RFQ 2024-114 Clarifying Questions 1.pdf

PDF 295 KB Posted

Attached to
BID# 2024-114 Concrete for Lake Road Health Center
Solicitation number
S-C01010-00012194
Issued by
Clackamas County, Mission CDP, Oregon

About this file

This is a Response to Clarifying Questions document from Clackamas County Department of Finance's Procurement & Contracting Services for RFQ #2024-114 regarding concrete work at the Lake Road Health Center. The document, dated December 19, 2024, addresses five key questions about the project scope, including confirmation that truncated domes are required at sidewalk ramps with ADA compliance, the need for asphalt removal and replacement for proper curb installation, contractor responsibility for purchasing and installing three bollards at the building front, specific sidewalk grinding and replacement requirements (one panel at front needs grinding, two panels at back need replacement), and clarification that the contractor is not responsible for signage installation.

All scope clarifications reference an Addendum #1 drawing for specific details, indicating this is part of the broader bid package documentation. The questions and answers provide technical clarification for potential bidders without altering the original RFQ terms. The document maintains a formal structure with clear question-and-answer formatting, helping bidders understand specific project requirements and responsibilities before submitting their quotes.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PH: 503-742-5400 WWW.CLACKAMAS.US

REQUEST FOR QUOTES #2024-114

Lake Road Health Center Concrete

RESPONSE TO CLARIFYING QUESTIONS #1

December 19, 2024

Note that these are questions submitted by interested firms to the above referenced solicitation. The below answers are for clarification purposes only and in no way alter or amend the RFQ as published.

1. Are truncated domes required at sidewalk ramps?

Answer: Yes. All sidewalk and ramp work must be ADA compliant. See Addendum #1 drawing for details.

2. In order that the concrete sidewalk get rebuilt correctly at the rear of the building, will a strip of asphalt have to be removed and replaced?

Answer: Yes. For proper installation of the curb, the asphalt will have to be removed and replaced. See Addendum #1 drawing for details.

3. Is the Contractor responsible for purchasing and installing the bollards?

Answer: Yes, the Contractor is responsible for purchasing and installing the three bollards at the front of the building. See Addendum#1 drawing for details.

4. Is there any grinding or replacement of existing sidewalk?

Answer: Yes. There is a panel at the front of the building that needs grinding. There are two panels at the back of the building that need to be removed and replaced. See Addendum #1 drawing for details.

5. Is the Contractor responsible for installing any signage?

Answer: No, the Contractor will not be responsible for installing any signage

End of Clarifying Questions #1