This addendum to Request for Qualifications RFQ-26-2 modifies the bidding documents for Owner's Representative Services for Cruise Terminal 10 Landside Improvements issued by the Canaveral Port Authority in Cape Canaveral, Florida. The addendum updates critical deadlines, with the question deadline set for May 8, 2026, and responses to the RFQ due May 15, 2026, at 2:00 PM at the Canaveral Port Authority. The selection committee will review and short-list firms on May 21, 2026, with notification of selected candidates occurring the same day. Short-list oral presentations and final selection are scheduled for May 27, 2026, followed by the Canaveral Port Authority Board of Commissioners meeting for selection of the successful firm on June 3, 2026. The scope of services encompasses professional and technical project management during the construction delivery process, with the consultant's team consisting of two primary roles—Senior Field Inspector and Project Manager—supplemented by additional field inspectors as needed, scheduling experts, cost change experts, materials testing capabilities, and surveying services. Key responsibilities include contractor coordination, pay application reviews, schedule monitoring, submittal tracking, field inspections, weekly meeting attendance, cost change administration, daily progress reporting, and coordination with Authority personnel, clients, consultants, architects, engineers, and construction contractors.
The addendum specifies detailed general operating parameters and professional service tasks encompassing construction phase services, post-construction and closeout services, and claims services. Construction phase duties include establishing field offices, maintaining project documentation, conducting preconstruction meetings, monitoring submittal reviews and project schedules, performing routine inspections, reviewing contractor payment requests, administering change orders, scheduling progress meetings, monitoring safety and labor standards compliance, and providing cost estimating assistance. Post-construction services include facility start-up planning, ensuring delivery of contractual requirements such as warranties and as-built drawings, providing claims services when disputes arise, assisting with lessons learned, and supporting occupancy planning. The consultant is prohibited from assuming design responsibilities or contractual obligations of architects-engineers and construction contractors and cannot bind the Authority without prior written permission. Personnel substitutions require 24-hour written notification and Authority approval, with no rate increases permitted. Authority retains the right to remove any consultant employee deemed unsuitable. Monthly written reports beginning one month after award are required, summarizing contract status, pending and issued contracts, and project cost, schedule, and quality metrics. No pricing information, set-asides, incumbents, funding sources, or renewal options are specified in this addendum document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ-26-2 Page 1 Addendum #1
CANAVERAL PORT AUTHORITY
OWNER’S REPRESENTATIVE SERVICES FOR CRUISE TERMINAL 10 LANDSIDE
IMPROVEMENTS
RFQ-26-2
Addendum #1
May 1, 2026
This addendum is issued as part of the Bidding Documents for the above-described project. The changes incorporated in this addendum shall be considered as a part of the Bidding Documents and shall supersede, amend, add to, clarify, or subtract from those conditions shown in the original Bidding Documents. The Bidder shall take care to coordinate modifications herein with all trades and disciplines related to the work. The Bidder shall acknowledge receipt of this addendum on their Bid Form by addendum number and date. Failure to do so may subject Bidder to disqualification.
Released Via VendorLink
30 Pages Total (including attachments)
GENERAL
• Replace dates throughout the RFQ document with the new dates provided:
RFQ/Proposal/Qualification Due Date: May 15, 2026 @ 2PM Question Deadline: May 8, 2026
• On page 17 of the RFQ document, replace TENTATIVE PROJECT MILESTONES with new dates provided:
TENTATIVE PROJECT MILESTONES (RFQ page 17)
Tuesday April 14, 2026
Legal Advertisements
Friday May 15, 2026 Responses to RFQ due 2:00 PM Location: The Canaveral Port Authority
Thursday May 21, 2026 Selection Committee Meeting to Review and Short List Firms for Oral Presentations and/or Interviews
Thursday May 21, 2026 Notification of Selected Short List Candidates
Wednesday May 27, 2026 Short List Oral Presentations and/or Interviews (if required) and Final Selection: Short List Candidates
Wednesday June 3, 2026 Canaveral Port Authority Board of Commissioners Meeting:
Selection of Successful Firm
Owner’s Representative Services for Cruise Terminal 10 Landside Improvements
RFQ-26-2 Page 2 Addendum #1
SPECIFICATIONS – RFQ DOCUMENT
• Starting on page 2, SCOPE OF SERVICES (including I. GENERAL OPERATING PARAMETERS and II. PROFESSIONAL SERVICES TASKS A and B, replace with the following:
I. SCOPE OF SERVICES
The Services include professional and technical Project Management services for Authority in their construction delivery process for the Project. The Services are to be performed in cooperation with Authority, its clients, consultants, architects, engineers, and construction contractors contracted with Authority. Consultant shall provide maximum coordination, support, and professionalism under this Agreement.
Consultant’s team will consist of two (2) primary roles: Senior Field Inspector and Project Manager.
They will be supplemented with an additional field inspector (as needed based on contractor working schedule), scheduling expert(s), cost change expert(s), materials testing, and topographic and bathymetric surveying capabilities.
Duties include, but are not limited to, contractor coordination, pay application reviews, schedule review, submittal/shop drawing tracking and review, field inspections, attend all weekly meetings, review and track all cost change events. Consultant shall work directly with Authority’s Project Manager daily and provide updates of progress and daily reports. Consultant will work directly with Authority’s contractor(s) to track schedule on a weekly basis to make sure milestones are being met or what changes may be needed. All other industry standard owner’s representative task as needed to support Authority’s successful project completion.
A. GENERAL OPERATING PARAMETERS
1. Consultant shall provide Authority with sound management advice regarding all work performed on the Project while achieving the best value in the work being performed by managing schedule and budget. Consultant shall be proactive in helping to resolve problems and minimize claims taking all reasonable measures to anticipate problems and delays and to minimize or eliminate their adverse impact on project completion. Consultant must take the initiative and act to mitigate circumstances that could lead to claims, resolve conflicts promptly, and keep Authority advised of any potential disputes. Consultant shall exercise all due diligence, utilizing competent personnel within authorized limitations, to make certain that work is performed in conformity with applicable requirements (e.g., codes, regulations, standards, construction contract plans and specifications).
2. Consultant shall develop and maintain good working relationships with Authority personnel, client agency personnel, A/E personnel, developers, and construction contractors involved with all work performed.
3. Consultant will not be held responsible for design defects and does not assume any of the contractual responsibilities or duties of the architect-engineers. The architects-engineers are solely responsible for the project designs and shall perform all design related services in accordance with their contracts with Authority. Consultant does not assume any of the contractual responsibilities or duties of the construction contractors. The construction
RFQ-26-2 Page 3 Addendum #1 contractors are solely responsible for construction means, methods, sequences and procedures used in the construction of the projects, and for related performance in accordance with their contracts with Authority. Consultant does not have the authority to contractually commit or obligate Authority to any third parties without Authority’s prior written permission to do so.
4. Consultant shall advise Authority immediately of any potential delays in completion of work associated with Work Authorizations and any problems that are outside the responsibilities of Consultant per the Work Authorizations issued.
5. Consultant shall be responsible for the security of all Project documents provided to them.
Consultant agrees that building/Project information is to be given only to those with a need to know; that records be kept of who received the information; that good judgment, common sense, and reasonableness be used to safeguard the information during use, and that it be returned or properly destroyed after use as directed by Authority.
6. Consultant shall be responsible for obtaining all information required to successfully carryout the scope of work authorized under each Work Authorizations. In cases where Consultant believes that available information is not adequate, or of such poor quality as to be unusable, Consultant shall immediately notify Authority and propose alternative data and/or collection methods.
7. Consultant shall establish and maintain proper business relations with representatives of the construction contractor(s), with A/E firms and with Authority Manager(s) at the work site. Any known or anticipated conflicts of interest shall immediately be identified in writing to the Work Authorizations contracting officer.
8. The official dealings of Consultant shall be with prime contractors and Team Members, but not with subcontractors.
9. Consultant personnel shall not settle disputes or differences of opinion between prime contractors and their subcontractors, or between subcontractors.
10. Where differences of opinion exist between personnel of Consultant and Authority, the differences shall not be discussed in the presence of prime contractors or their subcontractors.
11. Consultant shall not disseminate any information concerning the project or any information that might be confidential, inflammatory, or derogatory. All requests for information must immediately be forwarded to Authority’s designated representative before being acted upon.
12. Consultant shall not issue written or oral instructions to, or make any agreements with, prime contractors or their representatives which affect the work in material ways, or which may result in disputes and claims. Consultant has no authority, either implied or explicit, to bind Authority in any manner. Consultant shall not represent him or herself as an Authority employee under any circumstances and shall further clearly identify that he or she is a contractor employee when interacting with other contractors and Authority officials.
13. Consultant shall not under any circumstances assume the responsibilities of the construction contractor(s). This specifically includes the areas of quality control, safety or coordination of work to be performed by subcontractors.
RFQ-26-2 Page 4 Addendum #1
14. Consultant shall establish all necessary liaisons, coordination, and support with any project related agencies and representatives at the Federal, State, Regional, and Local levels as appropriate for each Work Authorization. Consultant shall also coordinate work with clients, A/E’s, and construction contractors involved with work under each Work Authorizations.
15. For each Consultant employee located full time at the Project site, the Consultant shall provide its own computer equipment and software to fully satisfy all operational requirements of Authority. No direct reimbursement is authorized for such items. Consultant’s equipment and software must be compatible with the systems and software used by Authority (e.g., Microsoft Office applications such as AutoCAD (latest release); Office 365 (including Outlook, Word, Excel, PowerPoint); Oracle P6 and Procore).
B. PROFESSIONAL SERVICE TASKS
1. TASK 1: CONSTRUCTION PHASE SERVICES
a. Project Construction Phase Services: These Services include establishing temporary field offices; setting up job files, working folders, and record keeping systems; maintaining organized construction files; scheduling and conducting preconstruction meetings; handling/preparing project correspondence to respond to the parties involved with each project, confirm verbal discussions/directives, document actions taken and decisions made; preparing and maintaining daily diaries for project activities noting events affecting construction progress (weather, manpower, site equipment, work performed); monitoring the submittal review process including maintenance of submittal logs; review and monitoring of project schedules for construction progress with emphasis on milestone completion dates, phasing requirements, work flow, material deliveries, test dates, assisting in problem resolution and handling of disputed issues (including development of Authority position, drafting final decision letter); maintaining marked up sets of project plans and specifications for future as-built drawings; performing routine inspections of construction as work proceeds, taking action to identify work that does not conform to the contract requirements, and notifying the Contractor when work is thought to require correction; compiling, through site inspections, lists of defects and omissions related to the work performed and providing these lists to the Contractor for determination of the need for correction; review of construction contractor payment requests (including preparation of necessary forms for payment processing by Authority); monitoring and reporting project financial data and budgetary cost accounting (maintain spreadsheets indicating project fund allowances, obligations, payments, balances, planned expenditures); administration of construction contract change orders(preparing cost estimates, reviewing cost proposals at the request and providing recommendations to Authority in negotiations or handling negotiations, preparing change order packages for processing); scheduling, conducting, and documenting regular progress meetings with all interested parties to review project status, discuss problems, and resolve issues;
scheduling, conducting, and documenting (prepare minutes for distribution) construction related project meetings; monitoring construction contractor compliance with established safety standards (note and report unsafe working conditions, failures to adhere to safety plan required by construction contract); monitoring construction contractor’s compliance with any contract labor standards (including if required, performing site labor interviews, collecting, reviewing, and maintaining weekly payrolls for all project contractors and subcontractors, reporting potential wage violations to Authority personnel); monitoring the design and construction clarification process and, when appropriate, reminding the A/E and other parties involved of the need for timely actions and notifying Authority of potential delays that the Project Manager cannot
RFQ-26-2 Page 5 Addendum #1 eliminate; participation in all “Partnering” activities during construction (workshops, meetings,);
preparing special reports and regular project status reports; providing for progress and/or final photographs of project work; perform site surveys using a registered surveyor (establish building lines, elevations, approaches, utility locations); provide assistance in obtaining permits; perform hazardous material assessments and monitoring of hazardous material abatement work; and provide cost estimating assistance.
2. TASK 2: POST CONSTRUCTION AND CLOSEOUT SERVICES
a. Project Closeout Services: These Services shall include, but are not limited to, providing professional and expertise for start-up of a facility or operating systems within a facility. These services may require start-up planning, forecasting start-up duration, estimating start-up costs, organizing start-up teams and team assignments, managing O&M material, overseeing scheduling and scheduling O&M training. Ensuring contractually required attic stock has been delivered to Authority; all guarantees and warranties meet the specifications and have been submitted to Authority, the red-line, as-built drawings are provided to the A/E, and review of the final record drawings. Ensure Authority receives an electronic archive of the drawings, specifications, submittals, RFIs, test reports, as-built surveys, O&M manuals, etc. Ensuring the A/E provide a full/final set of record drawings to Authority.
b. Claims Services. The Project Manager may be tasked to provide “Claims Services” when and as required by Authority. For definition purposes, Claims Services apply to providing technical support (not legal assistance) in handling disputed matters once a contractor has made written demand for payment or other relief under a contract and submitted it to Authority for decision in accordance with their respective contract. A claim does not arise solely upon the occurrence of a dispute or controversy. In relation to Claims Services, Consultant will review disputes and claims from the A/E and/or construction contractor(s) and render all assistance that Authority requires, including, but not limited to, the following:
i. Furnishing reports with supporting information necessary to resolve disputes or defend against the claims.
ii. Preparation and assembly of appeal files.
iii. Participation in meetings or negotiations with claimants.
iv. Appearance in legal proceedings.
v. Preparation of cost estimates for use in claims negotiations.
vi. Preparation of risk assessments/analyses relative to claim exposures.
vii. Preparation of findings of fact and any other documentation required by the governmental authorities.
c. Post-Construction Services: At or near substantial completion of project construction, Consultant may be tasked to provide services such as:
i. Assisting Authority in the formulation of lessons learned.
ii. Providing occupancy planning including development of move schedules, cost estimates, inventory lists.
iii. Providing telecommunication and computer coordination.
iv. Providing move coordination, relocation assistance, and/or furniture coordination.
3. Consultant Team Staffing: Consultant will utilize the key personnel, specialists, and individual consultants named in their proposal, as accepted by Authority, for the Project.
i. Consultant’s team will consist of two (2) primary roles: Senior Field Inspector and
RFQ-26-2 Page 6 Addendum #1
Project Manager. They will be supplemented with an additional field inspector (as needed based on contractor working schedule), scheduling expert(s), cost change expert(s), materials testing and topographic surveying capabilities (if additional testing or survey is requested by the Canaveral Port Authority).
ii. In the event that any of the key personnel named in Consultant’s quotation, as accepted by Authority for this Project, are unable to perform because of death, illness, resignation from employ, dissolution of agreement, or other reasons, Consultant shall submit within 24 hours to Authority, detailed written explanations of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any other information that Authority deems pertinent to approve the substitution. No substitution is to be made without the prior written approval of Authority. No increases in hourly rate pricing will be allowed when substitutions are authorized by Authority.
iii. Authority will have the right to effect the removal of any Consultant employee during the Term of the Agreement, if those employees are deemed not to possess the proper level of competence or abilities, or otherwise found to be unsuitable for work required.
In such cases, Consultant must promptly submit the names and any other information pertinent to approvals of substitutions if requested.
iv. Personnel possessing unique technical specialties (including State of Florida
Professional Engineering or Registered Architect licensure) may be required for certain services related to the Work Authorizations.
v. Failure or delays by Consultant in providing qualified personnel, who meet the stated requirements of the Project, may be deemed sufficient reason by Authority to recommend termination for cause.
4. Progress Reports and Records: Consultant shall submit a written monthly report to Authority beginning one (1) month after award of the Effective Date and thereafter on the first of each month of the Term. The report shall summarize the status identifying pending and issued contracts for projects under the management of Consultant. The report shall also provide a summary indicating the current status of the cost, schedule, and quality of the Project.
DRAWINGS
OTHER DOCUMENTS ISSUED WITH ADDENDUM
• Revised Draft Contract (titled Draft Contract-Addendum 1 in VendorLink)
END OF ADDENDUM #1
Issued via VendorLink
By Authority of the Canaveral Port Authority
| May 1, 2026 |
| Issued via VendorLink |
| By |
| Authority of the Canaveral Port Authority |