Hopkins 2-0013.00 Bid Package.pdf

PDF 43 MB Posted

Attached to
Emergency Purchase - I-69 Repairs
Solicitation number
RFQ 605 2600000028 1
Issued by
Harrison County, Kentucky

About this file

Summary

This is a Special Note for Mine Grouting prepared by the Kentucky Department of Highways (KYTC) for emergency repairs to I-69 in Hopkins County at mile point 110.9-111.1, covering both northbound and southbound lanes. The project involves systematically drilling vertical holes into an existing underground coal mine (No. 11 and No. 12 seams) and injecting grout material to reduce potential ground settlement and subsidence caused by historical mining activities. The work scope includes drilling to depths of 19 to 28 feet below roadway surface with provisions for drilling to a minimum of 50 feet, grouting operations using positive displacement pumps capable of delivering grout at pressures of 150 psi or greater, real-time automated monitoring and recording of grouting parameters, and proper abandonment and backfilling of all boreholes. Preconstruction submittals required include detailed personnel qualifications demonstrating five years of recent supervision experience, project references from at least three similar projects completed within the previous five years, comprehensive installation and work plans addressing drilling methods and grouting procedures, and grout mix design reports with compressive strength documentation. A mandatory preconstruction meeting will be scheduled prior to any grouting activities to clarify construction requirements and review submittals.

Payment for the project will be made on a unit basis for three line items: Mobilization for Grouting (lump sum), Drilling (linear foot), Curtain Grout (cubic yard), and Infill Grout (cubic yard). The contract is subject to overrun or underrun at the Engineer's direction without adjustment to unit prices. The contractor must obtain all necessary permits from the Kentucky Energy and Environmental Cabinet, comply with site drainage and environmental regulations, provide quality control testing including slump tests and compressive strength cylinders at specified intervals, and submit daily technical reports with drilling logs and grout placement data within one work shift of completion. The Department reserves the right to perform independent verification drilling, coring, and downhole video inspections at any time, with costs for such verification work paid at contract unit prices. All costs associated with mobilization, demobilization, equipment, materials, labor, site cleanup, and compliance with special requirements are included in the unit bid prices, with no direct payment for incidental expenses.

View the file

Other files

File Type Posted
Final_RFQ_605_2600000028_1_SO_FORM.PDF PDF
RFQ 26.28 Bid Sheet - I-69 Repairs.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Special Note for Mine Grouting 4/7/2026 Hopkins County, I-69 MP 110.9-111.1 (NB and SB) Page 1 of 13

SPECIAL NOTE FOR MINE GROUTING

Hopkins County – I-69 Mile point 110.9-111.1 (NB and SB)

Item No. 2-13.00

1. DESCRIPTION

1.1. This work shall consist of grouting portions of an existing underground coal mine along I-69 within the limits shown on the contract documents. The purpose of the grouting is to reduce potential ground settlement and subsidence.

1.2. The Kentucky Standard Specifications for Road and Bridge Construction, current edition, governs unless otherwise specified in this Special Note or in the contract documents. For the purposes of this Special Note, “Department” refers to the Kentucky Department of Highways and/or consultants acting on behalf of the Department of Highways. “Engineer” is defined in Section 101.03 of the

Standard Specifications.

1.3. The method of grouting shall consist of systematically drilling vertical holes into mine locations and injecting grout material to provide bearing support for soil and rock layers beneath the highway facilities.

1.4. Bidders and Contractors shall understand the potential difficulties posed by the nature of the site and the requirements of the work. Parts of the mine may be open, collapsed, silt or muck filled, previously backfilled, or partially backfilled.

Ground settlement during drilling and grouting activities may occur. Difficult drilling, high torque, and hole instability may occur.

1.5. The Engineer, using real-time data provided by the contractor during the drilling and grouting operations, will evaluate and determine the extent of treatment work to be conducted at each location specified in the contract documents.

1.6. Monitoring, recording, and analyzing of drilling and grouting data shall be performed in real time.

1.7. No grouting activities shall be performed from the interior of the mine. The mine space is partially water filled. Several exploratory borings conducted by the

Department were cased and are available for inspection using downhole camera equipment. Video recordings taken by the Department of the borings and mine openings are available for viewing (see section 2 of this note).

1.8. The existing cased exploratory borings are available for the Contractor’s use during construction. At the completion of the grouting activities, grout these exploratory borings to the ground surface.

Special Note for Mine Grouting 4/7/2026 Hopkins County, I-69 MP 110.9-111.1 (NB and SB) Page 2 of 13

1.9. Disclaimer. Acceptance of any of the contractor’s submissions required by this note does not constitute endorsement or approval. The acceptance is acknowledgement of the work performed and authorization for the contractor to proceed. The Department is not bound by acceptance of any of the submissions required by this note. Final acceptance will be contingent on the satisfactory completion of the work required by this note.

2. SITE, SUBSURFACE INFORMATION, AND SAMPLE INSPECTION

Bidders are encouraged to consult available geological literature including but not necessarily limited to the Madisonville East Geologic Quadrangle Map (GQ-252).

Additional geotechnical information is presented in contract documents.

Borings advanced using hollow stem augers indicate that the overburden soils vary from 5 to 20 feet in thickness. Rock core specimens obtained in the borings consist of limestone, shales, sandstones and coal as shown in attached project bore logs.

According to geologic mapping the coal seams encountered at the project site are the No. 12 and 11 coal seams within the zone of interest. Geologic mapping and core samples indicates the coal seams can vary from 3 to 9 feet thick and is absent in several locations. Geologic mapping indicates mining activities throughout the project area.

The initial set of exploratory borings (Holes B1 through B6) were performed in August 2025. These borings were obtained using conventional boring techniques (hollow- stem augers, solid-stem augers, and diamond-bit core barrels). Several of the borings where mine openings were encountered were cased through the overburden soil so that a downhole camera could be utilized to view the rock in the borings as well as to view conditions in the mine opening(Borings B-5 and B-6). These borings are assumed to be water filled at this time.

The subsurface data sheets are included in the project documents. The downhole videos of B-5 and B-6 from August 2025 are available for viewing by prospective bidders at the following link:

B5 - https://youtu.be/uOP6rVm6OE4 B6 - https://youtu.be/VKL7vusyb-A

The videos generally show the mine openings to be water filled. In some instances, the videos show a small gap between the top of the water and the mine roof, however subsequent checks with an observation well reader indicate the void is completely water filled at this time.

Additional borings (B-7 through B-11) were performed in March 2026 to further help define the extent of the mined area. These borings were obtained using conventional boring techniques (hollow- stem augers, solid-stem augers, and diamond-bit core barrels). One boring was cased through the overburden soils (B-7).

https://youtu.be/uOP6rVm6OE4 https://youtu.be/VKL7vusyb-A

Special Note for Mine Grouting 4/7/2026 Hopkins County, I-69 MP 110.9-111.1 (NB and SB) Page 3 of 13

Prospective bidders are strongly encouraged to visit the project site and view the downhole videos and may request viewing of rock cores obtained. The bidders are also responsible to familiarize themselves with the available geotechnical data, which provides further information regarding the anticipated soil and bedrock conditions that will impact the grouting operations.

3. GENERAL SCOPE AND REQUIREMENTS

Work included consists of providing all labor, equipment, materials, water, and power;

performing all operations necessary to complete the intended grouting for the project;

cleaning up the area upon completion of the work; and providing all other operations that are incidental to the work specified herein. Key aspects of the work to be performed or furnished by the contractor include, but are not limited to, the following:

1. Provide appropriate drilling equipment and experienced drill operators capable of drilling holes for the injection of grout.

2. Coordinate with relevant utility companies to avoid damage to utilities including, but not limited to, sewer, gas, water, and telecommunication lines.

3. Provide an appropriate system to deliver, mix, and place grout. All data related to volume and pressure of injected materials shall be collected using an automated system. A back-up system consisting of mechanical pressure gauges, in good operating condition, shall be located at the pump so that the pressure may be checked by the operator and the Engineer’s representative.

A mechanical counter shall be used at the pump to monitor the quantity of grout placed at each location and during each shift of work. The volume of grout displaced per pump stroke shall be verified by the Contractor prior to grout placement.

4. Comply with Kentucky Energy and Environmental Cabinet (EEC) requirements. Obtain necessary permits and provide proper notification to

EEC offices prior to beginning the work.

5. Use proper abandonment techniques for injection holes including injection holes that do not encounter voids. All bore holes must be grout filled to roadway surface elevation upon completion.

6. Demobilize equipment and clean-up site.

Special Note for Mine Grouting 4/7/2026 Hopkins County, I-69 MP 110.9-111.1 (NB and SB) Page 4 of 13

4. PRECONSTRUCTION SUBMITTALS

4.1. Submit to the Engineer for review in electronic format (PDF) the following at least one (1) working days prior to the Preconstruction Grouting Meeting.

4.2. Personnel Qualifications and Site Organization. The contractor shall submit verification that the supervision of all drilling and grouting work will be conducted by a resident Superintendent with at least five (5) years of recent on-the job supervision in similar applications. In addition, the Project Manager, Project Engineer, and foremen shall each have completed at least three (3) similar projects in the previous five (5) years. The Project Engineer shall be a licensed Professional Engineer. The resumes submitted shall be of the personnel that will be on-site working on the project.

At a minimum, resumes of the following key field personnel shall be included in the submission:

Project Manager

Superintendent(s)

Project Engineer(s)

Foremen

Resumes must demonstrate, by specific project detail, competence and experience in the following areas: (1) drilling and grouting capabilities in similar ground conditions; (2) logging of drilling; (3) automated monitoring of grouting parameters; and (4) ability to process, interpret, display, and act upon these data in real time during the construction process.

The functions of planning and quality control are particularly important on this project. The responsibility for carrying out these functions must be clearly addressed within the group of individuals whose resumes are submitted. If during the construction the Contractor proposes to change any of the key personnel, the resume of the proposed replacement person shall be submitted and accepted by the Engineer prior to assuming responsibilities on the project.

4.3. References for Past Projects. List of at least three (3) previously completed projects of similar scope and purpose within the last five (5) years for acceptance by the Engineer. The list shall include a description of the project, quantity of material placed, time period that grouting was performed, and client contact person with phone number.

4.4. Installation and Work Plan. Submit a detailed step-by-step description of the proposed drilling and grouting construction procedure including personnel, testing, and equipment to assure quality control, as well as procedures and measures to avoid interference between drilling and previously grouted holes.

Special Note for Mine Grouting 4/7/2026 Hopkins County, I-69 MP 110.9-111.1 (NB and SB) Page 5 of 13

At a minimum, the submittal shall address the following:

• Contractor’s understanding of the scope of work, and interaction with the investigation and treatment activities.

• Practical operational interface with the Engineer in the field.

• Construction operation sequence and schedule.

• Details of delivery of materials and equipment to the project site.

• Details of drilling methods including casing advancement and withdrawal;

approach to drilling through variable materials including soil, rock, rubble, and previously backfilled areas; and procedures to monitor quality control including sample drilling logs.

• Details of grout type, storage, testing and delivery methods.

• Details of grout placement.

• Details of all automated recording and analysis systems.

• Details of equipment and number of drill rigs to be used.

• Equipment and method of monitoring heave or ground movement.

• Plan describing control and proper disposal of surface water, water displaced from mine void due to grouting activities, drill flush, and excess grout.

• Subcontracting plan, including proposed subcontractors.

• Details for traffic control.

• Details of quality control including qualifications, certifications, etc.

4.5. Grout Mix Design Report. Provide grout mix design report for the grouts to be used. Include details regarding batching method, batch quantities, mixing method, set times, slump cone, and compressive strength results from laboratory samples or data from representative mixes from previous projects.

Include a description of the methods and equipment for accurate automated monitoring, recording, and analyzing of the grout volume and pressure during placement. Finally, provide procedure and equipment for monitoring grout quality control during placement including sample logs for grouting.

4.6. Related work shall not begin until the submittals have been received, reviewed, and accepted in writing from the Engineer. Allow the Engineer one

(1) working days to review the submittals after the complete final set has been received. Additional time required due to incomplete or unacceptable submittals are not cause for delay or impact claims. All costs associated with incomplete or unacceptable submittals shall be the responsibility of the

Contractor.

Special Note for Mine Grouting 4/7/2026 Hopkins County, I-69 MP 110.9-111.1 (NB and SB) Page 6 of 13

5. DEFINITIONS

The following is a list of technical terms which are used in this Special Note. The list does not include all technical terms used since a general understanding of these is assumed.

5.1. Admixture: Substance added to a grout to control bleed and/or shrinkage, improve flowability, reduce water content, or retard setting time.

5.2. Ascending Stage Drilling/Grouting: The process of drilling a hole to full depth and then grouting the hole in stages from the bottom up.

5.3. Casing: Steel tube introduced during the drilling process in overburden soil and/or fractured rock to temporarily stabilize the drill hole.

5.4. Order of Hole: Exploratory holes along outside shoulder to determine limits of curtain wall grouting. Injection holes along skip line, inside shoulders and median to infill void areas identified during exploratory drilling. Additional holes may be required to allow for venting or proper void infill. All holes will be paid as drilling by linear foot.

5.5. Refusal: A grout stage shall be considered refused when one of the following occurs:

• Grout flow ceases at a header reading pressure of 150 psi.

• Sustained pumping at a header pressure of 100 psi or greater

• Surface Ground heave of 0.125 inches (1/8”) is observed.

• Interconnection or surface breakout is observed.

• Grout exits vent holes in the vicinity of pumping location

• Additional refusal criteria presented by contractor will be considered and accepted or rejected by the engineer.

6. PRECONSTRUCTION GROUTING MEETING

6.1. A preconstruction meeting for the grouting work will be scheduled by the

Engineer prior to the anticipated start of any grouting activities. Attendance by the Contractor and any Subcontractors at the meeting is mandatory.

6.2. The preconstruction meeting for the grouting work will be conducted to clarify the construction requirements and method statement, to review the submittals for the work, to coordinate the construction schedule and activities, and to identify contractual relationships and delineation of responsibilities among the Contractor and any Subcontractors, specifically those pertaining to ground improvement grouting, anticipated subsurface conditions, testing, survey control, and site drainage control.

Special Note for Mine Grouting 4/7/2026 Hopkins County, I-69 MP 110.9-111.1 (NB and SB) Page 7 of 13

7. MATERIALS

7.1. Materials will be furnished new and without defects. Defective materials will be removed from the jobsite and replaced by the Contractor at no additional cost to the Department.

7.2. Admixtures. Admixtures shall conform to the requirements of Section 802 of the Standard Specifications. Admixtures that control bleed, improve flowability, reduce water content, and retard set may be used in the grout, subject to the review and acceptance of the engineer. Admixtures shall be compatible with the grout and mixed in accordance with the manufacturer’s recommendations.

Accelerators and admixtures containing chlorides are not permitted.

7.3. Cement. All cement shall be Portland cement, conforming to Section 801 of the Standard Specifications.

7.4. Fine Aggregate. If sand-cement grout is used, sand shall conform to Section

804 of the Standard Specifications.

7.5. Grout . Grout with a minimum 28-day compressive strength of 500 psi. Material components may include sand, cement, fly ash, and water in accordance with

Section 601.03.03 of the Standard Specifications for Road and Bridge

Construction, current edition. Compressive strength of grout is designed to be

500 psi at 28 days and to provide a permanent, non-erodible material.

7.6. Water. Water used in the grout mix shall conform to Section 803 of the

Standard Specifications and shall be potable, clean, and free from substances that may be injurious to cement and steel. Ground or local surface water may be used provided the Contractor provides documentation the water is not detrimental to grout.

8. EQUIPMENT

8.1. Drilling. Use drilling equipment suitable for the work capable of drilling vertical holes and capable of penetration all subsurface materials including soil, intact bedrock, collapsed bedrock, and rubble. Anticipated mine void depths are between 19 and 28 feet below roadway surface. Provide equipment capable of drilling to a minimum depth of 50 feet. The drilling equipment and methods shall not damage the existing underground mine, adjacent ground, or overlying structures. Drilling means and methods shall be selected by the Contractor to match the anticipated ground conditions.

8.2. Pumps. Furnish positive displacement pumps suitable for the work. For grout injection, the pumps shall be capable of continuously delivering the grout at pressures of at least 150 psi at rates between 0.5 and 3 cubic feet per minute.

Special Note for Mine Grouting 4/7/2026 Hopkins County, I-69 MP 110.9-111.1 (NB and SB) Page 8 of 13

8.3. Real-Time Grout Injections Monitoring. Provide either a X-Y recorder or a computer based system capable of accurately monitoring, recording, and displaying the grouting pressures and flow rates in real time at a location suitable for assessing and controlling the grouting operation, as well as allowing the Engineer to view the data as it is collected. The system shall be capable of monitoring as many injection points as the Contractor injects simultaneously. A print-out clearly identifying the injection details (i.e., pressure, rate of injection, and volume) at each stage of grouting shall be submitted after each shift.

8.4. Grout Injection Pipes. Furnish steel grout pipes, casing, and connections of sufficient strength to maintain the hole and to withstand the required installation, jacking and pumping stresses. The pipes shall have a minimum diameter in order to adequately handle the grout without plugging. All casing shall be flush joint threaded, or shall be single piece tubing to provide a smooth inner wall and an unobstructed inside diameter. All fittings (elbows, bends, adapters, reducers, etc.) shall be long sweep, gradual transition pieces specifically designed and manufactured for high pressure grout and concrete pumping applications. Standard pipe elbows and reducers will not be allowed.

It shall be the Contractor’s responsibility to install casing that does not detrimentally impact the grouting procedure. Casings shall be sized and installed such that grout material will not travel in the annulus area between the pipe and adjacent ground and escape at the surface when pumped.

8.5. Grout Hoses. Use grout hoses suitable for the execution of the work. The hoses shall be sized and rated to accommodate the required pumping pressures and flows with acceptable factors of safety against rupture.

8.6. Grout Plant. For grout produced on site, provide a grout plant suitable for the execution of the work. The plant shall be sized to accommodate the

Contractor’s selected pumping rates and shall be capable of continuously producing uniformly mixed grout. The plant shall be capable of accurately and routinely proportioning materials used in the grouts.

The grout shall be either batched on site or brought to the site by agitator trucks.

If the grout is batched on site, the mixer shall be a continuous auger type to ensure complete and uniform mixing of the materials used and shall be of sufficient capacity to continuously provide the pumping unit with mixed grout at its normal pumping range. The mixer must be capable of accurately proportioning the grout materials.

The maximum distance between the mixing/supply point of grout and its point of injection shall be less than 300 feet unless otherwise approved by the

Engineer.

Special Note for Mine Grouting 4/7/2026 Hopkins County, I-69 MP 110.9-111.1 (NB and SB) Page 9 of 13

8.7. Communication System. An appropriate voice communication system shall be maintained between the mixing and pumping location(s) and the drilling and injection locations(s).

9. DETAILED PHILSOPHY, SCOPE, AND DERIVATION OF QUANTITIES

9.1. Philosophy and Scope. Each hole shall be drilled to the elevations of the mine voids/coal seams identified on the contract documents or as identified through exploratory boring. The contractor shall log each hole to identify subsurface materials and voids. Each hole will also be used for grout injection or backfilled as indicated by the Engineer. Casing shall be installed to allow drilling to proceed without loss of drilling flush into the overburden and to maintain an open hole during grouting operations.

The contractor shall submit drill plan to the Engineer for approval prior to any grouting. Drilling plan shall include exploratory holes along north and south bound outer shoulder limits as determined by the engineer. Spacing for exploratory holes should be approximately 20 feet longitudinally along the side of roadway.

Injection holes will be located on pattern determined by the contractor and engineer as site conditions warrant. Spacing of these holes are estimated 20 feet longitudinally with a row along skip line of each lane, inside shoulder of each lane (North and South Bound) and median of interstate. Addition or deletion of holes and/or rows is at the discretion of the Engineer. Thus, monitoring, processing, and interpreting the drilling and grouting data is necessary in real time to avoid delays or interruptions. The Engineer will collaborate with the contractor in reviewing the drilling and grouting data, but will be the final decision-maker for instructing the scope of work. Each hole shall be grouted until refusal, as defined in section 5.5 of this Special Note. Grouting pressure shall ease at the top of rock. The remainder of the hole shall be backfilled with grout to the roadway surface. Holes not encountering voids will be backfilled with grout to the roadway surface.

9.2. Derivation of Quantities. The planned approach to drilling and grouting is uniform and consistent in general philosophy. The foreseen amount and type of drilling and grouting activities are estimated using the current understanding of local subsurface conditions and the treatment area geometry. Estimates of grout are based on treatment of the mine mass as a whole, and not on a hole by hole quantity.

This data and this Special Note represent the current best estimate of the scope of work to be conducted. Modifications to the scope of work at each location will be directed by the Engineer based on the data provided by the Contractor regarding drilling and grouting conditions actually encountered. Addition or

Special Note for Mine Grouting 4/7/2026 Hopkins County, I-69 MP 110.9-111.1 (NB and SB) Page 10 of 13 deletion of holes is at the discretion of the Engineer.

The estimated quantities of drilling and grouting are provided solely for the purpose of providing bidders with an introduction to the scope of the work to be conducted. They are not a guarantee of quantities, absolute or relative, and can reasonably be expected to vary depending on the actual site conditions encountered.

10. EXECUTION OF WORK

Site Drainage Control. Control and properly dispose of drill flush and construction related waste, groundwater, displaced groundwater from mine void grouting, excess grout, and equipment washout water, in accordance with the Standard Specifications, project plans, contract documents and all applicable local codes and regulations. All work shall be done in accordance with EEC regulations. On- site disposal is permitted, with the approval of the

Engineer, with control of solids content to prevent runoff of uncontrolled sediment, grout, etc., directly off of KYTC property. Maintain all pipes or conduits used to control surface water during construction. Repair damage caused by surface water control pipes or conduits from the site. At completion of the work, restore the site to the grades and conditions required by the contract documents and specifications. No direct payment will be made for meeting these requirements.

10.1. Dust Suppression. Dust suppression shall conform to the applicable portions of Section 107 of the Standard Specifications. In addition to any requirements set forth by a health and safety plan required elsewhere in this Special Note, the Contractor shall have no prolonged and significant emission of dust. No direct payment will be made for any expenses incurred by the Contractor for compliance with this requirement except for those items which have been included in the contract as a pay item.

10.2. Drilling. The drilling equipment and methods shall be suitable for drilling through all the conditions to be encountered, and shall be selected and modified, if necessary, by the Contractor. The drilling method shall not cause damage to the adjacent ground, underground mine, or adjacent structures. The

Contractor is to observe the boring during drilling and provide the Engineer a log of all pertinent information.

10.3. Grouting. Once initiated, the Contractor shall methodically proceed to complete all grouting activities in a continuous operation until refusal criteria are met. Areas of excessive grout takes may be required to rest between grouting intervals to control runaway grout. Cost incurred to remove grout from areas outside the work limits shall be borne by the Contractor.

Special Note for Mine Grouting 4/7/2026 Hopkins County, I-69 MP 110.9-111.1 (NB and SB) Page 11 of 13

10.4. Monitoring of Ground Heave/Settlement. During construction, the Contractor shall monitor the ground for heave/settlement in the vicinity of the drilling and grouting locations. The Contractor shall immediately notify the Engineer of any instances of suspected or observed tilt, ground surface heave, or settlement and suspend or modify drilling or backfilling operations pending resolution with the

Engineer.

No direct payment will be made for any expenses incurred by the Contractor for compliance with this Special Note except for those items which have been included in the contract as a pay item.

11. CONTRACTOR’S QUALITY CONTROL

11.1. The Contractor’s Quality Control Representative (CQCR) shall perform slump tests (ASTM C143) at least once per day of injection or at any time as requested by the Engineer. Preparation and testing for compressive strength testing shall be in accordance with ASTM D4832. The CQCR shall cast 4-inch by 8-inch or

6-inch by 12-inch cylinders at the rate three sets for every 100 cubic yards of grout injected, but not less than once during each shift grout is placed. One set of the cylinders is to be tested for compressive strength at 7 days, one is to be tested at 28 days, and one set is extra to be used if needed. All test data shall be promptly forwarded to the Engineer. Testing of the 28-day and extra cylinders will not be required if the required minimum strength is obtained at 7 days. Temperature readings of the grout are to be taken each time compressive strength cylinders are cast.

11.2. The CQCR shall verify the layout of injection and verification holes. The

Contractor shall provide survey data accurate to within 0.1 foot for horizontal control and 0.1 foot for vertical control for all injection and verification holes drilled by the contractor. Proposed locations for such holes (if not already indicated with the initial plan provided before start of construction) shall be provided by the Contractor at least one (1) day prior to hole drilling. Survey data for all hole locations shall be provided no later than one week following hole drilling.

11.3. In addition, the CQCR shall submit records to the Engineer as follows:

1. Accurate daily reports providing technical details and quantities associated with drilling, grout installation, and results of material tests.

2. The Contractor shall provide a log for each boring used for installing grout.

Such logs shall be neat, legible, and include an accurate characterization of all material encountered in the hole and notation of special features such as voids, soft or broken rock, ground water, loss of circulation of drilling fluids, rod drop, or any other item of interest. The Contractor shall prepare and submit to the Engineer full installation logs for each drilling or grouting

Special Note for Mine Grouting 4/7/2026 Hopkins County, I-69 MP 110.9-111.1 (NB and SB) Page 12 of 13 operation at each work location. The records shall be submitted within one work shift after the drilling or grouting operation has been completed. A separate log shall be provided for each operation with the format established in the preconstruction submittals and meeting. All automated data generated during drilling and grouting operations shall be made available in real time to the Engineer, with hard copies included in the daily logs.

3. The contractor shall submit the laboratory test results to the Engineer as they become available.

11.4. In all cases the Department reserves the right to request raw data, field notes and/or other available information that may be necessary to evaluate the results of the work specified in this Special Note. Upon request, provide any available information at no additional cost to the Department.

In all cases the Department reserves the right to perform testing to obtain independent results of testing specified in this Special Note. The Department may also conduct other ancillary testing as needed to verify the adequacy of the work performed. Upon request provide any assistance required for the

Department or the Department’s representative to perform such testing at no additional cost to the Department.

The Department reserves the right to perform drilling, coring, and downhole video inspection at any time to evaluate the results of the work specified in this

Special Note. Drilling and grouting of holes for verification, if requested from the Contractor, will be paid at the contract unit prices for Drilling and Infill Grout and includes casing to prevent hole collapse while using downhole video inspection equipment. Provide clear access around the inspection location at no additional cost to the Department.

12. METHOD OF MEASUREMENT AND BASIS OF PAYMENT

No direct payment will be made for any expenses incurred by the Contractor for compliance with this Special Note except for those items which have been included in the contract as a pay item.

12.1. Mobilization for Grouting. Mobilization will be paid as a lump sum.

12.2. Drilling. Payment will be measured to the 0.1 Linear Foot for accepted length measured from the ground surface to the depths directed and approved by the

Engineer. This item may be overrun or underrun at the direction of the Engineer without adjustment in the contract unit price. All costs associated with and incidental to drilling (including casing and layout of grout injection locations) of the hole for the grouting operations shall be included in the contract unit price for Drilling, Linear Foot.

Special Note for Mine Grouting 4/7/2026 Hopkins County, I-69 MP 110.9-111.1 (NB and SB) Page 13 of 13

12.3. Curtain Grout. Payment will be measured to the 0.1 Cubic Yards for accepted quantity of grout placed as approved by the Engineer. This item may be overrun or underrun at the direction of the Engineer without adjustment in the contract unit price. All costs associated with and incidental to providing, placing, and testing for the grouting operations shall be included in the contract unit price for Curtain Grout, Cubic Yards. The anticipated use of this item is to limit flow of infill grout to the limits of the I-69 roadway. This grout is anticipated to be low slump grout, mix design shall be submitted by contractor to engineer for approval.

12.4. Infill Grout. Payment will be measured to the 0.1 Cubic Yards for accepted quantity of grout placed as approved by the Engineer. This also includes the quantity grout required to backfill holes, overburden, and exploratory borings.

This item may be overrun or underrun at the direction of the Engineer without adjustment in the contract unit price. All costs associated with and incidental to providing, placing, and testing for the grouting operations shall be included in the contract unit price for Grout, Cubic Yards. The anticipated use of this item is to infill voids located beneath the I-69 roadway. This grouting shall be placed after curtain grouting has been performed to prevent excessive quantity migration beyond roadway limits. This grout is anticipated to be high slump grout, mix design shall be submitted by contractor to engineer for approval.

12.5. Payment. Payment will be made under:

Pay Item Pay Unit

Mobilization for Grouting Lump Sum

Drilling Linear Foot

Curtain Grout Cubic Yard

Infill Grout Cubic Yard

Aaron.Wallace Image

Text Box Attachment #1

Callout add table that shows bore number, void and depth? Have in Excel

Aaron.Wallace Text Box Attachment #2

Image

Line

Aaron.Wallace Line

Aaron.Wallace Callout Grouting exploration Extents ~850 feet along roadway from Shoulder to Shoulder

Aaron.Wallace Arrow

Aaron.Wallace Callout

MP 111.1

Aaron.Wallace

MP 110.95

County Hopkins Date 4/2/2026

I-69

D-2 Survey Notes:

Richey Cline ALL POINTS WERE COLLECTED USING

Item # 2-13.00 GPS METHODS.

Mars # 2011301D COORDINATE SYSTEM USED IS:

Project # STATE PLANE SINGLE ZONE GEOID 18

(circle one) ALL BORING LOCATIONS MOVED IN FIELD

ARE HIGHLIGHTED IN ORANGE

HOLE LATITUDE LONGITUDE HOLE NORTHING EASTING ELEVATION (ft)

NUMBER NUMBER (STATE PLANE) (STATE PLANE)

B-1 37.283795 -87.457285 B-1 3631458.301 4424574.956 459.575 B-2 37.283665 -87.457231 B-2 3631410.838 4424589.878 460.595 B-3 37.283861 -87.457305 B-3 3631482.539 4424569.686 459.232 B-4 37.284056 -87.457377 B-4 3631553.814 4424549.986 457.457 B-5 37.283795 -87.45761 B-5 3631460.061 4424480.436 457.848 B-6 37.283992 -87.457678 B-6 3631532.263 4424461.862 456.237 B-7 37.281987 -87.456705 B-7 3630797.438 4424731.46 466.89 B-8 37.284371 -87.457481 B-8 3631668.895 4424521.753 454.57 B-9 37.285513 -87.458297 B-9 3631296.484 4424551.97 441.53

B-10 37.284118 -87.457743 B-10 3631578.512 4424444.231 454.83 B-11 37.283349 -87.457354 B-11 3632089.752 4424292.244 461.76

Elevation Datum NAVD88 Assumed

Road Number

Survey Crew / Consultant

Contact Person

COORDINATE DATA SUBMISSION FORM

KYTC DIVISION OF STRUCTURAL DESIGN -- GEOTECHNICAL BRANCH

(Decimal Degrees) (Decimal Degrees)

21.7

31.7

5.6

10.0

16.1

18.6

25.6

31.7

Overburden.

Limestone.

Coal: #11 Coal.

Shale: Heavily weathered shale and underclay.

(Begin Core)

25 /

30 / 0

(Bottom of Hole 31.7')

4.3

9.7

Elevation Depth Std/Ky

RQD

Lithology

Depth (ft)

SPT

Blows

Sample Type

Rec (ft)

Geologist

Hole Type core

Rec

Rec.

(ft)

Sample No.

Run (ft)

Description

Overburden

Rock Core

SDI

(JS)

Remarks

Rig_Number

Hole Number 1

Surface Elevation '

Total Depth 31.7'

End Date 08/19/2025

Start Date 08/19/2025

Driller Cody Davidson

GEOLOGIST'S SUBSURFACE LOG

GQ-

Longitude(83)

Static Water Depth NA

Immediate Water Depth NA

Location 1+95.00 14.0' Rt.

Top of Rock = 16.1' Elevation = '

Latitude(83)

Printed: 9/16/25

Drilling Firm: Kentucky Transportation Cabinet For: Division of Structural Design Geotechnical Branch

Project Type: Miscellaneous Sinkhole

Project Manager: Richey Cline

Project ID: M-008-2025

Item Number: 02-00000.

Hopkins - I-69 MP 111.0-

Aaron.Wallace

Attachment #3

32.2

42.2

2.9

10.0

10.0

29.3

33.1

41.8

50.1

Overburden.

Shale: Heavily weathered light gray shale.

Shale: Light gray, weathered shale with calcareous inclusions.

Shale: Medium gray, calcareous shale.

(Begin Core)

34 / 0

57 / 7

49 / 0

2.6

10.0

9.7

Elevation Depth Std/Ky

RQD

Lithology

Depth (ft)

SPT

Blows

Sample Type

Rec (ft)

Geologist

Hole Type core

Rec

Rec.

(ft)

Sample No.

Run (ft)

Description

Overburden

Rock Core

SDI

(JS)

Remarks

Rig_Number

Hole Number 2

Surface Elevation '

Total Depth 62.2'

End Date 08/22/2025

Start Date 08/22/2025

Driller Cody Davidson

GEOLOGIST'S SUBSURFACE LOG

GQ-

Longitude(83)

Static Water Depth NA

Immediate Water Depth NA

Location 1+45.00 16.7' Rt.

Top of Rock = 21.0' Elevation = '

Latitude(83)

Printed: 9/16/25

Drilling Firm: Kentucky Transportation Cabinet For: Division of Structural Design Geotechnical Branch

Project Type: Miscellaneous Sinkhole

Project Manager: Richey Cline

Project ID: M-008-2025

Item Number: 02-00000.

Hopkins - I-69 MP 111.0-

52.2

62.2

10.0

10.0

56.6

62.2

Shale: Dark gray sandy shale.

Sandstone: Dark gray shaly calcareous sandstone.

49 / 0

61 /

(Bottom of Hole 62.2')

9.7

10.0

Elevation Depth Std/Ky

RQD

Lithology

Depth (ft)

SPT

Blows

Sample Type

Rec (ft)

Geologist

Hole Type core

Rec

Rec.

(ft)

Sample No.

Run (ft)

Description

Overburden

Rock Core

SDI

(JS)

Remarks

Rig_Number

Hole Number 2

Surface Elevation '

Total Depth 62.2'

End Date 08/22/2025

Start Date 08/22/2025

Driller Cody Davidson

GEOLOGIST'S SUBSURFACE LOG

GQ-

Longitude(83)

Static Water Depth NA

Immediate Water Depth NA

Location 1+45.00 16.7' Rt.

Top of Rock = 21.0' Elevation = '

Latitude(83)

Printed: 9/16/25

Drilling Firm: Kentucky Transportation Cabinet For: Division of Structural Design Geotechnical Branch

Project Type: Miscellaneous Sinkhole

Project Manager: Richey Cline

Project ID: M-008-2025

21.8

31.8

41.8

6.3

10.0

10.0

10.0

15.5

19.2

27.3

33.2

42.0

Overburden.

Limestone: Gray limestone.

VOID.

Shale: Gray, heavily weathered shale, slightly calcareous.

Shale: gray shale with calcareous layers.

Sandstone: Medium gray silty sandstone, calcareous.

(Begin Core)

51 /

38 / 0

77 / 8

94 /

3.7

4.4

10.0

10.0

Elevation Depth Std/Ky

RQD

Lithology

Depth (ft)

SPT

Blows

Sample Type

Rec (ft)

Geologist

Hole Type core

Rec

Rec.

(ft)

Sample No.

Run (ft)

Description

Overburden

Rock Core

SDI

(JS)

Remarks

Rig_Number

Hole Number 3

Surface Elevation '

Total Depth 109.7'

End Date 08/21/2025

Start Date 08/21/2025

Driller Cody Davidson

GEOLOGIST'S SUBSURFACE LOG

GQ-

Longitude(83)

Static Water Depth NA

Immediate Water Depth NA

Location 2+20.00 15.3' Rt.

Top of Rock = 15.5' Elevation = '

Latitude(83)

Printed: 9/16/25

Drilling Firm: Kentucky Transportation Cabinet For: Division of Structural Design Geotechnical Branch

Project Type: Miscellaneous Sinkhole

Project Manager: Richey Cline

Project ID: M-008-2025

51.8

61.8

71.8

81.8

91.8

10.0

10.0

10.0

10.0

10.0

10.0

71.8

94.0

96.3

Sandstone: Medium gray silty sandstone, calcareous.

Shale: Dark gray sand shale.

VOID.

VOID: Void with shale foliations.

94 /

100 /

100 /

98 /

92 / 0

15 / 0

10.0

10.0

10.0

10.0

9.9

4.9

Elevation Depth Std/Ky

RQD

Lithology

Depth (ft)

SPT

Blows

Sample Type

Rec (ft)

Geologist

Hole Type core

Rec

Rec.

(ft)

Sample No.

Run (ft)

Description

Overburden

Rock Core

SDI

(JS)

Remarks

Rig_Number

Hole Number 3

Surface Elevation '

Total Depth 109.7'

End Date 08/21/2025

Start Date 08/21/2025

Driller Cody Davidson

GEOLOGIST'S SUBSURFACE LOG

GQ-

Longitude(83)

Static Water Depth NA

Immediate Water Depth NA

Location 2+20.00 15.3' Rt.

Top of Rock = 15.5' Elevation = '

Latitude(83)

Printed: 9/16/25

Drilling Firm: Kentucky Transportation Cabinet For: Division of Structural Design Geotechnical Branch

Project Type: Miscellaneous Sinkhole

Project Manager: Richey Cline

Project ID: M-008-2025

101.8

109.7

10.0

7.9

101.8

109.7

VOID: Void with shale foliations.

Shale: Coal remnants with heavily weathered shale.

15 / 0

10 / 0

(Bottom of Hole 109.7')

4.9

4.0

Elevation Depth Std/Ky

RQD

Lithology

Depth (ft)

SPT

Blows

Sample Type

Rec (ft)

Geologist

Hole Type core

Rec

Rec.

(ft)

Sample No.

Run (ft)

Description

Overburden

Rock Core

SDI

(JS)

Remarks

Rig_Number

Hole Number 3

Surface Elevation '

Total Depth 109.7'

End Date 08/21/2025

Start Date 08/21/2025

Driller Cody Davidson

GEOLOGIST'S SUBSURFACE LOG

GQ-

Longitude(83)

Static Water Depth NA

Immediate Water Depth NA

Location 2+20.00 15.3' Rt.

Top of Rock = 15.5' Elevation = '

Latitude(83)

Printed: 9/16/25

Drilling Firm: Kentucky Transportation Cabinet For: Division of Structural Design Geotechnical Branch

Project Type: Miscellaneous Sinkhole

Project Manager: Richey Cline

Project ID: M-008-2025

16.8

26.8

36.8

46.8

6.8

10.0

10.0

10.0

10.0

10.3

12.4 12.7

16.8 17.0

23.2

26.8

30.8 31.8

36.8

38.3

39.5

42.5

46.8

Overburden.

Shale: Weathered shale and coal.

Shale: Gray shale.

Limestone: Gray limestone, fossils present.

Coal: Shale and coal.

Coal: Coal.

Shale: Weathered shale and clay.

Shale: Gray, heavily weathered shale.

Shale: Gray shale.

Shale & Limestone: Interbedded shale and limestone.

Shale: Gray shale.

Shale: Highly weathered shale.

Shale: Weathered shale.

Shale & Limestone: Shaly sandstone, calcareous.

Shale: Dark gray shale, highly laminated.

(Begin Core)

39 /

14 / 0

47 /

53 /

62 /

5.0

9.3

10.0

10.0

9.1

Elevation Depth Std/Ky

RQD

Lithology

Depth (ft)

SPT

Blows

Sample Type

Rec (ft)

Geologist

Hole Type core

Rec

Rec.

(ft)

Sample No.

Run (ft)

Description

Overburden

Rock Core

SDI

(JS)

Remarks

Rig_Number

Hole Number 4

Surface Elevation '

Total Depth 56.8'

End Date 08/25/2025

Start Date 08/25/2025

Driller Cody Davidson

GEOLOGIST'S SUBSURFACE LOG

GQ-

Longitude(83)

Static Water Depth NA

Immediate Water Depth NA

Location 2+95.00 16.3' Rt.

Top of Rock = 10.0' Elevation = '

Latitude(83)

Printed: 9/16/25

Drilling Firm: Kentucky Transportation Cabinet For: Division of Structural Design Geotechnical Branch

Project Type: Miscellaneous Sinkhole

Project Manager: Richey Cline

Project ID: M-008-2025

56.8

10.0 91

56.8

Shale: Dark gray shale, highly laminated. 62 /

(Bottom of Hole 56.8')

9.1

Elevation Depth Std/Ky

RQD

Lithology

Depth (ft)

SPT

Blows

Sample Type

Rec (ft)

Geologist

Hole Type core

Rec

Rec.

(ft)

Sample No.

Run (ft)

Description

Overburden

Rock Core

SDI

(JS)

Remarks

Rig_Number

Hole Number 4

Surface Elevation '

Total Depth 56.8'

End Date 08/25/2025

Start Date 08/25/2025

Driller Cody Davidson

GEOLOGIST'S SUBSURFACE LOG

GQ-

Longitude(83)

Static Water Depth NA

Immediate Water Depth NA

Location 2+95.00 16.3' Rt.

Top of Rock = 10.0' Elevation = '

Latitude(83)

Printed: 9/16/25

Drilling Firm: Kentucky Transportation Cabinet For: Division of Structural Design Geotechnical Branch

Project Type: Miscellaneous Sinkhole

Project Manager: Richey Cline

Project ID: M-008-2025

17.5

27.5

37.5

47.5

7.5

10.0

10.0

10.0

10.0

14.5 15.1

18.1

27.5

32.5

47.5

Overburden.

Coal.

Shale: Heavily weathered shale.

Limestone.

VOID.

Shale: Gray, heavily weathered, calcareous shale.

Shale & Sandstone: Interbedded sandstone and shale.

(Begin Core)

33 /

6 / 6

39 / 6

50 /

6.4

0.8

9.1

10.0

Elevation Depth Std/Ky

RQD

Lithology

Depth (ft)

SPT

Blows

Sample Type

Rec (ft)

Geologist

Hole Type core

Rec

Rec.

(ft)

Sample No.

Run (ft)

Description

Overburden

Rock Core

SDI

(JS)

Remarks

Rig_Number

Hole Number 5

Surface Elevation '

Total Depth 47.5'

End Date 08/26/2025

Start Date 08/26/2025

Driller Cody Davidson

GEOLOGIST'S SUBSURFACE LOG

GQ-

Longitude(83)

Static Water Depth NA

Immediate Water Depth NA

Location 2+20.00 16.0' Lt.

Top of Rock = 10.0' Elevation = '

Latitude(83)

Printed: 9/16/25

Drilling Firm: Kentucky Transportation Cabinet For: Division of Structural Design Geotechnical Branch

Project Type: Miscellaneous Sinkhole

Project Manager: Richey Cline

Project ID: M-008-2025

(Bottom of Hole 47.5')

Elevation Depth Std/Ky

RQD

Lithology

Depth (ft)

SPT

Blows

Sample Type

Rec (ft)

Geologist

Hole Type core

Rec

Rec.

(ft)

Sample No.

Run (ft)

Description

Overburden

Rock Core

SDI

(JS)

Remarks

Rig_Number

Hole Number 5

Surface Elevation '

Total Depth 47.5'

End Date 08/26/2025

Start Date 08/26/2025

Driller Cody Davidson

GEOLOGIST'S SUBSURFACE LOG

GQ-

Longitude(83)

Static Water Depth NA

Immediate Water Depth NA

Location 2+20.00 16.0' Lt.

Top of Rock = 10.0' Elevation = '

Latitude(83)

Printed: 9/16/25

Drilling Firm: Kentucky Transportation Cabinet For: Division of Structural Design Geotechnical Branch

Project Type: Miscellaneous Sinkhole

Project Manager: Richey Cline

Project ID: M-008-2025

17.3

27.3

29.4

10.0

10.0

2.1

7.3

13.1

15.6

24.8

26.2

28.3 29.4

Overburden.

Coal: #12 Coal.

Limestone.

VOID.

Shale: Dark gray, soft, weathered shale.

Shale: Medium gray, weathered shale.

Shale: Gray shale.

(Begin Core)

38 /

0 / 0

0 / 0

(Bottom of Hole 29.4')

8.3

2.5

2.1

Elevation Depth Std/Ky

RQD

Lithology

Depth (ft)

SPT

Blows

Sample Type

Rec (ft)

Geologist

Hole Type core

Rec

Rec.

(ft)

Sample No.

Run (ft)

Description

Overburden

Rock Core

SDI

(JS)

Remarks

Rig_Number

Hole Number 6

Surface Elevation '

Total Depth 29.4'

End Date 08/26/2025

Start Date 08/26/2025

Driller Cody Davidson

GEOLOGIST'S SUBSURFACE LOG

GQ-

Longitude(83)

Static Water Depth NA

Immediate Water Depth NA

Location 2+95.00 15.0' Lt.

Top of Rock = 7.3' Elevation = '

Latitude(83)

Printed: 9/16/25

Drilling Firm: Kentucky Transportation Cabinet For: Division of Structural Design Geotechnical Branch

Project Type: Miscellaneous Sinkhole

Project Manager: Richey Cline

Project ID: M-008-2025

21.3

26.3

31.3

36.3

41.3

46.3

48.3

2.9

5.0

5.0

5.0

5.0

5.0

2.0

448.5

446.8

439.1

430.6

418.6

18.4

20.1

27.8

36.3

48.3

Overburden.

Limestone: Fragmented Limestone.

VOID.

Shale: Gray Shale.

Sandstone: Gray Sandstone with shale partings.

(Begin Core)

0 / 0

0 / 0

66 /

86 /

96 /

98 /

100 /

0.8

0.0

3.2

5.0

5.0

5.0

2.0

Elevation Depth Std/Ky

RQD

Lithology

Depth (ft)

SPT

Blows

Sample Type

Rec (ft)

Geologist Cline Richey

Hole Type core

Rec

Rec.

(ft)

Sample No.

Run (ft)

Description

Overburden

Rock Core

SDI

(JS)

Remarks

Rig_Number 0104-320

Hole Number 7

Surface Elevation 466.9'

Total Depth 48.3'

End Date 03/18/2026

Start Date 03/18/2026

Driller Cody Davidson

GEOLOGIST'S SUBSURFACE LOG

GQ-1471

Madison East

Longitude(83) -87.456705

Static Water Depth NA

Lisman and Carbondale Formation

Immediate Water Depth NA

Location + ' Lt.

Top of Rock = 18.4' Elevation = 448.5'

Latitude(83) 37.281987

Printed: 4/1/26

Drilling Firm: Kentucky Transportation Cabinet For: Division of Structural Design Geotechnical Branch

Project Type: Miscellaneous

Project Manager: Richey Cline

Project ID: M-003-2026

Hopkins - I-69 MP 110.7-

(Bottom of Hole 48.3')

Std/Ky

RQD

Lithology

Depth (ft)

SPT

Blows

Sample Type

Rec (ft)

Geologist Cline Richey

Hole Type core

Rec

Rec.

(ft)

Sample No.

Run (ft)

Description

Overburden

Rock Core

SDI

(JS)

Remarks

Rig_Number 0104-320

Hole Number 7

Surface Elevation 466.9'

Total Depth 48.3'

End Date 03/18/2026

Start Date 03/18/2026

Driller Cody Davidson

GEOLOGIST'S SUBSURFACE LOG

GQ-1471

Madison East

Longitude(83) -87.456705

Static Water Depth NA

Lisman and Carbondale Formation

Immediate Water Depth NA

Location + ' Lt.

Top of Rock = 18.4' Elevation = 448.5'

Latitude(83) 37.281987

Printed: 4/1/26

Drilling Firm: Kentucky Transportation Cabinet For: Division of Structural Design Geotechnical Branch

Project Type: Miscellaneous

Project Manager: Richey Cline

Project ID: M-003-2026

11.2

16.2

21.2

26.2

31.2

36.2

41.2

4.8

5.0

5.0

5.0

5.0

5.0

5.0

448.2

443.9 442.9

439.7

433.4

432.2

425.7

413.4

6.4

10.7 11.7

14.9

21.2

22.4

28.9

41.2

Overburden.

Coal.

Shale: Highly weathered Clay/Underclay.

Limestone: Gray Limestone.

Coal.

Shale: Highly weathered Clay/Underclay.

Shale: Gray Shale.

Sandstone & Shale: Gray Sandstone with Shale partings.

(Begin Core)

54 /

72 /

52 /

76 /

100 /

80 /

94 /

(Bottom of Hole 41.2')

4.5

5.0

4.9

4.9

5.0

4.9

5.0

Elevation Depth Std/Ky

RQD

Lithology

Depth (ft)

SPT

Blows

Sample Type

Rec (ft)

Geologist Cline Richey

Hole Type core

Rec

Rec.

(ft)

Sample No.

Run (ft)

Description

Overburden

Rock Core

SDI

(JS)

Remarks

Rig_Number 0104-320

Hole Number 8

Surface Elevation 454.6'

Total Depth 41.2'

End Date 03/18/2026

Start Date 03/18/2026

Driller Cody Davidson

GEOLOGIST'S SUBSURFACE LOG

GQ-1471

Madison East

Longitude(83) -87.457481

Static Water Depth NA

Lisman and Carbondale Formation

Immediate Water Depth NA

Location + ' Lt.

Top of Rock = 6.4' Elevation = 448.2'

Latitude(83) 37.284371

Printed: 4/1/26

Drilling Firm: Kentucky Transportation Cabinet For: Division of Structural Design Geotechnical Branch

Project Type: Miscellaneous

Project Manager: Richey Cline

Project ID: M-003-2026

6.5

11.5

16.5

21.5

26.5

31.5

2.0

5.0

5.0

5.0

5.0

5.0

437.0

430.0

423.9

412.9

410.0

4.5

11.5

17.6

28.6

31.5

Overburden.

Limestone: Highly fractured, possible fill material.

Shale: Heavily weathered.

Sandstone & Shale: Light gray Sandstone with Shale partings.

Sandstone & Shale: Dark gray Sandstone with Shale partings.

(Begin Core)

0 / 0

0 / 0

94 /

96 /

98 /

100 /

(Bottom of Hole 31.5')

0.6

0.9

5.0

4.9

5.0

5.0

Elevation Depth Std/Ky

RQD

Lithology

Depth (ft)

SPT

Blows

Sample Type

Rec (ft)

Geologist Cline Richey

Hole Type core

Rec

Rec.

(ft)

Sample No.

Run (ft)

Description

Overburden

Rock Core

SDI

(JS)

Remarks

Rig_Number 0104-320

Hole Number 9

Surface Elevation 441.5'

Total Depth 31.5'

End Date 03/19/2026

Start Date 03/19/2026

Driller Cody Davidson

GEOLOGIST'S SUBSURFACE LOG

GQ-1471

Madison East

Longitude(83) -87.458297

Static Water Depth NA

Lisman and Carbondale Formation

Immediate Water Depth NA

Location + ' Lt.

Top of Rock = 4.5' Elevation = 437.0'

Latitude(83) 37.285513

Printed: 4/1/26

Drilling Firm: Kentucky Transportation Cabinet For: Division of Structural Design Geotechnical Branch

Project Type: Miscellaneous

Project Manager: Richey Cline

Project ID: M-003-2026

6.2

11.2

16.2

21.2

26.2

31.2

0.9

5.0

5.0

5.0

5.0

5.0

449.5

443.5 442.7

440.0

434.0

430.2

426.8

423.6

5.3

11.3 12.1

14.8

20.8

24.6

28.0

31.2

Overburden.

Coal.

Shale: Heavily weathered Shale/Underclays.

Limestone: Light gray.

Coal.

Shale: Heavily weathered.

Shale.

Sandstone: Light gray.

(Begin Core) 67 /

54 /

66 /

28 /

78 /

98 /

(Bottom of Hole 31.2')

0.8

5.0

5.0

5.0

5.0

4.9

Elevation Depth Std/Ky

RQD

Lithology

Depth (ft)

SPT

Blows

Sample Type

Rec (ft)

Geologist Cline Richey

Hole Type core

Rec

Rec.

(ft)

Sample No.

Run (ft)

Description

Overburden

Rock Core

SDI

(JS)

Remarks

Rig_Number 320-0104

Hole Number 10

Surface Elevation 454.8'

Total Depth 31.2'

End Date 03/25/2025

Start Date 03/25/2026

Driller Joshua Smallwood

GEOLOGIST'S SUBSURFACE LOG

GQ-1471

Madison East

Longitude(83) -87.457743

Static Water Depth NA

Lisman and Carbondale Formation

Immediate Water Depth NA

Location + ' Lt.

Top of Rock = 5.3' Elevation = 449.5'

Latitude(83) 37.284118

Printed: 4/1/26

Drilling Firm: Kentucky Transportation Cabinet For: Division of Structural Design Geotechnical Branch

Project Type: Miscellaneous

Project Manager: Richey Cline

Project ID: M-003-2026

11.3

16.3

21.3

26.3

31.3

36.3

41.3

46.3

4.5

5.0

5.0

5.0

5.0

5.0

5.0

5.0

455.0

450.7

445.8 444.8

441.2

435.4

431.5

424.1

415.5

6.8

11.1

16.0 17.0

20.6

26.4

30.3

37.7

46.3

Overburden.

Shale: Heavily weathered, possible fill material.

Coal.

Shale: Heavily weathered.

Limestone: Light gray Limestone.

Coal.

Shale: Heavily weathered.

Shale.

Sandstone: Gray Sandstone.

(Begin Core)

51 /

44 /

96 /

6 / 0

22 /

94 /

94 /

92 /

3.4

4.9

5.0

2.8

5.0

5.0

5.0

5.0

Elevation Depth Std/Ky

RQD

Lithology

Depth (ft)

SPT

Blows

Sample Type

Rec (ft)

Geologist

Hole Type core

Rec

Rec.

(ft)

Sample No.

Run (ft)

Description

Overburden

Rock Core

SDI

(JS)

Remarks

Rig_Number 320-0104

Hole Number 11

Surface Elevation 461.8'

Total Depth 46.3'

End Date 03/26/2025

Start Date 03/26/2025

Driller Joshua Smallwood

GEOLOGIST'S…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .