RFQ 15F06725Q000085 Fuel Tank Replacement.pdf
PDF 1 MB Posted
- Attached to
- Fuel Tank Piping Replacement
- Solicitation number
- RFQ-15F06725Q000085
About this file
This Request for Quote (RFQ) is issued by the Federal Bureau of Investigation (FBI) Procurement Section for a stainless steel piping replacement project at the Criminal Justice Information Service Division in Clarksburg, WV. The solicitation, numbered 15F06725Q000085, seeks a contractor to remove and replace existing steel piping with new stainless-steel piping in the maintenance holes of unleaded and E85 fuel tanks. The contract is a Firm-Fixed Price, one-year purchase order set aside for small businesses, with a performance period from 07/21/2025 to 12/31/2025.
Key procurement details include a total small business set-aside under NAICS code 236220, with a requirement that the contractor be West Virginia Underground Storage Tank (UST) certified and located within a 200-mile radius of Clarksburg. Potential offerors must submit quotes by 11:00 AM ET on 07/17/2025 via email to Contract Specialist Jamie Melzer and Contracting Officer Maureen Murdock. The government will evaluate quotes using a Lowest Price Technically Acceptable (LPTA) methodology, assessing technical capability and past performance, with award anticipated during the week of July 21st, 2025.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEDERAL BUREAU OF INVESTIGATION
FINANCE AND FACILITIES DIVISION | PROCUREMENT SECTION
REQUEST FOR QUOTE
Request for Quote RFQ Version 1.2 Page 1
DEPARTMENT OF JUSTICE
RFQ – 15F06725Q000085
Criminal Justice Information Service Division
Unleaded and E85 Fuel Tank Piping Replacement July 9, 2025
FINANCE AND FACILITIES DIVISION | PROCUREMENT SECTION
Request for Quote RFQ Version 1.2 Page 2
Date: July 9, 2025
To: Prospective Offerors From: Federal Bureau of Investigation/ CJIS Division Subject: Request for Quotation (RFQ) for Facilities Management Unit
Unleaded and E85 Fuel Tank Piping Replacement Solicitation Number: 15F06725Q000085
The Federal Bureau of Investigation (FBI) Procurement Section is issuing this Request for Quotation (RFQ) to solicit all Prospective Offerors for the purpose of entering into a Firm-Fixed Price one-year Purchase Order to provide stainless steel piping replacement of the unleaded and E85 fuel tanks for the Facilities Management Unit in the Criminal Justice Information Service Division.
The period of performance for this Purchase Order will be 07/21/2025-12/31/2025.
Contractors interested in competing for this effort may participate by submitting quotes in accordance with the procedures set forth in this RFQ.
Questions To the Contracting Officer Are Due: 07/11/2025 11:00 AM ET
Quotes Must Be Submitted No Later Than: 07/17/2025 11:00 AM ET
Request for Quote RFQ – Fuel Pipe Replacement Version 1.2 Page 3
1.0 GENERAL DESCRIPTION
COMBINED SYNOPSIS / SOLICITATION FOR COMMERCIAL SERVICES
Document Type: Combined Synopsis/Solicitation Contract Type: FFP Solicitation Number: 15F06725Q000085 Posted Date: July 9, 2025 Product or Service Code: J047 - MAINT/REPAIR/REBUILD OF EQUIPMENT- PIPE, TUBING, HOSE, AND FITTINGS
Set Aside: Total Small Business Set-Aside NAICS Code: 236220 -Commercial and Institutional Building Construction
Contracting Office Address:
Federal Bureau of Investigation 1000 Custer Hollow Road Clarksburg, WV 26306
2.0 DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
2.1 PURPOSE
The purpose of this contract is to remove the existing steel piping and replace with the same size new stainless-steel piping in the maintenance holes of the unleaded and E85 fuel tank at the FBI in Clarksburg, WV.
2.2 BACKGROUND
The current steel piping in the maintenance holes of the unleaded and E85 fuel tank is heavily corroded and will fail if not replaced causing a fuel spill.
2.3 SCOPE OF WORK
See Attachment 1
This is a Firm-Fixed Price for the removal of existing steel piping and replace with the same size new stainless-steel piping in the maintenance holes of the Unleaded and E85 fuel tank at the Federal Bureau of Investigation (FBI) CJIS Division, Clarksburg, WV. This is a non-personal services contract. The Government shall not exercise any supervision or control over contractor employees performing the services herein. Such contract service providers shall be accountable
Request for Quote RFQ – Fuel Pipe Replacement Version 1.2 Page 4 solely to the Contractor who, in turn is responsible to the Government. The contractor must be West Virginia Underground Storage Tank (UST) certified and be within a 200-mile radius of Clarksburg, WV.
2.4 DELIVERABLES
See Attachment 1
2.5 TERM OF CONTRACT
The period of performance (PoP) for this contract is anticipated to be a one-year base.
Contract Year Period of Performance (Example is based on the Friday during the week of award in Section 2.10)
Base Year 07/01/2025-12/31/2025
2.6 CLIN Structure
CLIN Description Base Period Quantity Unit Total Price 0001 Unleaded and E85 piping replacement 1
2.7 REQUIREMENTS FOR QUOTE PREPARATION
2.7.1 INSTRUCTIONS FOR SUBMISSION OF QUOTES
a) Communications - All communications prior to award shall only be directed in writing to the Contract Specialist Jamie Melzer at jlmelzer@fbi.gov and CC Contracting Officer Maureen Murdock at mmurdock@fbi.gov. No telephone calls will be entertained.
b) Questions – All questions must be submitted in writing via e-mail to Contract Specialist Jamie Melzer at jlmelzer@fbi.gov and CC Contracting Officer Maureen Murdock at mmurdock@fbi.gov by July 11, 2025 at 11:00 AM Eastern Time (ET).
c) Quote Submission – Quotes are due via email by July 17, 2025 AT 11:00 AM EASTERN TIME (ET) to Contract Specialist Jamie Melzer at jlmelzer@fbi.gov and CC Contracting Officer Maureen Murdock at mmurdock@fbi.gov. Early submissions are encouraged.
Request for Quote RFQ – Fuel Pipe Replacement Version 1.2 Page 5
2.7.2 QUOTE ORGANIZATION
Quotes shall be divided into three separate volumes as indicated in Table 1 below, each comprised of the required factors and each volume shall be in a separate file. Quotes shall ensure that each volume stands alone for evaluation purposes by the FBI.
Table 1. Quote Organization
Volume # - Title
Volume I: Technical Capability
Factor I: Technical Capability
Volume II: Past Performance Factor II: Past Performance
Volume III: Price Factor III: Price
Table 2 below specifies the page limits the Government has set for each volume that Contractor is required to submit. The page limits are maximums, not recommended lengths. If page limitations are exceeded, the excess pages may not be read or considered in the evaluation of the quote. Contractor(s) are strongly encouraged to keep their responses focused and brief.
Information outside what is required is not encouraged. The cover page is not included in the page count; however, the cover page may not exceed one page. If this exceeds one page, the additional pages will be counted against the page count.
Quotes shall be submitted in Volumes referenced below:
Table 2. Quote Submission and Formatting
QUOTE SUBJECTS ELECTRONIC
COPY
PAGE LIMIT
Volume I: Technical Capability
Factor I: Technical Capability
1 10 pages
Volume II: Past Performance
Factor II: Past Performance
1 10 pages
Request for Quote RFQ – Fuel Pipe Replacement Version 1.2 Page 6
Volume III: Price
Factor IIII: Price
1 N/A
The Contractor must use their discretion on the allotment of pages in the Technical Volume for the subfactors when preparing their quotes. The page limit indicates the total pages allowed for that volume and section.
a) Font Sizes and Styles –
1. Word documents: Primary text throughout the Contractor’s quote shall be a regular font style, e.g., Times New Roman, font size of 12. Only graphs, captions, and other inserts may use font sizes that differ from 12.
2. Spreadsheets: The pre-populated fonts and sizes for any government-provided spreadsheets are to be used.
3. Indexing/Page Numbers: Each volume shall contain a detailed table of contents to delineate the subparagraphs within that volume. Tab indexing shall be used to identify sections. The Table of Contents does not count towards page counts. Each volume page shall have its own unique number. It is the Quoter’s responsibility to ensure data considered sensitive is marked as such. Only these markings may appear in the margins.
4. Foldouts: Legible tables, charts, graphs, and figures shall be used whenever practical to depict organizations, systems and layout, implementation schedules, plans, etc. These displays shall be uncomplicated, legible, and shall not exceed 11 by 17 inches in size.
Foldout pages shall fold entirely within the volume. Foldout pages may only be used for large tables, charts, graphs, diagrams, and schematics; not for pages of text. Foldouts will only be counted as one page. For tables, charts, graphs, and figures, the font shall be no smaller than 10 point.
b) Volume Format – All volumes submitted by the Contractor will require the following format requirements:
1. Quotes shall be submitted in current, but no earlier than 2010 Microsoft Office format, unless the file is a Microsoft Excel Spreadsheet that was provided by the FBI or an attachment that was provided in PDF. If a file requires a signature, then a PDF file is acceptable.
2. Files shall be searchable.
Request for Quote RFQ – Fuel Pipe Replacement Version 1.2 Page 7
3. No file shall be password protected unless directed in this RFQ.
c) Line spacing – Spacing between lines in all volumes shall be no less than 1-1/2 spaces.
2.7.3 QUOTE REQUIREMENTS
a) The quote shall include a cover sheet, clearly marked with title, RFQ number, and Contractor’s name.
b) The term “Contractor” as used herein refers to the single legal entity submitting their quote to the FBI. The work performed by the Quoter shall be conducted by a corporate entity that will be totally responsible for all activities as detailed in the Performance Work Statement.
c) No classified information shall be included in the Contractor’s written quote.
d) The Government reserves the right to award without seeking clarifications or having discussions. Therefore, the Contractor’s quote must contain the Contractor’s best terms.
However, the Government reserves the right to solicit clarifications or conduct discussions of the Contractor’s quote if the Contracting Officer determines them to be necessary.
e) The Contractor shall include the point of contact (name, telephone number, e-mail address, and fax number) that can assist the Contracting Officer with technical questions/problems associated with the Contractor’s quote submission.
f) The Title Page, table of contents, indexes, page separators, resumes, Letters of Commitment, glossaries, and Past Performance Information Forms will not count against page limitations.
Qualifying pages partially used will be counted as one qualifying page.
g) The Contractor shall fill out all attachments and attach as a part of their quote including the SF-1449. Failure to have a complete quote with all requirements completed under this solicitation could result in a determination of non-responsive and may no longer be considered for award.
2.8 EVALUATION AND AWARD PROCESS
2.8.1 BASIS FOR AWARD
The Government will evaluate the submitted quotes against the criteria set forth below and award an order to the responsible offeror whose quote which is conforming to the solicitation will be the Lowest Price Technically Acceptable (LPTA). Award will be made in accordance with
Request for Quote RFQ – Fuel Pipe Replacement Version 1.2 Page 8 the basic contract ordering procedures, the procedures specified in the quote and on the basis of the lowest priced quote meeting the acceptability standards for non-price factors.
The Government will organize the quotes based on the lowest price and will evaluate the technical approach of the lowest priced Offeror first. If the lowest priced Offeror is technically acceptable, that offer represents the best value for the Government and the evaluation process ceases at this point. Award shall be made to that Offeror without further consideration to any other offers.
The Government intends to make award based on the initial quote submissions without conducting interchanges. Therefore, each offer should contain the Offeror’s best terms from a price and technical standpoint. However, the Government reserves the right to hold interchanges if, during the evaluation, it is determined to be in the best interest of the Government. Interchanges are fluid interaction(s) between the Contracting Officer (CO) and the contractors that may address any aspect of the quote and may or may not be documented in real time. However, the Government reserves the right to conduct interchanges using Interchange Notices (IN). Offeror responses to INs will be considered in making the order selection decision.
The quote shall address the Offeror’s experience, capabilities and the means proposed to satisfy the requirements stated in the RFQ and attached Statement of Work. The offeror shall provide information to facilitate the Government’s consideration of the evaluation factors defined below.
Volume I- Factor 1 Technical Capability:
The Government will evaluate the offeror’s response and proposed approach to meeting the requirements of SOW. The offeror will receive one of the ratings described below.
Rating Description Acceptable Quote meets the requirements of the solicitation Unacceptable Quote does not meet the requirements of the solicitation
Volume II- Factor 2 Past Performance:
The past performance evaluation is an assessment of the offeror’s probability of meeting the minimum past performance solicitation requirements. This assessment is based on the offeror’s record of relevant, recent, and quality past performance information that pertain to the requirement outlined in the solicitation requirements. Recency is considered to be within the last 5 years from the date of the solicitation. Relevant is where the past performance is similar to the requirement, complexity, dollar value, and contract type. Quality is how well the offeror has performed on the past contracts. An overall rating shown below will be applied to each past performance.
Rating Description
Request for Quote RFQ – Fuel Pipe Replacement Version 1.2 Page 9
Acceptable Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown*.
Unacceptable Based on the offeror’s performance record, the Government does not have a reasonable expectation that the offeror will be able to successfully perform the required effort.
* In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a)(2)(iv)). Therefore, the offeror shall be determined to have unknown (or “neutral”) past performance. In the context of acceptability/unacceptability, a neutral rating shall be considered “acceptable.”
In conducting this evaluation, the Government reserves the right to use past performance information provided by the offeror and data obtained from other sources available to the Government, to include, but not be limited to, the Contractor Performance Assessment Reporting System (CPARS) or other databases; interviews with Program Managers and Contracting Officers (COs).
Volume III Cost / Price:
The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be the Lowest Price Technically Acceptable ("LPTA") to the Government, price and other factors considered.
2.9 PROCESS SCHEDULE
Below is the schedule for the procurement:
Solicitation Release: July 9, 2025
Questions Due from Quoter: July 11, 2025
Government Answers provided back to Quoter: July 14, 2025 COB
Quotes due: July 17, 2025
Government Source Selection: Week of July 21st
Award: Week of July 21st
NTP/ Contract Start: Day of Award
Request for Quote RFQ – Fuel Pipe Replacement Version 1.2 Page 10
2.10 POINTS OF CONTACT
For questions regarding this RFQ and any other questions, reach out to:
Maureen Murdock Contracting Officer mmurdock@fbi.gov
Jamie Melzer Contract Specialist jlmelzer@fbi.gov
2.11 ATTACHMENTS
Attachment / Exhibit Title Attachment 1 Statement of Work
File details come from the government source that posted it. Updated .