RFQ 2026-015 MMC Optimization CMAR v2.pdf
PDF 259 KB Posted
- Solicitation number
- 2026-015, Proj FA117
- Issued by
- Pima County, Arizona
About this file
This is a Request for Statement of Qualifications (RFQ) issued by the Town of Marana, Arizona, for Construction Manager at Risk (CM@R) services for the Ed Honea Marana Municipal Complex Optimization Plan (Project FA117, BID NO. 2026-015). The Town seeks a qualified professional firm to provide pre-construction and construction services for the remodeling of floors 1, 2, and 3 of Building A and floors 1 and 2 of Building B at 11555 W. Civic Center Drive, Marana, Arizona 85653. The project scope includes cubicle reconfigurations, office modifications, conference rooms, lobby areas, kitchenettes, gymnasium renovations, and shared spaces, with potential mechanical, electrical, and plumbing modifications. The project must conform to the Facilities Master Plan and Town of Marana Design Standards Manual. The mandatory pre-submittal conference is scheduled for December 3, 2026, at 10:00 a.m., with a site visit to follow. Statements of Qualifications are due December 18, 2026, by 3:00 p.m. local time. Contractor Performance Inquiry forms from references must be received by December 17, 2026, by 3:00 p.m. The selected contractor will execute a Construction Manager at Risk Contract for pre-construction services and, if the Guaranteed Maximum Price (GMP) is successfully negotiated, will proceed with construction services.
The RFQ does not request fees, pricing, man-hours, or any other cost information during the SOQ evaluation or interview process. The selection process follows Arizona Revised Statutes, Title 34, Chapter 6, Article 1, and will be conducted by an Evaluation Committee consisting of three Town representatives, a registered architect or engineer, and a licensed contractor. The Committee will select three to five qualified firms for interviews based on established evaluation criteria covering pre-construction services team qualifications (15 points), construction services team qualifications (15 points), pre-construction capabilities (20 points), construction capabilities (15 points), past CMAR project performance (15 points), safety record (10 points), and subcontractor selection plan (10 points). The highest-ranked firm will enter fee negotiations; if negotiations fail, the Town will proceed with the next-ranked firm. No set-asides are specified. All submittals become Town property subject to public records requests. The contractor must obtain and maintain a current Town Business License and is subject to annual performance reviews.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
00083572.DOC /1
TOWN OF MARANA
FINANCE DEPARTMENT
11555 W. CIVIC CENTER DRIVE
MARANA, ARIZONA 85653
(520) 382-1999
REQUEST FOR
STATEMENT OF QUALIFICATIONS
OF FIRMS INTERESTED IN
PERFORMING CONSTRUCTION MANAGER AT RISK SERVICES
FOR ED HONEA MARANA MUNICIPAL COMPLEX (MMC)
OPTIMIZATION PLAN
PROJECT NO. FA117
FOR
THE TOWN OF MARANA
BID NO. 2026-015
November 2027
WT073, CMAR ii
TABLE OF CONTENTS
INFORMATION AND INSTRUCTIONS FOR THE PREPARATION AND SUBMITTAL OF STATEMENT
OF QUALIFICATIONS FOR
GENERAL SCOPE OF SERVICES:
DESCRIPTION OF SERVICES:
MANDATORY PRE-SUBMITTAL CONFERENCE IS SCHEDULED
CONTRACTOR SELECTION PROCESS:
RIGHT TO REVIEW AND EVALUATE PERFORMANCE:
NON-RESPONSIVE SUBMITTALS:
REJECTION OF SUBMITTAL:
WITHDRAWAL OR CHANGE OF SUBMITTAL:
NO CONSTITUTION OF OBLIGATION:
AWARD OF CONTRACT:
INSTRUCTION FOR SUBMITTAL:
INSTRUCTIONS, FORMAT AND EVALUATION CRITERIA FOR STATEMENT OF
QUALIFICATIONS:
FORMATTING REQUIREMENTS:
SECTION I. COVER LETTER
SECTION II. CONTRACTOR’S STATEMENT OF QUALIFICATIONS:
EVALUATION CRITERIA:
SECTION III. EXHIBITS:
EXHIBIT A – CONTRACTOR INFORMATION SHEET
EXHIBIT B – CONTRACTOR 3 YEAR HISTORY
EXHIBIT C – CONTRACTOR PERFORMANCE HISTORY
EXHIBIT D - FORM OF CMAR CONTRACT FOR PRE-CONSTRUCTION SERVICES SEPARATE FILE
EXHIBIT E - FORM OF CONTRACT BETWEEN OWNER & CONTRACTOR (GMP) . SEPARATE FILE
EXHIBIT F - FORM OF CMAR TERMS & CONDITIONS ......................................... SEPARATE FILE
Rudy Torres Update table as needed
FA117, 2026-015 CMAR 3
INFORMATION AND INSTRUCTIONS FOR THE PREPARATION AND SUBMITTAL OF STATEMENT
OF QUALIFICATIONS FOR
PERFORMING CONSTRUCTION MANAGER AT RISK SERVICES (CMAR) FOR
CONSTRUCTION SERVICES
FOR
MMC OPTIMIZATION PLAN
PROJECT NO. FA117
BID NO. 2026-015
In the Town of Marana Pima County, Arizona
Statement of Qualifications Due December 18, 2026, 3:00 p.m. local time.
Notice is hereby given that the Town of Marana, hereinafter referred to as the “Town,” is conducting a competitive process to retain one Contractor to provide Construction Manager at Risk (CMAR) Services, including pre-construction and construction services for the MMC Optimization Plan.
The Town invites interested firms to submit written Statements of Qualifications (SOQ) relating to this solicitation. A Selection Committee will evaluate the firm’s qualifications and experience with similar projects through the evaluation process described in the RFQ. Those firms deemed best qualified shall be invited to an interview process. The invited finalists will be provided with interview criteria and instructions. After the Selection Committee evaluates the proposals and completes the interview process, the highest-ranked firm will enter into negotiations with the TOWN for fees under the contract.
All submittals shall become the property of the Town, subject to public record requests, and any portion thereof may be subject to publication and/or public review, pursuant A.R.S. § 39-121 et seq.
SOQ will be accepted up to, but no later than, the date and time shown above/ SOQ shall be delivered to the 1st Floor Receptionist at or mailed to Marana Municipal Complex, Finance Department, 11555 West Civic Center Drive, Marana, Arizona 85653, all in accordance with the provisions herein. Any SOQ submitted after the time and date specified herein will not be considered. A SOQ received by the Town in accordance with the requirements herein will be processed to identify eligible Contractors for the selection process.
The Solicitation Documents providing information and instructions for the SOQ for the MMC Optimization Plan will be available at:
http://www.publicpurchase.com/gems/marana.az/buyer/public/home.
Questions can be addressed to Rudy Torres at rtorres@maranaaz.gov. Issues with the function of the Public Purchase website are best directed to Public Purchase through the “Chat” tab on the left-hand side of the toolbar.
ADVERTISEMENT DATES: NOVEMBER 23 and 30, 2026 http://www.publicpurchase.com/gems/marana.az/buyer/public/home mailto:rtorres@maranaaz.gov
FA117, 2026-015 CMAR 4
GENERAL SCOPE OF SERVICES:
Introduction
The Town of Marana Public Works Department seeks to retain the services of a qualified, professional firm (Contractor) to provide Construction Manager at Risk (CM@R) Pre-Construction and Construction Services specific to the Ed Honea Marana Municipal Complex located at 11555 W. Civic Center Drive, Marana, AZ 85653. The scope of this project is to remodel floors 1, 2, & 3 of Building A and floors 1 & 2 of Building B of the complex to optimize space within the facility. This project includes cubicle configurations, potential office modifications, conference rooms, lobby areas, kitchenettes, the gym, and other shared spaces. The project will utilize existing cubicles and match new cubicle purchases to the existing cubicles as closely as possible. The project will include new furniture for new offices, as well as furniture updates and replacements as needed. This project may include mechanical, electrical, and plumbing modifications. The project shall conform to the Facilities Master Plan and Town of Marana Design Standards Manual.
The selected CM@R shall work closely with the Architect during the programming phase to determine the project phasing. A phased approach to design and/or construction may be selected based on the analysis conducted during the programming phase, and the needs of the Town and its various affected departments.
Project Location The Ed Honea Marana Municipal Complex is located at 11555 W. Civic Center Drive, Marana, Arizona 85653. The work is within the jurisdictional limits of the Town on property owned by the Town.
DESCRIPTION OF SERVICES:
Pre-Construction Services The Contractor selected to provide CMAR pre-construction services for the MMC Optimization Plan will work closely with the Town and BWS Architects to develop the following:
• Provide detailed cost estimating and knowledge of marketplace conditions;
• Provide a comprehensive critical path method, resource-loaded construction schedule with detailed phasing and sequencing;
• Provide long-lead procurement studies and initiate procurement of long-lead items, as necessary.
• Provide quality and quantity reviews of the plans and specifications.
FA117, 2026-015 CMAR 5
• Provide complete GMP proposals with assumptions to the Town.
• Propose cost-saving and/or value engineering initiatives that accommodate the design intent.
• Work cooperatively with the Town and the Architect to develop high-quality plans, specifications, and a construction schedule to accommodate the CM@R means and methods for construction of the project.
• Work cooperatively with the Town and Architect to determine a construction phasing plan.
• Perform pre-construction advanced preparation services prior to the construction phase.
• Ensure that all contract language, specifications, equipment, and materials comply with all local and state building codes.
• Work closely with the Town, Architect, and vendors to determine timing for ordering, delivery, and installation of Furniture, Fixtures, and Equipment
(FF&E).
• Conduct Hazardous Materials Testing.
Construction Services The Contractor selected for the pre-construction services will be asked to develop a guaranteed maximum price (GMP) for the construction phase of the Ed Honea Marana Municipal Complex Space Optimization Project. If the GMP is successfully negotiated with the Town, the Contractor will be authorized to proceed with the construction phase utilizing the construction schedule and phasing plans developed during the pre-construction services.
General Services
The Construction Manager at Risk (“CM@R” or “Contractor” herein) shall attend regularly scheduled meetings and assist the Owner and Design Professional during the Pre-Construction Phase consistent with the Terms and Conditions described herein.
CMA@R shall provide one of its employees to act as a Representative to the Town. CM@R's Representative shall be reasonably available to the Town and shall have the necessary expertise and experience required to supervise the Contract Services. CM@R's Representative shall communicate regularly with the Town, but not less than once a week, and shall be vested with the authority to act on behalf of the CM@R. CM@R’s Representative may only be replaced with the approval of the Town.
Design Review and Analysis
The CM@R will evaluate periodically the availability of labor, materials/equipment, building systems, cost-sensitive aspects of the design;
FA117, 2026-015 CMAR 6
and other factors that may impact the cost estimate, GMP Proposals and/or the Project Schedule.
CM@R shall visit the Site and become familiar with existing conditions under which the Work is to be performed and correlate personal observations with requirements of the Contract Documents.
The CM@R will meet with the Project Team as required to review designs during their development. The CM@R will familiarize itself with the evolving documents through the design phase. The CM@R will proactively advise the Project Team and make recommendations on factors related to construction costs, and concerns pertaining to the feasibility and practicality of any proposed means and methods, selected materials, equipment and building systems, and labor and material availability. The CM@R will furthermore advise the Project Team on proposed site improvements and concerns that exist with respect to coordination of the Drawings and Specifications. The CM@R will recommend cost-effective alternatives. The CM@R shall thoroughly familiarize themself with the evolving documents through Construction Document Phase.
CM@R may be requested to provide the following but not exclusive services/deliverables:
Project Review, to include a written evaluation of the Owner's project program and project budget, each in terms of the other with recommendations on the appropriateness of each.
Constructability Review, to include an analysis and report on the Construction Documents to indicate if they are consistent, coordinated, practical, feasible and constructible. CM@R shall notify the Owner, that to the best of its knowledge, the work described in the plans and specifications for the various bidding packages is constructible within the Owner's scheduled construction time.
Value Engineering includes a review of the Site, systems, materials, construction feasibility, installation and construction costs, relative costs, and provides recommendations to the Owner and Design Professional for economies as appropriate.
The CM@R shall promptly notify the Design Professional and Owner in writing of any noted deficiencies or variances in respect to applicable laws, statutes, ordinances, building codes, rules and regulations
When Project requirements have been sufficiently identified but no later than 20 days after acceptance of schematic or 30% design, the CM@R shall
FA117, 2026-015 CMAR 7
prepare, and thereafter periodically update, a project schedule, based on a Critical Path Method (CPM) for the Design Professional's and Owner's review and approval.
The CM@R shall review the design and make recommendations regarding the phased issuance of Construction Documents to facilitate phased construction of the Work. They shall take into consideration such factors as natural and practical lines of severability, sequencing effectiveness, access and availability constraints, total time for completion, construction market conditions, availability of labor and materials, and any other factors pertinent to saving time and cost.
The CM@R shall recommend to the Owner and Design Professional a list and a schedule for the procurement by the Owner of long-lead time items, which will be required to meet the Project Schedule.
If the Owner determines that it is in their own best interest to have the CM@R procure such long-lead time items, the Owner may, at its sole discretion, direct the CM@R to solicit bids.
Unless otherwise agreed to by the Project Team, within 14 days after receipt of the documents for the various phases of design, the CM@R shall provide a detailed cost estimate and a written review of the documents. The Design Professional and CM@R shall reconcile any disagreements on the estimate to arrive at an agreed cost. If no consensus is reached, the Owner will make the final determination.
The CM@R shall submit to the Town and the Architect as-built drawings throughout the construction phase to ensure they are updated monthly, current, and reflect all RFI, ASI, or other changes made in the field during the course of construction. As-built records shall be submitted to the Town and the Architect in an appropriate format for their review and acceptance.
The CM@R shall develop bidder interest for each trade in the Work for approval by the Owner and solicit bids for the various work categories. The CM@R shall distribute plans and specifications, and when appropriate, conduct pre-bid conferences with prospective bidders.
The Contractor shall, at its expense, obtain all necessary permits and licenses for work performed under the Contract, and shall give all necessary notices required by laws, ordinances, rules, regulations and lawful orders of public authorities pertaining to performance of the Work, public health and safety.
After approval of the GMP and the amendment, including bonds, insurance, and signatures, and before the commencement of any Work, the Owner's
FA117, 2026-015 CMAR 8
Representative will schedule a pre-construction conference. CM@R attendees shall include, at a minimum, the CM@R's Representative, who is authorized to execute and sign documents on behalf of the firm, the job superintendent, and the CM@R's safety officer.
Control of the Work
CM@R shall provide through itself or Subcontractors the necessary supervision, labor, inspection, testing, start-up, material, equipment, machinery, temporary utilities and other temporary facilities to permit CM@R to complete the Work consistent with the Contract Documents.
CM@R shall provide and display (2) Construction Zone signs during active construction.
Shop Drawings Product Data and Samples
The CM@R shall review, approve, verify, and submit to the Owner five copies of each Shop Drawing, Product Data, Sample, and similar submittal required by the Contract Documents in accordance with the approved GMP schedule as to cause no delay in the Work or in the activities of the Owner or of separate contractors. Submittals made by the CM@R, which are not required by the Contract Documents, may be returned without action.
The CM@R shall at the time of Substantial Completion, submit Project Record Drawing prints and Shop Drawings to the Owner or its representative for review and comment.
Phased GMPs. The CM@R may be requested to provide individual GMP proposals for specific construction phases of this Project. These individual phase GMP proposals shall be based on the specific phase construction documents and will be prepared in accordance with the procedures identified in this Section.
MANDATORY PRE-SUBMITTAL CONFERENCE IS SCHEDULED
A mandatory Pre-Submittal Conference (Conference) will be held to provide an overview of the project and provide an opportunity for interested Contractors to ask questions of the project team. The Conference will be held at the Marana Municipal Complex, 11555 W. Civic Center Drive, Marana, Arizona 85653, on December 3, 2026, at 10:00 a.m. in the Conference Center, followed by a site visit for all contractors interested in walking the facility. Contractors who do not attend the pre-submittal conference will not be allowed to submit for this solicitation.
Technical questions regarding this RFQ shall be submitted by email to rtorres@maranaaz.gov no later than December 9, 2026, at 3:00 p.m. An
FA117, 2026-015 CMAR 9
addendum will be issued providing the Town’s responses to written questions.
DO NOT POST QUESTIONS ON THE PUBLIC PURCHASE WEBSITE.
CONTRACTOR SELECTION PROCESS:
The selection process will follow the requirements of Arizona Revised Statutes, Title 34, Chapter 6, Article 1. The Evaluation Committee will consist of three representatives from the Town, a registered architect or engineer, and a licensed contractor not submitting a SOQ for this project.
This RFQ does not request, nor will the Evaluation Committee request or consider, fees, price, man-hours, or any other cost information at any point in the review and scoring of SO Qs or during the interview process.
The selection process will consist, at a minimum, of the submittal and evaluation of SOQs by the Evaluation Committee. The Evaluation Committee will review and score the SOQs according to the criteria detailed in this RFQ.
The tabulation of individual evaluators’ submittal rankings will be used to rank the SOQs. The Evaluation Committee shall select no less than three nor more than five of the SOQs, and those Contractors will be notified of their selection for interviews.
The Town will invite the selected finalists to participate in a presentation and structured interview. Scores from the initial SOQ evaluation will not carry over into the interview phase. Finalists will receive the criteria and instructions for their presentations at least two weeks prior to the interview date.
Presentations will be limited to one hour. The Town will provide interview questions consisting of both standard questions asked by all firms and questions specific to each firm based on its proposal. Additional questions may arise during the presentation. The Evaluation Panel will score the presentations and interviews and will award the project to the consultant receiving the highest rank. The Town will notify the other Contractors that they are not the top-ranked Contractor and invite them to a debriefing.
The Town will begin negotiations with the top-ranked Contractor on the scope of work, fees, and general conditions costs. If the Town and top-ranked Contractor are unable to reach fair and reasonable contract terms, the Town will terminate negotiations with that Contractor and move to negotiate with the next-ranked Contractor. This process will continue until a successful contract is negotiated or the Town elects to reject all the Contractors. At no time in the negotiation process will the Town re-open negotiations or award a contract to a Contractor after negotiations have been terminated with that Contractor.
RIGHT TO REVIEW AND EVALUATE PERFORMANCE:
Within 45 calendar days after project completion or as the Town deems appropriate, the Town reserves the right to evaluate the Contractor’s performance. The Town will provide a copy of the evaluation report to the Contractor. The Contractor shall then have ten calendar days to respond in
FA117, 2026-015 CMAR 10
writing to the evaluation. The evaluation and Contractor’s comments shall be retained in a database and will be used as an evaluation factor under “Past Performance” in future selections for services on future Town projects that the Contractor may wish to pursue.
NON-RESPONSIVE SUBMITTALS:
The SOQ format described in this RFQ shall be followed. SOQ not following the correct format may be considered non-responsive and may be rejected and not given further consideration, at the sole discretion of the Town. Points may be gained or lost depending on the Contractor’s ability to respond to the items and the indicated order of the items below.
REJECTION OF SUBMITTAL:
The Town reserves the right to reject any or all SOQs and to waive any irregularity or informality in any SOQ, at its sole discretion, to the extent permitted by law. The Town reserves the right to hold all SOQs, including the interest, commitments and availability indicated in the cover letter, for 30 calendar days after the submittal date specified hereinabove.
WITHDRAWAL OR CHANGE OF SUBMITTAL:
SOQ may be withdrawn by written notice, on the Contractor’s letterhead stationery, when received by the Town Public Works Deputy Director at any time before the due date specified for SOQ submittals. A submittal may be withdrawn prior to the due date by any Contractor or its authorized representative if the identity of the person requesting the withdrawal is established and that person signs a receipt for the submittal. A withdrawn SOQ may be resubmitted and/or replaced at any time prior to the SOQ submittal due date.
NO CONSTITUTION OF OBLIGATION:
This RFQ does not obligate the Town to pay any cost incurred by any Contractor in the preparation of and the submission of the SOQ or preparation for an interview, if interviews are held. The Town is not obligated to enter into a contract with any of the Contractors submitting an SOQ.
PROTEST POLICY:
The Town’s bid protest policies and procedures are located in Section 3-4-34 of the Marana Town Code. The Marana Town Code is available on the Town’s website www.maranaaz.gov.
AWARD OF CONTRACT:
The Contractor awarded the contract to provide Construction Manager at Risk Services for the MMC Optimization Plan. Contractors not selected will be notified by letter and invited to a debriefing meeting.
The Contractor selected to provide services will be required to execute a Construction Manager at Risk Contract for Pre-Construction Services
FA117, 2026-015 CMAR 11
Between Owner and Contractor (Contract) in the form of the sample Contract included in this RFQ as Exhibit D, and subject to the Construction Manager at Risk Terms and General Conditions included in this RFQ as Exhibit F.
The Contractor awarded the Contract shall obtain and maintain a current Town Business License for the duration of the Contract.
The identity of the selected Contractor will be posted as public information at the Marana Municipal Complex, 11555 W. Civic Dr., Marana, Arizona 85653, and on the Public Purchase website.
The Contractor should anticipate an annual performance review. The Town may, at its sole discretion, terminate a contract if the Town deems such action to be in its best interest.
INSTRUCTION FOR SUBMITTAL:
One copy of the Contractor’s submittal on a flash drive in PDF format of the SOQ is required by the Town. The submittal shall be in a sealed envelope or box and marked “CMAR Services for MMC Optimization Plan, Project FA117, BID NO. 2026-015” and shall be delivered to:
Town of Marana 1st Floor Receptionist Marana Municipal Complex 11555 West Civic Center Drive Marana, Arizona 85653
The Contractor’s name and address shall be inscribed/printed in the upper left corner of the envelope or box in which the submitted documents are contained at the time of delivery. Any addenda issued shall be acknowledged on the envelope or box containing the submitted documents.
INSTRUCTIONS, FORMAT AND EVALUATION CRITERIA FOR STATEMENT OF
QUALIFICATIONS:
The submittal package shall include the following pages in the order as set out below with all pages, including résumés, subject to the formatting requirements as prescribed below:
• A cover letter (see SECTION I. COVER LETTER below) not to exceed one page in length (this page is not a part of the maximum 12-page count).
• A narrative responding to the evaluation criteria (see SECTION II.
EVALUATION CRITERIA below) not to exceed 12-pages in length.
• Résumés – An unlimited number of résumés, each résumé not to exceed one page in length. Résumés do not count in the 12-page limitation indicated above.
FA117, 2026-015 CMAR 12
EXHIBITS A and B to this RFQ (see SECTION III. EXHIBITS below for requirements related to the exhibits)
FORMATTING REQUIREMENTS:
• The outside of the front and the back covers may be used to identify the SOQ, to display the Contractor’s company logo and/or address and contact information and may include images.
• The inside of the front and the back cover shall be left blank and shall be one solid color only.
• A Table of Contents or other pages or EXHIBITS not indicated above shall be counted toward the page limitation.
• If dividers are used, they shall be left blank except for text identifying the title, or they will be counted as pages. No images, sketches, markings or company identifying information of any kind will be permitted on divider pages.
• Links to other pages or websites are not permitted.
• A page shall be defined as an 8½ x 11-inch sheet, printed on one side only.
• Type font shall be “Times New Roman,” minimum font size 12 (uncondensed), single line spacing, and comply with the original software specifications regarding letter and line spacing. This includes the introductory letter, the narrative response to the evaluation criteria, and text that is provided in which it is outlined or boxed. The only exceptions to the type size requirements are Contractor name/logo, graphs, charts, maps, and image/photo captions. The font and font size requirements do not apply to the EXHIBITS and résumés.
• Margins for all pages within the SOQ submittal (this includes the cover letter and narrative response to evaluation criteria) shall be one inch or greater on all pages of the submitted SOQ, this includes pages with text, graphs, images, or the use of outlines or boxes.
• Headers and footers are allowed but shall only contain page numbers, Contractor’s name/logo, and the title of the SOQ. Headers and footers shall fall within a one-inch or greater area as measured from the outside edge of each sheet and shall have a minimum of ¼” clearance from the bottom and top edge of each page. In no case shall images (except for the Contractor’s Logo), graphs, charts, maps, or other items listed and not listed in this RFQ be allowed in the format of headers and footers.
Submittals exceeding the page limitations or failing to follow the format instructions outlined above may be considered as non-responsive and may be rejected at the sole discretion of the Town.
FA117, 2026-015 CMAR 13
SECTION I. COVER LETTER
Maximum of one page.
The cover letter shall be addressed to:
Jennifer Flood, Public Works Deputy Director Marana Municipal Complex 11555 W. Civic Center Drive Marana, Arizona 85653
The cover letter shall contain the following items:
• An expression of the Contractor’s interest in being selected to provide CMAR Services and a commitment to providing such services if deemed qualified, selected, and awarded the contract for the Town of Marana MMC Optimization Plan, Project FA117, BID NO. 2026-015.
• A statement confirming the commitment of the key personnel identified in the submittal to the extent necessary to meet the Town’s quality and schedule expectations.
• A statement of the period of validity of interest, commitment, and availability to perform the services (must be at least 30 calendar days).
• A summary of key points regarding the CMAR’s qualifications.
• A statement that the Contractor takes no exception to any portion of this RFQ, or if the Contractor does take exception(s) to any portion of this RFQ, the Contractor shall identify and explain the specific portion(s) of the RFQ to which exception(s) are taken.
SECTION II. CONTRACTOR’S STATEMENT OF QUALIFICATIONS:
Maximum of 12 pages.
Section II shall be the Contractor’s response to the evaluation criteria set forth below. In addition to the information set forth in Section II, the Town shall consider the information provided in Section III, the information included in Section IV, and the responsive Contractor Performance Inquiry forms in determining points to be awarded for items in Section II.
EVALUATION CRITERIA:
The following evaluation criteria shall be used to rank the Contractor’s qualifications. The Contractors selected as best qualified will be those Contractors that score the highest based on the following evaluation criteria:
A. CMAR’s Pre-Construction Services Team (15 points)
• Qualifications and relevant technical experience
• Unique qualifications of key team members
• Organization chart including subcontractors
FA117, 2026-015 CMAR 14
B. CMAR’s Construction Services Team (15 points)
• Qualifications and relevant technical experience
• Particular qualifications of key team members
• Organization chart including subcontractors
C. Contractor’s Pre-Construction Capabilities (20 points)
• Experience with the CMAR delivery method for similar projects
• Management and organizational capabilities, including approach
• Experience developing schedules using Microsoft Project
• Experience reviewing plans and specifications during their development by the Architect
• Experience developing cost-saving initiatives
• Record for developing GMPs
D. Firm’s Construction Capabilities (15 points)
• Management and organizational capability, including approach
• Ability and approach to maintaining project schedule
• Methods for controlling construction costs
• Technical approach
• Quality control plan
E. Past Construction Performance on a similar CMAR Project (15 points)
• Technical performance
• Cost control
• Business relations (professionalism, focus on satisfaction, approach to changes, and resolution and avoidance of disputes)
• Timely completion of projects
F. Safety Record (10 points)
• Safety program
• 5-Year record of lost time accidents;
• Provide workers’ compensation Experience Modification Rate (EMR) for the company as a whole
G. CMAR’s Subcontractor Selection Plan (10 points)
• Pursuant to A.R.S. § 34-603(C)(2)(e)(ii), the CMAR shall implement the
Town’s subcontractor selection plan, which is as follows:
• The CMAR and Owner shall receive, open, record, and evaluate the subcontractor proposals. The CMAR will prepare a list of recommended subcontractors and suppliers for each category of work for the Owner's
FA117, 2026-015 CMAR 15
review and approval. The recommended subcontractors may be interviewed to determine the responsiveness of their proposals. Price shall not be the only factor in selection of subcontractors; rather, selection shall be based on a combination of qualifications and price.
The CMAR shall provide a Schedule of Values based on the CMAR self-performed work and the bids accepted from the successful subcontractors, and that information shall be incorporated into the
GMP.
• Description of the procedures CMAR proposes to use to implement the Town’s subcontractor selection plan, as described above. The Town reserves the right to include otherwise non-responsive submittals in the evaluation process and to adjust the final score to account for page count and format irregularities from those required above.
SECTION III. EXHIBITS:
The items specified below as exhibits are not considered part of the page count limitation. Additional sheets not specified will count toward the page count limitation.
EXHIBIT A - CONTRACTOR INFORMATION SHEET shall be submitted. Not to exceed one page.
EXHIBIT B - CONTRACTOR THREE-YEAR CONTRACT HISTORY shall be submitted for the Contractor. Projects are to be of similar scope and cost to this project. The form outlined in EXHIBIT B may be reproduced or reformatted as needed to account for the number of contracts or formatting of the SOQ.
Unlimited number of pages.
EXHIBIT C - CONTRACTOR PERFORMANCE INQUIRY FORM shall be submitted for the respondent submitting the SOQ per the following instructions:
• Provide the Contractor Performance Inquiry form (EXHIBIT C) to not less than three references. The forms are to be emailed to:
rtorres@maranaaz.gov. This form must be received on or before the Due Date of December 17, 2026, at 3:00 p.m., local time. Do not use Town of Marana staff or Town projects for references. Do not include this EXHIBIT as part of the SOQ submittal. It must be submitted separately to the Town by the reference agency/client.
• It is the respondent’s responsibility to ensure that the Contractor Performance Inquiry forms are submitted by the Contractor’s reference on or before the due date.
• The Town may be contacted to determine which forms have been received by the Town.
The following exhibits are not to be included in the SOQ, they are sample contract documents of the form to be used for the pre-construction services and, if successfully negotiated, the guaranteed maximum price contract for
FA117, 2026-015 CMAR 16
the construction of this project. By submission of an SOQ, each firm will be certifying to the Town that the contract is acceptable as written, unless exceptions are taken and specific alternate language proposed. Any such exception or proposed alternate language shall include correlating explanations of why the proposed exception or proposed alternate language is necessary. All exceptions shall be included in the submittal. The Town may consider proposed changes and negotiate terms or conditions if deemed in the interest of the Town. However, the Town reserves the right to reject any proposal that takes exceptions or proposes alternate language unacceptable to the Town.
EXHIBIT D - FORM OF CONSTRUCTION MANAGER AT RISK CONTRACT FOR PRE-
CONSTRUCTION SERVICES BETWEEN OWNER AND CONTRACTOR
Exhibit D is for information purposes only and is not to be included in the submittal.
EXHIBIT E - FORM OF CONTRACT BETWEEN OWNER AND CONTRACTOR
(GUARANTEED MAXIMUM PRICE)
Exhibit E is for information purposes only and is not to be included in the submittal.
EXHIBIT F - CONSTRUCTION MANAGER AT RISK TERMS AND GENERAL
CONDITIONS
The terms and general conditions shall form the basis of the pre-construction services contract and the construction services contract (if the GMP is accepted by the Town). Exhibit F is for information purposes only and is not to be included in the submittal.
FA117, 2026-015 CMAR 17
EXHIBIT A
CONTRACTOR INFORMATION SHEET
(Complete and Return with Your SOQ)
PROJECT: CMAR Services for MMC Optimization Plan
Project FA117, BID NO. 2026-015
CONTRACTOR NAME: _______________________________________________________
Address of Primary or Corporate Headquarters
Name of Principal, Title
Address of Local Office
Phone
Name & Title Who will Execute Agreements
Name & Title Who will Receive Notices (Article 3)
Office Address for Executed Agreement
Name of Contracts Contact Person
Phone
FA117, CMAR 2026-015 18
EXHIBIT B
CONTRACTOR/SUBCONTRACTOR THREE-YEAR CONTRACT HISTORY
PROJECT: CMAR Services for MMC Optimization Plan
Project FA117, BID NO. 2026-015
CONTRACTOR NAME: _______________________________________________________
CLIENT PROJECT NAME
CONTRACT
COMPLETION DATE
(If current, so state)
TOTAL
CONTRACT
AMOUNT
CLIENT
REFERENCE
NAME AND
TEL/FAX
NUMBER Start Complete
FA117, CMAR 2026-015 19
EXHIBIT C
CONTRACTOR PERFORMANCE INQUIRY FORM
CONTRACTOR: Please fill out your name and address and send to Referring Agency/Client.
Contractor: _________________________________________________________________
Address: ____________________________________________________________________
REFERRING AGENCY/CLIENT INFORMATION:
The Town of Marana, Arizona, is considering this Contractor’s application to provide Marana CMAR Services for MMC Optimization Plan, Project FA117, BID NO. 2026-015. Please rank the Contractor’s past performance in the categories indicated below using a scale of 1 to 5, with 5 being exceptional. Please email your completed questionnaire to the following on or before December 17, 2026, 3:00 p.m., local time.
ATTENTION: Rudy Torres, Purchasing Officer E-MAIL: rtorres@maranaaz.gov
WE SINCERELY APPRECIATE YOUR COOPERATION.
Name of Agency/Client:
Survey Completed By: Position: _____________________________
Name of the project to which survey refers:
Note: If the Contractor met all your requirements, the Contractor should receive a score “3”.
The Contractor should receive a higher score only if the Contractor exceeded your requirements and expectations.
1 = Most requirements not met 2 = Some requirements not met, ineffective corrective actions 3 = Met all requirements; minor problems; effective corrective actions 4 = Met requirements, exceeded some (5%); minor problems; effective corrective actions 5 = Met all requirements, exceeded a significant amount/number; no or minor problems; highly effective corrective actions; quality results or product; innovative.
PRIME CONTRACTOR REFERENCES QUESTIONNAIRE
Rating
1 Technical Performance (quality of product/service) 2 Cost Control 3 Timeliness 4 Business Relations (professionalism; focus on customer satisfaction; approach to change proposals, resolution or avoidance of disputes)
5 Total (1+2+3+4)
Comments: (Please include any comments you wish to offer here. Respondent may attach one additional sheet if needed.)
FA117, CMAR 2026-015 20
EXHIBIT D (SEPARATE FILE)
FORM OF CONSTRUCTION MANAGER AT RISK CONTRACT FOR PRE-
CONSTRUCTION SERVICES BETWEEN OWNER AND CONTRACTOR
EXHIBIT E (SEPARATE FILE)
FORM OF CONTRACT BETWEEN OWNER AND CONTRACTOR (GUARANTEED
MAXIMUM PRICE)
EXHIBIT F (SEPARATE FILE)
CONSTRUCTION MANAGER AT RISK TERMS AND GENERAL CONDITIONS
| INFORMATION AND INSTRUCTIONS FOR THE PREPARATION AND SUBMITTAL OF STATEMENT OF QUALIFICATIONS FOR |
| GENERAL SCOPE OF SERVICES: |
| DESCRIPTION OF SERVICES: |
| MANDATORY PRE-SUBMITTAL CONFERENCE IS SCHEDULED |
| CONTRACTOR SELECTION PROCESS: |
| RIGHT TO REVIEW AND EVALUATE PERFORMANCE: |
| NON-RESPONSIVE SUBMITTALS: |
| REJECTION OF SUBMITTAL: |
| WITHDRAWAL OR CHANGE OF SUBMITTAL: |
| NO CONSTITUTION OF OBLIGATION: |
| AWARD OF CONTRACT: |
| INSTRUCTION FOR SUBMITTAL: |
| INSTRUCTIONS, FORMAT AND EVALUATION CRITERIA FOR STATEMENT OF QUALIFICATIONS: |
| FORMATTING REQUIREMENTS: |
| SECTION I. COVER LETTER |
| SECTION II. CONTRACTOR’S STATEMENT OF QUALIFICATIONS: |
| EVALUATION CRITERIA: |
| SECTION III. EXHIBITS: |
| EXHIBIT A |
| EXHIBIT B |
| EXHIBIT C |
| EXHIBIT D (Separate file) |
| EXHIBIT E (Separate file) |
| EXHIBIT F (Separate file) |