RFQ 27-005 Union Station Electrical Modifications.pdf

PDF 11 MB Posted

Attached to
RFQ 27 005 Springfield Union Station Bus Berth Display Replacement Electrical Modifications
Solicitation number
BD-26-2263-PTA01-PTVA1-135613
Issued by
Hampden County, Massachusetts

About this file

RFQ #27-005 Summary

This Request for Quotes (RFQ) is issued by the Pioneer Valley Transit Authority (PVTA), a regional transit authority in western Massachusetts, for electrical modifications at Springfield Union Station. PVTA seeks quotes from licensed Massachusetts electrical contractors to modify electrical wiring at seventeen bus berth stops—ten bus shelters and seven island canopy stops—to support thirty-four new passenger information displays that PVTA will furnish and install. The work includes disconnecting existing display cables, hardwiring new outdoor-rated power cords to junction boxes, replacing berth number sign cables, and potentially replacing junction boxes where necessary. PVTA also requires permitting, inspection, testing, circuit separation work at one canopy panel, and diagnosis of a breaker trip issue. The RFQ was issued on November 20, 2026, with a site walkthrough scheduled for December 1, 2026, questions due December 3, 2026, and quotes due December 11, 2026, at 2:00 PM EST. Award is anticipated the week of December 14, 2026. The contract period requires work to begin within fifteen calendar days after the Notice to Proceed and be completed within fifteen business days thereafter, subject to PVTA's display installation schedule.

This is a firm fixed unit price contract subject to Massachusetts prevailing wage law and federal Davis-Bacon Act requirements. The contract is funded through Federal Transit Administration (FTA) assistance and incorporates FTA-required clauses. All work must comply with the Massachusetts Electrical Code and the City of Springfield electrical inspector's requirements, performed by or under direct supervision of a licensed Massachusetts electrician. The prevailing wage schedules (Exhibits E-1 and E-2) specify minimum rates by classification, with the higher of Massachusetts or federal rates applied. A payment bond of fifty percent of the contract price is required if the contract exceeds $25,000. The DBE participation goal is zero percent; participation will be obtained through race-neutral means. Award will be made to the responsible quoter meeting minimum qualifications and offering the lowest Total Evaluated Price. Insurance requirements include commercial general liability of $1,000,000 per occurrence and $2,000,000 general aggregate, business automobile coverage of $1,000,000 combined single limit, and an installation floater equal to contract value. All employees must have completed OSHA-approved ten-hour construction safety and health training before work begins.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PIONEER VALLEY TRANSIT AUTHORITY

REQUEST FOR QUOTES

RFQ #27-005

FOR

Springfield Union Station Bus Berth Display Replacement Project

Electrical Modifications

RFQ ISSUE:

November 20, 2026

RFQ DUE:

December 11, 2026

2:00 PM, EST

CONTACT:

Wesley Brown, Procurement Officer

Pioneer Valley Transit Authority 2808 Main Street

Springfield, MA 01107 wbrown@pvta.com mailto:wbrown@pvta.com

Pioneer Valley Transit Authority 2808 Main Street, Springfield, MA 01107 | www.pvta.com

REQUEST FOR QUOTES (RFQ) #27-005

Springfield Union Station Bus Berth Display Replacement Project

Electrical Modifications

Section 1. General Information

Request for Quotes (RFQ) #27-005: Springfield Union Station Bus Berth Display Replacement Project, Electrical Modifications

QUOTES DUE: Friday, December 11, 2026 @ 2:00 PM EST

Contact: Wesley Brown, PVTA Procurement Officer, wbrown@pvta.com

Quotes must be submitted in PDF format by email.

1.1 Introduction

The Pioneer Valley Transit Authority (PVTA) is a regional transit authority and political subdivision of the Commonwealth of Massachusetts, organized under Chapter 161B of the Massachusetts General Laws. PVTA provides public transit service to twenty-four (24) communities in the Pioneer Valley region of western Massachusetts.

PVTA is seeking quotes from licensed Massachusetts electrical contractors to modify the electrical wiring at seventeen (17) bus berth stops at Springfield Union Station, to support thirty-four (34) new passenger information displays that PVTA will furnish and install.

PVTA will award to the responsible Quoter that meets the minimum qualifications in Section 3 and offers to perform the work at the lowest Total Evaluated Price, as described in Section 5.

1.2 Funding

Any contract resulting from this RFQ is subject to financial assistance from the Federal Transit Administration (FTA). The Federally Required Contract Clauses in Exhibit G will become part of the contract.

1.3 Public Construction

This is a public building construction contract solicited by written quotes under M.G.L. c.

149. Massachusetts prevailing wage rates and federal Davis-Bacon wage rates apply (Section 6A).

1.4 Disadvantaged Business Enterprises

Any contract entered into under this RFQ will afford Disadvantaged Business Enterprises (DBEs) full opportunity to submit quotes. DBEs will not be subjected to discrimination on the basis of race, color, sex or national origin in consideration for an award. The DBE participation goal for this contract is 0%. No contract goal has been set; DBE participation will be obtained through race-neutral means, and the successful Quoter will be required to report its DBE participation throughout the contract.

1.5 Reservation

PVTA reserves the right to reject any and all quotes, and to waive informalities and irregularities, as it deems in its best interest.

Section 2. Scope of Work

2.1 Background

PVTA is replacing thirty-four (34) bus berth passenger information displays at Springfield Union Station, 55 Frank B. Murray Street, Springfield, MA 01103. The overall project includes structural modifications to the existing display mounts, changes to the bus berth electrical system, and the installation of new displays. PVTA will complete the mount modifications and install the displays with its own staff. This contract covers only the electrical modifications needed to power the new displays and the berth number signs.

The work is at seventeen (17) bus berth stops, shown on Attachment 1 (Electrical Modifications drawing set):

Stop type Stops Displays per stop Total displays

Location on Attachment 1

Bus shelter 10 (Shelters 8 to 17)

2, one on each side of the shelter

20 Pages 4 to 7

Island canopy stop

7 (Canopy Berths 1 to 7)

2, mounted back to back

14 Pages 4 and 8 to

2.2 Existing Conditions

• Shelters. Each shelter has two junction boxes inside the shelter, at opposite ends, fixed to the framing. Each existing display is wired to its junction box with 18 AWG, 3-conductor cable and Mini-Con-X 3-pin bulkhead connectors. Each lighted berth number sign is wired to its display with 3-conductor cable through a waterproof pass-through cable gland.

• Canopy stops. Each canopy stop has one single-gang junction box on top of the display mount, with a circuit on/off switch on top of the box. The displays and berth number signs are wired the same way as at the shelters.

• Circuits. The stops are fed from three 120-volt panels (Attachment 1, page 3).

Several 20-amp breakers serve more than one stop, and not every circuit has been identified. The Contractor shall verify each circuit before working on it. Breaker and branch circuit work is limited to Tasks E and F.

• Loads. Each new display draws 480 watts (4 amps at 120 volts). Each berth number sign draws 10.1 watts. The load per stop is 8.17 amps.

Quoters are responsible for examining the site and verifying existing conditions before submitting a quote. The site walkthrough (Section 4.1) is the opportunity to do so with PVTA staff present. Attendance is not required, but a Quoter’s failure to attend or to examine the site will not be grounds for a claim or a price adjustment.

2.3 Work Required

The Contractor shall upgrade the shelter and canopy bus stop electrical wiring as shown on Attachment 1, and shall furnish all labor, materials, tools, equipment, permits and supervision for the work. Attachment 1 shows the existing and new wiring for each stop type. Each task maps to a line on the Price Form (Exhibit A).

Task A: Shelter electrical modifications (10 shelters). See Attachment 1, pages 6 and 7.

At each shelter, for each of its two displays:

1. Disconnect and remove the existing 18 AWG display cable and Mini-Con-X connectors.

2. Connect the new display to the junction box using the outdoor-rated power cord supplied with the display (10 feet long, with an IEC C14 inlet on the back of the display). The cord’s connector end plugs into that inlet. Cut the plug off the opposite end and hardwire the cord’s line, neutral and ground conductors to the complementary leads in the junction box. Where this step differs from a note in Attachment 1, this step governs.

3. Replace the existing berth number sign 3-conductor cable with new, longer 3-conductor cable. The new cable terminates in the junction box, routes to and through the berth number cable gland, and connects to the complementary leads in the berth number sign. The Contractor shall furnish all new cable, approximately 100 feet in total: 18 AWG, 3-conductor, unshielded, 300-volt cable with a polyurethane jacket (Alpha Wire 25063 or an equal accepted by PVTA in writing;

Attachment 1, page 2).

Task B: Canopy stop electrical modifications (7 canopy stops). See Attachment 1, pages 9 and 10. At each canopy stop, perform the Task A work for both displays and both berth number signs from the single junction box on top of the display mount. Keep the circuit on/off switch in service.

Task C: Canopy junction box replacement (as directed, up to 7). Where the existing single-gang junction box cannot hold the added conductors, terminations and the circuit switch in compliance with code, replace it with a weatherproof box of adequate size and reinstall the switch. PVTA will pay this unit price only for boxes it approves in writing before replacement.

Task D: Permit, inspection, testing and closeout (lump sum).

1. Obtain the electrical permit from the City of Springfield and arrange all required inspections.

2. After PVTA installs the displays at a stop, test voltage, polarity and grounding, energize the stop, and confirm with the PVTA Project Manager that both displays and both berth number signs operate.

Task E: Canopy circuit separation (lump sum). Canopy Panel Breaker 5 serves Canopy Berths 1, 2 and 3 (Attachment 1, page 3) and will exceed 20 amps with the new displays.

Furnish and install a new 20-amp breaker in the Canopy panel and re-feed the last berth on that circuit from the new breaker, including all wire, raceway, fittings and terminations.

Label both breakers.

Task F: Breaker 7 diagnosis (lump sum). Shelter Panel 1 Breaker 7 (Berth 10) tripped during PVTA testing (Attachment 1, page 3). Find the cause and give PVTA a written report with a recommended correction and a price. The correction is not included in this task.

PVTA may order it by change order (Section 6.12).

Code compliance recommendations. The Contractor shall notify PVTA in writing of any changes it recommends to comply with the Massachusetts Electrical Code before performing the affected work. Any work beyond Tasks A to F requires a written change order (Section 6.12).

2.4 Standards

• All work shall comply with the Massachusetts Electrical Code (527 CMR 12.00) and the requirements of the City of Springfield electrical inspector.

• All work shall be performed by or under the direct supervision of a Massachusetts-licensed electrician.

• All materials shall be new and rated for outdoor use.

2.5 Site Conditions and Coordination

• Springfield Union Station is an operating bus terminal. The Contractor shall keep each berth it is not working on open to buses and passengers, and shall barricade its work area.

• The Contractor shall schedule its work hours with the PVTA Project Manager and give at least two (2) business days’ notice before working at any berth so PVTA can reassign buses.

• PVTA will remove the existing displays and install the new displays. The Contractor shall coordinate its work at each stop with PVTA’s display installation.

• The Contractor shall remove and legally dispose of all removed cable, connectors and debris, and leave each work area clean at the end of each shift.

2.6 Inspection, Acceptance and Warranty

PVTA will inspect each stop after testing and will accept or reject the work within five (5) business days. The Contractor warrants its labor and the materials it furnishes for one (1) year after final acceptance and shall correct defects at no cost to PVTA.

2.7 Period of Performance

The Contractor shall begin work within fifteen (15) calendar days after the Notice to Proceed and complete all work within fifteen (15) business days after starting work, subject to PVTA’s display installation schedule. PVTA may extend the time for unforeseen conditions by written approval of the Procurement Officer.

2.8 Reports and Communication

The Contractor shall report to the PVTA Project Manager named in the Notice to Proceed.

Until then, all communications go through the Procurement Officer (Section 4.2). Only the Procurement Officer may change the contract’s price, scope or schedule, and only in writing.

Section 3. Minimum Qualifications

Quotes that do not show the minimum qualifications below will be found not responsible.

These requirements are pass/fail. They are not scored.

3.1 Qualifications

• License. The Quoter holds a current Massachusetts electrical license that allows it to contract for and perform this work. Provide the license number and holder’s name.

• Relevant projects. At least three (3) commercial, institutional or public electrical projects within the past five (5) years similar in size and scope to this RFQ. For each, give the client, contact name, phone or email, and a short description.

• Personnel. Name the licensed electrician who will supervise the work on site.

• Safety training. All employees who will work at the site have completed an OSHA-approved construction safety and health course of at least ten (10) hours (Exhibit C, Construction Certification).

• Availability. The Quoter can begin work within fifteen (15) calendar days after the Notice to Proceed.

3.2 Conflicts of Interest

By submitting a quote, the Quoter certifies that it has no real or apparent organizational conflict of interest in performing this contract, or it discloses any such conflict in its cover letter. PVTA may disqualify a Quoter or impose conditions if it determines a conflict exists.

The Massachusetts Conflict of Interest Law, M.G.L. c. 268A, applies.

Section 4. Schedule and Submission Requirements

4.1 Schedule

Dates are anticipated and may change by addendum.

Activity Date

RFQ issued and posted Friday, November 20, 2026

Notice published in the Central Register

Wednesday, November 25, 2026

Site walkthrough (not mandatory)

Tuesday, December 1, 2026 @ 1:00 PM EST, Springfield Union Station

Questions due Thursday, December 3, 2026 @ 2:00 PM EST

Answers / addenda issued Friday, December 4, 2026

Quotes due Friday, December 11, 2026 @ 2:00 PM EST

Anticipated award Week of December 14, 2026

To attend the walkthrough, email the Procurement Officer by 2:00 PM EST on Monday, November 30, 2026. Statements made at the walkthrough do not change this RFQ unless confirmed by written addendum.

4.2 Questions

Submit questions in writing to Wesley Brown, Procurement Officer, wbrown@pvta.com, by the deadline above. Answers that change or clarify the RFQ will be issued to all Quoters by written addendum and posted on COMMBUYS and www.pvta.com. Quoters shall not contact other PVTA staff about this RFQ. Doing so may result in disqualification.

4.3 Where the RFQ Is Posted

This RFQ, all of its exhibits and attachments, and all addenda are posted on COMMBUYS (www.commbuys.com) and on www.pvta.com. A notice of this RFQ is published in the Central Register and posted at PVTA’s office, 2808 Main Street, Springfield. PVTA does not distribute solicitation documents in hard copy or on electronic media. Quoters are responsible for checking either site for addenda before submitting a quote.

4.4 How to Submit

Email one PDF to wbrown@pvta.com by the due date and time. Use the subject line “RFQ 27-005 Union Station Electrical – Firm Name.”

4.5 Contents of the Quote

A quote must include all of the following. A quote that is late, not in the requested format, or missing required documents may be rejected.

• Cover letter signed by an authorized official, acknowledging all addenda and listing any exceptions (Section 6.10).

• Statement of qualifications responding to each item in Section 3.1, including the license number and project references.

• Exhibit A – Price Form.

• Exhibit B – General Information Form and Certificate of Authority.

• Exhibit C – Required Certifications (MA-1 to MA-8, F-1 Certification of Eligibility and the Construction Certification).

• Exhibit H – DBE Certification, DBE Letter of Intent and Statement on Subcontractors.

By submitting a quote, the Quoter agrees that it can meet PVTA’s insurance requirements (Exhibit D) and will pay the prevailing wage rates in Exhibit E. The Quoter also acknowledges that the Federally Required Contract Clauses (Exhibit G) will become part of the contract.

4.6 Public Records

Quotes become PVTA property and are subject to the Massachusetts Public Records Law, M.G.L. c. 66, § 10, after award.

Section 5. Pricing and Basis of Award

5.1 Pricing

Quoters shall quote on Exhibit A. This is a firm fixed unit price contract. Each price for Tasks A to F is a fixed, all-inclusive price covering labor at prevailing wage rates, materials, equipment, permits, bond premium, travel, overhead, profit and all other expenses. No other charges will be paid. Prices must remain firm for the full contract term.

5.2 Total Evaluated Price

PVTA will compute each Quoter’s Total Evaluated Price by multiplying each quoted price by the quantity on Exhibit A and adding the results. If a unit price and its extended price do not agree, the unit price governs. The quantity for Task C is an estimate for evaluation only.

PVTA does not guarantee any quantity for Task C and will pay only for work it authorized and accepted.

5.3 Basis of Award

PVTA will award to the responsible Quoter offering to perform the work at the lowest Total Evaluated Price. Award is conditioned on:

• meeting all minimum qualifications in Section 3.1;

• satisfactory reference checks;

• a determination that the price is fair and reasonable; and

• verification that the Quoter is not debarred by the Commonwealth or excluded in SAM.gov.

If only one quote is received, PVTA may re-solicit or may award after a cost or price analysis.

5.4 Contract Ceiling

The contract will state a total not-to-exceed amount equal to the awarded Total Evaluated Price. Exceeding a ceiling requires a written contract modification.

Section 6. General Terms

6.1 Acceptance Period

Quotes must remain valid for ninety (90) calendar days after the due date. This is the period available to PVTA to award a contract.

6.2 Contract and Billing

The contract will be entered into directly between PVTA and the selected firm by purchase order incorporating this RFQ, its exhibits and addenda, and the Contractor’s Price Form.

The Contractor shall invoice for stops completed, tested and accepted, attaching the certified payroll reports for the period (Section 6A.1). Invoices may be sent to accountspayable@pvta.com. PVTA will pay only after the Project Manager confirms the work was accepted. PVTA will not pay interest on late payments.

6.3 Reservation of PVTA’s Rights

PVTA reserves the right, at any time and in its sole discretion, to the fullest extent permitted by law:

• to reject any and all quotes, or to cancel or suspend this RFQ, with no recourse for any Quoter;

• to waive informalities and minor irregularities in any quote;

• to contact references and others familiar with a Quoter’s past performance, and submission of a quote authorizes such inquiries;

• to disqualify any Quoter that has been debarred or suspended by any governmental body, has failed to disclose a material matter, or presents a real or perceived conflict of interest; and

• to reject any proposed individual or subcontractor and require a mutually acceptable replacement.

The information in this RFQ is provided as general information. PVTA makes no warranty as to its accuracy or completeness, and each Quoter must satisfy itself as to all matters affecting its quote. No PVTA Advisory Board member, officer, agent or employee shall be personally liable to any Quoter under this RFQ.

6.4 Limitation on Funding

The contract is subject to the availability of funds from PVTA’s funding sources. If funding is eliminated or decreased, PVTA may terminate or modify the contract.

6.5 Controlling Law

The contract is governed by the laws of the Commonwealth of Massachusetts. Venue for any legal action is the state court in Hampden County.

6.6 Taxes, Charges and Extras

PVTA is exempt from federal excise taxes, tax on transportation and Massachusetts sales tax. Prices shall not include those taxes. PVTA will furnish a tax exemption certificate on request. No charge for travel, insurance, license fees, permits, bond premium or any other purpose will be paid unless included in the quoted prices.

6.7 Insurance

Before starting work, the successful Quoter shall provide a current certificate of insurance naming PVTA as an additional insured and meeting Exhibit D.

6.8 Protests

Protests are handled under PVTA’s Protest Procedures (Exhibit F). Because this procurement is under $100,000, protests will be handled informally by the Procurement Department (Protest Procedures, §1.2). For FTA-funded procurements, an interested party may appeal to FTA only for PVTA’s failure to have or follow its protest procedures (Protest Procedures, §10).

6.9 Amendments and Assignment

Any amendment to the contract must be in writing and signed by officials authorized to bind PVTA. The Contractor may not assign or subcontract the contract, in whole or in part, without PVTA’s prior written approval. No payment will be made for work performed before the contract is fully executed.

6.10 Quoter Terms Not Accepted

The contract will be on PVTA’s terms. Quote forms, terms and conditions, or sales acknowledgments that Quoters attach will not become part of the contract. A quote conditioned on the Quoter’s own terms, such as a limitation of liability, a different governing law or venue, interest on late payments, or reimbursement of expenses not shown on Exhibit A, may be rejected. A Quoter that takes exception to any term must list each exception in its cover letter.

6.11 Termination

PVTA may terminate the contract for convenience or for default as provided in Exhibit G, Section 17.

6.12 Changes

PVTA may order changes within the general scope of the contract by written change order signed by the Procurement Officer. The Contractor shall not perform changed or additional work without one. Price adjustments will use the unit prices on Exhibit A where they apply.

6.13 Indemnification

To the fullest extent permitted by law, the Contractor shall indemnify, defend and hold harmless PVTA and its Advisory Board members, officers, employees and agents from all claims, damages, losses and expenses, including reasonable attorneys’ fees, arising out of the performance of the work, to the extent caused by the negligence or misconduct of the Contractor, its subcontractors, or anyone for whom they are responsible.

Section 6A. Massachusetts Public Construction Requirements

6A.1 Prevailing Wage

This contract is subject to the Massachusetts prevailing wage law, M.G.L. c. 149, §§ 26 to 27H. The prevailing wage schedule issued by the Department of Labor Standards for this project is Exhibit E-1 and will be part of the contract. The Contractor and every subcontractor shall:

• pay each employee performing work on this project at least the rate listed on Exhibit E for the employee’s classification;

• post Exhibit E at the worksite where it can be easily seen;

• submit weekly certified payroll reports and a Statement of Compliance to PVTA, and keep them for three (3) years; and

• pay apprentice rates only to apprentices registered with the Massachusetts Division of Apprentice Standards.

This contract is also subject to the Davis-Bacon Act and the Copeland Anti-Kickback Act (Exhibit G, Section 18). The U.S. Department of Labor wage determination for Hampden County is Exhibit E-2. For each classification, the Contractor and every subcontractor shall pay at least the higher of the Massachusetts rate (Exhibit E-1) and the federal rate (Exhibit E-2). Award is conditioned on the Quoter’s acceptance of the wage determination.

6A.2 OSHA Safety Training

All employees to be employed at the worksite must have successfully completed a course in construction safety and health approved by the U.S. Occupational Safety and Health Administration that is at least ten (10) hours in duration. The Contractor shall submit documentation of completion for each employee with its first certified payroll report (M.G.L. c. 30, § 39S).

6A.3 Payment Bond

If the contract price is more than $25,000, the Contractor shall furnish a payment bond in the amount of fifty percent (50%) of the contract price, issued by a surety company licensed to do business in Massachusetts, within ten (10) days after notice of award and before the Notice to Proceed (M.G.L. c. 149, § 29). No bid deposit or performance bond is required.

6A.4 Workers’ Compensation

The Contractor shall carry workers’ compensation insurance for all employees on the project as required by M.G.L. c. 152 and shall provide proof before starting work (M.G.L.

c. 149, § 34A).

6A.5 Licenses, Permits and Inspections

The Contractor shall hold all licenses required by Massachusetts law for the work, obtain the electrical permit, and arrange and pass all required inspections. Permit and inspection fees are included in the quoted prices.

6A.6 Employment Preference

In employing mechanics, apprentices, teamsters, chauffeurs and laborers on this project, the Contractor shall give preference to veterans and to citizens of the Commonwealth as required by M.G.L. c. 149, § 26.

6A.7 Labor Harmony

The Contractor shall furnish labor that can work in harmony with all other elements of labor employed or to be employed on the work.

6A.8 Site Safety

The Contractor is responsible for the safety of its employees and the public in its work area, shall comply with applicable OSHA standards, and shall de-energize and lock out each circuit before working on it.

6A.9 Notice of Award

PVTA will publish a notice of the contract award in the Central Register.

6A.10 Federal Construction Provisions

The Contractor shall comply with the Davis-Bacon and Copeland Anti-Kickback clauses (Exhibit G, Section 18) and the veterans employment preference for capital projects (Exhibit G, Section 19), and shall include both in its subcontracts.

Section 7. List of Exhibits

Exhibit Title Submit with quote?

A Price Form Yes

B General Information Form and Certificate of Authority Yes

C Required Certifications: MA-1 Tax Compliance; MA-2 Non- Collusion; MA-3 Right-to-Know; MA-4 Northern Ireland;

Yes

Exhibit Title Submit with quote?

MA-5 Anti-Boycott; MA-6 Undocumented Workers; MA-7 Conflict of Interest; MA-8 Public Contractor Debarment; F- 1 Certification of Eligibility; Construction Certification

D Required Insurance (Construction tier) Acknowledge only

E Massachusetts Prevailing Wage Schedule, Department of Labor Standards (E-1); U.S. Department of Labor Davis- Bacon Wage Determination, Hampden County (E-2)

No

F PVTA Protest Procedures No

G Federally Required Contract Clauses Acknowledge only

H DBE Certification (D-1), DBE Letter of Intent (D-2), Statement on Subcontractors (D-3)

Yes

Attachment Electrical Modifications drawing set (11 pages, separate file)

No

Exhibits A to H follow this section. Attachment 1 is posted with this RFQ as a separate file on COMMBUYS and www.pvta.com. All are part of this RFQ.

Exhibit A – Price Form

RFQ #27-005, Springfield Union Station Bus Berth Display Replacement Project, Electrical Modifications

Quoter: ______________________________

Line Task (RFQ Section 2.3) Unit Quantity Unit price

Extended price

1 Task A: Shelter electrical modifications

Per shelter

10 $ $

2 Task B: Canopy stop electrical modifications

Per canopy stop

7 $ $

3 Task C: Canopy junction box replacement

Each 7 (estimate, evaluation only)

4 Task D: Permit, inspection, testing and closeout

Lump sum 1 $ $

5 Task E: Canopy circuit separation

Lump sum 1 $ $

6 Task F: Breaker 7 diagnosis

Lump sum 1 $ $

Total Evaluated Price $

Prices are firm, all-inclusive and in U.S. dollars, as described in Section 5.1. Labor is priced at not less than the prevailing wage rates in Exhibit E.

Addenda acknowledged: No. ____ dated ________ No. ____ dated ________

Authorized signature: ______________________ Name and title: ______________________ Date:

Exhibit B – General Information Form and Certificate of Authority

Modifications

General Information Form

Name of organization: ____________________________________________

Address: ____________________________________________

Telephone: ______________________ Email: ______________________

This firm has been in continuous business under its present name for ________ years.

Organization type (check one): ☐ Corporation ☐ Partnership ☐ Limited Liability

Company ☐ Joint Venture ☐ Sole Proprietorship ☐ Other (explain): ______________________

1. Is the firm registered to do business in Massachusetts? ☐ Yes ☐ No

2. Is the firm a certified DBE? ☐ Yes ☐ No If yes, certifying agency:

3. Is the firm a small business? ☐ Yes ☐ No

4. NAICS code(s) for the work the firm will perform: ______________________

5. Annual gross receipts of the firm (check one): ☐ Less than $1 million ☐ $1 to 3 million ☐ $3 to 6 million ☐ $6 to 10 million ☐ More than $10 million

Questions 2 to 5 are for PVTA’s DBE and bidders list reporting only (49 CFR 26.11). They are not evaluation factors.

Name, title, telephone and email of the authorized representative:

Acknowledgment of addenda received: Addendum No(s). ______________ (write “None” if none)

The undersigned, having read all pages, documents and exhibits of this RFQ, agrees to perform the work described in it at the prices quoted on Exhibit A. This quote is firm for ninety (90) calendar days from the due date. The undersigned affirms that this quote is genuine, not a sham or collusive, and is not made in the interest of any person not named in it.

Authorized signature: ______________________ Printed name and title: ______________________ Date: __________

Certificate of Authority (corporations and limited liability companies)

At a duly authorized meeting of the Board of Directors (or Managers) of ______________________________ (name of entity) held on ______________ (date), it was VOTED that ______________________ (name), ______________________ (title), is authorized to submit bids, proposals and quotes, execute contracts and bonds in the name and on behalf of the entity, and affix its seal; and that such execution shall be valid and binding on the entity.

A true copy. ATTEST: ______________________ Title: ______________________

I certify that I am the Clerk / Secretary of the entity named above; that ______________________ is the duly elected ______________________ of the entity; and that the vote above has not been amended or rescinded and remains in full force and effect as of the date of this quote.

Clerk / Secretary: ______________________ Date: __________ (Corporate seal, if any)

A sole proprietor or partnership signs the General Information Form only.

Exhibit C – Required Certifications

Modifications

Each Quoter must sign and submit every certification in this exhibit with its quote: MA-1 to MA-8, F-1 and the Construction Certification.

MA-1 Certification of Tax Compliance

Pursuant to M.G.L. c. 62C, § 49A(b), I, ______________________, authorized signatory for ______________________________ (Quoter), certify under the pains and penalties of perjury that the Quoter has complied with all laws of the Commonwealth of Massachusetts relating to taxes, reporting of employees and contractors, and withholding and remitting child support.

Signature: ______________________ Title: ______________________ Date: __________

Do not write a tax identification number on this form. PVTA collects it on a W-9 at award.

MA-2 Certification of Non-Collusion

The undersigned certifies under penalties of perjury that this quote has been made and submitted in good faith and without collusion or fraud with any other person. As used in this certification, the word “person” means any natural person, business, partnership, corporation, union, committee, club or other organization, entity or group of individuals (M.G.L. c. 30B, § 10).

Signature: ______________________ Name and title: ______________________ Date: __________

Firm: ______________________________

MA-3 Right-to-Know Law Certification

The undersigned certifies that the Quoter, if awarded this contract, will fully comply with the Massachusetts Right-to-Know Law, M.G.L. c. 111F, including:

• Obtaining a Safety Data Sheet for every substance or mixture on the Massachusetts Substance List that the Contractor or any subcontractor brings to or uses on the work site, and keeping a copy on the work site.

• Labeling each container of a listed substance or mixture as required by Section 7 of the Act.

• Providing the same training and non-technical instruction required by Section 15 of the Act to all PVTA employees exposed to a listed substance or mixture the Contractor or its subcontractors bring to or use on the work site.

• Providing PVTA employees at the work site with the same protective equipment the Contractor and its subcontractors provide to their own employees.

Signature: ______________________ Name and title: ______________________ Date: __________

Firm: ______________________________

MA-4 Certification Regarding Business With or In Northern Ireland

Pursuant to M.G.L. c. 7, §§ 22C–22F, the undersigned certifies that, if the Contractor or any affiliate conducts business operations in Northern Ireland, those operations do not discriminate in employment, compensation, or the terms, conditions and privileges of employment on account of religious or political belief, and the Contractor promotes freedom of workplace opportunity consistent with the MacBride Principles.

☐ The Contractor has business operations in Northern Ireland and so certifies. ☐ The Contractor has no business operations in Northern Ireland.

The Contractor will notify PVTA in writing of any change in these circumstances during the contract, and understands that misrepresentation or failure to notify may result in termination or other sanctions provided by law.

Signed under the pains and penalties of perjury on ______________ (date).

Signature: ______________________ Name and title: ______________________

MA-5 Anti-Boycott Certification

Pursuant to M.G.L. c. 151E and Section 999(b)(3) and (4) of the Internal Revenue Code of 1954, as amended, the Contractor certifies that, during the term of this contract, neither it nor any affiliated company participates in or cooperates with an international boycott, or engages in conduct declared unlawful by M.G.L. c. 151E, § 2. If this certification is breached, PVTA may rescind the contract and pursue other remedies at law or in equity. “Affiliated company” means any business entity of which at least 51% of the ownership interests are directly or indirectly owned or controlled by the Contractor; that directly or indirectly owns or controls at least 51% of the Contractor’s ownership interests; or that is under common ownership or control with the Contractor.

Signature: ______________________ Name and title: ______________________ Date: __________

Firm: ______________________________

MA-6 Prohibition on Use of Undocumented Workers

Under Executive Order No. 481 (effective February 23, 2007), and as a condition of receiving Commonwealth funds, the Contractor certifies and agrees that it (1) shall not knowingly use undocumented workers in performing this contract; (2) shall verify the immigration status of all workers assigned to this contract through proper completion of federal Form I-9 or other lawful verification, without unlawful discrimination; and (3) shall not knowingly or recklessly alter, falsify, or accept altered or falsified documents from any worker. A breach may be treated as a material breach, subjecting the Contractor to sanctions including monetary penalties, withholding of payments, suspension or termination.

Signed under the pains and penalties of perjury.

Signature: ______________________ Name and title: ______________________ Date: __________

MA-7 Conflict of Interest Certification

The undersigned certifies under the pains and penalties of perjury that the Quoter and all of its employees, agents and subcontractors shall comply with the Massachusetts Conflict of Interest Law, M.G.L. c. 268A, and with the conflict-of-interest provisions of this RFQ, and further certifies that:

• No officer, employee, agent or public official of the Commonwealth or of PVTA has or shall have any direct or indirect financial or personal interest in this procurement or any resulting contract;

• The Quoter has not offered or given, and shall not offer or give, any gratuity, favor or thing of value to any officer, employee or agent of PVTA to influence the award or administration of this contract; and

• The Quoter understands that a violation of M.G.L. c. 268A may be grounds for civil or criminal penalties and for termination of any resulting contract for cause.

Signature: ______________________ Name and title: ______________________ Date: __________

Firm: ______________________________

MA-8 Public Contractor Debarment Certification

The undersigned certifies under penalty of perjury that it is not presently debarred from the award of any contract for public (local, state or federal) work by the Federal Government or in the Commonwealth of Massachusetts under 2 CFR Part 180, Subpart C, as adopted and supplemented by U.S. DOT at 2 CFR Part 1200; M.G.L. c. 29, § 29F; M.G.L. c.

149, § 44C; M.G.L. c. 7, § 38D; or any other applicable state or federal debarment provision.

Signature: ______________________ Name: ______________________ Date: __________

Firm: ______________________________

F-1 Certification of Eligibility (Federal Debarment, Tax Liability and Felony Conviction)

______________________________ (Quoter) certifies, to the best of its knowledge and belief, that it and its principals:

1. are not presently debarred, suspended, proposed for debarment, declared ineligible or voluntarily excluded from covered transactions by any Federal department or agency, and are not listed as excluded in the System for Award Management (SAM.gov) (2 CFR Part 180; 2 CFR Part 1200);

2. have not, within three (3) years before this quote, been convicted of or had a civil judgment rendered against them for fraud or a criminal offense in connection with obtaining, attempting to obtain or performing a public (Federal, State or local) transaction; violation of Federal or State antitrust statutes; or embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements or receiving stolen property;

3. are not presently indicted for or otherwise criminally or civilly charged by a governmental entity with any offense listed in item 2;

4. have not, within three (3) years before this quote, had one or more public transactions terminated for cause or default;

5. do not have any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner under an agreement with the collecting authority;

and

6. were not convicted of a felony criminal violation under any Federal law within twenty-four (24) months before this quote.

If the Quoter cannot certify to any statement above, it shall attach an explanation. The Quoter shall include this certification requirement in any lower-tier covered transaction.

☐ I DO CERTIFY ☐ I DO NOT CERTIFY

Signature: ______________________ Name and title: ______________________ Date: __________

Construction Certification

The undersigned certifies under penalties of perjury that:

1. The Quoter is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed on the work.

2. All employees to be employed at the worksite will have successfully completed a course in construction safety and health approved by the U.S. Occupational Safety and Health Administration that is at least ten (10) hours in duration at the time the employee begins work, and the Quoter will furnish documentation of completion for each employee with its first certified payroll report.

3. The Quoter will pay all employees on this project not less than the prevailing wage rates in Exhibit E and will submit weekly certified payroll reports to PVTA.

4. The Quoter carries workers’ compensation insurance for its employees as required by M.G.L. c. 152.

5. The Quoter holds a current Massachusetts electrical license. License number:

______________ Holder: ______________________

Quoter: ______________________________

Authorized signature: ______________________ Name and title: ______________________ Date:

Exhibit D – Required Insurance

Modifications

The Contractor and each subcontractor shall maintain the following insurance at its own expense for the full contract term.

Coverage Minimum limit

Commercial General Liability: each occurrence / general aggregate / products-completed operations

$1,000,000 / $2,000,000 / $2,000,000

Business Automobile (owned, hired and non-owned), combined single limit

$1,000,000

Workers’ Compensation Statutory (M.G.L. c. 152)

Employers Liability: each accident / disease each employee / disease policy limit

$500,000 each

Umbrella / Excess Liability, per project aggregate $5,000,000

Installation floater (materials and equipment the Contractor furnishes, until accepted)

Contract value

Terms. The Contractor shall give PVTA certificates of insurance and endorsements before work begins. PVTA, its Advisory Board, officers and employees shall be additional insureds on the general liability, automobile and umbrella policies, on a primary and noncontributory basis, with a waiver of subrogation in PVTA’s favor. All policies shall be written by insurers rated “A” or better by A.M. Best and licensed in Massachusetts. Insurers shall give PVTA thirty (30) days’ written notice of cancellation or material change, and the Contractor shall deliver renewal certificates at least ten (10) days before expiration. Failure to keep this insurance in force is a material breach.

Exhibit E – Prevailing Wage Schedules

Modifications

Two wage schedules apply to this contract (Section 6A.1). For each classification, the Contractor and every subcontractor shall pay at least the higher of the two rates.

Exhibit Schedule Issued by

E-1 Massachusetts Prevailing Wage Schedule, Wage Request Number 20261117145406, issued November 18, 2026 (M.G.L. c. 149, §§ 26 to 27H)

Massachusetts Department of Labor Standards

E-2 Davis-Bacon Wage Determination, General Decision Number MA20260003, Modification 1, published May 18, 2026 (Building; Berkshire, Franklin, Hampden and Hampshire Counties)

U.S. Department of Labor

Exhibit E-1 and Exhibit E-2 follow this page.

Exhibit E-1

Massachusetts Prevailing Wage Schedule

Massachusetts Department of Labor Standards, Wage Request Number 20261117145406 (November 18, 2026)

The schedule follows this page.

THE COMMONWEALTH OF MASSACHUSETTS

EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT

DEPARTMENT OF LABOR STANDARDS

Prevailing Wage Rates

MAURA HEALEY

Governor

KIM DRISCOLL

Lt. Governor

As determined by the Director under the provisions of the Massachusetts General Laws, Chapter 149, Sections 26 to 27H

LAUREN JONES

Secretary

MICHAEL FLANAGAN

Director

Awarding Authority: Pioneer Valley Transit Authority City/Town: SPRINGFIELD

Wage Request No: 20261117145406 Job Location: 55 Frank B. Murray Street, Springfield, MA 01103

Description of Work: Electrical modifications at 17 existing bus berth stops (10 bus shelters and 7 canopy stops) at Springfield Union Station to support the replacement of 34 passenger information displays.

Contract Number:

§§ 26-27D Construction Project

This Prevailing Wage Schedule establishes the minimum wage rates that employees on this public works construction project must be paid. The project’s Wage Request Number is listed above and on all pages of this Schedule. This schedule applies only to this specific project.

Awarding Authority Responsibilities Contractor Responsibilities

You must include this Prevailing Wage Schedule (PWS) or an appropriate reference to it in all advertisements and calls for bids.

The PWS must be incorporated in its entirety into all contracts for this project (G.L. c. 149, § 27).

The wage rates on this PWS will remain in effect for the duration of the project. Exception: You must request an updated schedule for any multi-year construction project no later than 2 weeks before the project’s yearly anniversary date.

For CM AT RISK projects, the anniversary date is the earlier of the signing date of: (a) the GMP Amendment; or (b) the first amendment to permit procurement of construction services.

For all other construction projects, the anniversary date is the date the contract was signed by the Awarding Authority and the General

Contractor.

You must also request an updated PWS if you have not opened bids or selected a contractor within 90 days of the date of issuance on this PWS.

For CM AT RISK projects, the earlier of (a) the signing date of the

GMP Amendment; or (b) the bid for the first construction scope of work must be within 90 days of the date of issuance on this Schedule.

You must provide any updated PWS to all contractors working on the project, including general and sub-contractors.

You must keep the contractors’ weekly certified payroll records and

Statements of Compliance on file for 3 years.

Awarding authorities have other prevailing wage responsibilities not listed above. Learn more at: [Prevailing wage: for awarding authorities |

Mass.gov] and G.L. c. 149, §§ 26-27D.

You must pay all employees who perform construction work on this project at least the wage rate listed on this PWS. Warning! If you do not follow this requirement, you can face civil fines, criminal charges, or private lawsuits.

You must post this PWS at the worksite where it can be easily seen. (G.L.

c. 149, § 27)

You must file weekly payroll reports and a Statement of Compliance with the awarding authority (not DLS). You can file payroll reports by mail or email and must keep them on file for 3 years. Each weekly payroll report must include each employees’ name, address, occupational classification(s), hours worked, and wages paid. Find a sample report at:

mass.gov/dols/pw.

You cannot pay any employees at the apprentice rates listed on this PWS unless they are registered with the Massachusetts Division of Apprentice

Standards (DAS). Qualifying apprentices must be paid at the applicable step rate and must carry their apprentice ID card during all work hours on the project. Apprentices not registered with DAS must be paid at the listed journeyworker’s rate, even if they are registered with a different federal/state public agency or private entity. For every week in which apprentice rates are paid, a copy of each apprentice's apprentice ID card issued by DAS shall be attached to the certified payroll records.

If you don’t know what classification or rate applies to the work being performed, you must ask DLS; paying the wrong rate subjects you to enforcement.

Please contact DLS if you have any questions about the Prevailing Wage

Schedule: (617) 626-6953 or DLS.Feedback@mass.gov

Employees who are not paid the wage listed on the Prevailing Wage Schedule (PWS) may file a complaint with the Attorney General’s Fair Labor

Page 1 of 30Wage Request Number: 20261117145406Issue Date: 11/18/2026 https://www.mass.gov/info-details/prevailing-wage-for-awarding-authorities https://www.mass.gov/info-details/prevailing-wage-for-awarding-authorities mailto:DLS.Feedback@mass.gov

Division: www.mass.gov/ago/fld; (617) 727-3465.

Page 2 of 30Wage Request Number: 20261117145406Issue Date: 11/18/2026 https://www.mass.gov/ago/fld

Construction

Classification Effective Date Base Wage Health Pension Annuity Supplemental

Unemployment Total Rate

6/1/2026 $41.95 $16.17 $21.78 $0.00 $0.00 $79.90

12/1/2026 $41.95 $16.17 $23.52 $0.00 $0.00 $81.64

(2 AXLE) DRIVER - EQUIPMENT

TEAMSTERS JOINT COUNCIL NO. 10

TEAMSTERS JOINT COUNCIL NO. 10 ZONE B

1/1/2027 $41.95 $16.77 $23.52 $0.00 $0.00 $82.24

6/1/2026 $42.02 $16.17 $21.78 $0.00 $0.00 $79.97

12/1/2026 $42.02 $16.17 $23.52 $0.00 $0.00 $81.71

(3 AXLE) DRIVER - EQUIPMENT

TEAMSTERS JOINT COUNCIL NO. 10

TEAMSTERS JOINT COUNCIL NO. 10 ZONE B

1/1/2027 $42.02 $16.77 $23.52 $0.00 $0.00 $82.31

6/1/2026 $42.14 $16.17 $21.78 $0.00 $0.00 $80.09

12/1/2026 $42.14 $16.17 $23.52 $0.00 $0.00 $81.83

(4 & 5 AXLE) DRIVER - EQUIPMENT

TEAMSTERS JOINT COUNCIL NO. 10

TEAMSTERS JOINT COUNCIL NO. 10 ZONE B

1/1/2027 $42.14 $16.77 $23.52 $0.00 $0.00 $82.43

ADS/SUBMERSIBLE PILOT

PILE DRIVER LOCAL 56

PILE DRIVER LOCAL 56 (ZONE 3)

8/1/2024 $117.16 $10.08 $11.62 $12.67 $0.00 $151.53

For apprentice rates see "Apprentice- PILE DRIVER"

6/1/2026 $37.75 $10.90 $9.75 $8.62 $0.00 $67.02

12/7/2026 $39.05 $10.90 $9.75 $8.62 $0.00 $68.32

6/7/2027 $40.45 $10.90 $9.75 $8.62 $0.00 $69.72

12/6/2027 $41.85 $10.90 $9.75 $8.62 $0.00 $71.12

6/5/2028 $43.35 $10.90 $9.75 $8.62 $0.00 $72.62

AIR TRACK OPERATOR

LABORERS

LABORERS - ZONE 3 (BUILDING & SITE)

12/4/2028 $44.85 $10.90 $9.75 $8.62 $0.00 $74.12

For apprentice rates see "Apprentice- LABORER"

6/1/2026 $37.74 $10.90 $9.75 $6.60 $0.00 $64.99AIR TRACK OPERATOR (HEAVY & HIGHWAY)

LABORERS

LABORERS - ZONE 3 (HEAVY & HIGHWAY)

12/1/2026 $39.03 $10.90 $9.75 $6.60 $0.00 $66.28

For apprentice rates see "Apprentice- LABORER (Heavy and Highway)

ASBESTOS WORKER (PIPES & TANKS)

HEAT & FROST INSULATORS LOCAL 6

HEAT & FROST INSULATORS LOCAL 6 (SPRINGFIELD)

12/1/2025 $40.32 $14.50 $4.30 $6.25 $0.00 $65.37

6/1/2026 $37.25 $10.90 $9.75 $8.62 $0.00 $66.52

12/7/2026 $38.55 $10.90 $9.75 $8.62 $0.00 $67.82

6/7/2027 $39.95 $10.90 $9.75 $8.62 $0.00 $69.22

12/6/2027 $41.35 $10.90 $9.75 $8.62 $0.00 $70.62

6/5/2028 $42.85 $10.90 $9.75 $8.62 $0.00 $72.12

ASPHALT RAKER

LABORERS

LABORERS - ZONE 3 (BUILDING & SITE)

12/4/2028 $44.35 $10.90 $9.75 $8.62 $0.00 $73.62

For apprentice rates see "Apprentice- LABORER"

6/1/2026 $37.24 $10.90 $9.75 $6.60 $0.00 $64.49ASPHALT RAKER (HEAVY & HIGHWAY)

LABORERS

LABORERS - ZONE 3 (HEAVY & HIGHWAY)

12/1/2026 $38.53 $10.90 $9.75 $6.60 $0.00 $65.78

For apprentice rates see "Apprentice- LABORER (Heavy and Highway)

6/1/2026 $37.25 $10.90 $9.75 $8.62 $0.00 $66.52

12/7/2026 $38.55 $10.90 $9.75 $8.62 $0.00 $67.82

6/7/2027 $39.95 $10.90 $9.75 $8.62 $0.00 $69.22

12/6/2027 $41.35 $10.90 $9.75 $8.62 $0.00 $70.62

BARCO-TYPE JUMPING TAMPER

LABORERS

LABORERS - ZONE 3 (BUILDING & SITE)

Page 3 of 30Wage Request Number: 20261117145406Issue Date: 11/18/2026

Supplemental

Unemployment Total Rate

6/5/2028 $42.85 $10.90 $9.75 $8.62 $0.00 $72.12

12/4/2028 $44.35 $10.90 $9.75 $8.62 $0.00 $73.62

For apprentice rates see "Apprentice- LABORER"

6/1/2026 $37.75 $10.90 $9.75 $8.62 $0.00 $67.02

12/7/2026 $39.05 $10.90 $9.75 $8.62 $0.00 $68.32

6/7/2027 $40.45 $10.90 $9.75 $8.62 $0.00 $69.72

12/6/2027 $41.85 $10.90 $9.75 $8.62 $0.00 $71.12

6/5/2028 $43.35 $10.90 $9.75 $8.62 $0.00 $72.62

BLOCK PAVER, RAMMER / CURB SETTER

LABORERS

LABORERS - ZONE 3 (BUILDING & SITE)

12/4/2028 $44.85 $10.90 $9.75 $8.62 $0.00 $74.12

For apprentice rates see "Apprentice- LABORER"

6/1/2026 $37.74 $10.90 $9.75 $6.60 $0.00 $64.99BLOCK PAVER, RAMMER / CURB SETTER (HEAVY &

HIGHWAY)

LABORERS

LABORERS - ZONE 3 (HEAVY & HIGHWAY)

12/1/2026 $39.03 $10.90 $9.75 $6.60 $0.00 $66.28

For apprentice rates see "Apprentice- LABORER (Heavy and Highway)

BOILER MAKER

BOILERMAKERS LOCAL 29

BOILERMAKERS LOCAL 29

1/1/2024 $48.12 $7.07 $14.60 $6.00 $0.00 $75.79

8/1/2026 $58.56 $12.84 $15.57 $5.89 $0.00 $92.86BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY

WATERPROOFING)

BRICKLAYERS LOCAL 3

BRICKLAYERS LOCAL 3 (SPRINGFIELD/PITTSFIELD)

2/1/2027 $59.96 $12.84 $15.57 $5.89 $0.00 $94.26

Apprentice: BOILER MAKER

Effective Date: 1/1/2024

Step Percent Apprentice Base Wage Health Pension Annuity

Supplemental Unemployment

Total Rate

1 65.00 $31.28 $7.07 $9.32 $3.90 $0.00 $51.57

2 65.00 $31.28 $7.07 $9.32 $3.90 $0.00 $51.57

3 70.00 $33.68 $7.07 $10.03 $4.20 $0.00 $54.98

4 75.00 $36.09 $7.07 $10.74 $4.50 $0.00 $58.40

5 80.00 $38.50 $7.07 $11.45 $4.80 $0.00 $61.82

6 85.00 $40.90 $7.07 $12.18 $5.10 $0.00 $65.25

7 90.00 $43.31 $7.07 $12.88 $5.40 $0.00 $68.66

8 95.00 $45.71 $7.07 $13.62 $5.70 $0.00 $72.10

Apprentice to Journeyworker Ratio: 1:4