This is a Routine Level Inspection Report prepared by Jacobs Engineering Group Inc. for the Canaveral Port Authority (CPA) in Cape Canaveral, Florida, documenting the condition assessment of Port Canaveral's marine bulkhead facilities. The inspection was conducted between March 4, 2024, and July 26, 2024, and encompassed above-water and underwater evaluations of bulkheads at North Cargo Piers 1 and 2, North Cargo Berths 5, 6, and 8, South Cargo Piers 1, 2, 3, and 4, the Marina, the Cove, the Tug Berth, and Cruise Terminals 1, 2, 3, 5, 6, 8, and 10. The inspection was performed in accordance with American Society of Civil Engineers (ASCE) MOP-130 Waterfront Facilities Inspection and Assessment Guidelines Manual and was conducted by a three-person certified diver team from a surface-supplied diving operation. Findings are presented using a six-point condition assessment rating scale ranging from Good to Critical, with detailed defect documentation and ultrasonic thickness measurements for steel elements.
The overall condition of Port Canaveral's bulkhead facilities ranges from Good to Fair, with the exception of North Cargo Pier 2 Bulkhead and Marina Bulkhead, which are rated Poor condition. Notably, the North Cargo Pier 2 Bulkhead exhibits severe corrosion in the splash zone with up to 40 percent section loss and numerous corrosion holes in steel sheet piles, while the Marina Bulkhead demonstrates severe defects including large voids in concrete caps with severely corroded reinforcing steel and widespread 100 percent coating loss on underwater steel sheet piles. The report indicates that many condition ratings are driven by protective and structural concrete cap deterioration, with steel sheet piles and steel combi walls generally showing minimal defects except where specifically noted. Comparison of ultrasonic thickness readings from the previous 2016 inspection reveals minimal uniform section loss of steel elements below water. The report includes recommendations for Priority and Routine repair actions based on condition severity, with specific attention to load-bearing capacity impacts and maintenance scheduling.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Port Canaveral Bulkheads Condition Assessment Report
Routine Level Inspection
Cape Canaveral, Florida
Document Number: 24CPA002-0
Er ror! Unknown document property name.
Er ror! Unknown document property name.
Port Canaveral – Condition Assessment
24PCA002-0 2
Canaveral Port Authority
Port Canaveral
Cape Canaveral, Florida
ROUTINE LEVEL INSPECTION
Document Number: 24CPA002-0
Submitted By:
Jacobs
445 Challenger Road Suite 130
Cape Canaveral, FL 32920
24PCA002-0 3
Executive Summary Jacobs Engineering Group Inc. (Jacobs) performed an above water and underwater Routine Level
Inspection of Port Canaveral marine bulkhead facilities between March 4, 2024, and July 26, 2024. The following facilities were included in this work:
North Cargo Piers 1 and 2
North Cargo Berths 5, 6, and 8, South Cargo Piers 1, 2, 3, and 4, The Marina, the Cove, and the Tug Berth
Cruise Terminals 1, 2, 3, 5, 6, 8, and 10.
This Inspection was performed in accordance with the American Society of Civil Engineers (ASCE) MOP-130
Waterfront Facilities Inspection and Assessment Guidelines Manual. The general condition assessment ratings for the entire facility as well as its individual structures and element groups are based on a six-point assessment scale developed by the ASCE. The six condition assessment ratings are:
Good: No problems or only minor problems noted. Structural elements may show very minor deterioration, but no overstressing observed. No repairs or upgrades are required.
Satisfactory: Limited minor to moderate defects or deterioration observed, but no overstressing observed. No repairs or upgrades are required.
Fair: All primary structural elements are sound; but minor to moderate defects or deterioration observed. Localized areas of moderate to major deterioration may be present but do not significantly reduce the load-bearing capacity of the structure. Repairs are recommended, but the priority of the recommended repairs is low.
Poor: Advanced deterioration or overstressing observed on widespread portions of the structure but does not significantly reduce the load-bearing capacity of the structure. Repairs may be carried out with moderate urgency.
Serious: Advanced deterioration, overstressing, or breakage may have significantly affected the load-bearing capacity of primary structural components. Local failures are possible and loading restrictions may be necessary. Repairs may need to be carried out on a high-priority basis with urgency.
Critical: Very advanced deterioration, overstressing, or breakage has resulted in localized failure(s) of primary structural components. More widespread failures are possible or likely to occur and load restrictions should be implemented as necessary. The capacity of the structure is critically deficient relative to the structural requirements. Repairs may need to be carried out on a very high priority basis with strong urgency.
In general, the condition of all the bulkhead facilities was found to be Good to Fair except for the North
Cargo Pier 2 Bulkhead and the Marina Bulkhead which are in Poor condition. It should be noted that many of these ratings are driven by the condition of the protective and structural concrete caps and that the steel sheet piles and steel combi walls are relatively free of significant defects except where noted.
Comparing ultrasonic thickness readings from the previous inspection in 2016 indicates minimal uniform section loss of all steel elements below water. For a comparison of overall ratings between 2016 and 2024 see Table 1 below.
24PCA002-0 4
Table 1 Port Canaveral Bulkheads Condition Rating Summary
Report
Section # Bulkhead Structure
Approx. Year of
Construction
2016 Condition
Rating
2024 Condition
Rating
3.1
North Cargo Pier 1
Bulkhead
Fair Fair
North Cargo Pier 2
Bulkhead Poor Poor
North Cargo Pier 1 & 2
Toe Wall Satisfactory Satisfactory
3.2 North Cargo Berth 5 & 6
Bulkhead 2015 N/A Satisfactory
3.3 Tug Berth Bulkhead 1973 Fair Fair
3.4 North Cargo Berth 8
Bulkhead 2019 N/A Good
3.5 Cruise Terminal 5 Bulkhead 1990 Good Satisfactory
3.6 Cruise Terminal 6 Bulkhead 2016 N/A Fair
3.7
Cruise Terminal 8 Bulkhead
Fair Fair
Cruise Terminal 8 Toewall Fair Fair
3.8
Cruise Terminal 10 Bulkhead
Fair Fair
Cruise Terminal 10 Toewall Fair Fair
3.9 Marina Bulkhead 1970 Poor Poor
3.10 The Cove Bulkhead 2000 Fair Fair
3.11 Cruise Terminal 1 Bulkhead 2014 N/A Satisfactory
3.12 South Cargo Pier 4 Bulkhead 1999 Fair Fair
3.13 South Cargo Pier 3 Bulkhead 1980 Fair Fair
3.14 South Cargo Pier 2 Bulkhead 2005 Good Good
3.15 South Cargo Pier 1 Bulkhead 1990 Good Good
3.16 Cruise Terminal 2 Bulkhead 1973 N/A Fair
3.17 Cruise Terminal 3 Bulkhead 2020 N/A Satisfactory
24PCA002-0 5
Bulkheads Rated Good
The North Cargo Berth 8, South Cargo Pier2, and South Cargo Pier1 Bulkheads are in Good condition overall with only minor deficiencies noted.
Bulkheads Rated Satisfactory
The North Cargo Pier 1 Toewall, the North Cargo Berth 5 & 6 Bulkhead, the Cruise Terminal 5 Bulkhead, the Cruise Terminal 1 Bulkhead, and the Cruise Terminal 3 Bulkhead are in Satisfactory condition overall.
The North Cargo Pier 1 Toewall is in Satisfactory condition overall due to minor to moderate corrosion of the steel sheet piles and some lateral displacement.
The North Cargo Berth 5 & 6 Bulkhead is in Satisfactory condition overall due to areas of voids in the concrete cap with exposed reinforcing steel. Additionally, two safety ladders and several fender retention chains are broken.
The Cruise Terminal 5 Bulkhead is in Satisfactory condition overall with limited moderate defects, including spalling and voids in the concrete cap and localized areas of concrete scour mattress displacement or undermining.
The Cruise Terminal 1 Bulkhead is in Satisfactory condition overall with minor to moderate defects including several voids in the concrete cap with exposed reinforcing steel.
The Cruise Terminal 3 Bulkhead is in Satisfactory condition overall due to areas of minor spalling and localized areas of undermined concrete scour mattresses.
Bulkheads Rated Fair
The North Cargo Pier 1 Bulkhead, the Tug Berth Bulkhead, the Cruise Terminal 6 Bulkhead, the Cruise
Terminal 8 Bulkhead and Toe Wall, the Cruise Terminal 10 Bulkhead, the Cove Bulkhead, the South Cargo
Pier 4 Bulkhead, the South Cargo Pier 3 Bulkhead, and the Cruise Terminal 2 Bulkhead are in Fair condition overall.
The North Cargo Pier 1 Bulkhead is in Fair condition overall due to moderate to major corrosion of the steel sheet piles and widespread spalling and voids with exposed reinforcing steel in the concrete cap.
The Tug Berth Bulkhead is in Fair condition overall due to numerous areas of spalling throughout the concrete pile cap typically with exposed severely corroded reinforcing steel.
The Cruise Terminal 6 Bulkhead is in Fair condition overall with moderate to major defects identified.
Defects observed include areas of moderate to major concrete voids with exposed reinforcing steel in areas of latent concrete on the bottom of the concrete pile cap.
The Cruise Terminal 8 Bulkhead is in Fair condition overall due to moderate to major defects including widespread voids and spalling with exposed reinforcing steel throughout the concrete cap. Additionally, undermining of the concrete scour mattresses has caused displacement up to 8 ft from the design depth to an elevation of 35 ft below MLW.
The Cruise Terminal 8 Toe Wall is in Fair condition overall due to two major defects. The toe wall is out of plumb, with the top of the wall rotated towards the channel, from Station 8+70 to 9+25. At Station 9+00 the toe wall is leaning against the adjacent pier pile. At the bulkhead corner, the toe wall sheeting is not engaged with the bulkhead sheeting with a gap up to 2 in. wide.
The Cruise Terminal 10 Bulkhead is in Fair condition overall with moderate to major defects including isolated voids, spalling, and delamination throughout the concrete cap and widespread undermining and
24PCA002-0 6
displacement of the concrete scour mattresses. The steel toe wall is in Fair condition due to sheet pile overlap repairs with open gaps and one open interlock with a gap up to 15 in. wide.
The Cove Bulkhead is in Fair condition overall with moderate defects throughout including voids and spalling. Below water, the steel sheet piles have several noted corrosion holes and widespread coating loss and section loss.
The South Cargo Pier 4 Bulkhead is in Fair condition overall due to cracking and extensive spalling in the concrete pile cap as well as sinkholes between Station 2+45 and 3+35, just inshore of the concrete pile cap.
The South Cargo Pier 3 Bulkhead is in Fair condition overall due to several voids and spalling in the concrete cap. The steel sheets and king piles have most of the coating intact, with isolated areas of coating loss with minor corrosion. The mooring and berthing system is in Serious condition overall due to major to severe corrosion throughout the bollard fittings and spalling up to 4 in. in the concrete foundations and several broken arch fenders.
The Cruise Terminal 2 Bulkhead is in Fair condition overall with moderate to major defects including, widespread delamination and spalling of the concrete sheet piles. Additionally, the concrete sheet piles exhibit widespread erosion on the bottom 2 ft. of the bulkhead that is up to ¾ in. deep. The upland portion of the facility contains a sinkhole at Station 3+34 and a broken fence support at Station 6+78.
Bulkheads Rated Poor
The North Cargo Pier 2 Bulkhead and the Marina Bulkhead are in Poor condition overall.
The North Cargo Pier 2 Bulkhead is in Poor condition overall due to severe corrosion throughout the steel sheet piles and widespread spalling and voids with exposed reinforcing steel in the concrete cap. The area of the most severe corrosion is in the splash zone, which is the top 6 ft of the sheet piles and has up to
40% section loss with numerous corrosion holes.
The Marina Bulkhead is in Poor condition overall due to severe defects including large voids in the concrete cap with severely corroded steel reinforcing steel. Below water, the steel sheet piles widespread
100% coating loss and two corrosion holes.
24PCA002-0 7
Contents Page No.
Executive Summary
List of Tables
1. Introduction
1.1 Site History
1.2 Inspection Procedure
1.3 References to Elevation
1.4 Damage Grade Assessment
1.5 Condition Assessment Rating
1.6 Recommended Repair Actions
2. Description of Facility
3. 2024 Inspection Findings
3.1 North Cargo Pier 1 & 2
3.1.1 Description of Structure
3.1.2 Observed Conditions
3.1.2.1 NCP 1 Bulkhead
3.1.2.2 NCP 2 Bulkhead
3.1.2.3 NCP 1 Toewall
3.1.3 Conclusions and Recommendations
3.2 North Cargo Berth 5 & 6
3.2.1 Description of Structure
3.2.2 Observed Conditions
3.2.2.1 Combi Wall with Concrete Cap
3.2.3 Conclusions and Recommendations
3.3 Tug Berth Bulkhead
3.3.1 Description of Structure
3.3.2 Observed Conditions
3.3.3 Conclusions and Recommendations
3.4 North Cargo Berth 8
3.4.1 Description of Structure
3.4.2 Observed Conditions
3.4.2.1 Combi Wall with Concrete Cap
3.4.3 Conclusions and Recommendations
3.5 Cruise Terminal 5
3.5.1 Description of Structure
24PCA002-0 8
3.5.2 Observed Conditions
3.5.2.1 Steel Sheet Pile with Concrete Cap
3.5.3 Conclusion and Recommendation
3.6 Cruise Terminal 6
3.6.1 Description of Structure
3.6.2 Observed Conditions
3.6.3 Conclusions and Recommendations
3.7 Cruise Terminal 8
3.7.1 Description of Structure
3.7.2 Observed Conditions
3.7.2.1 Steel Sheet Pile with Concrete Cap
3.7.2.2 Steel Sheet Pile Toe Wall
3.7.3 Conclusions and Recommendations
3.8 Cruise Terminal 10
3.8.1 Description of Structure
3.8.2 Observed Conditions
3.8.2.1 Steel Sheet Pile with Concrete Cap
3.8.2.2 Steel Sheet Pile Toe wall
3.8.3 Conclusions and Recommendations
3.9 Marina
3.9.1 Description of Structure
3.9.2 Observed Conditions
3.9.3 Conclusions and Recommendations
3.10 Cove
3.10.1 Description of Structure
3.10.2 Observed Conditions
3.10.3 Conclusions & Recommendations
3.11 Cruise Terminal 1
3.11.1 Description of Structure
3.11.2 Observed Conditions
3.11.3 Conclusions and Recommendations
3.12 South Cargo Pier 4
3.12.1 Description of Structure
3.12.2 Observed Conditions
3.12.3 Conclusions and Recommendations
3.13 South Cargo Pier 3
24PCA002-0 9
3.13.1 Description of Structure
3.13.2 Observed Conditions
3.13.3 Conclusions and Recommendations
3.14 South Cargo Pier 2
3.14.1 Description of Structure
3.14.2 Observed Conditions
3.14.3 Conclusions and Recommendations
3.15 South Cargo Pier 1
3.15.1 Description of Structure
3.15.2 Observed Conditions
3.15.3 Conclusions and Recommendations
3.16 Cruise Terminal 2
3.16.1 Description of Structure
3.16.2 Observed Conditions
3.16.3 Conclusions and Recommendations
3.17 Cruise Terminal 3
3.17.1 Description of Structure
3.17.2 Observed Conditions
3.17.3 Conclusion and Recommendations
Appendix A: Inspection Drawings
24PCA002-0 10
List of Tables Table Title Page No.
Table 1. Port Canaveral Bulkheads Condition Rating Summary
Table 3.1-A. North Cargo Pier 1 Bulkhead Defects
Table 3.1-B. North Cargo Pier 1 Bulkhead Ultrasonic Thickness Readings
Table 3.1-C. North Cargo Pier 2 Bulkhead Defects
Table 3.1-D. North Cargo Pier 2 Bulkhead Ultrasonic Thickness Readings
Table 3.1-E. North Cargo Pier 1 Sheet Pile Toe Wall Defects Table 3.1-F. North Cargo Pier 1 Toe Wall Ultrasonic Thickness Readings
Table 3.2-A. North Cargo Berths 5 & 6 Defects
Table 3.2-B. North Cargo Berth 5 & 6 Bulkhead Ultrasonic Thickness Readings
Table 3.3-A. Tug Berth Bulkhead Defects
Table 3.3-B. Tug Berth Bulkhead Ultrasonic Thickness Readings
Table 3.4-A. North Cargo Berth 8 Defects Table 3.4-B. North Cargo Berth 8 Ultrasonic Thickness Readings
Table 3.5-A. Cruise Terminal 5 Defects
Table 3.5-B. Cruise Terminal 5 Ultrasonic Thickness Readings
Table 3.6-A. Cruise Terminal 6 Defects
Table 3.6-B. Cruise Terminal 6 Ultrasonic Thickness Readings
Table 3.7-A. Cruise Terminal 8 Main Bulkhead Defects
Table 3.7-B. Cruise Terminal 8 Main Bulkhead Ultrasonic Thickness Readings
Table 3.7-C. Cruise Terminal 8 Sheet Pile Toe Wall Defects
Table 3.7-D. Cruise Terminal 8 Ultrasonic Thickness Readings
Table 3.8-A. Cruise Terminal 10 Main Bulkhead Defects
Table 3.8-B. Cruise Terminal 10 Main Bulkhead Ultrasonic Thickness Readings
Table 3.8-C. Cruise Terminal 10 Sheet Pile Toe Wall Defects
Table 3.8-D. Cruise Terminal 10 Ultrasonic Thickness Readings
Table 3.9-A. Marina Bulkhead Defects
Table 3.9-B. Marina Bulkhead Ultrasonic Thickness Readings
Table 3.10-A. Cove Bulkhead Defects
Table 3.10-B. Cove Bulkhead Ultrasonic thickness Ratings
Table 3.11-A. Cruise Terminal 3 Bulkhead Defects
Table 3.11-B. Cruise Terminal 1 Main Bulkhead Ultrasonic Thickness Readings
Table 3.11-C. Cruise Terminal 1 East Wing Wall Ultrasonic Thickness Readings
Table 3.11-D. Cruise Terminal 1 West Wing Wall Ultrasonic Thickness Readings
Table 3.12-A. South Cargo Pier 4 Bulkhead Defects
Table 3.12-B. South Cargo Pier 4 Bulkhead Ultrasonic Thickness Readings
Table 3.13-A. South Cargo Pier 3 Bulkhead Defects
Table 3.13-B. South Cargo Pier 3 Bulkhead Ultrasonic Thickness Readings
Table 3.14-A. South Cargo Pier 2 Bulkhead Defects
Table 3.14-B. South Cargo Pier 2 Bulkhead Ultrasonic Thickness Readings
Table 3.15-A. South Cargo Pier 1 Bulkhead Defects
Table 3.15-B. South Cargo Pier 1 Bulkhead Ultrasonic Thickness Readings
Table 3.17-A. Cruise Terminal 3 Bulkhead Defects
Table 3.17-B. Cruise Terminal 3 Bulkhead Ultrasonic Thickness Readings
24PCA002-0 11
1. Introduction
At the request of the Canaveral Port Authority (CPA), Jacobs Engineering Group Inc. (Jacobs) performed a
Routine Level Inspection of Port Canaveral marine facilities. The Port is located on the east coast of the
Florida Space Coast in Cape Canaveral, Florida. The inspection was performed during three mobilizations between March 4, 2024, and July 26, 2024 and included an above water and underwater inspection of the bulkheads (and toe walls if present) at North Cargo Piers 1 and 2, North Cargo Berths 5, 6, and 8, South
Cargo Piers 1, 2, 3, and 4, the Marina, the Cove, the Tug Berth, and Cruise Terminals 1, 2, 3, 5, 6, 8, and 10.
This summary report was developed in accordance with the American Society of Civil Engineers (ASCE)
MOP-130 Waterfront Facilities Inspection and Assessment Guidelines Manual and includes the inspection scope, methodology, findings, and recommended actions with accompanying photos and drawings.
The purpose of the inspection was to perform a structural condition assessment of the Port facilities as the basis for determination of potential future maintenance and repair activities. This report also includes recommendations for subsequent inspection intervals.
1.1 Site History
Port Canaveral, located on the east coast of Florida in Cape Canaveral was originally constructed in 1953 for commercial fishing. Throughout the 1960s and 1970s, Port Canaveral began to support America’s space program and cruise lines. With long-term tenants like Disney, Royal Caribbean, and SpaceX, Port Canaveral has significant cruise and cargo ship activity daily. The port has 7 cruise terminals and 11 cargo berths, with a total of over 7 miles of bulkhead supporting these facilities.
Canaveral Port Authority has a significant investment in the harbor’s marine infrastructure and the condition of this infrastructure needs to be monitored as part of regular maintenance and for future planning. The bulkhead walls range from approximately 5 to over 55 years in age, with a significant portion of the walls at over 45 years in age. The last comprehensive underwater condition survey of these walls was performed in
2016, and the Port staff recognizes the importance of the marine facilities to Port operations.
1.2 Inspection Procedure
The Routine Inspection was performed by a three-person team consisting of a Professional Engineer-Diver, an Engineer-Diver, and a Technician Diver. Dive operations were staged from a work boat outfitted with a surface-supplied air diving spread and hard-wired communications. All inspection and assessment work was conducted in accordance with the American Society of Civil Engineers (ASCE) MOP-130 Waterfront Facilities
Inspection and Assessment Guidelines Manual. The Engineer Dive inspection team is certified by the
Association of Diving Contractors International (ADCI).
Underwater inspection of the bulkheads and monopiles at Port Canaveral was conducted by first performing a "swim-by" inspection to note any obvious defects, damage, and deterioration. This work is characterized by a Level I inspection effort that consists of a visual/tactile inspection from mean low water (MLW) to the mudline on 100 percent of the accessible underwater portions of the substructure components. The purpose of a Level I inspection is to detect major and obvious damage and deterioration including, but not limited to, cracking, and spalling induced by overstress or chemical deterioration, and corrosion of steel components. As part of the Level I inspection, mudline elevations are recorded throughout the structures, while making note of bottom conditions, so future comparisons can be made.
In addition, at every 100 linear feet, the substructure components were carefully examined by way of a Level
II inspection effort. This effort involved removal of a 12-in. by 12-in. square area of marine growth at Mean
24PCA002-0 12
Low Water (MLW) elevation, near the mudline, and midway between the two elevations, and includes a detailed examination of underwater surfaces to detect damaged or deteriorated areas that may be hidden by biofouling organisms or surface deterioration.
Level III inspection efforts were additionally performed at all Level II locations. For steel elements, Level III investigations include measuring remaining steel thickness with an underwater ultrasonic thickness meter.
For concrete elements, hammer sounding techniques were employed to detect any voids, delaminations, or other subsurface defects.
Visual observations were recorded and photographed using a digital underwater camera system.
Photographic documentation is intended to clearly identify specific defects and represent each condition observed.
Jacobs also performed a full visual inspection of all accessible above-water portions of the structural components as well as mooring hardware and upland areas within 50 ft of the high-level platforms. The focus of the above-water inspection was to assess and evaluate the conditions of the structures and their associated topside loading surfaces, such that any deficiencies are checked for continuity with underwater observations.
1.3 References to Elevation
In this report, elevation notes are referenced by distance in feet from the Mean Low Water (MLW) elevation, minus for below and plus for above. For example, -1.0 MLW is 1 ft below the MLW elevation whereas +1.0
MLW is 1 ft above the MLW elevation.
1.4 Damage Grade Assessment
For this report, the following general condition assessment ratings, developed by the ASCE Waterfront
Facilities Inspection and Assessment guidelines, were utilized.
The general damage grade assessment ratings for individual steel elements are based on a five-point assessment scale and are listed and defined below:
No Defects: Protective coating or wrap intact. Light surface rust. No apparent loss of material.
Minor: Protective coating damaged and loss of thickness up to 15 percent of nominal at any location. Less than 50 percent of surface area affected by corrosion at any elevation or cross section.
Moderate: Protective coating damaged and loss of thickness 15 to 30 percent of nominal at any location. More than 50 percent of surface area affected by corrosion at any elevation or cross section.
Major: Protective coating damaged and loss of nominal thickness 30 to 50 percent at any location.
Partial loss of ange edges or visible reduction of wall thickness on pipe piles.
Severe: Protective coating damaged and loss of wall thickness exceeding 50 percent of nominal at any location. Structural bends or buckling, breakage and displacement at supports, loose or lost connections.
24PCA002-0 13
The general damage grade assessment ratings for individual concrete elements are based on a five-point assessment scale and are listed and defined below:
No Defects: Good original hard surface, hard material, sound.
Minor: Mechanical abrasion or impact spalls up to 1 in. in depth. Occasional corrosion stains or small pop-out corrosion spalls. General cracks up to 1/16 in. in width.
Moderate: Structural cracks up to 1/16 in. in width. Corrosion cracks up to 1/4 in. in width. Chemical deterioration: Random cracks up to 1/16 in. in width; “Soft” concrete and/or rounding of corners up to 1 in. deep. Mechanical abrasion or impact spalls greater than 1 in. in depth.
Major: Structural cracks 1/16 in. to 1/4 in. in width and partial breakage (through section cracking with structural spalls). Corrosion cracks wider than 1/4 in. and open or closed corrosion spalls
(excluding pop-outs). Multiple cracks and disintegration of surface layer due to chemical deterioration. Mechanical abrasion or impact spalls exposing the reinforcing.
Severe: Structural cracks wider than 1/4 in. or complete breakage. Complete loss of concrete cover due to corrosion of reinforcing steel with more than 30 percent of diameter loss for any main reinforcing bar. Loss of bearing and displacement at connections. Loss of concrete cover (exposed steel) due to chemical deterioration. Loss of more than 30 percent of cross section due to any cause.
1.5 Condition Assessment Rating
Each structural element or group of elements inspected within a facility is given a condition assessment rating, as is the overall facility. The ratings provide guidance regarding the recommended priorities of follow-up actions to be taken by the owner. The condition assessment rating of the overall facility and elements comprising the structure is established using the information gathered during the inspection process. The severity, type, and quantity of damage, defects, and deterioration on a structure, as well as the overall impact that a set of conditions has on the facility, are processed to derive the defined condition assessment ratings. The general condition assessment ratings for the entire facility as well as its individual structures and element groups are based on a six-point assessment scale developed by the ASCE. The six condition assessment ratings are:
Good: No problems or only minor problems noted. Structural elements may show very minor deterioration, but no overstressing observed. No repairs or upgrades are required.
Satisfactory: Limited minor to moderate defects or deterioration observed, but no overstressing observed. No repairs or upgrades are required.
Fair: All primary structural elements are sound; but minor to moderate defects or deterioration observed. Localized areas of moderate to major deterioration may be present but do not significantly reduce the load-bearing capacity of the structure. Repairs are recommended, but the priority of the recommended repairs is low.
Poor: Advanced deterioration or overstressing observed on widespread portions of the structure but does not significantly reduce the load-bearing capacity of the structure. Repairs may be carried out with moderate urgency.
24PCA002-0 14
Serious: Advanced deterioration, overstressing, or breakage may have significantly affected the load-bearing capacity of primary structural components. Local failures are possible and loading restrictions may be necessary. Repairs may need to be carried out on a high-priority basis with urgency.
Critical: Very advanced deterioration, overstressing, or breakage has resulted in localized failure(s) of primary structural components. More widespread failures are possible or likely to occur and load restrictions should be implemented as necessary. The capacity of the structure is critically deficient relative to the structural requirements. Repairs may need to be carried out on a very priority basis with strong urgency.
1.6 Recommended Repair Actions
Recommended repair actions are based on the overall condition of the structures and the individual component groups, and the structural impacts of the observed defects or deterioration. Recommended actions can be categorized into the following four general types of actions:
Emergency/Immediate: Actions that require prompt response to prevent unsafe conditions at the structure. These recommendations may include restricting access to portions of the structure, identifying deteriorated elements that require immediate strengthening, and/or scope for additional analysis to determine if the condition can be tolerated through redundant load paths.
Priority: Actions that are required to maintain the structure in a safe operating condition and/or prevent the discovered condition from continuing to a point where future repairs will be significantly more costly. Unless noted otherwise, Priority level actions should be implemented within one to three years depending on the severity of the condition.
Routine: Actions that indicate tasks that should be undertaken as part of a scheduled maintenance program or other scheduled project. Postponing recommended Routine level actions will not compromise the stability of the structure. Unless noted otherwise, Routine level actions that consist of rehabilitation should be implemented within three to five years.
Additional Investigations: Actions that are recommended when more information is needed to better determine the overall structural condition, the cause or significance of non-typical defects or deterioration, or an appropriate repair method.
24PCA002-0 15
2. Description of Facility
Port Canaveral is in Brevard County on the east coast of Florida, approximately nine miles north of Cocoa
Beach. The Port is mainly orientated in an east-west direction, extending from the Atlantic coast to the
Banana River. The north is bounded by the Cape Canaveral Space Force Station and the Banana River, and the south by the City of Cape Canaveral. The harbor consists of three turning basins. Starting from the east:
The Trident Turning Basin (TTB), the Middle Turning Basin (MTB), and the West Turning Basin (WTB). The basins are connected by a 500-ft-wide channel (Inner Channel and West Access Channel) that forms the south boundary of each basin. Within this channel, a federally maintained Barge Canal extends from the south side of the MTB and the WTB, through the Banana River, across Merritt Island, and connects with the
Intracoastal Waterway system in the Indian River. Where the Barge Canal enters the Banana River, the
Canaveral Lock separates the tidal harbor from the almost non-tidal river. Present authorized project depths range from -46 (MLLW) in the approach channel, to -43 ft in the WTB.
The inner channel and turning basins are bounded by various commercial and military bulkhead facilities and wharves. Of the total 21 commercial and military berths in Port Canaveral, 12 are open pile wharves that stand off in front of shallow bulkhead walls, and 9 are deep wall sheet pile or combination pipe pile and sheet pile bulkheads.
A Vicinity Map and Location Plan of the project site are provided in Drawing 2.1 and Drawing 2.2, respectively. Individual bulkhead plans are provided in Appendix A Drawings 3.1 through 3.19 and sections are provided in Appendix A Drawings 4.1 through 4.28.
FILENAME: \\brevard\Proj\PortCanaveralPortAut\24CPA002 Bulkhead Dive Inspections\Drawings\001-G-F201.dwg PLOT DATE: 4/14/2025 PLOT TIME: 3:44 PM
CANAVERAL PORT AUTHORITY
445 CHALLENGER RD., SUITE 301
CAPE CANAVERAL, FLORIDA 32920
(321) 783-7831
445 CHALLENGER RD., SUITE 130
CAPE CANAVERAL, FLORIDA 32920
(321) 799-1236 (321) 799-1183 (FAX)
SCALE:
PROJ #:
DWG
24CPA002
AS NOTEDBULKHEAD ASSESSMENT
2.1
VICINTY MAP
CHIPLEY
PANAMA CITY
LAKE CITY
ST AUGUSTINE
GAINESVILLE
BARTOW
MIAMI
TALLAHASSEE
DELAND
DAYTONA BEACH
ORLANDO
TAMPA
KEY WEST
SARASOTA
FT. PIERCE
OCALA
LAKE
OKEECHOBEE
PENSACOLA
JACKSONVILLE
FT. LAUDERDALE
G U
L F
O
F
M
E
X
I C
O
A T
L A
N T
I C
O C
E A
N
N
VICINITY MAP
NTS
BREVARD
COUNTY
SCOTTSMOOR
MIMS
TITUSVILLE
PORT ST JOHN
COCOA
ROCKLEDGE
VIERA
SUNTREE
MELBOURNE
PALM BAY
GRANT
BAREFOOT BAY
MERRITT ISLAND
KENNEDY SPACE CENTER
CAPE CANAVERAL
SPACE FORCE STATION
CAPE
CANAVERAL
COCOA BEACH
SATELLITE BEACH
INDIAN HARBOUR
BEACH
INDIALANTIC
PATRICK SFB
MELBORNE
BEACH
528 A1A
A1A
A1A
PORT
CANAVERAL
FILENAME: \\brevard\Proj\PortCanaveralPortAut\24CPA002 Bulkhead Dive Inspections\Drawings\001-G-F202.dwg PLOT DATE: 4/14/2025 PLOT TIME: 3:45 PM
CANAVERAL PORT AUTHORITY
445 CHALLENGER RD., SUITE 301
CAPE CANAVERAL, FLORIDA 32920
(321) 783-7831
445 CHALLENGER RD., SUITE 130
CAPE CANAVERAL, FLORIDA 32920
(321) 799-1236 (321) 799-1183 (FAX)
SCALE:
PROJ #:
DWG
24CPA002
AS NOTEDBULKHEAD ASSESSMENT
2.2
LOCATION PLAN
N
BREVARD COUNTY MAP
NTS
SR 401
12.70
E
XI
T E
XI
T
E
XIT
ME
R
GE
ME
R
GE
21 3 4 5 6
STO P
O NL Y
S T
O P
O
NL
Y
EX
IT EX
IT E
XI
T
ON
LY
STOP
NO PARKING
NO PARKING
PILENCAGAGAGAG
PILENCAGAGAGENC
ENCPIL AGAG
ONLY
NO PARKING NO PARKINGNO PARKING
STOP STOP
FIRE LANE
C T-6 E XI T
X
BUSES
ONLY
N O
P
AR
KI
NG
MERGE
LEFT
MERGE
LEFT
STO
P
MM
E
E
E
C
E
E
E T B
E
M M
E E E
E
E E
S T
S
E S T
C
G
TB
TB
G
MERGE
F LP
E
HH
E HH
F LP
E
HH
T/W: -3' TO -25'
B/W: -16' TO -37'
(±80 LF)
BULKHEAD DEPTH (D) RANGE:
UP TO 20'
20' <= D <= 30'
30' <= D <= 40'
D >= 40'
FACILITY INSPECTION PLAN
NTS
N
T/W: +10.75' B/W: -37'
(±1510 LF)
T/W: +10.67' B/W: -41'
(±610 LF)
T/W: +10.13' B/W: -15'
(±140 LF)
T/W: +10.13' B/W: -15'
(±173 LF)
T/W: +10.66' B/W: -37'
(±1475 LF)
T/W: +8' B/W: -25'
(±190 LF)
T/W: +10' B/W: -43'
(±2101 LF)
T/W: +8.5' B/W: -9'
(±520 LF)
T/W: +11' B/W: -35'
(±995 LF)
T/W: +10.5' B/W: -5'
(±1770 LF)
T/W: +10' B/W: -5'
(±890 LF)
T/W: +10.66' B/W: -35'
(±820 LF)
T/W: +10.25 B/W: -5'
(±870 LF)
T/W: -10'
B/W: -10' TO -35'
(±950 LF)
T/W: -10'
B/W: -10' TO -35'
(±1077 LF)
T/W: +11.25' B/W: -1'
(±1075 LF)
T/W: +11.25' B/W: -5'
(±250 LF)
T/W: +11.25' B/W: -15'
(±504 LF)
T/W: -15' B/W: -35'
(±755 LF)
CT3CT1 CT2
SCP1SCP2SCP3SCP4COVE
CT10
CT8
CT6
CT5
NCB8
NCB6
NCB5
NCP1
NCP2
T/W: +11.5'
B/W: -1' TO -2'
(±840 LF)
T/W: +10.75' TO +14.5'
B/W: -5' TO -10'
(±1170 LF)
T/W: +11.33 B/W: -35'
(±850 LF)
T/W: +11.33' B/W: -15'
(±380 LF)
ABBREVIATIONS:
T/W APPROXIMATE TOP OF WALL ELEVATION
B/W APPROXIMATE DREDGE DEPTH ELEVATION
WALL TYPE:
TYPE 1 - COMBI WALL WITH CONCRETE CAP
TYPE 2 - STEEL SHEET PILE WITH CONCRETE CAP
TYPE 3 - PRECAST/PRESTRESSED CONCRETE
TYPE 4 - STEEL SHEET PILE
T/W: +2' B/W: -15'
(±250 LF)
T/W: +8' B/W: -25'
(±230 LF)
T/W: +8' B/W: -25'
(±230 LF)
T/W: +8' B/W: -25'
(±340 LF)
T/W: +8.5
B/W: -7.78' TO -4
(±300 LF)
T/W: +11.33' B/W: -15'
(±400 LF)
T/W: +8.5'
B/W: -9' TO -10'
(±1683 LF)
T/W: +8.5'
B/W: -9' TO -10'
(±2840 LF)
T/W: +8.5'
B/W: -9' TO -10'
(±350 LF)
FILENAME: \\brevard\Proj\PortCanaveralPortAut\24CPA002 Bulkhead Dive Inspections\Drawings\001-G-F203.dwg PLOT DATE: 4/14/2025 PLOT TIME: 4:25 PM
CANAVERAL PORT AUTHORITY
445 CHALLENGER RD., SUITE 301
CAPE CANAVERAL, FLORIDA 32920
(321) 783-7831
445 CHALLENGER RD., SUITE 130
CAPE CANAVERAL, FLORIDA 32920
(321) 799-1236 (321) 799-1183 (FAX)
SCALE:
PROJ #:
DWG
24CPA002
AS NOTEDBULKHEAD ASSESSMENT
2.3
FACILITY PLAN
MARINA
12.70
X
X
X
X
XX
X
X XX
X X
X
X X
X
XX
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X X
X
X X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X X
X
X
X
X
X
X
X
X
X X
X X
XXX
X
X
X
E
XI
T E
XI
T
E
XIT
X XX X
X
X
X
X
X X X X
X
X
X
X
X
X
XXX
X X
X
X
X X
XXXXXXXX
X
X
X X
X
X
X
X
XXX
XXXXX
X X
X X
X X
X
X X
X X
X
XX
ME
R
GE
ME
R
GE
21 3 4 5 6
STO P
O NL Y
S T
O P
O
NL
Y
EX
IT EX
IT E
XI
T
ON
LY
STOP
NO PARKING
NO PARKING
PILENCAGAGAGAG
PILENCAGAGAG ENC
ENCPIL AGAG
ONLY
NO PARKING NO PARKINGNO PARKING
STOP
X
X
X
XX
X
FIRE LANE
X
X X X X X X XX
X
X X
X
X X
X X
X X
X
X
X
XX
X X
X
XX
C T-6 E XI T
BUSES
N O
P
AR
KI
NG
MERGE
LEFT
MERGE
LEFT
X
STO
P
X
X
X
M M
E
C
E
E
T B
E
M M
S T
S
X
S T
C
X
X
X
XX
X
X
X
X
X X
X
X
X
X
X
X
G
TB
TB
G
X X
MERGE
X
X
F LP
E
HH
E HH
F LP
E
HH
X
X
X
WEST
TURNING
BASIN MIDDLE
TURNING
BASIN
TRIDENT
BASIN
S.R. 401
S .R
A1A
CT10
CT8
CT6
CT5
NCB6&5
CT1
NCB4&3
NCB8
CT3
CT2
N C
P
N C
P
S.R. 528
TUG
MARINA
COVE
SCP4 SCP1SCP3, 2
FILENAME: \\brevard\Proj\PortCanaveralPortAut\24CPA002 Bulkhead Dive Inspections\Drawings\001-G-F204.dwg PLOT DATE: 4/14/2025 PLOT TIME: 3:45 PM
CANAVERAL PORT AUTHORITY
445 CHALLENGER RD., SUITE 301
CAPE CANAVERAL, FLORIDA 32920
(321) 783-7831
445 CHALLENGER RD., SUITE 130
CAPE CANAVERAL, FLORIDA 32920
(321) 799-1236 (321) 799-1183 (FAX)
SCALE:
PROJ #:
DWG
24CPA002
AS NOTEDBULKHEAD ASSESSMENT
2.4
CONDITION PLAN
OVERALL BULKHEAD
NO VISIBLE DAMAGE OR ONLY MINOR DAMAGE IS NOTED. STRUCTURAL ELEMENTS MAY SHOW VERY MINOR
DETERIORATION, BUT NO OVERSTRESSING OBSERVED. NO REPAIRS REQUIRED.
LIMITED MINOR TO MODERATE DEFECTS OR DETERIORATION OBSERVED BUT NO OVERSTRESSING
OBSERVED. NO REPAIRS ARE REQUIRED
ALL PRIMARY STRUCTURAL ELEMENTS ARE SOUND BUT MIONR TO MODERATE DEFECTS OR
DETERIORATION OBSERVED. LOCALIZZED AREAS OF MODERATE TO ADVANCED DETERIORATION MAY BE PRESENT BUT DO NOT SIGNIFICANTLY REDUCE THE LOAD-BEARING CAPACITY OF THE STRUCTURE.
REPAIRS ARE RECOMMENDED, BUT THE PRIORITY OF THE RECOMMENDED REPAIRS IS LOW.
ADVANCED DETERIORATION OR OVERSTRESSING OBSERVED ON WIDESPREAD PORTIONS OF THE
STRUCTURE BUT DOES NOT SIGNIFICANTLY REDUCE THE LOAD-BEARING CAPACITY OF THE STRUCTURE.
REPAIRS MAY NEED TO BE CARRIED OUT WITH MODERATE URGENCY
ADVANCED DETERIORATION, OVERSTRESSING, OR BREAKAGE MAY HAVE SIGNIFICANTLY AFFECTED THE LOAD-BEARING CAPACITY OF THE PRIMARY STRUCTURAL COMPONENTS. LOCAL FAILURES ARE POSSIBLE, AND LOADING RESTRICTIONS MAY BE NECESSARY. REPAIRS MAY NEED TO BE CARRIED OUT ON A
HIGH-PRIORITY BASIS WITH URGENCY.
VERY ADVANCED DETERIORATION, OVERSTRESSING, OR BREAKAGE HAS RESULTED IN LOCALIZED FAILURE(S) OF PRIMARY STRUCTURAL COMPONENTS. MORE WIDESPREAD FAILURES ARE POSSIBLE OR LIKELY TO OCCUR, AND LOAD RESTRICTIONS SHOULD BE IMPLEMENTED AS NECESSARY. REPAIRS MAY
NEED TO BE CARRIED OUT ON A VERY HIGH-PRIORITY BASIS WITH STRONG URGENCY.
GOOD
SATISFACTORY
FAIR
POOR
SERIOUS
CRITICAL
SCALE: 1" =
1000 2000
1000'
N
OVERALL BULKHEAD CONDITION PLAN
1"=1000'
24PCA002-0 20
3. 2024 Inspection Findings
3.1 North Cargo Pier 1 & 2
3.1.1 Description of Structure
North Cargo Piers 1 and 2 were constructed in 1987. They are oriented north to south and are located along the west side of the Middle Turning Basin at Port Canaveral. For the purpose of this inspection, the bulkhead walls at North Cargo Piers 1 and 2 were stationed continuously since the main bulkhead is constructed as one continuous wall behind the piers. The majority of the bulkhead runs north to south with the exception of a return wall at the northernmost portion of the wall that runs approximately 300 ft to the east, terminating at the Space Force Station property line. Station 0+00 begins at the easternmost point of the return wall. The North Cargo Pier 1 return wall is constructed of steel sheet piles with a concrete cap that extends down to elevation -1.0 MLW. The tieback system has one level of anchor rods centered at elevation +1.0 MLW with the outboard connections encapsulated by a concrete encasement on the bulkhead face. The anchor rods are connected to concrete deadman anchors.
The North Cargo Pier 1 bulkhead continues from Station 3+10 to Station 11+20, which is the interface with the northern end of the North Cargo Pier 2 bulkhead (Photos 3.1-1 and 3.1-2). The North Cargo Pier
1 bulkhead is constructed of steel sheet piles with a concrete cap that extends down to an elevation of -
1.0 MLW. The tieback system has anchor rods centered at +1.0 MLW and +2.0 MLW with the outboard connections encapsulated in a concrete encasement. The North Cargo Pier 2 bulkhead begins at Station
11+20 and extends to Station 17+75, which is the interface with the recently reconstructed North Cargo
Pier 3 Bulkhead. The North Cargo Pier 2 bulkhead is constructed of steel sheet piles with a short concrete cap leaving the steel piles exposed in the splash zone. The tieback system has one level of anchor rods at elevation +1.0 MLW, and the outboard connections are exposed. The anchor rods here are connected to a continuous steel sheet pile anchor wall.
The mooring system at the bulkheads consists of various secondary T-head, single-bit, and double-bit bollards located along the upland portion of the bulkhead (Photos 3.1-4). The majority of mooring fittings supporting this facility are on the NCP1 and NCP2 Piers themselves.
The North Cargo Pier 1 Toewall runs parallel to the North Cargo Pier 1 bulkhead and is located approximately 100 ft offshore of the bulkhead, between the third and fourth offshore pier pile rows. The toe wall stationing corresponds to the main bulkhead stationing. At the north end of the toe wall, the steel sheet piles are buried into the slope and the exposed sheets begin at Station 4+20. The top of the steel sheet piles are generally cut at the same elevation and the sloped fill on the inshore side of the wall meets the top of the toe wall. There is a change in the geometry of the toe wall at Station 10+50 where the toe wall turns 6 ft to the east before returning south. Along the southernmost portion of the toe wall, from
Station 11+20 to 11+65, the sheeting tapers down in elevation. The toe wall is comprised of steel sheet piles and the top of the wall is submerged at an elevation of -15.0 MLW.
24PCA002-0 21
Photo 3.1-1. Overall view of North Cargo Pier 1 Bulkhead looking west.
Photo 3.1-2. Overall view of North Cargo Pier 2 Bulkhead looking south.
24PCA002-0 22
Photo 3.1-3. Typical condition of concrete cap.
Photo 3.1-4. Typical condition of double-bit bollards.
24PCA002-0 23
3.1.2 Observed Conditions
3.1.2.1 NCP 1 Bulkhead
The steel sheet piles and concrete cap at the North Cargo Pier 1 Bulkhead are in Fair condition due to moderate to major deterioration. The concrete cap exhibits major spalling and voids throughout. At
Station 2+07, a spall is present approximately 2 ft from the top of the concrete cap measuring 12 in. long by 24 in. high, and up to 3 in. deep. Additionally, a 24-in. high by 18-in. deep void is present from Station
6+15 to 7+00 exposing multiple reinforcing bars with major to severe corrosion (Photo 3.1-5). Refer to
Table 3.1-A for a detailed list of defects at the NCP 1 Bulkhead.
Table 3.1-A. North Cargo Pier 1 Bulkhead Defects
Defect # Repair Action Station Elevation Defect Description
1 Routine 0+20 to
0+75
Below Cap Corrosion Exposed steel sheet piles (approx. 1.5 ft high) have major to severe corrosion.
2 No Repair 0+20 to
2+07
Conc. Cap Cracking Transverse hairline cracking with efflorescence in concrete cap spaced at approximately 5 ft.
3 Routine 2+07 Conc. Cap Spall Spall is located 2 ft from the top of the concrete cap measuring 12 in. long, 24 in. high, and 3 in.
deep.
4 Routine 5+02 -1.0 MLW Spall Spall on the underside of concrete encasement that measures 8 in. high, 8 in. wide, and 15 in.
deep with no rebar exposed.
5 Routine 5+75 +3.0 MLW Spall Spall on the top corner of concrete encasement measuring 5 ft. long, 12 in. high, and 3 in. deep with one exposed rebar with minor corrosion.
6 Routine 6+18 -1.0 MLW Void Void on the underside of concrete cap that measures 8 in. high, 8 in. wide, and 36 in. deep to the inner flange of the steel sheet piles.
7 Routine 6+15 to
6+25
-1.0 MLW Voids Intermittent voids between the steel sheet piles and the inboard face of the concrete cap. The voids measure 8 to 24 in. high and 2 to 4 in.
wide.
8 Priority 6+25 to
6+35
0.0 MLW Large Void Large void in concrete cap measuring 10 ft.
long, 10 in. high, and 15 in. deep with 7 rebars exposed that have moderate corrosion.
9 Priority 6+15 to
7+00
Conc. Cap Large Void Failed repair caused a void in the concrete cap measuring 85 ft. long, 24 in. high, and up to 18
in. deep with multiple bars exposed with severe corrosion.
9-1 Priority 6+00 to
8+00
-9.0 MLW Corrosion Exposed steel sheet piles (approx. 2.5 ft high) have major to severe corrosion.
10 Priority 9+75 Below Enc. Void Void in repair exposes one layer of tie rod below the concrete encasement.
24PCA002-0 24
Photo 3.1-5. Void in concrete cap at Station 7+00.
Below water, the steel sheet piles exhibited moderate to major corrosion with 100% coating loss throughout (Photo 3.1-6). Additionally, ultrasonic thickness measurements revealed the average section loss of the steel sheets is approximately 15%. Stations 6+00 and 7+00 have up to 33% section loss with pitting up to 1/16 in. deep at these locations with isolated areas of corrosion holes. Refer to Table 3.1-B below for the detailed steel thickness data that was collected on the North Cargo Pier 1 Bulkhead.
Table 3.1-B. North Cargo Pier 1 Bulkhead Ultrasonic Thickness Readings
Location
Readings (in.)
Nominal
Thickness (in.)
Percent
Thickness Lost
Approx.
Section Lost Station Depth
(ft) Sheet Pile Loc
4+00 -5
Outer Flange 0.425 0.460 8%
6% Web 0.327 0.350 7%
Inner Flange 0.442 0.460 4%
5+00 -6
Outer Flange 0.418 0.460 9%
7% Web 0.323 0.350 8%
Inner Flange 0.442 0.460 4%
6+00 -6
Outer Flange 0.297 0.460 36%
33% Web 0.225 0.350 36%
Inner Flange 0.328 0.460 29%
7+00 -6
Outer Flange 0.320 0.460 30%
24% Web 0.245 0.350 30%
Inner Flange 0.412 0.460 11%
8+00 -6
Outer Flange 0.397 0.460 14%
13% Web 0.265 0.350 24%
Inner Flange 0.452 0.460 2%
9+00 -6
Outer Flange 0.397 0.460 14%
13% Web 0.265 0.350 24%
Inner Flange 0.452 0.460 2%
24PCA002-0 25
Location
Readings (in.)
Nominal
Thickness (in.)
Percent
Thickness Lost
Approx.
Section Lost Station Depth
(ft) Sheet Pile Loc
10+00 -6
Outer Flange 0.343 0.460 25%
13% Web 0.293 0.350 16%
Inner Flange 0.467 0.460 -1%
11+00 -7
Outer Flange 0.425 0.460 8%
7% Web 0.305 0.350 13%
Inner Flange 0.458 0.460 0%
Photo 3.1-6. Typical steel sheet pile condition at NCP1 Bulkhead. Note corrosion holes.
3.1.2.2 NCP 2 Bulkhead
The NCP 2 Bulkhead is in Poor condition due to areas of severe corrosion and holes in the steel sheet piles
(Photo 3.1-7) and moderate to major voids and spalls throughout the concrete cap. Spalling at Stations
13+00 and 14+00 exposes the top of the steel sheet pile. Refer to Table 3.1-C for a detailed list of defects at the NCP 2 Bulkhead.
Table 3.1-C. North Cargo Pier 2 Bulkhead Defects
Defect # Repair Action Station Elevation Defect Description
11 Priority 11+63 to
14+08
Top 6 ft. of exp. SSP
Severe
Corrosion
Major to severe corrosion with heavy delaminations and intermittent corrosion holes up to 12 in.
diameter near the bottom of the concrete cap.
12 Routine 11+72 to
12+75
Btm of Cap Delam. Horizontal crack/delamination in the bottom of the concrete cap up to 1/8 in. wide.
13 Routine 13+00 Btm of Cap Spall Spall on the bottom of the cap that measures 18 in.
high, 6 ft. long, and 9 in. deep with the outer flange of the steel pile exposed and heavily corroded.
24PCA002-0 26
Defect # Repair Action Station Elevation Defect Description
14 Routine 13+75 to
14+40
Btm of Cap Spalling Intermittent spalling along the bottom of the cap measuring up to 2 ft. high and 10 in. deep with exposed outer flanges of sheet piles.
15 Priority 14+08 to
17+50
Top 4 ft. of exp. SSP
Major
Corrosion
Major corrosion of the exposed steel sheet piles from the bottom of the cap down 4 ft.
16 Priority 17+50 to
17+75
Top 4 ft. of exp. SSP
Severe
Corrosion
Severe corrosion of the top 4 ft of steel sheet piles with corrosion holes above and below water, typically in the webs, at 1 ft. & 7 ft. below cap.
Photo 3.1-7. Severe corrosion of steel sheet piles at Station 17+75. Note corrosion holes.
Below water, the steel sheet piles exhibit major to severe corrosion with 100% coating loss and numerous corrosion holes (Photo 3.1-8) throughout the splash zone, which extends from the bottom of the concrete cap down 6 ft. Additionally, ultrasonic thickness measurements revealed the average section loss of the steel sheets is approximately 20%. Stations 16+00 and 17+00 exhibit over 40% section loss with pitting up to 1/8 in. deep and corrosion holes isolated throughout the splash zone. Refer to Table 3.1-D below for the detailed steel thickness data that was collected on the North Cargo Pier 2 Bulkhead.
Table 3.1-D. North Cargo Pier 2 Bulkhead Ultrasonic Thickness Readings
Location 2024 Readings
(in.)
Nominal
Thickness (in.)
Percent
Thickness Lost
Approx.
Section Lost Station Depth (ft) Sheet Pile Loc
12+00 -3
Outer Flange 0.445 0.460 3%
10% Web 0.265 0.350 24%
Inner Flange 0.450 0.460 2%
12+00 -8 Outer Flange 0.383 0.460 17%
11% Web 0.273 0.350 22%
24PCA002-0 27
Location 2024 Readings
(in.)
Nominal
Thickness (in.)
Percent
Thickness Lost
Approx.
Section Lost Station Depth (ft) Sheet Pile Loc
Inner Flange 0.488 0.460 -6%
13+00 -8
Outer Flange 0.367 0.460 20%
20% Web 0.237 0.350 32%
Inner Flange 0.427 0.460 7%
13+15 -8
Outer Flange 0.405 0.460 12%
11%Web 0.318 0.350 9%
Inner Flange 0.405 0.460 12%
14+00 -8
Outer Flange 0.417 0.460 9%
11% Web 0.292 0.350 17%
Inner Flange 0.430 0.460 7%
15+00 -11
Outer Flange 0.330 0.460 28%
19% Web 0.263 0.350 25%
Inner Flange 0.447 0.460 3%
16+00 -3
Outer Flange 0.308 0.460 33%
43% Web 0.113 0.350 68%
Inner Flange 0.335 0.460 27%
16+00 -7
Outer Flange 0.427 0.460 7%
19% Web 0.255 0.350 27%
Inner Flange 0.362 0.460 21%
17+00 -3
Outer Flange 0.417 0.460 9%
13% Web 0.285 0.350 19%
Inner Flange 0.408 0.460 11%
17+00 -8
Outer Flange 0.212 0.460 54%
41% Web 0.175 0.350 50%
Inner Flange 0.373 0.460 19%
17+50 -3
Outer Flange 0.410 0.460 11%
16% Web 0.233 0.350 33%
Inner Flange 0.438 0.460 5%
17+50 -8
Outer Flange 0.305 0.460 34%
33% Web 0.150 0.350 57%
Inner Flange 0.422 0.460 8%
24PCA002-0 28
Photo 3.1-8. Corrosion hole in steel sheet pile below water with active fill loss at Station 15+50.
3.1.2.3 NCP 1 Toewall
The NCP 1 Toewall is in Satisfactory condition due to minor to moderate deterioration in the steel sheets.
At Station 5+20, there are local deformations on the top edge of the sheets up to 3 in. deep. Additionally, at Station 9+58, the top of the steel sheet pile toewall has laterally displaced up to 6 in. from vertical to the east and is in contact with the adjacent concrete piles (Photo 3.1-9). Refer to Table 3.1-E below for the detailed defect notes for the NCP 1 Toewall.
Table 3.1-E. North Cargo Pier 1 Sheet Pile Toewall Defects
Defect
Repair Action Station Elevation Defect Description
17 No Repair 5+20 -16 MLW Impact
Damage
Indentations up to 3 in. deep and 8 in.
wide along the top 10 in. of sheet pile.
17-1 No Repair 9+58 Top of
Toewall
Deflection Top of toewall laterally displaced 6 in.
towards east and it is in contact with adjacent concrete pile.
The NCP 1 Toewall exhibits minor to moderate defects with isolated areas of coating loss throughout
(Photo 3.1-10). Ultrasonic thickness measurements revealed the average section loss of the steel sheet piles is approximately 9%. Refer to Table 3.1-F below for the detailed steel thickness data that was collected on the North Cargo Pier 1 Toewall.
24PCA002-0 29
Table 3.1-F. North Cargo Pier 1 Toewall Ultrasonic Thickness Readings
Location 2024 Readings
(in.)
Nominal
Thickness (in.)
Percent
Thickness Lost
Approx.
Section Lost Station Depth (ft) Sheet Pile Loc
5+00 -18
Outer Flange 0.532 0.581 8%
10% Web 0.388 0.440 12%
Inner Flange 0.523 0.581 10%
5+00 -25
Outer Flange 0.538 0.581 7%
10% Web 0.393 0.440 11%
Inner Flange 0.510 0.581 12%
6+00 -19
Outer Flange 0.537 0.581 8%
8% Web 0.407 0.440 8%
Inner Flange 0.533 0.581 8%
6+00 -25
Outer Flange 0.542 0.581 7%
7% Web 0.410 0.440 7%
Inner Flange 0.537 0.581 8%
7+00 -18
Outer Flange 0.530 0.581 9%
9%Web 0.393 0.440 11%
Inner Flange 0.528 0.581 9%
7+00 -23
Outer Flange 0.532 0.581 8%
9% Web 0.395 0.440 10%
Inner Flange 0.528 0.581 9%
7+00 -27
Outer Flange 0.535 0.581 8%
8% Web 0.407 0.440 8%
Inner Flange 0.540 0.581 7%
8+00 -19
Outer Flange 0.530 0.581 9%
9% Web 0.398 0.440 9%
Inner Flange 0.535 0.581 8%
8+00 -25
Outer Flange 0.532 0.581 8%
8% Web 0.403 0.440 8%
Inner Flange 0.535 0.581 8%
8+90 -20
Outer Flange 0.463 0.581 20%
15% Web 0.397 0.440 10%
Inner Flange 0.493 0.581 15%
8+90 -26
Outer Flange 0.513 0.581 12%
10% Web 0.393 0.440 11%
Inner Flange 0.528 0.581 9%
10+00 -20
Outer Flange 0.530 0.581 9%
9% Web 0.398 0.440 9%
Inner Flange 0.523 0.581 10%
10+00 -25
Outer Flange 0.533 0.581 8%
9% Web 0.393 0.440 11%
Inner Flange 0.535 0.581 8%
10+00 -29
Outer Flange 0.532 0.581 8%
9% Web 0.398 0.440 9%
Inner Flange 0.537 0.581 8%
11+00 -20
Outer Flange 0.532 0.581 8%
11% Web 0.377 0.440 14%
Inner Flange 0.528 0.581 9%
11+00 -25
Outer Flange 0.540 0.581 7%
9% Web 0.395 0.440 10%
Inner Flange 0.527 0.581 9%
11+00 -29
Outer Flange 0.533 0.581 8%
9% Web 0.397 0.440 10%
Inner Flange 0.527 0.581 9%
11+50 -25
Outer Flange 0.543 0.581 6%
7% Web 0.408 0.440 7%
Inner Flange 0.532 0.581 8%
24PCA002-0 30
Photo 3.1-9. Toewall (arrow) in contact with adjacent concrete pile at Station 9+58.
Photo 3.1-10. Typical condition of steel sheets at NCP 1/2 Toewall.
24PCA002-0 31
The upland portion of North Cargo Piers 1 & 2 is in Fair condition with moderate to major defects. Map cracking up to 1/16 in. wide was observed throughout the concrete cap and concrete encasement.
Additionally, isolated…