RFQ 190078D001-RP Final Approved for posting.pdf

PDF 468 KB Posted

Attached to
JACKSON ARMORY ASLEP DESIGN BUILD PROJECT
Solicitation number
S-24800-00000575
Issued by
Multnomah County, Oregon

About this file

This document is a Request for Qualifications (RFQ) issued by the Oregon Military Department (OMD) for a Design-Build Contract for the Jackson Armory Service Life Extension Project located in Portland, Oregon. OMD is seeking a Design-Build Contractor to provide project management, design, review, value engineering, testing, inspections, commissioning, and construction for the project, including selective demolition, removal of regulated building materials, hazardous material abatement and disposal, material recycling, renovations of existing facilities, and additions of new facilities, structures, and infrastructure. The project is estimated to cost between $3.5 to $4.3 million, and SOQs are due by September 21, 2021.

The procurement will use a Best Value process, and OMD will short-list 3 to 5 of the highest qualified proposers to submit proposals in the second step of the RFP process. The Design-Build Contract will be a Guaranteed Maximum Price, Design-Build Agreement, and the completed project must comply with State of Oregon energy efficiency requirements, the Oregon Department of Energy's Green Energy Technology requirements, and aim to achieve the highest possible LEED certification for a Major Renovations project.

View the file

Other files

File Type Posted
190078D001 repost Proposal Name Read Sheet.pdf PDF
2022200012_A2_Addendum_1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF OREGON

Oregon Military Department (“OMD”)

Request for Qualifications (“RFQ”)

Solicitation 190078D001-RP

JACKSON ARMORY

ARMY SERVICE LIFE EXTENSION PROGRAM (“ASLEP”)

A DESIGN-BUILD PROJECT

LOCATED IN PORTLAND, OREGON

STATEMENTS OF QUALIFICATIONS (“SOQ”s) ARE DUE NO LATER THAN

SEPTEMBER 21, 2021 at 11 AM PT

RFQ 190078D001-RP Page 1

TABLE OF CONTENTS

I. GENERAL INFORMATION

1. EXECUTIVE SUMMARY 3

2. PROJECT NAME/CONTACT INFORMATION 3

3. SITE INFORMATION

4. PRELIMINARY PROGRAM BRIEF 3

II. PROCUREMENT PROCESS

1. BEST VALUE PROCESS 4

2. TWO STEP SELECTION PROCESS 5

III. RFQ INSTRUCTIONS TO INTERESTED PROPOSERS

1. RFQ DOCUMENTS 6

2. RFQ SCHEDULE 6

3. RFQ SUBMISSION INSTRUCTIONS 7

4. RFQ FORMS INSTRUCTIONS 7

5. RFQ ATTACHMENT INSTRUCTIONS 8

6. REQUESTS FOR CLARIFICATION, CHANGES, AND PROTESTS

7. WITHDRAWAL OF SOQ 9

IV. SOQ EVALUATION PROCESS

1. EVALUATION 9

2. SHORT LIST ANNOUNCEMENT AND PROTEST 10

V. STEP II: REQUEST FOR PROPOSALS INFORMATION

1. RFP GENERAL INFORMATION 12

2. RFP SCHEDULE 12

3. SUMMARY OF RFP EVALUATION 13

4. BOND / SURETY REQUIREMENTS 13

5. INSURABILITY REQUIREMENTS 13

VI. OMD RIGHTS AND DISCLAIMERS

1. OMD RIGHTS 17

2. OMD DISCLAIMERS 17

VII. APPLICABLE REQUIREMENTS

1. Confidentiality 19

2. Federal Required Provisions. 19

3. BOLI Required Provisions. 19

4. Trade Secrets: Identification of Information 19

5. State Immunity 19

APPENDIX

Form 1 – Statement of Qualification Form (Three pages)

Form 2 – Company Information Form (Two pages)

Form 3 – Key Personnel Information Form (One page)

Form 4 – Similar Projects Form (One page)

RFQ 190078D001-RP Page 2

I. GENERAL INFORMATION

1. EXECUTIVE SUMMARY

The Oregon Military Department has an infrastructure portfolio spread throughout the State of Oregon. Types of buildings include readiness centers, armories, maintenance facilities, warehousing, storage, aviation facilities, administrative space, and training site facilities. The portfolio contains roughly 3.3 million square feet of building area with nearly 400 buildings located at approximately 49 sites across the State.

OMD is committed to constructing the highest quality buildings and infrastructures OMD can afford and expects structures which promulgate cultural leadership. In short, the three primary goals in OMD facilities can be expressed as follows:

a) Soldier/Unit/Equipment Readiness;

b) Sustainability/Innovation; and,

c) Community Partnership.

When these goals are fully expressed in its facilities, OMD has the greatest likelihood of sustained success over time.

Limited capital and sustainment funds means OMD’s buildings must perform for extended periods of time with minimal maintenance. OMD requires quality in the design and construction process, to ensure it can meet these requirements. To this end, OMD’s desire in the procurement process is to seek the “best value” for the State of Oregon (“State”). OMD is interested in retaining firms capable of bringing superior design principles to bear in a sustainable manner and constructing the highest quality buildings in the region. OMD wants to ensure tax dollars being spent on capital construction result in cultural enrichment for its communities while also developing innovative and sustainable buildings that are ready to respond to any emergencies which arise and capable of withstanding the test of time.

OMD is requesting Statements of Qualification from entities interested in submitting Design-Build Proposals for a Design-

Build Contract for the Jackson Armory Service Life Extension Project located in Portland, Oregon, as more fully described in Section II(3). The Design-Build Contract (also referred to as the Contract) will be between the Design-Builder and

OMD.

SOQs will only be accepted from Interested Proposers intending to provide complete services required under the Contract.

Responses from individual engineering, construction, or consultant firms not offering to provide all required services will not be accepted.

The Contract will be a Guaranteed Maximum Price (“GMP”), Design-Build Agreement.

2. PROJECT NAME / CONTACT INFORMATION

a) Project Number: 190078D001-RP

b) Project Name: Jackson Armory ASLEP

c) Project Location: Portland, Multnomah County, Oregon

d) Project Owner: Oregon Military Department

e) Project Manager: Scott Mansfield

f) Single Point of Contact (“POC”):

Sam Goff, CPPB Contract Specialist

775 Airport Road

Phone: 503-584-3195 Fax 503-584-3584

E-mail: samuel.a.goff.nfg@mail.mil

1. SITE INFORMATION

The Jackson Armory and its supporting infrastructure (the “Facility”) is located in Portland, Oregon. The Jackson Armory serves 145 traditional full and part time employees of 2/218 Field Artillery, A-Battery & C-Battery and 1/82nd CAV C-

Troop for the Oregon Army National Guard.

The Facility is located on an approximately 4 acre parcel of property adjacent to the Portland Airport, in Multnomah

County, Oregon (the “Site”).

The Site address is:

Oregon Army National Guard Jackson Armory

6255 NE Cornfoot Rd.

Portland Oregon, 97218 mailto:samuel.a.goff.nfg@mail.mil

RFQ 190078D001-RP Page 3

SECURITY REQUIREMENTS: All OMD facilities are governed by U.S. Homeland Security REAL ID compliance regulations. Valid Photo identification is required. Facility owners/staff are prohibited from accepting driver’s licenses or ID cards from non-compliant states or jurisdictions. Proposers are responsible for providing appropriate valid identification. OMD is not responsible for Proposers who are denied access for not having proper identification.

4. PROJECT INFORMATION

A. Project Description

The Oregon Military Department (“OMD” “Owner” or “Agency”) is seeking a Design-Build Contractor (“DBC” or

“Contractor”) to provide Project management, design, review, value engineering, testing, inspections, commissioning and construction of the Jackson Armory ASLEP Project (the “Project”), including but not limited to, selective demolition, removal of regulated building materials, hazardous material abatement and disposal, material recycling, renovations of existing and additions of new facilities, structures, buildings, and infrastructures, both on- and off-Site, as may be necessary to remodel, replace and expand the facilities at the Site.

The Jackson Armory Project consists of the design and remodel of an approximately 39,373 square foot (“SF”) 2 story

Armory to include energy efficiency improvements and site and infrastructure upgrades. The Jackson Armory, located in Portland, Oregon, was built in 1963 and has been sporadically remodeled over the past 57 years. The remodeled

Armory will serve approximately 145 people, comprised of both full-time traditional guardsmen, and part time personnel. The Armory will provide administrative, training, classrooms, lockers, offices and conference rooms. The

Project will also include Site and Facility upgrades to include but not limited to the provisions for the appropriately sized paved military equipment parking areas, domestic and fire water, effluent disposal, mechanical, electrical and plumbing, latrines and showers, equipment storage areas, kitchen, assembly hall, training areas, classrooms, administrative spaces, supply rooms, site lighting, landscaping and fencing.

OMD’s goals for this Project include: extending the useful life of the facility by a minimum of an additional 25 years, implementation of cost effective energy conserving measures, achieving code compliance, and adding additional square footage.

B. Facility Information

The Facility’s readiness rating, according to the Infrastructure Status Report (the “ISR”), indicates that the facility is adequate for interim use. The report however finds that the Armory does not meet current code requirements and indicates that regulated building material must be removed to meet current standards. Recent changes in the force structure of the military, combined with the standards required by the federal design guides, means the Facility no longer meet the requirements of the soldiers utilizing them.

The Facility lacks appropriately sized training areas, administrative spaces, supply rooms, and arms vaults; kitchen space, toilets/showers, physical fitness space, and locker room space are inadequate; the current vehicle parking area is degraded requiring repair/replacement; and military vehicle parking and unheated storage space are not to standards.

The Site’s current utility infrastructure requires constant repairs and must be evaluated for current replacement or rehabilitation as part of this Project. Further, the Facility is not compliant with the Americans with disabilities Act

(ADA) or Anti-terrorism Force Protection (ATFP) requirements.

Original construction techniques employed little to no energy saving measures. Cost effective energy conservation features must be incorporated into the design, including energy management, automation and remote monitoring.

C. Contract Scope:

The Design Build contract will include Project management, design, review, value engineering, testing, inspections, commissioning and construction of the Project. Work will include, but not be limited to, selective demolition, removal of regulated building materials, hazardous material abatement and disposal, material recycling, renovations of existing and additions of new facilities, structures, buildings, and infrastructures, both on- and off-Site, as may be necessary, in support of the OMD’s continued and ongoing operations.

D. Contract Type:

OMD intends to issue a “Design-Build Agreement” (“DBA”) with a Guaranteed Maximum Price (“GMP”).

E. Target GMP:

RFQ 190078D001-RP Page 4

The estimated GMP for this project is 3.5 to 4.3 million dollars

F. Project Requirements.

Design and construction of the Project must comply with technical specifications contained in the Army National Guard

Criteria Pamphlet DG 415-5 ‘General Facilities Information Design Guide’ as provided by the Army Installations

Division. DG 415-5 provides functional and technical requirements relevant to the contracting practices and procedures for military funded projects for any Federal funds used for the Project. The Project must also comply with other applicable federal, state, and local codes and regulations as per Public Law 90-480 and 90-400. The Facility must be designed to a minimum life of 25 years and be in compliance with Department of Defense’s (“DoD's”) Unified Facilities

Code (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance.

Access for individuals with disabilities must be provided. Under these requirements, OMD desires to employ cost saving, space saving, energy saving, and other sustainable design and construction features.

In extending the usefulness of the Facility, cost effective energy conserving measures such as building insulation, envelope upgrades, mechanical and electrical system, direct digital control system, and meeting State SEED (and if applicable or otherwise directed by Owner, Federal LEED) requirements must be employed. Additional Project betterments include bringing the facility up to the current building code and seismic code requirements, including the facility’s electrical, mechanical, structural, natural gas, water well, sewer, and voice, and data and additional building systems.

Furthermore, the completed Project must be completed in accordance with the following:

a) the State of Oregon energy efficiency design (“SEED”) requirements set forth at Oregon Revised Statutes

(“ORS”) 276.900 through 276.915 and Oregon Administrative Rules (“OAR”) 330-130-0010 through 330-130-

0100 (which can be reviewed at http://egov.oregon.gov/ENERGY/CONS/SEED/SEEDhome.shtml);

b) the Oregon Department of Energy (“ODOE”) 1.5% Green Energy Technology in Public Building Construction

Contracts requirements pursuant to ORS 279C.527, 279C.528 and OAR 330-135-0010 to 330-135-0055; and,

c) the Agency will strive to meet the highest possible Certification of the US Green Building Council (“USGBC”)

Leadership in Energy and Environmental Design (“LEED”®) rating for a Major Renovations project.

d. Facility Tenants: The Army National Guard, 2/218 Field Artillery, A-Battery & C-Battery and 1/82nd CAV C-

Troop, currently occupies the Readiness Center. The completed Project will provide adequate space for four (4) full-time and one hundred twenty one (145) traditional (part-time, aka M-day) Oregon Army National Guard personnel. The Design-Build Contractor shall cooperate with the Owner to minimize conflicts and to facilitate

Owner’s continued and ongoing use of the Project Site and Facility. Work will take place in the Owner-occupied facility, and Owner intends to continue to occupy the Facility, swing-space, or Contractor provided space, during the entire course of the Project.

G. Risk Analysis Summary

The following items have been identified by OMD as relevant considerations for a preliminary risk analysis:

i. Hazardous Material Handling and Abatement

The Oregon Military Department is committed to protecting the environment during construction and will require the Contractor to follow and comply with all applicable requirements including but not limited to those administered and enforced by the U.S. Environmental Protection Agency (“EPA”), U.S. Occupational Safety and

Health Administration (“OSHA”), U.S. Department of Transportation (“DOT”), Army National Guard

(“ARNG”), Oregon Department of Environmental Quality (“ODEQ”), Oregon Occupational Safety and Health

Division (“OR-OSHA”), Oregon Department of Human Services (“ODHS”), Oregon Department of

Transportation (“ODOT”), and OMD. The Contractor should aggressively pursue a mitigation plan for protecting the environment during construction activities.

ii. Schedule

The OMD is looking for a Design-Build Team with an aggressive schedule to provide the highest quality Facility renovations in the least amount of time feasibly possible.

iii. Equipment Driven Spaces

As many of the programmed spaces support the function of specific equipment, the Contractor shall take care in coordinating and accommodating the various items of equipment. Power sources for the equipment (electricity, fuel, air, etc.) must be designed and installed according to the project plans, and all equipment must be integrated into the commissioning plan and ‘start-up’ procedures.

RFQ 190078D001-RP Page 5

iv. Jurisdictional Controls and Code Upgrades

The Contractor shall be responsible for meeting all jurisdictional regulation related to design, construction, commissioning, offsite improvements, and ‘start-up’ of the facility. This responsibility applies to the design-build work, as well as the impact work may have on existing facilities.

v. Agency Reviews and Milestones

The U.S. Department of Defense and other approval authorities shall, at the request of OMD, be included in periodic reviews during the design-build process. OMD shall have ultimate control over the approvals process and can be depended on for coordination of the approval process as defined in the contract.

vi. Operational Impacts

While improvements are desirable, construction brings to this Facility interruptions that have a short-term negative impact on the OMD’s state of readiness. The OMD is looking for a Design-Build Team with creative ideas to reduce this impact.

vii. Ground Water

This Project has a high likelihood of creating human and equipment interactions with ground waters in the development and renovations of domestic water systems (wells) and effluent disposal systems. Contractor must ensure that the strict adherence to regulatory requirements is maintained in order to mitigate negative impacts to these sensitive natural resources.

viii. SEED and LEED

The completed Project must comply with the State of Oregon SEED requirements, with aspirations of attaining the highest LEED certification possible.

The following Risk Table rates the impact of each Risk Element with relation to Project cost, Project quality, and

Project schedule. The ratings are 1 = low impact, 2 = moderate impact, 3 = high impact. . These ratings are not universally definitive; each element may not have impact to the degree indicated on this chart. Rather, the ratings indicate special attention should be focused in order to manage the risk and reduce its impact on the overall Project.

Risk Element Cost Quality Schedule

Hazardous Material Handling and Abatement 3 3 3

Schedule 3 2 3

Equipment Driven Spaces 2 3 1

Jurisdictional Controls / Code Upgrades 2 2 1

Agency Reviews and Milestones 1 3 1

Operational Impacts 1 1 2

Ground Water 2 3 2

SEED and LEED 2 2 1

H. Exemption From Competitive Bidding

Under current Oregon law, the use of Design-Build as an alternative contracting method instead of the conventional

“low bid” approach requires that the Director of the Department of Administrative Services (“DAS”) as the public contract review authority for the State of Oregon (“State”) grant an exemption based on certain findings. The exemption process has been initiated and is in progress (Exemption No. 392-21). OMD must comply with the terms of that exemption, in order to proceed with a request for proposal process and to award a design-build contract pursuant to that process.

II. PROCUREMENT PROCESS

1. BEST VALUE PROCESS

This procurement will use a “Best Value” process. The intent of OMD is to award the Contract to the Proposer that provides the Proposal with the best combination of price and quality, which will be based on an evaluation of the following: Project narrative, Project schedule, Project costs, Project approach, Project management and commissioning plans, Project understanding, Project quality, Project objectives, Project desires and betterments, Project completion time, and compliance with all RFP requirements as determined by OMD at its sole discretion.

2. TWO STEP SELECTION PROCESS. The procurement will be a two-step RFQ/RFP process:

a) Step 1: RFQ Those firms who submit an SOQ pursuant to this RFQ are referred to as “Interested Proposers.”

RFQ 190078D001-RP Page 6

OMD will determine a Short List consisting of three (3) to five (5) of the highest qualified Interested Proposers.

The total number of short listed firms will be decided upon by OMD, at its sole discretion. Only those firms on the Short-List will then be invited to submit Proposals in Step II RFP Phase. SOQ scores will not carry-over to the RFP step.

b) Step 2: RFP The Owner will evaluate proposals from only the “short listed” firms identified in Phase 1 to select a the Proposer who offers the Best Value to OMD to award the Design-Build Contract with a GMP. Those short listed firms who will be providing Proposals in response to the RFP are referred to as “Proposers.” More information regarding the RFP Step can be found in Section V of this RFQ.

III. RFQ INSTRUCTIONS TO INTERESTED PROPOSERS

1. RFQ DOCUMENTS OREGONBUYS SYSTEM

A. The RFQ Documents include this RFQ and all forms, exhibits, attachments, appendices, and other documents incorporated herein. The documents may be obtained as follows:

1) "OregonBuys" or “OregonBuys System means the on-line automated electronic purchasing information network administered by the Oregon Department of Administrative Services (“DAS”). The OregonBuys System website is located at: http://oregonbuys.gov

2) The OregonBuys system is the ONLY OFFICIAL repository for RFQ documents. The State of Oregon assumes no responsibility for content obtained from other sources.

3) Electronic copies of the RFQ Documents including all Addenda and most attachments, are posted on

OregonBuys and will not be mailed to prospective Offerors.

4) The official suppliers list is maintained by the OregonBuys system. Interested Proposers who are registered and who download the RFQ documents from OregonBuys will automatically be added to the suppliers list.

Interested Proposers who obtain the RFQ documents elsewhere may add themselves to the suppliers list. These interested Bidders must be registered on OregonBuys in order to do so

5) The RFQ Documents may be examined in person at the Oregon Military Department, 775 Airport Road. In order to examine the documents at OMD, Bidders must contact the POC referenced in Section II.2.E to schedule an appointment

6) OMD provides the RFQ Documents for the express purpose of obtaining SOQs from prospective proposers for this Project and does not confer any license or grant for any other use.

7) Complete sets of RFQ Documents must be used in preparing SOQs. OMD assumes no responsibility for errors or misinterpretations resulting from the use of incomplete sets of RFQ Documents.

B. Examination of Documents:

1) It is the responsibility of each Interested Proposer, before submitting an SOQ, to perform the following tasks:

a. Examine thoroughly all RFQ Documents.

b. Consider federal, state, and local laws and regulations that may affect cost, progress, and performance of the work.

c. Study and carefully correlate the proposer's knowledge and observations with the RFQ Documents and other related data.

d. Promptly notify OMD of all conflicts, errors, ambiguities, and discrepancies that the proposer has discovered in the RFQ Documents.

C. Pre-qualification Meeting: OMD will not hold a pre-qualification meeting.

2. RFQ SCHEDULE

A. RFQ Document Availability Date: August 19, 2021

B. Last Date for Questions, Clarifications, and Request for Changes: September 14, 2021

C. RFQ Closing Date for SOQ Submissions:

1) Date: September 21, 2021 http://oregonbuys.gov/

RFQ 190078D001-RP Page 7

2) Time: 11:00 am. Pacific Time (PT)

D. Notification of Short-List: September 24, 2021(Estimated)

E. OMD reserves the right to change the schedule or terminate the entire RFQ solicitation process at any time.

3. RFQ SUBMISSION INSTRUCTIONS

A. SOQs must be submitted to the OMD, Salem Reserve Center located at 775 Airport Road, Salem, Oregon 97301, Attention: POC identified in the RFQ

B. Proposers must submit one (1) “original” Proposal bearing original ink signatures secured within an appropriate size

3 ring binder that is clearly marked “original”.

C. Proposers must submit one (1) electronic copy of their proposal on Compact Disc (“CD”). NO OTHER MEDIA

STORAGE DEVICES ARE ACCEPTABLE. Electronic copy’s MUST be submitted on CD.

D. Proposers must submit FIVE (5) copies of their proposals individually secured within appropriately sized 3 ring binders.

E. All SOQ submissions must be made in strict compliance with the instructions provided to the Interested Proposers.

Submissions not in compliance will be deemed non-responsive.

F. SOQs must be enclosed in an opaque sealed envelope or box, marked with the solicitation title, OregonBuys

Number, OMD solicitation number, and the name and address of the proposer.

G. Submissions must be sent through the mail, courier service or hand-delivered. SOQs may NOT be submitted by email or fax.

H. Submission materials must be no larger than 8 ½ x 11 inches and must be securely contained within an appropriate size 3 ring binder.

I. Materials larger than 8 ½ x 11 inches will not be accepted. Any materials received that are larger than this format will be removed from an Interested Proposer’s submission prior to being given to the evaluation committee for review.

J. All exhibits, schedules or other attachments shown on the SOQ Form must accompany the SOQ Form in the same envelope or box; clearly identify each separate item with the Interested Proposer’s name and the solicitation name and number.

4. RFQ FORM INSTRUCTIONS

A. Complete and submit Forms 1, 2, 3, and 4. Interested Proposers shall use the forms as supplied in this RFQ and should not modify or customize the forms in order to ensure that no inadvertent changes are made. Additional sheets with full identification may be added if all the information will not legibly fit on the form. All forms must be filled in completely by the Interested Proposer and clearly demonstrate your ability to meet the RFQ Qualifications

Criteria. Forms that are not completed may result in Interested Proposer’s SOQ being deemed non-responsive

B. Form 1 - SOQ Form:

1) All blanks on the SOQ Form must be completed by typing or printing in ink.

2) Signatures must be in ink and notarized.

3) SOQs submitted by partnerships or joint ventures must be executed in the partnership or joint venture name, as applicable, and signed by all partners/joint venturers whose titles must appear under the signature.

4) SOQs submitted by corporations or other business entities must be executed in the corporate/business entity name, by the president, vice-president (or other corporate/business entity officer accompanied by evidence of authority to sign), with the corporate/business entity seal affixed and signed by the secretary, assistant secretary or other required officer of the entity.

a. The corporate/business entity address and state of incorporation/organization must be shown below the signature.

b. If the proposer is an out-of-state corporation/business entity, evidence of authority to conduct business in the State of Oregon must be attached.

RFQ 190078D001-RP Page 8

5) The SOQ Form must contain an acknowledgement of receipt of all Addenda, the numbers of which must be filled in on the SOQ Form.

C. Form 2 - Company Information Form:

1) Identify the type of resources, number of experienced personnel, and the direct role of each of the Project team members.

2) Team Composition: In addition to the Design-Builder, architect, engineer, and consultants, provide:

a. Company names of Key Subcontractors/Consultants providing design services.

b. Company names of Key Subcontractors/Consultants providing construction services.

D. Form 3 - Key Personnel Information Form:

1) Provide qualifications of key personnel assigned to the Project, and identify the employer of the key personnel

(the Interested Proposer, a named sub-contractor or sub-consultant, etc.). Provide specific project experience that demonstrates the individual’s knowledge, skills and abilities to fulfill their Project roles.

2) Provide the key personnel's recent, current, and projected workloads.

3) Provide the proportion of time by phase that proposed key personnel will spend on this Project.

4) Note: Key personnel submitted cannot be replaced without prior written approval from the OMD Contract

Administrator. OMD reserves the right to limit substitution consent to situations where the identified Key

Personnel is no longer employed by the Design-Builder, the subcontractor or sub-consultant, as applicable. Any substitute offered must be possess equivalent qualifications to the identified Key Personnel. These restrictions apply during the RFQ and RFP process and after contract award and execution.

E. Form 4 - Similar Projects Form:

1) Complete a separate Similar Projects Form for each project.

2) Limit the number of projects to a listing of five (5) projects.

3) Complete all blocks and information requested on the form.

4) Note: project photos are optional.

5. RFQ ATTACHMENT INSTRUCTIONS

A. SOQ Attachments:

1) In addition to Forms 1, 2, 3, & 4, provide all attachments as outlined in this section.

2) Bind attachments and attach to Form 1- the SOQ Form.

3) Standard printed brochures are preferable to custom-prepared graphics.

4) No other attachments other than those described in this Section are allowed. Any additional attachments received will be removed from the Interested Proposer’s SOQ prior to evaluation committee review.

B. SOQ Attachment 1 – Cover Letter:

1) Provide a cover letter identifying Interested Proposer’s firm name, address, phone number, and the name of the principal contact for the firm.

2) Include in the cover letter a statement confirming Interested Proposer’s intention to provide a proposal for the design and construction of the Project, if selected as a “Qualified Proposer” and included on the Short-List.

3) Provide a statement confirming Interested Proposer’s ability to commit personnel and resources to the Project, and include an estimated project schedule encompassing Project start time, design time, construction time, and substantial and final completion dates.

C. SOQ Attachment 2 – Proof of Financial Capability / Experienced Modification Rate:

1) Provide a letter from Interested Proposer’s surety company indicating Interested Proposer’s bonding capacity that is greater than the target GMP listed in Section 1(4)(E).

2) Provide letter from Interested Proposer’s surety company describing Interested Proposer’s construction cost

RFQ 190078D001-RP Page 9 bonding capacity history.

3) Provide a letter from Interested Proposer’s Insurance or Surety Company substantiating its Experience

Modification Rate

4) Provide a letter from Interested Proposer’s financial institution or Certified Public Accountant stating Interested

Proposer’s financial stability and ability to be financially responsible for the duration of the Project.

D. SOQ Attachment 3 – Letters of Reference:

1) Provide references and recommendations from three (3) major suppliers from the Interested Proposer’s last project.

2) Provide references and recommendations from three (3) subcontractors from the Interested Proposer’s last project.

3) Provide references and recommendations from three (3) past clients of the Interested Proposer.

E. SOQ Attachment 4 –Project Approach:

1) Provide a detailed description of the approach and methodology for preparing the design documents, specifications, and other required deliverables, including a discussion of design management and the designer’s construction administration philosophy.

2) Provide a detailed description of the approach and methodology for construction execution, including a discussion of Project administration, fiscal management, quality assurance/quality control, risk mitigation, and

Project closeout.

3) Provide a detailed description of the approach and methodology for the Owner’s role during the design and construction of the Project.

4) Provide a description of Interested Proposer’s knowledge of U.S. Army and National Guard Bureau (“NGB”) requirements for preparing drawings and specifications.

5) Provide a description of Interested Proposer's experience in completing contractual documents for government agencies, military training sites and remote project sites.

6. REQUESTS FOR CLARIFICATION, CHANGES, AND PROTESTS

A. Request for Clarification:

1) OMD will respond to each properly submitted written request for clarification. Where appropriate, OMD will issue revisions or clarifications via addenda posted on the OregonBuys System.

2) All questions about the meaning or intent of the RFQ Documents must be directed to POC.

3) Interpretations or clarifications of the RFQ considered necessary by OMD in response to such questions will be issued by Addenda and available to be downloaded from the OregonBuys System.

4) Questions received less than ten (10) calendar days prior to the SOQ due date will not be answered.

B. Request for Change:

1) An Interested Proposer may submit a request for changes to the RFQ terms. OMD will respond to each properly submitted written request for change of RFQ terms. Where appropriate, OMD will issue revisions or clarifications via addenda posted on the OregonBuys System.

2) To be considered, requests for changes must include the reason for requested changes supported by factual documentation supporting the requested changes.

3) To be considered, the request must be in writing and received within seven (7) calendar days prior to the SOQ due date

4) The request for clarification or changes must be marked “Request for Clarifications or Changes” and include the

Solicitation Number.

C. Protests:

1) Any Interested Proposer that believes the RFQ terms are unnecessarily restrictive or limit competition may submit a written protest.

RFQ 190078D001-RP Page 10

a. To be considered, the protest must be in writing and received within seven (7) calendar days prior to the

RFQ due date.

b. To be considered, the protest must include the legal and factual grounds for the protest, a description of the resulting prejudice to the Interested Proposer if the protest is not granted, and a statement of any desired changes.

c. OMD may, at its sole discretion, discuss the protest with the protestor. No hearing will be held on the protest, but it shall be decided by OMD on the basis of the protest.

d. The protest must be marked “Solicitation Provision Protest” and include the Solicitation Number.

e. This is the Interested Proposer’s only opportunity to protest or request changes to the RFQ terms. Any

Interested Proposer taking exception to the procurement requirements of this RFQ in their SOQ shall be deemed non- responsive and shall be rejected.

7. WITHDRAWAL OF SOQ. An Interested Proposer may withdraw its SOQ prior to the SOQ due date by submitting written notice on Proposer’s letterhead signed by an authorized representative. The notice must include the name and phone number of the Proposer’s representative that will be contacted to arrange for the Proposer to retrieve the withdrawn SOQ. Alternatively, an Interested Proposer may withdraw its SOQ in person prior to the SOQ due date upon presentation of identification and evidence of authorization to act for Proposer. If possible, OMD will return all SOQ materials at the time an in-person withdrawal is presented.

IV. SOQ EVALUATION PROCESS

1. EVALUATION

A. The Evaluators:

1) Evaluation will be conducted by an evaluation committee appointed by OMD. The evaluation committee will consist of no less than three (3) scoring evaluators. The total number of evaluators will be determined by OMD at its sole discretion who may consult with non-scoring technical advisers.

2) Interested Proposers are prohibited from discussing the RFQ, RFP, or the Project with any member of the evaluation committee. Any contact will be grounds for disqualification.

B. RFQ Selection: PASS/FAIL

1) Minimum Qualifications Required:

a. The Interested Proposer and any contractors that make up the Interested Proposer’s team must be licensed with the State of Oregon Construction Contractors Board (“CCB”) (ORS Chapter 701) prior to its submittal of the SOQ, unless (unless superseded by federal law in that requires such licensing prior to contract execution). .

b. All design services constituting the practice of architecture must be provided by or under the responsible charge of a duly-qualified and Oregon-licensed architect (in accordance with ORS Chapter 671), either employed by the Proposer or hired by the Proposer. All design services, if any, constituting the practice of engineering shall be provided by or under the responsible charge of a duly-qualified and Oregon-licensed engineer (in accordance with ORS Chapter 672), either employed by the Proposer or hired by the

Proposer.

c. SOQs will be reviewed for completeness and compliance with the requirements of this RFQ. SOQs that are incomplete may be rejected. If the SOQ is unclear, Proposer may be asked to provide clarification. No new information or documentation may be submitted.

d. SOQs that are found to be non-responsive will be rejected.

2) RFQ References:

References will be reviewed for compliance with RFQ Attachment Instructions.

C. SOQ Scoring Calculation of Average Score. (SCORED) Evaluation Committee members will independently score the responses and allocate points for each SOQ. All, part, or none of the maximum points for each answer may be awarded. The sum of all scores awarded to each Interested Proposer will be divided by the total number of scoring evaluation committee members to compute an average score for each Proposer. An Interested Proposer’s

RFQ 190078D001-RP Page 11 maximum score for evaluation criteria listed in this Section C is 100 points.

1) Design-Build Contractor Qualifications Maximum 25 points

a. Project Organization and Administration (Maximum 10 points)

b. Construction Delivery Approach and Methodology (Maximum 10 points)

c. Financial Capability (Maximum 5 points)

2) Team Qualifications: Maximum 25 points

a. Team Composition (Maximum 10 points)

b. Team Member Resumes (Maximum 10 points)

c. Quality Assurance / Control and Commissioning Experience (Maximum 5 points)

3) Performance History: Maximum 25 points

a. Demonstrate understanding of Owner’s role in integrated project delivery (Maximum 10 points)

b. Demonstrate Regulated Building Material Management (Maximum 10 points)

c. Demonstrate Client Satisfaction (Maximum 5 points)

4) Relevant Project Experience: Maximum 25 points

a. Maintaining tenants continued use of facility during construction. (Maximum 10 points)

b. State Contract and National Guard Contract Experience (Maximum 10 points)

c. Projects of similar size and scope (Maximum 5 points)

D Experience Modification Rate (“EMR”) – Maximum 25 points possible

The points for this section are scored separately by the Evaluation Committee Chairperson.

The lowest verified EMR rating (see Section II. 5 C 3) will be awarded the maximum number of Points possible. Firms with higher EMRs will be awarded a percentage of the maximum Points possible based on the following formula:

(L/X)Y = A

Where:

L = Lowest EMR rate among all Proposals

X = EMR Rate being scored

Y = Total Points Possible

A = Awarded points

F. RANKING OF SOQs:

An Interested Proposer’s maximum score is 125 points (Interested Proposer’s SOQ score combined with its EMR score). The highest cumulative total score will determine the Short-List.

2. SHORT LIST ANNOUNCEMENT AND PROTEST

A. Notice. An announcement of the short-listed firms will be posted on the OregonBuys System.

B. Right to Protest Short List.

1. An adversely affected or aggrieved Interested Proposer may submit a written protest of the Contracting

Agency's decision to exclude the Proposer from the Short List within seven days after issuance of the

OregonBuys notice of the Short List. The Interested Proposer's protest shall be in writing and must specify the grounds upon which the protest is based.

2. An Interested Proposer is adversely affected only if the Interested Proposer is responsible and submitted a

Responsive SOQ and is eligible for inclusion in the Short List, i.e., the protesting Interested Proposer must claim it is eligible for inclusion in the Short List if all ineligible higher-scoring Interested Proposers are removed from consideration, and that those ineligible Interested Proposers are ineligible for inclusion in the

Short List because: (i) their SOQs were not responsive; or (ii) OMD committed a substantial violation of a provision in the RFQ or of an applicable procurement statute or administrative rule, and the protesting

Interested Proposer was unfairly evaluated and would have, but for such substantial violation, been included in the Short List.

RFQ 190078D001-RP Page 12

C. OMD will not consider a protest submitted after the time period set forth above. An Interested Proposer may not protest a OMD’s decision not to increase the size of the Short-List above the size of the Short-List set forth in this RFQ.

V. STEP II: REQUEST FOR PROPOSALS

1. RFP GENERAL INFORMATION

A. As described in Section II(4), the selection process will be a two-step RFQ/RFP process. During the second step RFP

Process, OMD will evaluate proposals from only the firms on the Short List identified in Step1 to select a successful the Proposer who offers the Best Value to OMD for the award of a Design-Build Contract with a GMP. The RFP information contained herein is for informational purposes only and OMD reserves the right to change the RFP requirements and estimated dates in the final RFP to be issued. Furthermore, the RFP requirements and estimated dates are subject to the requirements of any exemption order issued by DAS.

B. Only those firms selected for the short-list during the RFQ process will receive the RFP and be eligible to submit proposals.

C. Each proposal submitted in response to the RFP must be accompanied by proposal security in the amount of

10% of the GMP that will be set forth in the RFP. Proposal security must be submitted in the form of a surety bond, irrevocable letter of credit issued by an insured institution as defined in ORS 706.008, cashier’s check or certified check.

D. All proposals must remain firm and subject to acceptance for one hundred and eighty (180) calendar days after the proposal opening date, but OMD may, at its sole discretion, release any proposal and return the proposal security prior to that date.

1) OMD reserves the right to reject any or all proposals, including without limitation the right to reject any or all nonconforming, nonresponsive, or conditional proposals.

2) OMD reserves the right to reject the proposal of any proposer if OMD deems it not to be in the best interests of

OMD, or to reject any or all proposers who fail to satisfy qualification requirements or fail to meet standards of responsibility.

3) OMD also reserves the right to waive all minor informalities not involving price, time, or changes in the work.

E. When OMD provides a Notice of Intent to Award to the successful proposer, the Design-Builder selected for contract award will be expected to execute the final form of the Design-Build Contract for the Project within twenty-one (21) calendar days thereafter and deliver the required performance and payment bonds, and insurance certificates.

F. The Design-Builder selected for contract award may be given access to information or records that are confidential under Oregon Law solely for the purpose of performing the required services under the contract. By submitting a proposal, the Design-Builder, and at the option of OMD, the Design-Builder’s employees, agents and subcontractors, agree, at OMD’s request, to sign a nondisclosure agreement prior to their receipt of such information or documents obligating each employee, agent, and subcontractor to comply with the confidentiality provisions of the contract.

G. A technical review panel may meet with proposers individually midway through the proposal period to conduct an open, collaborative question and answer period and to review the draft proposals with the design-build teams. This process is purely for the proposer’s benefit and will be completely independent from the scoring/evaluation/selection process.

2. RFP SCHEDULE – All dates and times are estimated - OMD reserves the right to change the schedule or terminate the RFP solicitation process at any time.

A. RFP Documents:

1) RFP Documents Available (Estimated): October, 2021

B. Mandatory Pre-Proposal Conference:

1) Date (Estimated): October 2021 Date, time, and location will be in the RFP)

2) Location: (Proposers will be provided directions to the Conference in advance.)

3) Only prospective proposers selected for the short list from the RFQ will be allowed to attend. Design-Builder team attendance at the Conference and tour is required to fully understand Project requirements.

RFQ 190078D001-RP Page 13

C. Proposal Submission:

1) Date (Estimated): November, 2021 (Date, time, and location will be in the RFP)

2) Location: Oregon Military Department - AGI, Joint Forces Headquarters, 775 Airport Road, Salem, OR 97301

Attention: Sam Goff, Contract Specialist.

3) Number of Copies: one (1) original bearing original ink signature(s) of authorized representative(s), five (5) copies, and one (1) electronic CD copy of its Proposal.

4) Interviews: OMD reserves the right to conduct interviews (Date and Time to be determined)

D. Notice of Intent to Award (Estimated): November, 2021

3. SUMMARY OF PROPOSAL EVALUATION

A. All proposals that will be submitted in response to the RFP must be based on the GMP that will be included in the

RFP.

B. The successful proposal will be the one that provides the overall best value to the OMD, with that best value determined at OMD’s sole discretion.

C. The detailed evaluation criteria will be provided as part of the RFP.

D. Proposers will be required to incorporate drawings, specifications, and other data as indicated on the RFP Submittal

Forms, of a form and character sufficient to adequately explain the design intent and the character of the proposed construction and Proposers’ submittals will be expected to incorporate all substantiation of the performance specifications. The RFP Documents will identify all items that require substantiation in the proposal.

E. All submitted artist renditions must be actual representations of the Proposer’s proposal. Artist renditions that are not substantiated within the proposal and that are not commensurate with the GMP may result in the proposal being deemed non-responsive and rejected.

4. BOND / SURETY REQUIREMENTS

A. Proposal Security: 10% of GMP that will be set forth in the RFP (Must be submitted by all Proposers with Proposal

B. Performance and Payment Bonds: Each in the amount of 100% of the GMP set forth in the RFP. (Must be submitted by Selected Proposer only following Notice of Intent to Award).)

5. INSURABILITY REQUIREMENTS

Insurability: Proposers must demonstrate the following proof of insurability at the RFP stage. For purposes of this Section, Contractor should be read to refer to “Design Builder.”

INSURANCE REQUIREMENTS

Contractor shall obtain at Contractor’s expense the insurance specified in Exhibit C prior to performing under this Contract and shall maintain it in full force and at its own expense throughout the duration of this Contract, as required by any extended reporting period, and all warranty periods that apply. Contractor shall obtain the following insurance from insurance companies or entities that are authorized to transact the business of insurance and issue coverage in the State of

Oregon and that are acceptable to Agency. Coverage shall be primary and non-contributory with any other insurance and self-insurance with the exception of Professional Liability and Workers’ Compensation. Contractor shall pay for all deductibles, self-insured retention and self-insurance, if any.

WORKERS’ COMPENSATION & EMPLOYERS’ LIABILITY

All employers, including Contractor, that employ subject workers, as defined in ORS 656.027, shall comply with ORS

656.017 and provide workers' compensation insurance coverage for those workers, unless they meet the requirement for an exemption under ORS 656.126(2). If Contractor is a subject employer, as defined in ORS 656.023, Contractor shall also obtain employers' liability insurance coverage with limits not less than $1,000,000 each accident.

If Contractor is an employer subject to any other state’s workers’ compensation law, Contractor shall provide workers’ compensation insurance coverage for its employees as required by applicable workers’ compensation laws including employers’ liability insurance coverage with limits not less than $1,000,000.

RFQ 190078D001-RP Page 14

As applicable, Contractor shall obtain coverage to discharge all responsibilities and liabilities that arise out of or relate to the Jones Act with limits of no less than $5,000,000 and/or the Longshoremen’s and Harbor Workers’ Compensation Act.

Contractor shall require and ensure that each of its subcontractors complies with these requirements.

COMMERCIAL GENERAL LIABILITY

Required

Commercial General Liability Insurance covering bodily injury and property damage written on an ISO CG 00 01 10 01

(or equivalent). This insurance shall include personal and advertising injury liability, products and completed operations, contractual liability coverage for the indemnity provided under this contract, and shall have no limitation of coverage to designated premises, project or operation. Coverage shall be written on an occurrence basis in an amount of not less than

$2,000,000 per occurrence. Annual aggregate limit shall not be less than $4,000,000

AUTOMOBILE LIABILITY

Required Not required

Automobile Liability Insurance covering Contractor’s business use including coverage for all owned, non-owned, or hired vehicles with a combined single limit of not less than $2,000,000 for bodily injury and property damage. This coverage may be written in combination with the Commercial General Liability Insurance (with separate limits for Commercial

General Liability and Automobile Liability).

A. Automobile Liability Broadened Pollution Liability Coverage Endorsement

If the Contractor is transporting any type of hazardous materials under the contract, then endorsements CA 99 48 or equivalent and MSC-90 (if the Contractor is a regulated motor carrier) are required on the Automobile Liability insurance coverage.

CONTRACTOR’S PROFESSIONAL LIABILITY

Professional Liability insurance covering any damages caused by an error, omission or any negligent acts related to the work, including design services, to be provided under this Contract by the Contractor and Contractor’s subcontractors, agents, officers or employees in an amount not less than $2,000,000 per claim. Annual aggregate limit shall not be less than $4,000,000. If coverage is on a claims made basis, the retroactive date of the policy must be prior to the inception of the work and an extended reporting period equal to the statute of ultimate repose shall be included in the Professional

Liability insurance coverage.

The Design-Builder or Subcontractor, whichever is performing the design related Work, shall obtain and maintain at its own expense Project-specific Professional Liability Insurance covering any damages caused by any negligent acts, errors or omission of the Design-Builder and, Subcontractors and their respective agents, officers or employees performing engineering, architectural, other design, or design-related or other professional services provided under the Contract. The per occurrence limit shall not be less than the dollar amount specified in the Contract. The annual aggregate limit shall not be less than the dollar amount specified in the Contract. The policy must be endorsed to state that the Professional

Liability Insurance annual aggregate limit will apply separately to the Contract.

If the Design-Builder subcontracts Design Services for the Project, the Design-Builder shall obtain and maintain at its own expense Project-specific Professional Liability Insurance covering any negligent acts, errors or omission of the Design-

Builder and Subcontractors and their respective agents, officers, or employees performing Design Services for the Project, in the dollar amount specified in the Contract.

The Design-Builder shall require its Subcontractors that perform engineering,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .