RFQ 2023-73 Addendum 1.pdf

PDF 325 KB Posted

Attached to
On-Call CBX Drop Construction
Solicitation number
S-C01010-00008178
Issued by
Clackamas County, Oregon

About this file

This document is an Addendum to Request for Quotes (RFQ) #2023-73 issued by Clackamas County, Oregon for On-Call CBX Broadband Exchange (CBX) American Rescue Plan Act (ARPA) Residential Drop Construction services. The addendum extends the quote due date from October 11 to October 18, 2023 and provides an updated CBX Drop Cost Quote Sheet. The contract opportunity involves providing on-call construction services to install residential fiber optic drops in Clackamas County and Oregon City, Oregon.

The updated quote sheet details unit pricing for various drop construction materials and services, including conduit, fiber cable, splicing, aerial and vault installations, and residential home installations. Respondents are required to provide firm-level pricing information on the quote sheet. The contract will be awarded to multiple vendors to provide on-call services as needed by the County.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PH: 503-742-5400 WWW.CLACKAMAS.US

REQUEST FOR QUOTES #2023-73

On-Call Clackamas Broadband Exchange (CBX), American Rescue Plan Act (ARPA) Residential Drop Construction

ADDENDUM NUMBER #1

October 9, 2023

On September 21, 2023, Clackamas County (“County”) published Request for Quotes #2023-73 (“RFQ”). The County has found that it is in its interest to amend the RFQ through the issuance of this Addendum #1. Except as expressly amended below, all other terms and conditions of the original RFQ and subsequent Addenda shall remain unchanged.

1. The Quote Due Date/Time is hereby changed from October 11, 2023 at 2:00PM to October 18, 2023 at 2:00PM

2. The CBX Drop Cost Quote Sheet is hereby deleted and replaced with Updated CBX Drop Cost Quote Sheet- Addendum 1 as part of this addendum.

End of Addendum #1

Drop Construction cost per foot

1 in rolled conduit 2 in rolled conduit

1 in conduit stick, 20 ft 1 in conduit stick, 10 ft 2 in conduit stick, 20 ft 2 in conduit stick, 10 ft

1 in conduit 2 in conduit self support single fiber cable self support 12 count fiber cable strand & lash, single fiber cable Strand & lash, 12 count cable

24x36x24 vault 24x36x36 vault 17x30x18 vault

Pull fiber cable in 1" conduit Pull fiber cable in 2" conduit

Fusion Splice (1-12 fibers) Fusion Splice (13-96 fibers) Re-enter Existing Case Install New Aerial Case Install New Vault Case

CBX Drop Costs

Plow

Trenching

Boring

Home Install (Unit Cost)

Splicing (Unit Cost)

Aerial

Vault (Unit Cost)

Pull Fiber Cable in conduit

Unit cost to coordinate and perform a home install. This would entail coordinating a time with the home owner, discussing location of building entry, performing the entry and coiling the new fiber drop in the house and mounting the ONT. All building penetrations need to be weather proof to ensure moister does not enter the home. CBX will provide the fiber cable and ONT. All other materials needed for the building entry will be the reasonability of the contractor.

Firm Name:

Print Name:

Authorized Signature:

Date:

File details come from the government source that posted it. Updated .