capabilities to provide services. For each project, the following information should be provided:
a. Client name, project location and dates during which services were performed.
b. Description of overall project and services performed by your firm.
c. Duration of project services provided by your firm, and overall project budget.
d. Client(s) current contact information including contact names, telephone numbers and email address.
e. Involvement of Key Team Leaders on the projects.
This information is limited to two (2) pages maximum.
C. Resources/Workload Capacity
1. Overall Resources - Provide information regarding the overall resources dedicated to delivering the specific project, including:
a. Organizational chart which identifies the project manager, prime, Key Team Leaders, support personnel, and reporting structure. This chart may be submitted on a 11” x 17” page. (Excluded from the page count)
b. Primary Office - Identify and discuss the primary office which will be responsible for handling the specific project and the number and types of staff within the office and how this office could benefit the project and promote efficiency. This information to be included on the one (1) page with the Narrative on Additional Resource Areas and Ability.
c. Narrative on Additional Resource Areas and Ability – Respondents are to provide information regarding additional resource areas identified as important to the project, to discuss how the key areas will integrate and work together on the project, to discuss any information which is pertinent to these areas, to provide a narrative regarding how the organization of the team, including the PM and Key Team Leaders can deliver the project on schedule given their workload capacity. (The Community recognizes that some individuals may be able to meet the schedule while carrying heavier project loads.) Respondents may discuss the advantages of your team and the abilities of the team members which will enable the project to meet the proposed schedule as identified in Exhibit I (where applicable). If there is no proposed schedule, discuss the advantages of the team and the abilities of the team members which will enable the project to move as expeditiously as possible. Respondents submitting more than the one (1) page allowed (combined for C1.b.
and C1.c.), will be subject to disqualification.
2. Project Manager Commitment Table - Provide a list of ALL projects (GDOT, other governments and private contracts - Information may be validated, and any firm determined not to be listing all projects may be subject to disqualification) on which the proposed project manager is currently committed, to enable the Community to ascertain the project manager’s availability. Utilize a table similar to the following format with a minimum of all criteria indicated to provide the requested information:
Project Manager
PI/Project # for GDOT Projects/Name of Customer for Non-GDOT Projects
Role of PM on Project
Project Description
Current Phase of Project
Current Status of Project
Monthly Time Commitment in Hours
3. Key Team Leader Project Commitment Table - Provide a table similar to the below, with a minimum of all criteria indicated, which identifies ALL projects the Key Team Leaders are committed on to enable the Community to ascertain the available capacity.
Key Team
Leader
PI/Project # for GDOT Projects/Name of Customer for Non-GDOT Projects
Role of Key Team Leader on Project
Project Description
Current Phase of Project
Current Status of Project
Monthly Time Commitment in Hours
This information is limited to the organization chart (excluded from page count), [one (1) page of text to include both C1.b. Primary Office and C1.c. Narrative on Additional Resource Areas and Ability], and the tables.
VII. Instructions for Preparing Technical Approach and Past Performance Response – Phase II Response
The following information will only be requested of the shortlisted firms. The Selection Committee will evaluate the shortlisted firms using the information provided as requested below (NOTE: Scores from Phase I will be carried forward to Phase II):
The Phase II response must be submitted in accordance with the instructions provided in Section IX, and must be organized, categorized using the same headings (in red), and numbered and lettered exactly as outlined below, and must be responsive to all requested information. For the sections in which page number limits are stated, each section with a stated limit must begin on a new page and end on the last page allowed for the section. It is not allowed to begin new sections on a page allowed for a previous section, if applicable. This will enable the Community to ensure compliance with the page limitations.
Phase II Cover page – Each submittal must have a separate cover page for each copy of each Phase II submittal, and each must indicate the response is for Phase II, list the RFQ#, RFQ Title, proposing firm’s full legal name and the specific project contract being submitted on to include the PI Number(s), County(ies), and Description.
A. Technical Approach
1. Provide any unique technical approaches your firm offers relative to addressing anticipated design concepts, use of any alternative methods for delivery (if applicable), and/or management of the project.
2. Identify any unique challenges of the project and how your firm intends to mitigate these challenges, including quality control, quality assurance procedures.
3. Provide any specific qualifications, skills, knowledge of the project and project area which may uniquely benefit the firm and project, and your ability and willingness to meet time requirements.
This information will be limited to a maximum of three (3) pages.
B. Past Performance
No additional information should be submitted to fulfill this requirement. Information from the relevant projects listed as well as information on file with the Community will be used to fulfill this requirement.
Past performance may be evaluated through the checking of project references for the proposed project manager as well as the firm. The County will check these references at random. For this reason, attention should be paid to the references provided to ensure that the contact information provided is accurate and the individual references are reachable. Other past performance information which may be utilized includes knowledge that any member of the Selection Committee has pertaining to the past performance of the firm on any project.
VIII. Instructions for Submittal for Phase I - Statements of Qualifications
A. There is one (1) electronic version submittal required. The Submittal must follow the format and meet the content requirements identified in Section VI, entitled Instructions for Content and Preparation of Statements of Qualifications – Phase I Response. See Attachment 1 for a summary of how the submittals should be prepared.
B. Submittals must be typed on standard (8½” x 11”) paper. The pages should be numbered; however, submittal pages will be counted by section to determine compliance with page limits. Responses are limited to the page counts indicated in each section using a minimum of size 11 font. Page counts will be determined by pages with print on them, not by the physical piece of paper. Each Statement of Qualifications shall be prepared simply and economically as indicated above. Colored displays and promotional materials are not desired. Emphasis must be on completeness, relevance, and clarity of content.
NOTE: Additional pages other than what has been specified above in each section should not be included and will be grounds for disqualification. Submittals are limited to the information requested in Section VI.
Instructions for Content and Preparation of Statements of Qualifications - Phase I Response only. Hyperlinks or embedded video are not allowed.
Statements of Qualifications submittals must be a PDF document for each project/contract. Each PDF document must follow the naming convention for electronic records as follows: the proposing firm’s full legal name, RFQ#, RFQ Title and the specific project contract number being submitted on. Submit your Statement of Qualification to - -- HTTPS://co-newton-ga.bonfirehub.com/portal/?tab=login. The maximum upload file size is 1 GB. Newton County BOC accepts no responsibility for non-receipt and/or delays in receipt caused by transmission and reception problems, equipment failure, or any other similar cause. Each item submitted is instantly sealed and will only be visible after the due date and time. Uploading large documents may take significant time, depending on the size of the files(s) and your internet connection speed.
Need help? Newton County BOC uses Bonfire’s portal for accepting BIDS digitally. Please contact Bonfire at https://co-newton-ga.bonfirehub.com/portal/support.
Statements of Qualifications must be received by the Community prior to the deadline indicated in the Schedule of Events (Section III of RFQ).
No submittals will be accepted after the time and date set for receipt.
All expenses for preparing and submitting responses are the sole cost of the party submitting the response. The County is not obligated to any party to reimburse such expenses. All submittals upon receipt become the property of the County. Labeling information provided in submittals “proprietary” or “confidential”, or any other designation of restricted use will not protect the information from public view. Subject to the provisions of the Open Records Act, the details of the proposal documents will remain confidential until final award.
The County reserves the right, in its sole discretion, to waive any technicalities associated with this submittal if deemed in the best interest of the County.
C. Questions and Requests for Clarification
Questions about any aspect of the RFQ, or the project, shall be submitted in writing via e-mail to rfincher@co.newton.ga.us. The deadlines for submission of questions relating to the RFQ are the times and dates shown in the (Schedule of Events- Section III). From the issue date of this solicitation until a successful proposer is selected and the award is made official and announced, respondents are subject to the Restriction of Communication in Section I.B.
X. Terms and Conditions
A. Statement of Agreement
With the submission of a Statement of Qualifications (SOQ), the respondent agrees that he/she has carefully examined the Request for Qualifications and agrees that it is the respondent’s responsibility to request clarification on any issues in any section of the Request for Qualifications with which the respondent disagrees or needs clarified.
The respondent also understands that failure to mention these items during the question period or in the SOQ will be interpreted to mean that the respondent is in full agreement with the terms, conditions, specifications, and requirements in the therein. With submission of a SOQ, the respondent hereby certifies: (a) that this SOQ is genuine and is not made in the interest or on behalf of any undisclosed person, firm, or corporation; (b) that respondent has not directly or indirectly included or solicited any other respondent to put in a false or insincere SOQ; (c) that respondent has not solicited or induced any person, firm, or corporation to refrain from sending a SOQ.
The respondent also understands that failure to provide required information may result in disqualification. Failure to provide administrative information may not result in disqualification. At the County’s discretion, the County may notify the respondent that administrative information is not provided or there was an error in the information provided, and the County will allow a respondent to provide an update to the administrative information. However, The exception to this is the provision of the required GEORGIA SECURITY AND IMMIGRATION COMPLIANCE ACT AFFIDAVIT, which by Georgia Law requires disqualification of the response. The above changes mentioned to administrative information would be considered allowable as these would be limited to changes which do not affect the information which the evaluators use to score the respondents. Failure of a respondent to provide the specific administrative information as required in the notice will result in disqualification. Any respondent who https://co-newton-ga.bonfirehub.com/portal/?tab=login provides changes in addition to the information requested in the notice shall be subject to disqualification. Failure of a respondent’s SOQ to provide any information pertaining to a respondent and its teams qualifications, of any type, will subject the SOQ to disqualification. The County will not allow updates to qualifications to be provided to avoid disqualifications as this would allow a respondent to modify its SOQ and alter the information which evaluators would score. The above changes related to qualifications would not be allowable as these would allow changes which do affect the information which the evaluators use to score the respondents SOQ.
B. Joint-Venue Proposals, Sub-Consultants, and Vendors
The County does not generally desire to enter into “joint-venture” agreements with multiple firms. In the event two or more firms desire to “joint-venture”, it is strongly recommended that one incorporated firm propose and maintain status as the Program Management firm with the remaining firms participating as major firms. Any joint-venture agreement, and care must be taken to ensure that the joint-venture bears its equitable share of the costs. Therefore, “unpopulated joint-ventures” would not have an adequate accounting system suitable for cost reimbursement contracts.
IX. Instructions for Submittal for Phase II – Technical Approach and Past Performance Response
THESE INSTRUCTIONS ARE INTENDED SOLELY FOR THOSE FIRMS IDENTIFIED AND NOTIFIED AS FINALISTS. Final Instructions will be provided to the Finalists in the notification.
Please note that each project/contract will follow an individual schedule which meets the availability of each Selection Committee. For this reason, the Notice to Selected Finalists and resulting Phase II responses may be on different schedules for each project/contract.
A. There is one (1) electronic version submittal required. The Submittal must follow the format and meet the content requirements identified in Section VII, entitled Instructions for Preparing Technical Approach and Past Performance Response - Phase II Response. See Attachment 1 for a summary of how the submittals should be prepared.
B. Submittals must be typed on standard (8½” x 11”) paper. The pages should be numbered; however, submittal pages will be counted by section to determine compliance with page limits. Responses are limited to the page counts indicated in each section using a minimum of size 11 font. Page counts will be determined by pages with print on them, not by the physical piece of paper. Each Technical Approach shall be prepared simply and economically as indicated above. Colored displays and promotional materials are not desired. Emphasis must be on completeness, relevance, and clarity of content.
NOTE: Additional pages other than what has been specified above in each section should not be included and will be grounds for disqualification. Submittals are limited to the information requested in Section VII. Instructions for Preparing Technical Approach and Past Performance Response-Phase II Response only. Hyperlinks or embedded video are not allowed.
C. Technical Approach submittal must be a PDF document for each project/contract. Each PDF document must follow the naming convention for electronic records as follows: the proposing firm’s full legal name, RFQ#, RFQ Title and the specific project contract being submitted on. To submit your Technical Approach email to ---rfincher@co.newton.ga.us.
If a firm is responding to multiple projects/contracts, each submittal must be e-mail separately using the naming convention for electronic records.
Technical Approach must be received by the Community prior to the deadline indicated in Notice to Selected Finalists.
No submittals will be accepted after the time and date set for receipt.
All expenses for preparing and submitting responses are the sole cost of the party submitting the response. The County is not obligated to any party to reimburse such expenses. All submittals upon receipt become the property of the Community. Labeling information provided in submittals “proprietary” or “confidential”, or any other designation of restricted use will not protect the information from public view. Subject to the provisions of the Open Records Act, the details of the proposal documents will remain confidential until final award.
The Community reserves the right, in its sole discretion, to waive any technicalities associated with this submittal if deemed in the best interest of the Community.
D. Questions and Requests for Clarification
Questions about any aspect of the Phase II Response for Finalists, shall be submitted in writing via e-mail to rfincher@co.newton.ga.us Add RFQ responsible in charge name, phone number, email and appropriate information such as file transfer method information --- or as directed in the Notice to Selected Finalists, if different. The deadlines for submission of questions relating to the Phase II Response will be identified in the Notice to Selected Finalists. From the issue date of this solicitation until a successful proposer is selected and the award is made official and announced, respondents are subject to the Restriction of Communication in Section I.B.
X. Terms and Conditions
A. Statement of Agreement
With the submission of a Statement of Qualifications (SOQ), the respondent agrees that he/she has carefully examined the Request for Qualifications and agrees that it is the respondent’s responsibility to request clarification on any issues in any section of the Request for Qualifications with which the respondent disagrees or needs clarified.
The respondent also understands that failure to mention these items during the question period or in the SOQ will be interpreted to mean that the respondent is in full agreement with the terms, conditions, specifications, and requirements in the therein. With submission of a SOQ, the respondent hereby certifies: (a) that this SOQ is genuine and is not made in the interest or on behalf of any undisclosed person, firm, or corporation; (b) that respondent has not directly or indirectly included or solicited any other respondent to put in a false or insincere SOQ; (c) that respondent has not solicited or induced any person, firm, or corporation to refrain from sending a SOQ.
The respondent also understands that failure to provide required information may result in disqualification. Failure to provide administrative information may not result in disqualification. At the Community’s discretion, the Community may notify the respondent that administrative information is not provided or there was an error in the information provided, and the Community will allow a respondent to provide an update to the administrative information. However, the exception to this is the provision of the required GEORGIA SECURITY AND IMMIGRATION COMPLIANCE ACT AFFIDAVIT, which by Georgia Law requires disqualification of the response.
The above changes mentioned to administrative information would be considered allowable as these would be limited to changes which do not affect the information which the evaluators use to score the respondents. Failure of a respondent to provide the specific administrative information as required in the notice will result in disqualification. Any respondent who provides changes in addition to the information requested in the notice shall be subject to disqualification. Failure of a respondent’s SOQ to provide any information pertaining to a respondent and its teams qualifications, of any type, will subject the SOQ to disqualification. The Community will not allow updates to qualifications to be provided to avoid disqualification as this would allow a respondent to modify its SOQ and alter the information which evaluators would score. The above changes related to qualifications would not be allowable as these would allow changes which do affect the information which the evaluators use to score the respondents SOQ.
B. Joint-Venture Proposals, Sub-Consultants, and Vendors
The Community does not generally desire to enter into “joint-venture” agreements with multiple firms. In the event two or more firms desire to “joint-venture”, it is strongly recommended that one incorporated firm propose and maintain status as the Program Management firm with the remaining firms participating as major firms. Any joint-venture, proposed and established as a separate business entity, should have its own set of books and supporting documentation sufficient for an audit trail. Transactions should be recorded consistent with the joint-venture agreement, and care must be taken to ensure that the joint-venture bears its equitable share of the costs. Therefore, “unpopulated joint-ventures” would not have an adequate accounting system suitable for cost reimbursement contracts.
mailto:rfincher@co.newton.ga.us
However more traditional “populated joint-ventures” are welcomed. A populated joint-venture is where an alliance is brought to life by infusing it with working capital, employees, and control systems. The alliance implements all necessary business systems, including payroll processing, purchasing, property control, etc. The alliance will develop its own indirect rate structure and calculates its own indirect cost rates, based on the direct and indirect costs it incurs.
Sub-Consultants shall generally be considered any team member which is performing any service which typically requires prequalification, which is subject to the Audit and Accounting System Requirements, and whose services are billed as costs. Sub-Consultant Team Members must be written into the resulting Agreement and are subject to all terms and conditions in the Agreement. Vendors shall be considered any team member which is performing any service which typically does not require prequalification, which is not subject to the Audit and Accounting System Requirements, and whose services are billed as direct expenses. Vendors may not be written into the resulting Agreement and may not be subject to all terms and conditions in the Agreement.
C. Non-Discrimination and Disadvantaged Business Enterprise (DBE) Requirements
The County, in accordance with Title VI of the Civil Rights Act of 1964 and 78 Stat. 252, 42 USC 2000d--42 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, part 21, Nondiscrimination in federally assisted programs of the Department of Transportation issued pursuant to such Act, hereby notifies all proposers that it will affirmatively ensure that any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, or national origin in consideration for an award.
A DBE goal of 15% is assigned to this project’s Preliminary Engineering (PE) phase. DBE participation is encouraged by prime contracting, sub-contracting, joint-venture or mentor/protégé relationship.
For more information on the GDOT DBE Program please contact:
Georgia Department of Transportation Equal Opportunity Division
One Georgia Center, 7th Floor 600 West Peachtree Street, NW
Atlanta, Georgia 30308 Phone: (404) 631-1972
D. Audit and Accounting System Requirements
The County reserves the right to reject any proposal with firms that do not meet the following requirements:
1. Firm(s) should have an accounting system in place to meet requirements of 48 CFR Part 31 and, in the case of non-profit organizations, OMB Circular A-122.
2. Any firm that currently has an aggregate contract amount exceeding $250,000 should have submitted their yearly CPA overhead audit.
3. Firm(s) should have no significant outstanding deficient audit findings from previous contracts with the
Community that have not been resolved.
4. The prime is responsible for being reasonably assured that all sub-consultant(s) presented as a part of the proposed team are similarly in compliance with the above requirements.
E. Submittal Costs and Confidentiality
All expenses for preparing and submitting responses are the sole cost of the respondent submitting the response.
The County is not obligated to any respondent to reimburse such expenses. All submittals upon receipt become the property of the County. Labeling information provided in submittals as “proprietary” or “confidential”, or any other designation of restricted use will not protect the information from public view. Subject to the provisions of the Open Records Act, the details of the proposal documents will remain confidential until a final award.
F. Award Conditions
This request is not an offer to contract or a solicitation of bids. This request and any proposal submitted in response, regardless of whether the proposal is determined to be the best proposal, is not binding upon the County and does not obligate the County to procure or contract for any services. Neither the County nor any respondent submitting a response will be bound unless and until a written contract mutually accepted by both parties is negotiated as to its terms and conditions and is signed by the County and a respondent containing such terms and conditions as are negotiated between those parties. The County reserves the right to waive non-compliance with any requirements of this Request for Qualifications and to reject any or all proposals submitted in responses. Upon review of responses, the County will determine the respondent(s) proposal that in the sole judgment of the County is in the best interest of the County (if any is so determined), with respect to the evaluation criteria stated herein. The County then intends to conduct negotiations with such respondent(s) to determine if an acceptable contract may be reached.
G. Debriefings
In lieu of Pre-Award and Post-Award debriefings, it shall be the County’s policy to provide the “Selection Package” at the time of the Selection Announcement (also referred to as the Announcement of Entering into Negotiations).
The “Selection Package” will include the scores and comments of phases for all firms who responded and will typically be provided as a PDF file and e-mailed. Previously, pre-award debriefings only provided the scores and comments of the firm. It shall be the policy of the County that all debriefings will typically be conducted in writing.
H. Right to Cancel or Change RFQ
The County reserves the right to cancel any and all Request for Qualifications where it is determined to be in the best interest of the County to do so. The County reserves the right to increase, reduce, add or delete any item in this solicitation as deemed necessary.
It is the responsibility of all firms interested in submitting Statement of Qualifications (SOQs) for this advertisement to routinely check the posting on the Georgia Procurement Registry for any revisions to this RFQ.
I. Substitutions, Alternates, Exceptions, and Extensions
No substitutions or alternates will be accepted for this solicitation. Any respondent submitting substitutions or alternates will be considered non-responsive and will not be considered for award.
J. Code of Conduct Pertaining to Conflict of Interest in the Award and Administration of Contracts
Contractor warrants and represents that:
The Services to be performed hereunder will not create an actual or apparent conflict of interest with any other work it is currently performing; and
The firm is not presently subject to any agreement with a competitor or with any other party that will prevent the firm from performing in full accord with this Agreement; and
The firm is not subject to any statute, regulation, ordinance, or rule that will limit its ability to perform its obligations under this Agreement; and
The firm shall be free to accept other work during the term hereof; provided, however, that such other work shall not interfere with the provision of Services hereunder.
EXHIBIT I
Project/Contract
1. PI Number: 0021218
2. County: Newton
3. Description: Widening of CR511/Brown Bridge Road from Jack Neely Road to Crowell Road
The Project includes the widening of CR511/Brown Bridge Road from two travel lanes to three travel lanes, beginning at Jack Neely Road and ending at Crowell Road. Includes curb and gutter, storm drainage, and sidewalks.
4. Required Area Classes:
Prime Consultants are defined as the firm submitting the Statement of Qualifications and the firm with whom the County will contact. The Team is defined as the Prime Consultant and their sub-consultants, who are considered team members. The Prime Consultant must be prequalified in the Area Classes identified below in Section 5.A. The Prime Consultant or sub-consultant team members must be prequalified in the Area Classes identified below in Section 5.B. Respondents should submit a summary form (example provided in Exhibit IV) which details the required area classes for the Prime Consultant and all sub-consultants or joint-venture of consultants on the team listed in the Statement of Qualifications. The area classes listed on the summary form must meet all required area classes or the team will be disqualified. The Prequalification Expiration Date must be current by the deadline stated for this RFQ.
A. The Prime Consultant MUST be prequalified by GDOT in the area classes listed below:
Number Area Class
3.02 Two-Lane or Multi-lane Urban Roadway Design
3.13 Facilities for Bicycles and Pedestrians
B. The Team (either the Prime Consultant and/or one or more of their sub-consultant team members) MUST be prequalified by GDOT in the area classes listed below:
1.06(g) Freshwater Aquatic Surveys
1.07 Altitude, Opinion, and County Value Studies (Public Involvement)
1.09 Location Studies
1.10 Traffic Analysis
3.03 Multi-Lane Urban Roadway Widening and Reconstruction
3.04 Multi-Lane Rural Interstate Limited Access Design
3.05 Multi-Lane Urban Interstate Limited Access Design
3.06 Traffic Operations Studies
3.07 Traffic Operations Design
3.08 Landscape Architecture Design
3.09 Traffic Control Systems Analysis, Design and Implementation
3.10 Utility Coordination
3.12 Hydraulic and Hydrological Studies (Roadway)
Number Area Class
1.05 Alternate Systems Planning
1.06(a) NEPA 1.06(b) History 1.06(c) Air Quality 1.06(d) Noise 1.06(e) Ecology 1.06(f) Archaeology
3.15 Highway and Outdoor Lighting
3.16 Value Engineering (VE)
5.01 Land Surveying
5.02 Engineering Surveying
5.03 Geodetic Surveying
5.04 Aerial Photography
5.05 Photogrammetry
5.06 Topographic Remote Sensing
5.08 Overhead/Subsurface Utility Engineering (SUE)
6.01(a) Soil Survey Studies 6.01(b) Geological and Geophysical Studies
6.03 Hydraulic and Hydrologic Studies (Soil & Foundation)
6.04(a) Laboratory Testing of Roadway Construction Materials 6.04(b) Field Testing of Roadway Construction Materials
6.05 Hazardous Waste Site Assessment Studies
8.01 Construction Engineering and Supervision
9.01 Erosion, Sedimentation, and Pollution Control Plan
9.02 Rainfall and Runoff Reporting
9.03 Field Inspection for Erosion Control
5. Scope:
The Consultant shall provide concept development, field surveys and database enhancements, development of the environmental document including all required special studies, preliminary construction plans, signing and marking plans, final right-of-way plans (including revisions), erosion control plans, utility plans, staging plans and final construction plans (including revisions through project final acceptance). All required engineering studies are considered part of the scope of services. All deliverables shall be in accordance with the Plan Development Process (PDP), Electronic Data Guidelines, Plan Presentation Guide, National Environmental Policy Act (NEPA), and the GDOT Environmental Procedures Manual.
The Consultant shall provide:
A. Concept:
1) Traffic Studies
2) Conceptual Right-of-Way Cost Estimate
3) Conceptual Construction Cost Estimate
4) Prepare Concept Layouts and Alignment Alternatives
5) Concept Design Data Book
6) Concept Team Meeting Preparation and Attendance
7) Identify Environmentally Friendly Sensitive Areas
8) Approved Concept Report
9) Practical Alternatives Review (PAR) as needed
10) Public Involvement Plan
B. Survey:
1) Survey Control Package
2) Complete Survey Database
3) Property Information and Owners Report (where needed)
4) Extended Survey Limits, if needed
5) Survey Package Report
C. Environmental Document:
1) Necessary Environmental Special Studies Survey Reports, and Assessment of Effects for Air, Noise, Ecology, Aquatics, Archaeology, History, and NEPA
2) Agency Coordination Including Multiple Meetings to Ensure Consistency of Expectation, Design, and Clearance limits
3) NEPA Documents:
a) Environmental Approval
b) NEPA Re-evaluations, as required
4) Public Involvement
5) Prepare for and attend the Preliminary Field Plan Review (PFPR), Constructability Review, and Final Field Plan Review (FFPR)
6) Certification for Right-of-Way
7) Certification for Let
8) TPro Updates
9) Preparation of Environmental Commitments Table “Green Sheet” and Environmental Resource Impact Table
(ERIT).
D. Preliminary Design:
1) Complete Preliminary Roadway Plans:
a) Preliminary Signing and Marking Plans
b) Preliminary Staging and Erosion Control Plans
2) Preliminary Cost Estimate with Annual Updates
3) Quality Assurance/Quality Control (QA/QC) Review
4) Location and Design Report for Approval
5) PFPR Participation, Report, and Responses (all plan sets, and other information requested by Engineering Services)
6) Preliminary Construction Plans
7) UST & Monitoring Wells
8) Preliminary Hydraulic Studies (as required)
9) Constructability Review Meeting
E. Right-of-Way Plans:
1) Prepare, Revise and Deliver Final…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .