This is a bid sheet for an Emergency Purchase Request for I-69 Repairs issued by the Kentucky Transportation Cabinet (KYTC). The project encompasses grouting operations, roadway milling and texturing, asphalt paving, pavement striping, traffic control, and associated support services. Key line items include drilling (10,000 linear feet), curtain grouting (3,000 cubic yards), infill grouting (9,000 cubic yards), milling and texture work (1,000 tons), CL4 asphalt surface application (1,000 tons), pavement striping in white (2,500 linear feet) and yellow (2,000 linear feet), shoulder rumble stripes (4,000 linear feet), and various traffic management elements including law enforcement support (100 hours), portable changeable message signs (4 units), and queue warning systems with portable radar sensors (12-month duration). The bid sheet does not specify response deadlines, site visit requirements, or pre-bid conferences.
All unit prices and extended prices on the bid sheet are listed as zero dollars, indicating this is a blank bid form awaiting contractor pricing submissions. The document explicitly notes that all quantities listed are estimates only and do not constitute guarantees; KYTC reserves the right to procure only quantities needed for the project, and actual requirements may exceed those shown, with contractors obligated to furnish all needed quantities at their submitted unit prices. Demobilization costs are calculated at 5 percent of the total bid cost. No information regarding set-asides, incumbent contractors, funding sources, or contract term duration is provided in this bid sheet.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Hopkins 2-0013.00 Bid Package.pdf | ||
| Final_RFQ_605_2600000028_1_SO_FORM.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Line Item | Item | |||||||
| Description | Estimated | |||||||
| Quantity | Unit of Measure | UNIT PRICE | EXTENDED PRICE | |||||
| 1 | Mobilization for Grouting | 1 | L.S. | Grouting | $ - 0 | |||
| 2 | Drilling | 10000.0 | LF* | All drilling required on job | $ - 0 | |||
| 3 | Curtain Grout | 3000.0 | CUYD* | Low slump perimeter grouting | $ - 0 | |||
| 4 | Infill Grout | 9000.0 | CUYD* | High slump interior grout | $ - 0 | |||
| 2 | $ - 0 | |||||||
| 5 | Milling and texture (2") | 1000 | Ton* | Roadway items | $ - 0 | |||
| 6 | Mobilization for Mill & Texture | 1 | L.S. | $ - 0 | ||||
| 7 | CL4 Asphalt Surface 0.5A PG76-22 (2") | 1000 | Ton* | $ - 0 | ||||
| 8 | Asphalt Material for Tack Non-Tracking | 3.5 | Ton* | $ - 0 | ||||
| 9 | Pave Striping - Thermo - 6 IN White | 2500 | LF* | $ - 0 | ||||
| 10 | Pave Striping - Thermo - 6 IN Yellow | 2000 | LF* | $ - 0 | ||||
| 11 | Shoulder Rumble Stripes | 4000 | LF* | $ - 0 | ||||
| 12 | Electronic Delivery Management System | 1 | L.S. | $ - 0 | ||||
| 13 | Staking | 1 | L.S. | Layout and survey of grout hole locations | $ - 0 | |||
| 2 | $ - 0 | |||||||
| 14 | Maintain & Control Traffic | 1 | L.S. | Traffic Control | $ - 0 | |||
| 15 | Temporary Signs | 350 | SQFT* | $ - 0 | ||||
| 16 | Law Enforcement Officer | 100 | Hours* | $ - 0 | ||||
| 17 | Portable Queue Warning Alert System | 2 | Months* | $ - 0 | ||||
| 18 | Queue Warning PCMS | 12 | Months* | $ - 0 | ||||
| 19 | Queue Warning Portable Radar Sensors | 12 | Months* | $ - 0 | ||||
| 20 | Portable Changeable Message Sign | 4 | Each* | $ - 0 | ||||
| 2 | $ - 0 | |||||||
| 21 | Demobilization | 1 | L.S. | 5 % of bid cost | Demob | $ - 0 | ||
| $ - 0 | ||||||||
| TOTAL | $ - 0 |
*Any and all quantities mentioned in this solicitation are purely estimates and are not to be implied nor inferred as being guarantees. KYTC is obligated to buy only that quantity needed for this project. Requirements may exceed the quantities shown and the contractor will be required to furnish all requirements at the unit prices bid.