RFQ 2031ZA24Q00307 - Sandblast Set of PVD Parts.pdf

PDF 578 KB Posted

Attached to
Sandblast Set of PVD Parts
Solicitation number
2031ZA24Q00307
Issued by

About this file

This document is a Request for Quote (RFQ) issued by the Department of the Treasury Bureau of Engraving and Printing for sandblasting services for Physical Vapor Deposition (PVD) chamber components.

The Bureau has a requirement to provide sandblasting services to remove excess chromium from the stainless steel components of its PVD equipment used in the currency production process. The vendor will be required to accept shipment of the items from the Bureau, uncrate and inventory them, sandblast the parts to an ISO 8501 Sa 2.5 standard, and return the sandblasted items to the Bureau within 30 calendar days. The contract will be a firm-fixed price with a 12-month base period and four 12-month option periods. There are no set-asides, and the contract is unrestricted. Vendors must submit quotes by the due date specified in the solicitation.

View the file

Other files

File Type Posted
Appendix A.pdf PDF
Media Blasting List Appendix A_2 Revised.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTE

2031ZA24Q00307

Sandblast Set of PVD Parts

Table of Contents

Section Description Page Number(s) A General Information 2 B Pricing Schedule 3 C Statement of Work Error! Bookmark not defined. - 10 D Packaging and Handling 11 E Inspection and Acceptance 12 F Delivery or Performance 13 G Contract Administration Data 14 - 15 H Special Contract Requirements 16 - 23 I Contract Clauses 24 - 30 J Attachments 31 K Certifications 32 - 45 L Instructions to Quoters 46 - 48 M Evaluation 49 - 50

2 Bureau of Engraving and Printing 2031ZA24Q00307

SECTION A – GENERAL INFORMATION

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12 & 13, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation shall not be issued.

A. This solicitation document and incorporated provisions and clauses are those in effect through Federal

Acquisition Circular FAC 2024-05 / effective date of 22 May 2024.

B. This procurement is unrestricted and the associated NAICS code is 332813 – Electroplating, Plating, Polishing, Anodizing and Coloring

C. The Defense Priorities and Allocations System (DPAS) and assigned rating are not applicable to this procurement.

[END OF SECTION]

3 Bureau of Engraving and Printing 2031ZA24Q00307

SECTION B – PRICING SCHEDULE

Base Year

CLIN DESCRIPTION QTY UNIT UNIT

PRICE

EXTENDED

PRICE

0001 Sandblast Set of PVD Parts 4 EA $ $ 0002 Shipping of Parts to and from BEP 4 EA $ $

Total Base Year $

Option Year 1

CLIN DESCRIPTION QTY UNIT UNIT

PRICE

EXTENDED

PRICE

1001 Sandblast Set of PVD Parts 4 EA $ $ 1002 Shipping of Parts to and from BEP 4 EA $ $

Total Option Year 1 $

Option Year 2

CLIN DESCRIPTION QTY UNIT UNIT

PRICE

EXTENDED

PRICE

2001 Sandblast Set of PVD Parts 4 EA $ $ 2002 Shipping of Parts to and from BEP 4 EA $ $

Total Option Year 2 $

Option Year 3

CLIN DESCRIPTION QTY UNIT UNIT

PRICE

EXTENDED

PRICE

3001 Sandblast Set of PVD Parts 4 EA $ $ 3002 Shipping of Parts to and from BEP 4 EA $ $

Total Option Year 3 $

Option Year 4

CLIN DESCRIPTION QTY UNIT UNIT

PRICE

EXTENDED

PRICE

4001 Sandblast Set of PVD Parts 4 EA $ $ 4002 Shipping of Parts to and from BEP 4 EA $ $

Total Option Year 4 $

GRAND TOTAL $

4 Bureau of Engraving and Printing 2031ZA24Q00307

SECTION C – PERFORMANCE WORK SCHEDULE (PWS)

Sandblast Physical Vapor Deposition (PVD) Chamber Components

PART 1 – GENERAL INFORMATION

1. The Bureau of Engraving and Printing (BEP),Office of Engraving (OE), District Currency Facility (DCF) is a component of the Department of the Treasury and has a requirement to provide sandblasting services for the BEP’s Physical Vapor Deposition (PVD) Chamber Stainless Steel components that needs to have excess chromium removed. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

2. Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to sandblast the itemized items listed and illustrated in Media Blasting Appendix A for each PVD equipment to ISO 8501 standards and to a grade of Sa 2.5. Shipping of items will be through the Bureau’s loading dock personnel and procedures.

3. Background: The mission of the Bureau of Engraving and Printing (BEP) is to manufacture Federal Reserve Notes and other security products for the United States. The BEP provides several types of high quality print products of which the primary is United States Currency. This requirement supports the Office of Engraving Plate Making Branch through the new PVD chroming process the Bureau started implementing. The PVD chroming process puts a thin layer of chromium nitride on the currency plates and as a byproduct all SS304 stainless steel components within the PVD chamber also get coated with the chrome nitride layer every cycle. It is anticipated these components be swapped out with spare components and the chromed ones be sent out for sandblasting making them suitable for use again. There are two (2) PVD machines located in the District Currency Facility (DCF). It is anticipated that each PVD machine will require sandblasting for a set of components once every six months or alternatively, two sets of components within the designation period of performance.

4. Objectives: The BEP will crate components and have the items and an inventory list sent to vendor location where vendor will sandblast components to a grade of Sa 2.5 “thoroughly cleaned” and Contractor will ship items from BEP back to BEP for service in the PVD machine. Appendix A is the complete list of items for one (1) PVD machine that may need sandblasting, no more than one set of the listed items will be sent at one time.

Access to Government Facilities: The BEP is a secure facility, and all instructions of the BEP Police must be obeyed. Weapons, cameras, alcohol, or illegal drugs are not allowed on site and are subject to seizure.

Persons entering the BEP will be subject to magnetic and/or hand examination and items under their control shall be examined by x-ray or hand inspection. Note that large items cannot be accepted through the 13th or 14th St. SW entrances and must be delivered through the BEP loading dock. During the life of the contract, access to the Government facility for the Contractor, its subcontractors, and suppliers shall be made available as required. During all operations on Government premises, personnel for whom the Contractor is responsible shall comply with the rules and regulations governing the conduct of personnel and the operation of the facility. The Government reserves the right to require the Contractor's employees to sign in and/or sign out of the Government facility. Schedule Deliveries with the Loading Dock at 202-874-2333 (24 hours advanced notice required).

5 Bureau of Engraving and Printing 2031ZA24Q00307

Washington, DC Currency Facility 14th & C St. SW Washington, DC 20228

5. Scope: The Contractor shall provide sandblasting services necessary to sandblast the itemized items listed and illustrated in Appendix A for each PVD equipment to ISO 8501 standards and to a grade of Sa 2.5 to include:

• Accept shipment from the BEP, uncrate, inventory, and inspect for any shipping damage

• Sandblast all parts to a sandblasting grade of Sa 2.5

• Distortion from bead blasting needs to be minimized. Appropriate media, glass, or dry ice is to be utilized with each part, if applicable. Parts should be blasted at their recommended pressure settings.

• Heavy metal testing media shall be performed before and after cleaning of BEP parts

• Stainless steel parts will be returned to original shipping crates and loaded onto customer’s truck for return to BEP

• Contractor shall dispose of glass bead media and chrome nitride material

6. Period of Performance: The period of performance for this contract is five (5) years: A twelve (12) months Base Year and four (4) option periods each of twelve (12) months. The Period of Performance reads as follows:

Base Year September 15, 2024 – September 14, 2025

Option Year I September 15, 2025 - September 14, 2026

Option Year II September 15, 2026 - September 14, 2027

Option Year III September 15, 2027 - September 14, 2028

Option Year IV September 15, 2028 - September 14, 2029

7. General Information:

7.1 Quality Assurance: The Government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is a Government only document primarily focused on what the Government must do to assure that the contractor has performed in accordance with the requirements of the contract.

7.2 Federal Government Holidays: The contractor is not required to perform on the following federally recognized holidays. If these holidays fall on Saturday, the preceding Friday shall be observed. If these holidays fall on Sunday, the following Monday shall be observed.

New Years Day 1st day of January

Martin Luther King Jr.'s Birthday 3rd Monday of January

Presidents Day 3rd Monday of February

Memorial Day Last Monday of May

Juneteenth Day 19th day of June

Independence Day 4th day of July

6 Bureau of Engraving and Printing 2031ZA24Q00307

Labor Day 1st Monday of September

Columbus Day 2nd Monday of October

Veterans Day 11th day of November

Thanksgiving Day 4th Thursday of November

Christmas Day 25th day of December

7.3 Hours of Operation: The contractor is responsible for conducting business, between the hours of 7:00 am- 2:00 pm. Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The contract shall coordinate with the Government regarding hour of operation for BEP Year End Shut Down. For other than firm fixed price contracts, the contractor will not be reimbursed when the Government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.

When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

7.4 Place of Performance: The work to be performed under this contract will be performed at vendor’s location.

7.5 Type of Contract: The Government will award a Firm Fixed Price Contract.

7.5.1 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5, Post Award Orientation. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the Contracting Officer will apprise the contractor of how the Government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

7.5.2 Contracting Officer Representative (COR): The COR will be identified by separate letter by the CO. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, and specifications; monitor Contractor's performance and notify both the Contracting Officer and Contractor of any deficiencies;

coordinate availability of Government furnished property; and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

7.5.3 Identification of Contractor Employees: All contract personnel (to include subcontractors) attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties are required to identify themselves as such

7 Bureau of Engraving and Printing 2031ZA24Q00307 to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed. All Contractor personnel shall clearly identify themselves as a Contractor and shall be required to wear identification (ID) badges in a visible location on the front of exterior clothing, above the waist, (except when safety or health reasons prevent such placement). ID badges shall be worn at all times when performing work. ID badges shall have an identification picture and shall state the name of the individual and the company they represent. A listing of issued identification cards shall be furnished to the Contracting Officer prior to the contract performance date and updated as needed to reflect Contractor and Subcontractor personnel changes. Contractor personnel are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their Contractor-owned or privately owned vehicle while on BEP premises.

7.5.4 Supervision of Contractor Employees: The Government will not exercise any supervision or control over Contractor or subcontractor employees while performing work under the contract. Such employees shall be accountable solely to the Contractor, not the Government. The Contractor, in turn, shall be accountable to the Government for Contractor or subcontractor employees.

PART 2

DEFINITIONS & ACRONYMS

Definitions and Acronyms:

DEFINITIONS:

8.1.1 CONTRACT SPECIALIST. The official Government representative delegated authority by the Contracting Officer to administer a contract. This individual is normally a member of the appropriate Contracting/Procurement career field and advises on all technical contractual matters.

8.1.2 CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or services to the Government. The term used in this contract refers to the prime.

CONTRACTING OFFICER. A person with authority to enter into, administer, and/or terminate contracts, and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.

CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

DELIVERABLE. Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.

8 Bureau of Engraving and Printing 2031ZA24Q00307

QUALITY ASSURANCE. The Government procedures to verify that services being performed by the Contractor are acceptable in accordance with established standards and requirements of this contract.

QUALITY ASSURANCE SPECIALIST. An official Government representative concerned with matters pertaining to the contract administration process and quality assurance/quality control. Acts as technical advisor to the Contracting Officer in these areas.

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

WORKDAY. The number of hours per day the Contractor provides services in accordance with the contract.

WORK WEEK. Monday through Friday, except for Federal holidays unless specified otherwise.

8.2 ACRONYMS:

CO Contracting Officer COR Contracting Officer Representative COTS Commercial off-the-Shelf FAR Federal Acquisition Regulation POC Point of Contact PM Preventative Maintenance PRS Performance Requirements Summary PWS Performance Work Statement

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

GOVERNMENT FURNISHED ITEMS AND SERVICES:

Facilities: The Government will provide access to areas necessary for work to be performed

Utilities: The Contractor (to include subcontractors) shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.

Responsibility: The Government will remove and store any tools, materials, equipment, parts from the place of performance used by the Government in support of this effort.

9 Bureau of Engraving and Printing 2031ZA24Q00307

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

General: The Contractor shall furnish all supplies, equipment, facilities, and services required to perform work under this contract that are not listed under Section 3 of this PWS.

Scheduling: Shall be coordinated with the Contracting Officer’s Representative (COR) on the specific dates and times for performance of the work.

Materials: N/A

PART 5

SPECIFIC TASKS

Specific Tasks:

Basic Services: The contractor shall provide the following services:

Accept shipment from the BEP, Uncrate parts shipped to Vendor facility, take inventory and inspect for any shipping damage. Send email to COR within two days of receipt. (not inclusive of weekends or holidays) with inventoried parts list. Immediately notify COR of any damaged items Sandblast the inventoried items to a grade of Sa 2.5. Distortion from bead blasting needs to be minimized. Bead blasting shall be either glass or dry ice media utilized. Ship sandblasted items back to the BEP in original shipping crates and loaded onto customers truck for return to BEP with enclosed inventory list within 30 calendar days of receipt. Contractor shall dispose of glass bead media and chrome nitride material

PART 6

APPLICABLE PUBLICATIONS

Applicable Publications (Current Editions)

The Contractor (to include subcontractors) must abide by all applicable regulations, publications, manuals, and local policies and procedures. The Contractor must comply with and performing all services associated with this effort in accordance with any and all applicable Regulations/Publications/Codes.

Regulations/Publications/Codes means any and all applicable Federal, State, City, Local and Organizational laws, regulations, codes, ordinances standards, and conditions (e.g. Department of Transportation (DOT), Environmental Protection Agency (EPA), and NFPA 70), public and occupational health, safety, and environmental, etc), original equipment manufacturer specifications, requirements and standards as well as any and all BEP policies, procedures, guidelines and requirements that govern the performance of the services as prescribed by the contract. The Contractor is solely responsible for ensuring it is complying with and performing in accordance with any such amendments, supplements to such Regulations/Publications/Codes as well as any and all superseding documents issued or enacted during the period of performance of the work. The Government reserves the right to request copies of the company license(s) and other certification documentation that demonstrates their company and personnel have the ability to perform the services at any time during performance. The Contractor shall provide the requested information within five (5) business days of the request.

10 Bureau of Engraving and Printing 2031ZA24Q00307

PART 7

ATTACHMENT/TECHNICAL EXHIBIT LISING

Attachment/Technical Exhibit List:

Attachment 1/Technical Exhibit 1 – Performance Requirements Summary

TECHNICAL EXHIBIT 1 - PERFORMANCE REQUIREMENTS SUMMARY

The Contractor tasks requirements summarizes the performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of work required for each requirement. These thresholds are critical to mission success.

Performance Objective

Performance Standard Performance Threshold Method of Surveillance

PRS #1

Function

Items will be sandblasted to a grade of Sa 2.5 also known as thoroughly cleaned.

No chrome flakes or visible chrome of greater than one eighth (1/8”) in diameter will remain

100% inspection made by COR or other designated BEP personnel

PRS #2

Shipping/Inv entory

Verify shipped items and provide inventory of items returned

No more than one instance of not notifying COR upon receipt of items within 2 days of receipt of items

No more than one instance of not returning items within 30 calendar days of receipt.

Tracking number verification

[END OF SECTION

11 Bureau of Engraving and Printing 2031ZA24Q00307

SECTION D – PACKAGING AND HANDLING

The following instructions are required for any shipments to the BEP:

D.1 NOTICE OF PACKAGING SLIP REQUIREMENTS

The following outlines the Bureau of Engraving and Printing’s packaging slip requirements to ensure efficient processing of shipments to the DCF:

• The Bureau of Engraving and Printing requires that all packaging slips be placed in a self-adhesive pack list envelope and affixed to the outside a shipment.

• The packing slip shall include, at minimum the following information:

D.2 GENERAL ITEMS – INFORMATION REQUIRED FOR EACH SHIPMENT

• Contract Number – The contract number BEP assigned to this purchase.

• Shipping Address – Point from which the merchandise was shipped.

• Telephone Number – The telephone number of the vendor contact to be called for inquires related to the merchandise.

• Customer Information – The name and telephone number of the party to which the merchandise is being shipped.

• Total Weight of Packages, Item number and the total number of items within the current shipment.

• If items are drop shipped from a supplier, you must ensure the proper contract number is written on the packaging slip by your supplier.

D.3 LINE ITEMS – INFORMATION REQUIRED FOR EACH LINE ITEM INCLUDED IN THE

SHIPMENT

• Manufacturer Product Identification – Item Number assigned by manufacturer/supplier.

• Quantity Ordered – Quantity on the purchase order or unit of measurement.

• Quantity Shipped – With the packing slip.

• Quantity Backordered, where applicable.

D.4 NOTICE OF SHIPPING LABEL REQUIREMENTS

Every box/skid must have at least one shipping label applied to it. The label is to include, at minimum, the following information:

• Manufacturer or Supplier – Name of Manufacturer or supplier/and

• Shipping Address – Point from which the merchandise was shipped/and

• BEP Contract Number – PO# or CC order #/and

• Customer Name & Telephone Number – First and last name, building and room #.

The vendor shall ensure that all items shipped to the BEP are properly labeled. Items may include but not be limited to closed containers, sealed boxes, wrapped packages, or strapped palettes. Failure to adhere to the packing slip and shipping label requirements could result in shipment rejection, processing delay, and payment delay. **

12 Bureau of Engraving and Printing 2031ZA24Q00307

SECTION E – INSPECTION AND ACCEPTANCE

13 Bureau of Engraving and Printing 2031ZA24Q00307

SECTION F – DELIVERY OR PERFORMANCE

F.1 PLACE OF DELIVERY

Deliverables as required during the performance of this contract shall be delivered F.O.B destination.

The equipment and supplies identified shall be delivered to the following address:

Bureau of Engraving and Printing Washington, District Currency Facility 14th and C Streets, S.W.

Washington, DC 20228

If the installation location changes during the performance period, the Government shall notify the vendor of the new address. The new location shall be inside of a 30-mi. (48 km) radius from the District of Columbia

F.2 NOTIFICATION OF DELIVERY

The vendor shall be responsible for providing all materials and services required for the delivery and placement of the equipment, all support equipment, and supplies at the designated installation site(s) within the BEP. The delivery services shall also include all freight, rigging, unpacking, and removal of packing materials from BEP premises. The BEP shall not provide any assistance during deliveries.

The vendor shall notify the COR seven (7) days prior to scheduling equipment deliveries. Copies of the packing lists shall be included with this notification and a list of vendor employees who shall need access to the BEP to perform installation and testing of the equipment.

F.3 DELIVERIES TO WASHINGTON, DC ANNEX BUILDING

LOADING DOCK ON “D” STREET SW, BETWEEN 13th & 14th STREETS SW): Vendors must call the appointment hotline at (202) 874-2333 twenty-four (24) hours in advance to schedule approximate delivery times. The hotline is manned from 6:30 am to 2:15 pm Monday through Friday.

A voicemail message maybe left after normal working hours. Deliveries are accepted between 8:00 am and 2:15 pm, Monday through Friday, excluding holidays.

Over the road vehicles having an overall height exceeding 12”6” (3.8 meters) empty, or an overall length exceeding 42’ (12.2 meters) cannot be accommodated at our receiving platform.

To resolve any delivery issue, please contact Shipping & Receiving at (202) 874-3620 care of Material Handler/Leader.

F.4 BEP YEAR END SHUTDOWN PERIOD AND FEDERAL HOLIDAYS

(a) BEP observes the federal holidays that are listed on the Office of Personnel website at:

https://www.opm.gov/fedhol/. The Presidential Inauguration Day is applicable only to the Washington, DC Currency Facility (DCF).

(b) BEP’s Y.E.S. Period typically occurs December 25th through January 1st of each calendar year.

https://www.opm.gov/fedhol/

14 Bureau of Engraving and Printing 2031ZA24Q00307

SECTION G – CONTRACT ADMINISTRATION DATA

G.1 CONTRACT ADMINISTRATION OFFICE

(a) This contract shall be administered by:

Bureau of Engraving and Printing Office of the Chief Procurement Officer 14th and C Streets, S.W.

Washington, D.C. 20228-0001

(b) Written communication to the Contracting Officer shall make reference to the contract number.

G.2 DTAR 1052.201-70, Contracting Officer’s Representative (COR) Appointment and Authority

(APR 2015)

(a) The COR SHALL BE APPOINTED AT CONTRACT AWARD.

(b) Performance of work under this contract is subject to the technical direction of the COR identified above, or a representative designated in writing. The term “technical direction” includes, without limitation, direction to the Contractor that directs or redirects the labor effort, shifts the work between work areas or locations, and/or fills in details and otherwise serves to ensure that tasks outlined in the work statement are accomplished satisfactorily.

(c) Technical direction must be within the scope of the contract specification(s)/work statement. The COR does not have authority to issue technical direction that:

(1) Constitutes a change of assignment or additional work outside the contract specification(s)/work statement;

(2) Constitutes a change as defined in the clause entitled “Changes”;

(3) In any manner causes an increase or decrease in the contract price, or the time required for contract performance;

(4) Changes any of the terms, conditions, or specification(s)/work statement of the contract;

(5) Interferes with the Contractor's right to perform under the terms and conditions of the contract; or

(6) Directs, supervises or otherwise controls the actions of the Contractor's employees.

(d) Technical direction may be oral or in writing. The COR must confirm oral direction in writing within five workdays, with a copy to the Contracting Officer.

(e) The Contractor shall proceed promptly with performance resulting from the technical direction issued by the COR. If, in the opinion of the Contractor, any direction of the COR or the designated representative falls within the limitations of (c) above, the Contractor shall immediately notify the Contracting Officer no later than the beginning of the next Government workday.

(f) Failure of the Contractor and the Contracting Officer to agree that technical direction is within the scope of the contract shall be subject to the terms of the clause entitled “Disputes.”

(End of clause)

G.3 DTAR 1052-223-7003, Electronic Submission of Payment Requests (APR 2015)

(a) Definitions. As used in this clause—

(1) “Payment request” means a bill, voucher, invoice, or request for contract financing payment with associated supporting documentation. The payment request must comply with the requirements identified in FAR 32.905(b), “Content of Invoices” and the applicable Payment clause included in this contract.

15 Bureau of Engraving and Printing 2031ZA24Q00307

(b) Except as provided in paragraph (c) of this clause, the Contractor shall submit payment requests electronically using the Invoice Processing Platform (IPP). Information regarding IPP, including IPP Customer Support contact information, is available atwww.ipp.gov or any successor site.

(c) The Contractor may submit payment requests using other than IPP only when the Contracting Officer authorizes alternate procedures in writing in accordance with Treasury procedures.

(a) If alternate payment procedures are authorized, the Contractor shall include a copy of the Contracting Officer's written authorization with each payment request. (End of clause)

16 Bureau of Engraving and Printing 2031ZA24Q00307

SECTION H – SPECIAL CONTRACT REQUIREMENTS

H.1 TYPE OF CONTRACT

This is a Firm Fixed-Price type contract.

H.2 INTERPRETATION OF CONTRACT REQUIREMENTS

No interpretation of any provision of this contract, including applicable specification(s)/work statement, shall be binding on the Government unless furnished or agreed to in writing by the Contracting Officer (CO).

H.3 NOTICE TO THE GOVERNMENT OF DELAYS

In the event the Contractor encounters difficulty in meeting performance requirements, or when it anticipates difficulty in complying with the contract delivery schedule or date, or whenever the Contractor has knowledge that any actual or potential situation is delaying or threatens to delay the timely performance of this contract, the Contractor shall immediately notify the CO and the COR, in writing, giving pertinent details, provided, however, that this data shall be informational only in character and that this provision shall not be construed as a waiver by BEP of any delivery schedule or date or of any rights or remedies provided by law or under this contract.

H.4 NON-DISCLOSURE OF NON PUBLIC INFORMATION AND DATA

During the period of performance of the contract, the Contractor may be granted access to Non Public information and data, which is the sole property of BEP, as well as proprietary information and data, which is the sole property of entities other than the contracting parties. In particular, the Contractor agrees that all information provided by representatives of BEP, either before or after contract award, concerning the design, manufacture, processing or transporting of United States currency is nonpublic.

Such information shall be shared only with employees or agents of the company having a need to know, and shall not be disclosed to other persons without the written consent of the CO.

Further, the Contractor agrees to maintain the confidentiality of all such information and data and shall not disclose any information and data, interpretations of, and/or derivatives of, such information and data to any unauthorized party without the express written approval of the CO, or of the party in which title is wholly vested. The Contractor hereby agrees to include this clause in all subcontracts or consulting agreements relating to work under this contract. The Contractor shall be required to sign a Non-Disclosure Agreement.

H.5 INDEMNIFICATION

(a) Responsibility for Government Property: The Contractor assumes full responsibility for and shall indemnify the Government against any and all losses or damage of whatsoever kind and nature to any and all Government property, including any equipment, supplies, accessories, or parts furnished, while in his custody and care for storage, repairs, or service to be performed under the terms of this contract, resulting in whole or in part from the negligent acts or omissions of the Contractor, any subcontractor, or any employee, agent or representative of the Contractor or subcontractor.

If due to the fault, negligent acts (whether of commission or omission) and/or dishonesty of the Contractor or its employees, any Government-owned or controlled property is lost or damaged as a result of the Contractor's performance of this contract, the Contractor shall be responsible to the Government for such loss or damage, and the Government, at its option, may in lieu of payment thereof, require the Contractor to replace at his own expense, all property lost or damaged.

17 Bureau of Engraving and Printing 2031ZA24Q00307

(b) Hold Harmless and Indemnification Agreement: The Contractor shall save and hold harmless and indemnify the Government against any and all liability claims, and cost of whatsoever kind and nature for injury to or death of any person or persons and for loss or damage to any Contractor property or property owned by a third party occurring in connection with or in any way incident to or arising out of the occupancy, use, service, operation, or performance of work under the terms of this contract, resulting in whole or in part from the acts or omissions of the Contractor, any subcontractor, or any employee, agent, or representative of the Contractor or subcontractor.

(c) Government's Right of Recovery: Nothing in the above paragraphs shall be considered to preclude the Government from receiving the benefits of any insurance the Contractor may carry which provides for the indemnification of any loss or destruction of, or damages to property in the custody and care of the Contractor where such loss, destruction or damage is to Government property. The Contractor shall do nothing to prejudice the Government's right to recover against third parties for any loss, destruction of, or damage to Government property, and upon the request of the Contracting Officer shall, at the Government's expense, furnish to the Government all reasonable assistance and cooperation (including assistance in the prosecution of suit and the execution of instruments of assignment in favor of the Government) in obtaining recovery.

(d) Government Liability: The Government shall not be liable for any injury to the Contractor's personnel or damage to the Contractor's property unless such injury or damage is due to negligence on the part of the Government and is recoverable under the Federal Torts Claims Act, or pursuant to other Federal statutory authority.

H.6 ORGANIZATIONAL CONFLICTS OF INTEREST

(a) The Contractor warrants that, to the best of the Contractor’s knowledge and belief, there are no relevant facts or circumstances which could give rise to an organizational conflict of interest (OCI), as defined in FAR 9.5, Organizational and Consultants Conflicts of Interest, or that the Contractor has disclosed all such relevant information.

(b) The Contractor agrees that if an actual or potential OCI is discovered after award, the Contractor shall make a full disclosure in writing to the Contracting Officer. This disclosure must include a description of actions, which the Contractor has taken or proposes to take, after consultation with the Contracting Officer, to avoid, mitigate, or neutralize the actual or potential conflict.

(c) The Contracting Officer may terminate this contract for convenience, in whole or in part, if it deems such termination necessary to avoid an OCI. If the Contractor was aware of a potential OCI prior to award or discovered an actual or potential conflict after award and did not disclose or misrepresented relevant information to the Contacting Office, the Government may terminate the contract for default, debar the Contractor from Government contracting, or pursue such other remedies as may be permitted by law or this contract.

(e) The Contractor must include this clause in all subcontracts and in lower tier subcontracts unless a waiver is requested from, and granted by, the Contracting Officer.

(f) In the event that a requirement changes in such a way as to create a potential conflict of interest for the Contractor, the Contractor must:

1) Notify the Contracting Officer of a potential conflict, and;

2) Recommend to the Government an alternate approach which would avoid the potential conflict, or

3) Present for approval a conflict of interest mitigation plan that shall:

18 Bureau of Engraving and Printing 2031ZA24Q00307

• Describe in detail the changed requirement that creates the potential conflict of interest;

and

• Outline in detail the actions to be taken by the Contractor or the Government in the performance of the task to mitigate the conflict, division of subcontractor effort, and limited access to information, or other acceptable means.

4) The Contractor must not commence work on a changed requirement related to a potential conflict of interest until specifically notified by the Contracting Officer to proceed.

5) If the Contracting Officer determines that it is in the best interest of the Government to proceed with work, notwithstanding a conflict of interest, a request for waiver must be submitted in accordance with FAR 9.503.

H.7 DISCLOSURE OF CONFLICTS OF INTEREST

It is the BEP policy to award contracts to only those Quoters whose objectivity is not impaired because of any related past, present, or planned interest, financial or otherwise, in organizations regulated by BEP or in organizations whose interests may be substantially affected by Departmental activities.

Based on this policy, if at any time during the performance of this contract the Contractor knows of any Conflict of Interest situation affecting the organization, any of its officers or Key Persons working under this contract, has reason to believe that a conflict of interest situation might arise, or is made aware of an actual or potential conflict of interest situation:

(a) The Contractor shall immediately provide to the Contracting Officer a written statement which describes in a concise manner all past, present or planned organizational, financial, contractual or other interest(s) with that organization regulated by BEP, or with that organization or individual whose interests may be substantially affected by Departmental activities, and which is related to the work under this contract. The interest(s) described shall include those of the Contractor, its affiliates, consultants, Subcontractors, and key personnel of any of the above. Past interest shall be limited to within one year of the date of the quoter's technical quote. Key personnel shall include any person owning more than 20% interest in the organization, and the organization's corporate officers, its senior managers and any employee who is responsible for making a decision or taking an action on this contract where the decision or action can have an economic or other impact on the interests of a regulated or affected organization.

(b) The Contractor shall describe in detail when it became aware of the actual or potential conflict of interest, what action the organization has taken or proposes to take to mitigate and / or rectify the situation, and why it believes, in light of the interest(s) identified in (a) above, that performance of the contract can still be accomplished in an impartial and objective manner.

(c) In the absence of any relevant interest identified in (a) above, the Contractor shall certify in its statement that to its best knowledge and belief no affiliation exists relevant to possible conflicts of interest. The Contractor must obtain the same information from any potential Subcontractors prior to award of a subcontract.

(d) The Contracting Officer shall review the statement submitted and may require additional relevant information from the Contractor. All such information, and any other relevant information known to BEP, shall be used to determine whether a conflict of interest exists or a situation exists that may create a conflict of interest. If any such conflict of interest is found to exist, the Contracting Officer may (1) terminate the contract, or (2) determine that it is otherwise in the best interest of the United States to continue the contract with the Contractor and (3) modify the contract to include appropriate provisions to mitigate or avoid such conflicts in the contract.

(e) If the Contractor refuses to provide the written statement called for in paragraph (a), or any additional information that the Contracting Officer may require, the Contracting Officer may terminate the Contract for convenience if he or she deems that termination is in the best interest of the Government.

19 Bureau of Engraving and Printing 2031ZA24Q00307

H.8 IDENTIFICATION OF CONTRACT EMPLOYEES

All contract personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.

All Contractor personnel shall clearly identify themselves as a Contractor and shall be required to wear identification (ID) badges in a visible location on the front of exterior clothing, above the waist, (except when safety or health reasons prevent such placement). ID badges shall be worn at all times when performing work. ID badges shall have an identification picture and shall state the name of the individual and the company they represent. Contractor personnel are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their Contractor-owned or privately owned vehicle while on BEP premises.

H.9 EVALUATION OF CONTRACTOR PERFORMANCE

(a) Interim and final evaluations of Contractor performance shall be prepared for this contract in accordance with FAR 42.1503. The final performance evaluations shall be prepared at the time of completion of work.

(b) The Contractor can elect to review the evaluation and submit additional information or a rebuttal statement. The Contractor shall be permitted 60 calendar days to respond. Contractor response is voluntary. If the Contractor does not respond within 60 days, the Government shall presume that the Contractor has no comment. Any disagreement between the parties regarding an evaluation shall be referred to an individual at a level above the Contracting Officer, whose decision is final.

(c) Copies of the evaluations, Contractor responses, and review comments, if any, shall be retained as part of the contract file, and may be used to support future award decisions.

Bureau of Engraving and Printing utilizes the Contractor Performance Assessment Reporting System (CPARS) and the Federal Awarded Performance and Integrity Information System (FAPIIS) to record and maintain past performance information. The past performance systems hosts a suite of web-enabled applications that are used to document Contractor performance information that is required by Federal Regulations.

The CPARS module assesses performance on contracts for Systems, Services, Information Technology, and Operations Support, Architect-Engineer contracts, and performance on Construction contracts. CPARS reference material can be accessed at https://cpars.cpars.gov/cpars/app/home.do

Federal Awarded Performance and Integrity Information System (FAPIIS) http://www.fapiis.gov/fapiis/govt/datareports.jsp

The registration process requires the Contractor to identify an individual that shall serve as a primary contact. This individual shall be authorized access to the evaluation for review and comment. In addition, the Contractor is encouraged to identify a secondary contact in the event the primary contact is unavailable to process the evaluation within the required 60-day time period. After the BEP Contract Specialist registers the contract in one of the systems listed above, the Contractor shall receive a system generated e-mail notifying him/her that the contract is registered. A system generated e-mail shall also provide the Contractor with a User ID if the person does not already have a system User ID.

Once a performance evaluation has been prepared and is ready for comment, the Contractor representative shall receive a system generated e-mail notification that the performance evaluation is https://cpars.cpars.gov/cpars/app/home.do

20 Bureau of Engraving and Printing 2031ZA24Q00307 electronically available for review and comment. The Contractor representative shall receive an automated e-mail whenever an assessment is completed and can subsequently retrieve the completed assessment from system. Contractors may access evaluations at one of the website listed above for review and comment in CPARS.

H.10 SAFETY

State “Right to Know” laws and 29 CFR 1910.1200, Employees Hazard Communication Program, require manufacturers, importers, and suppliers to label containers of toxic substances or hazardous chemicals with the chemical name and appropriate hazard warning and to provide Material Safety Data Sheets (MSDS) for these substances. Hazard Material Information not meeting the requirement shall not be accepted (off-loaded) by the BEP.

All machinery delivered under this contract shall be in accordance with the BEP’s Safety, Health and Environmental requirements.

H.11 ACCIDENT PREVENTION

The Contractor shall comply with safety practices as may be deemed necessary by the Bureau Safety Manager to ensure the safety and health of Contractor and Bureau employees.

When the Contractor’s performance requires the use of power-activated devices for welding, cutting or burning using open-flame or electric-arc equipment, the Contractor shall provide no less than three

(3) days advanced written notice to the COR requesting approval for the use of the power-activated devices. The COR shall obtain clearance of such use through the Bureau Safety Manager and provide written confirmation of approval or disposal to the Contractor.

The Contractor shall take any other precautions necessary to protect all persons against injury at the work site and shall be held responsible for all damages to persons and property that occur as a result of his fault or negligence in performing the contract work.

Any Contractor personnel that are deemed to be working in an unsafe manner or endangering their own or others health may be removed from the Bureau under order of the Contracting Officer. Any Contractor personnel removed for failure to maintain a safe and healthy work environment may not be allowed to return to the Bureau’s property.

H.12 BUREAU WORKING RESTRICTIONS

When the project specifications permit the undertaking of contract work during Bureau working hours, such work must be performed without:

• Interfering with Government business.

• Unduly restricting traffic.

• Causing unsafe conditions for employees and visitors; and

• Adversely affecting the operation of Bureau equipment.

When, the Contracting Officer has determined that the Contractor’s work is in violation of any of the four restrictions above, the Contractor shall be required to perform the work at such time and under such conditions as are in the best interest of the Bureau. In this connection, the directions of the Contracting Officer shall be binding and shall be executed by the Contractor at no additional cost to the Government.

H.13 PARKING

All vehicles entering the facility are subject to inspection. There is no available parking at the DCF.

21 Bureau of Engraving and Printing 2031ZA24Q00307

H.14 UTILITIES PROVIDED

For the purpose of this contract, utilities such as water, electricity, etc., shall be furnished by the Government at no cost to the Contractor for the preparation and performance of the BAT and installation of the equipment at the Bureau. All extensions, wiring, hoses, etc., required for connection to such utilities shall be furnished by the Contractor. The Contractor shall be required to participate in all BEP utility conservation programs. Long distance and FTS telephone services shall not be provided. If the Contractor anticipates any interruption to a utility service, the Contractor shall provide written notification to the COR 10 calendar days prior to the utility interruption.

H.15 BUREAU’S REGULATIONS

All persons working on Bureau premises under the terms of the Contract shall, while on the premises, be under the administrative direction of the Contracting Officer and shall be subject to all general rules and regulations governing the Bureau and, in particular, all applicable security regulations. If the contract requires contract employees to work on Bureau premises for a period of time exceeding five calendar days, such employees shall be subject to an appropriate preliminary personnel security check to be conducted by the Bureau's Office of Security. Such employees shall be approved by the Contracting Officer prior to commencing work on the premises. Employees who do not meet established security criteria shall not be permitted to work on the premises.

H.16 PERMITS AND LICENSES – GENERAL

In the performance of work hereunder, the Contractor shall obtain and maintain in effect all necessary permits and licenses required by Federal, State, or local government, or subdivision thereof, or of any other duly constituted…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .