RFQ 15BBNF26Q00000003.pdf

PDF 336 KB Posted

Attached to
USP LEE - Replace Cooling Towers Federal contract opportunity
Solicitation number
15BBNF26Q00000003
Issued by
Department of Justice Bureau of Prisons Field Acquisition Office

About this file

This is a Sealed Bid Invitation for Bid (IFB) solicitation issued by the Federal Bureau of Prisons for construction services. The solicitation number is 15BBNF26Q00000003, issued on February 5, 2026, with sealed bids due by 4:00 PM Eastern Time on February 26, 2026. The project involves replacing cooling towers at USP Lee located in Pennington Gap, Virginia. The contractor must begin performance within 10 calendar days of award and complete all work within 161 calendar days. The project magnitude is estimated between $250,000 and $500,000.

The contractor must provide all materials, labor, and equipment according to attached specifications, Statement of Work, and drawings. Bidders are required to submit a bid bond (20 percent of bid price or not to exceed $3,000,000). Within 10 days of award, the contractor must furnish performance and payment bonds, each at 100 percent of the original contract price. Required insurance includes Workers Compensation ($100,000), Comprehensive General Liability ($500,000 per occurrence for bodily injury), and Comprehensive Automobile Liability ($200,000 per person/$500,000 per occurrence for bodily injury/$20,000 per occurrence for property damage). A pre-construction conference, pre-bid site visit (scheduled for February 12, 2026 at 10:00 AM at FCI Lee Front Lobby), and security clearances for all employees are mandatory. The successful contractor shall be responsible for all applicable federal, state, and local taxes. The project is subject to prevailing wage requirements per wage determination VA20260009.

View the file

Other files for this federal contract opportunity

Other files attached to USP LEE - Replace Cooling Towers, newest first.
File Type Posted
Instructions to Offerors.docx DOCX document
Attachment 4 Criminal History Check Form.pdf PDF
Attachment 2 Wage Determination VA20260009.pdf PDF
Attachment 3 Bid Bond.pdf PDF
Attachment 1 SOW.pdf PDF
Attachment 5 Drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

15BBNF26Q00000003 Page 1 of 23

SOLICITATION,OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NUMBER

15BBNF26Q00000003

SEALED BID (IFB)

INVITATION FOR BID

NEGOTIATED (RFP)

REQUEST FOR PROPOSAL

2. TYPE OF SOLICITATION 3. DATE ISSUED

02/05/2026

PAGE OF PAGES

1 23

IMPORTANT -The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER

15B11725PR000189

6. PROJECT NUMBER

CODE 15BBNF

Federal Bureau of Prisons Field Acquisition Office U.S. Armed Forces Reserve Complex 346 Marine Forces Drive Grand Prairie, TX 75051

7. ISSUED BY

Federal Bureau of Prisons FCI Williamsburg

PO BOX 220

Salters, SC 29590

Ronald Calandra rcalandra@bop.gov

8. ADDRESS OFFER TO

9. FOR

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" means "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

The selected contractor shall provide all materials, labor, and equipment to complete the project titled Replace Cooling Towers at USP Lee located in Pennington Gap, VA in accordance with the attached Specifications, SOW, and Drawings.

PLEASE COMPLETE THE FOLLOWING ITEMS: _____________________________

UNIQUE ENTITY IDENTIFIER (FORMERLY DUNS): _____________________________

TAX IDENTIFICATION NUMBER: ____________________________

CAGE CODE: ________________________________

CONTRACTOR E-MAIL: ________________________________

11. The Contractor shall begin performance within calendar days and complete it within calendar days after receiving10 161 award, X notice to proceed. This performance period is X mandatory negotiable. (See __________________________.)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS? (If "YES," indicate within how many calendar days after award in Item 12b).

X YES NO

12b. CALENDAR DAYS

Sealed offers in original and copies to perform the work required are due at the place specified in item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

16:00US/

Eastern a.

02/26/2026

b. An offer guarantee X is, is not required.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.c.

90d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 12/2022)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d)

X

25Z1AC4

15BBNF26Q00000003 Page 2 of 23

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

CODE FACILITY CODE

The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within 30 calendar days after the date offers are due. (

17.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified) 27

ITEM

10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE

UNITED STATES CODE AT

26. ADMINISTERED BY BFAO

Federal Bureau of Prisons Field Acquisition Office U.S. Armed Forces Reserve Complex 346 Marine Forces Drive Grand Prairie, TX 75051

Federal Bureau of Prisons USP Lee Lee County Industrial Park/Hickory Flats Road Pennington Gap, VA 24277

27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return __________ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30a.NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA

BY

31c. DATE

STANDARD FORM 1442 (REV. 12/2022) BACK

15BBNF26Q00000003 Page 3 of 23

Table of Contents

Section Description Page Number

1 Solicitation, Offer and Award 2 Commodity or Services Schedule 3 Special Contract Requirements 4 Contract Clauses 5 Attachments 6 Solicitation Provisions

52.236-27 Alt I Site Visit (Construction) (Feb 1995) - Alternate I (Feb 1995) 7 Representations and Certifications

15BBNF26Q00000003 Page 4 of 23

Section 2 - Commodity or Services Schedule

SCHEDULE OF SUPPLIES/SERVICES

CONTINUATION SHEET

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 The selected contractor shall provide all materials, labor, and equipment to complete the project titled Replace Cooling Towers at (USP Lee) located in Pennington Gap, VA in accordance with the attached Statement of Work and Drawings.

Delivery Schedule:

Delivery Description:

Delivery Number: 1 Delivery Required On:

Quantity: 1.000000

1 EA $________ $_________________

NOTE: The successful contractor shall be responsible for all applicable federal, state, and local taxes. No tax exemption certification will be issued by the Federal Bureau of Prisons. THE TOTAL PRICE SHALL BE WRITTEN ON LINE ITEM 17 OF THE STANDARD

FORM

15BBNF26Q00000003 Page 5 of 23

Section 3 - Special Contract Requirements

Clauses By Full Text

FAO-0001 Bonds

(a) Bid Guarantee. Each bidder shall submit with his bid a Bid Bond (Standard Form 24) with good and sufficient surety or sureties acceptable to the Government, or other security as provided in provision 52.228-1, in the form of twenty percent (20) of the bid price or not to exceed $3,000,000. The bid bond penalty may be expressed in terms of a percentage of the bid price or may be expressed in dollars and cents. A bid bond is not required for bids of $150,000 or less. (FAR 28.102-1)

(b) Performance and Payment Bonds. Within 10 days after award the contractor shall execute and submit to the Contracting Officer two bonds, each with good and sufficient surety or sureties acceptable to the Government, as follows;

a Performance Bond (Standard Form 25) and a Payment Bond (Standard Form 25A). The penal sums of such bonds will be as follows: (Not required for contracts of $150,000 or less)

(1) Performance Bond: The penal sum of performance bonds at the time of contract award shall be 100 percent of the original contract price.

(2) Payment Bond: The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.

(c) For construction contracts greater than $35,000 but not greater than $150,000, the Contracting Officer shall select two or more of the following payment protections, giving particular consideration to inclusion of an irrevocable letter of credit as one of the selected alternatives (FAR 28.102-1(b)(1)):

(1) A Payment Bond;

(2) An irrevocable letter of credit (ILC);

(3) A tripartite escrow agreement;

(4) A Certificate of Deposit; or

(5) A deposit of the types of security listed in 28.204-1 and 28.204-2.

(d) Individual Sureties.

(1) Bidders may elect to furnish individual surety bonds. If individual surety bonds are furnished for bid guarantees, payment or performance bonds, the individual sureties must submit their bonds proof of ownership and value of the assets which they claim in their net worth at time of bid opening. The Government's preferred method of proof is to have a statement of net worth prepared by a Certified Public Accountant (CPA) in accordance with Generally Accepted Accounting Principles (GAAP). Statements from a CPA that contain disclaimers are not acceptable. The statement of net worth on the Standard Form 28, Affidavit of Individual Surety, is insufficient and will not be accepted without additional proof of value and ownership.

(2) Bidders are cautioned that individual sureties must provide complete and detailed information in Block 9 of Standard Form 28 concerning other contracts on which they have provided bonds. This information shall include contract number, contract location, amount, and type of bond and telephone number of the involved contracting office. Failure to provide the proof and information required may result in rejection of the bid or termination of the contract for failure to provide adequate bonds.

FAO-0002 Magnitude

The magnitude of this project is between $250,000.00 and $500,000.00.

15BBNF26Q00000003 Page 6 of 23

FAO-0003 Required Insurance

See FAR 52.228-5, Insurance - Work on a Government Installation.

The Contractor shall, at its own expense, provide and maintain during the entire performance period of this contract, at least the kinds and minimum amounts of insurance required in the

Schedule or elsewhere in the contract.

TYPE AMOUNT

(1) WORKERS COMPENSATION & EMPLOYER'S LIABILITY $100,000

The required Workmen's Compensation Insurance shall extend to cover employee's liability for accidental bodily injury or death and for occupational disease with a minimum liability of $100,000.

(2) COMPREHENSIVE GENERAL LIABILITY with a minimum limit of:

PER ACCIDENT OR

OCCURRENCE FOR BODILY INJURY $500,000

This insurance shall include contractor's protective and contractual liability.

(3) COMPREHENSIVE AUTOMOBILE LIABILITY with the following minimum limits:

PER PERSON $200,000

PER OCCURRENCE FOR BODILY INJURY $500,000

PER OCCURRENCE FOR PROPERTY DAMAGE $ 20,000

FAO-0004 Pre-Construction Conference

(a) Prior to the start of construction, Contracting Officers shall call a conference with the contractor, subcontractor(s), Warden, Controller/Business Administrator, Safety Manager, Facilities Administrator, Project Representative, A&E firm, Captain and other interested personnel to discuss the statutory labor standards, prevailing wage requirements, submission of the contractor's payrolls, subcontractor's responsibilities, institution work schedules, local policies, contraband, parking, storage of vehicles and equipment, etc.

15BBNF26Q00000003 Page 7 of 23

Minutes of the conference shall be recorded, listing the names and titles of all attendees, and the subject matter of all items covered. The minutes shall be signed by the contractor and the Contracting Officer, and a signed copy placed in the contract file.

(b) The Contractor shall familiarize himself/herself with all procedures involved in normal institution routines. Any requirements which may constitute a problem or result in conflict, will be brought to the attention of the Contracting Officer or his representative for determination.

FAO-0005 Submittals

Within 10 calendar days after commencement of work or as otherwise established by the Contracting Officer, all materials and articles requiring approval, as contemplated by the Materials and Workmanship clause, shall be submitted by the contractor.

The submittal process is in place to allow the Government the opportunity to determine whether materials or procedures used by the contractor are in accordance with contract requirements. It is ultimately the Contractor's responsibility via the quality control process to ensure submittal items installed under the contract and work performed on site are in accordance with industry standards and general practices.

(a) The types of submittal requirements specified in this contract may include, but is not limited to; shop drawings, product data, samples, certificates of conformance or compliance, certified test or inspection reports, equipment, materials, and miscellaneous work related submittals for construction. Individual submittal requirements are generally specified in applicable sections for each unit of work in the specifications and/or as a whole in one section in the statement of work.

(b) The Bureau of Prisons (BOP) Contracting Officer’s Representative (COR) shall act for the Contracting Officer in the review and acceptance of all submittals. The Contractor shall submit submittals as required by the contract/ specifications to the COR for transmittal to the Contracting Officer. Fabrication of any work or purchase or use of any submittals (such as materials for which samples are required or equipment, etc.) shall not take place until written acceptance is given by the COR, except at the Contractor's own risk.

(c) The Contractor shall submit all shop drawings and submittals sufficiently in advance (unless otherwise specified in the specifications) of the construction requirements to allow ample time for checking, re-submitting, and re-checking.

(d) Failure of any materials to pass their specified tests shall be sufficient cause for refusal to consider, under this contract, any further samples of the same brand or make of that material. The Government reserves the right to disapprove any material or equipment which has previously proven unsatisfactory in service.

(e) The Contracting Officer’s or designee’s approval or acceptance of submittals is not to be construed as a complete check. Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor is responsible for the satisfactory construction of all work. The Contractor is responsible for delivering a final product/system that is operational as intended by the contract requirements, regardless of any Government approvals or acceptance of submittals. The Government assumes no liability during the submittal approval/acceptance process. It is the sole responsibility of the Contractor to deliver a properly functioning product or system.

FAO-0006 Contractor Use of Premises

Work Hours The project schedule is based on a normal forty (40) hour work week, eight (8) hours per day, Monday through Friday, excluding Federal holidays. The Contracting Officer’s Representative (COR) shall establish the work hour time frames for the duration of the project, subject to the approval of the Contracting Officer. Work hours and work days may be altered only with a 48 hour advance approval of the Contracting Officer.

NOTE: Access to the site will be available during normal working hours except during emergencies. It shall be the responsibility of the Contractor to familiarize himself, his employees, and his subcontractors of the working hours and conditions in the correctional facility, as working hours may not constitute a full eight hour day. The Government assumes no responsibility to the Contractor, nor to any of his subcontractors, for shorter hours due to institutional emergencies or entry and/or exit of workers necessitated by normal institution routines. The procedures and institutional entrance/

15BBNF26Q00000003 Page 8 of 23 exit routines applicable to this project will be explained at both the pre-bid conference/site visit and the pre-construction meeting.

Contraband The Contractor shall inform his employees that intoxicating beverages, drugs, weapons, etc., will not be allowed on the site. Introduction of contraband shall be subject to the penalties prescribed by Title 18 USC-1791.

Explosives The use of explosives is absolutely forbidden without written authorization from the Contracting Officer.

Parking and Temporary Office Parking will be available at the site to the extent it does not interfere with construction activities. Otherwise, parking shall be provided for by the Contractor, at his expense, off the site for workmen employed on the project. Any temporary field office used by the Contractor shall be located in an area approved by the COR.

Safety and Accident Prevention In performing work under this contract the contractor shall:

(a) Conform to the specific safety requirements established by this contract;

(b) Comply with the safety rules of the Government institution that concern related activities not directly addressed in this contract;

(c) Take all reasonable steps and precautions to prevent accidents and preserve the life and health of contractor and Government personnel performing or in any way coming in contact with the performance of this contract; and

(d) Take such additional immediate precautions as the Contracting Officer and/or COR may reasonably require for safety and accident prevention purposes.

FAO-0007 Payment Services

(a) Original application for payment shall be prepared on AIA (American Institute of Architects) Form G-702 "Application and Certificate for Payment" and submitted to the Contracting Officer. The contractor may use another form;

however, it shall contain similar information as the AIA Form G-702. The Contracting Officer’s Representative (COR) will approve the amount of payment by signing. The approved application for payment shall be forwarded as follows: Original to Accounting; Copy for Contract Award File.

(b) All small business contractors are required to self-certify on all invoices their small business status.

(c) The following information is required with each application for payment:

• Name and address of contractor

• Contract number

• Contractor invoice/application for payment number

• Description, price, and quantity of construction completed/rendered

• Payment terms (reference the contract payment clause)

• Other substantiating documentation or information required by the contract

• Name, title, and phone number of official to be notified in the event of a defective invoice

• Contractor TIN (Tax ID Number)

FAO-0008 Request for Final Inspection

The Contractor shall give the Contracting Officer’s Representative (COR) a minimum of ten (10) working days advanced written notice of the date on which the work will be fully completed and ready for the Government’s final inspection.

FAO-0009(a) Construction Contract Security

FAO-0009(a) Construction Contract Security (Program Statement 3732.01 BOP Identifications and Background Investigation)

15BBNF26Q00000003 Page 9 of 23

In addition to the information contained in clause “DOJ-03 Personnel Security Requirements For Contractor Employees (Nov 2021); (Alt. I) -- Classified Information – Cleared Contractors”, the following additional security is required to be completed and submitted for all contract employees who will be working under the terms of the contract:

Criminal History Check – BP-A0660 (May 2018) CJIS Name Check Request Form BOP Contractor Pre-employment Questionnaire BOP Authority for Release of Information The contactor should be aware that the time required for contractor security clearances to be completed may vary. For the purposes of this solicitation, ____ calendar days [contracting officer to insert the number of days based on performance period memo] have been included in the performance period specified in FAR clause 52.211-10. The number of days listed above is contingent upon the contractor providing completed clearance packages for their employees within 10 calendar days of the Notice to Proceed. For any subsequently awarded subcontract, completed security clearance packages for subcontractor workers shall be submitted in conjunction with the completed SF-1413.

**A form package will be issued by the Administrative Contracting Officer or Contracting Officer's Representative (COR) at the institution upon contract award. Completed packages shall be submitted by the PRIME CONTRACTOR ONLY to obtain clearance for each prime and sub-contract employee. Security Clearance packages will NOT be accepted from sub-contractors. Upon clearance being obtained the contractor will be notified. Should a contract employee NOT be cleared to enter the facility for this project, the contractor will be notified immediately. The contractor will be responsible to submit another contract employee as soon as possible for clearance. Be advised, the Federal Bureau of Prisons cannot disclose why an individual does not pass the security clearance process, as it is a violation of law.**

FAO-0010 Assignment of Contract Administration Office and Functions

Pursuant to FAR 42.201 and 42.202, the assigned Contract Administration Office is listed in Block 26 of the Standard Form 1442 Back. This assignment carries with it the authority to perform all of the contract administration functions listed in FAR 42.302(a) and 42.302(b) to the extent that those functions apply to the contract.

The Contract Administration Office is required, however, to obtain written authorization from the Procuring Contracting Officer (PCO) to perform any function listed under 42.302(b). Specifically, the Administrative Contracting Officer (ACO) is required to obtain written authorization to perform the below referenced functions FOR CONSTRUCTION CONTRACT

AWARDS:

(1) Negotiate or negotiate and execute supplemental agreements incorporating contractor proposals resulting from change orders issued under the Changes clause. Before completing negotiations, coordinate any delivery schedule change with the contracting office.

(2) Negotiate prices and execute priced exhibits for unpriced orders issued by the contracting officer under basic ordering agreements.

(3) Negotiate or negotiate and execute supplemental agreements changing contract delivery schedules.

(4) Complete Contractor Performance Assessment Report System (CPARS) evaluations of contractor performance in accordance with FAR Subpart 42.15.

15BBNF26Q00000003 Page 10 of 23

Should any other function under FAR Subpart 42.15 not listed above be required, the ACO is required to contact the PCO for authority.

FAO-0011 Schedule of Values

The Contractor shall prepare a Schedule of Values (SOV) for the project and submit to the Contracting Officer for approval prior to submitting the first application for payment. The SOV shall be correlated with the construction schedule.

The SOV shall be formatted per the Construction Specification Institute Master Format structure. The Contractor may propose an alternate organizational format to the Contracting Officer for approval.

(a) The SOV shall include:

(1) Project name, location, and contract number;

(2) Contractor’s name and address;

(3) Date of submittal.

(b) The SOV shall be arranged in a tabular form with separate columns to indicate the following for each item listed:

(1) Description of Work or Material;

(2) Related specification section, if applicable;

(3) Name of subcontractor, if applicable;

(4) Name of manufacturer or fabricator, if applicable;

(5) Name of supplier, if applicable;

(6) Change orders (modifications) that have affected value, if applicable;

(7) Dollar value;

(8) Percentage of Contract sum rounded to the nearest percent, adjusted to total 100 percent.

(c) The SOV shall breakdown the contract sum in sufficient detail to facilitate continued evaluation of applications for payment and progress reports. The contractor should separate principal subcontract amounts down into several line items.

(d) SOV amounts shall be rounded to the nearest whole dollar. The total of all SOV amounts shall equal the total contract amount.

(e) The contractor shall progress the percentage of completion, with the concurrence of the Contracting Officer’s Representative, for each value in conjunction with the preparation of each monthly application for payment. The progressed value percentages shall directly correlate to the calculated total amount due for each monthly progress payment.

(f) The SOV shall remain fixed for the duration of contract performance. Any revisions to the SOV must be requested in writing, with justification, for approval by the Contracting Officer.

FAO-0012 Progress Meetings

The Administrative Contracting Officer (ACO) shall conduct progress meetings at the project site on a monthly basis, or at intervals as determined by the ACO.

(a) At a minimum, the attendees shall include but is not limited to:

(1) FBOP: Administrative Contracting Officer, Contracting Officer’s Representative (COR), Facility Administrator/Manager, Architect/Engineer (if applicable), Other Personnel (Executive Staff, Captain, Safety Manager, etc.).

(2) Contractor: Project Manager, Superintendent, and technical support disciplines as appropriate (Subcontractors, Manufacturers, Suppliers, etc.).

(b) The meeting should include, but is not limited to issues such as:

15BBNF26Q00000003 Page 11 of 23

Administrative Contracting Officer:

(1) Old business from previous progress meeting(s);

(2) Status of modifications, certified payrolls, submittals, requests for information (RFI);

(3) Review of payments made to date and review/approve current payment request;

(4) Status of modification proposal requests;

(5) Discuss new business.

COR:

(1) Status of escort coverage;

(2) Review gate or sallyport entrance/exit issues;

(3) Discuss other delays contractor may be experiencing;

(4) Discuss performance/quality issues.

Contractor:

(1) Review/discuss updated progress schedule;

(2) Provide 30 day outlook;

(3) Discuss other issues affecting performance.

FAO-0013 Contract Closeout Procedures (for construction contracts exceeding $150,000)

Contract Closeout must be completed within six (6) months of physical completion of the work.

Prior to payment of final invoice:

The contractor shall submit the following documents:

(1) Contractor’s Affidavit of Release of Liens (AIA Document G706A);

(2) Contractor’s Affidavit of Payment of Debts and Claims (AIA Document G706);

(3) All as-built drawings/shop drawings, if applicable;

(4) Contractor’s final invoice;

(5) Release of Claims (GSA Form 1142);

(6) Consent of Surety to Final Payment (AIA Document G707);

(7) Letter establishing warranty dates;

(8) Complete list of subcontractors with telephone numbers and points of contact;

(9) Guarantees and warranties;

(10) All balance and test reports;

15BBNF26Q00000003 Page 12 of 23

(11) All operation/maintenance manuals;

(12) All permits and certifications.

AIA forms can be obtained from The American Institute of Architects at www.aiabookstore.com.

GSA forms can be obtained from the General Services Administration at www.gsa.gov (click on the “Forms Library” link).

15BBNF26Q00000003 Page 13 of 23

Section 4 - Contract Clauses

Clauses By Reference

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.acquisition.gov

Clause Title Fill-ins (if applicable)

52.202-1 Definitions (Jun 2020)

52.203-3 Gratuities (Apr 1984)

52.203-5 Covenant Against Contingent Fees (May 2014)

52.203-6 Restrictions on Subcontractor Sales to the Government

(Jun 2020)

52.203-7 Anti-Kickback Procedures (Jun 2020)

52.203-8 Cancellation, Rescission, and Recovery of Funds for

Illegal or Improper Activity (May 2014)

52.203-10 Price or Fee Adjustment for Illegal or Improper Activity

(May 2014)

52.203-12 Limitation On Payments to Influence Certain Federal

Transactions (Jun 2020)

52.203-17 Contractor Employee Whistleblower Rights (Nov 2023)

52.203-19 Prohibition on Requiring Certain Internal Confidentiality

Agreements or Statements (Jan 2017)

52.204-9 Personal Identity Verification of Contractor Personnel

(Jan 2011)

52.204-10 (DEV) Reporting Executive Compensation and First-Tier

Subcontract Awards (Jun 2020)(DEVIATION NOV 2025)

52.204-13 (DEV) System for Award Management-Maintenance (Oct 2018)

(DEVIATION NOV 2025)

15BBNF26Q00000003 Page 14 of 23

Clause Title Fill-ins (if applicable)

52.204-14 (DEV) Service Contract Reporting Requirements (Oct 2016)

(DEVIATION NOV 2025)

52.204-15 (DEV) Service Contract Reporting Requirements for Indefinite-

Delivery Contracts (Oct 2016) (DEVIATION NOV 2025)

52.204-18 Commercial and Government Entity Code Maintenance

(Aug 2020)

52.204-19 Incorporation by Reference of Representations and

Certifications (Dec 2014)

52.204-23 Prohibition on Contracting for Hardware, Software, and

Services Developed or Provided by Kaspersky Lab

Covered Entities (Dec 2023)

52.209-6 (DEV) Protecting the Government's Interest When

Subcontracting with Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded (Jan

2025) (DEVIATION NOV 2025)

52.209-10 (DEV) Prohibition on Contracting With Inverted Domestic

Corporations (Nov 2015) (DEVIATION NOV 2025)

52.211-12 Liquidated Damages-Construction (Sept 2000) (a): "446.41"

52.215-21 Alt IV Requirements for Certified Cost or Pricing Data and

Data Other Than Certified Cost or Pricing Data-

Modifications (Nov 2021) - Alternate IV (Oct 2010)

52.219-6 (DEV) Notice of Total Small Business Set-Aside (Nov 2020)

(DEVIATION DEC 2025)

52.219-8 (DEV) Utilization of Small Business Concerns (Jan 2025)

(DEVIATION DEC 2025)

52.219-14 (DEV) Limitations on Subcontracting (Oct 2022) (DEVIATION

DEC 2025)

(f)(1) End of Perf Period: "X"

52.219-28 Alt I (DEV) Postaward Small Business Program Rerepresentation

(Jan 2025) - Alternate I (Mar 2020) (DEVIATION DEC

2025)

15BBNF26Q00000003 Page 15 of 23

52.222-1 (DEV) Notice to the Government of Labor Disputes (Feb 1997)

(DEVIATION DEC 2025)

52.222-3 (DEV) Convict Labor (June 2003) (DEVIATION DEC 2025)

52.222-4 (DEV) Contract Work Hours and Safety Standards--Overtime

Compensation (May 2018) (DEVIATION DEC 2025)

52.222-6 (DEV) Construction Wage Rate Requirements (Aug 2018)

(DEVIATION AUG 2025)

52.222-7 (DEV) Withholding of Funds (May 2014) (DEVIATION DEC

2025)

52.222-8 (DEV) Payrolls and Basic Records (Jul 2021) (DEVIATION

DEC 2025)

52.222-9 (DEV) Apprentices and Trainees (July 2005) (DEVIATION FEB

2025)

52.222-10 (DEV) Compliance with Copeland Act Requirements (Feb

1988) (DEVIATION DEC 2025)

52.222-11 (DEV) Subcontracts (Labor Standards) (May 2014)

(DEVIATION DEC 2025)

52.222-12 Contract Termination - Debarment (May 2014)

52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (May 2014)

52.222-14 (DEV) Disputes Concerning Labor Standards (Feb 1988)

(DEVIATION DEC 2025)

52.222-15 Certification of Eligibility (May 2014)

52.222-35 (DEV) Equal Opportunity for Veterans (Jun 2020) (DEVIATION

DEC 2025)

52.222-36 (DEV) Equal Opportunity for Workers with Disabilities (Jun

2020) (DEVIATION DEC 2025)

52.222-37 (DEV) Employment Reports on Veterans (Jun 2020)

(DEVIATION DEC 2025)

15BBNF26Q00000003 Page 16 of 23

52.222-40 (DEV) Notification of Employee Rights Under the National

Labor Relations Act (Dec 2010) (DEVIATION DEC

2025)

52.222-50 (DEV) Combating Trafficking in Persons (Oct 2025)

(DEVIATION DEC 2025)

52.222-54 (DEV) Employment Eligibility Verification (Jan 2025)

(DEVIATION DEC 2025)

52.222-55 (DEV) Minimum Wages for Contractor Workers Under

Executive Order 14026 (Jan 2022) (DEVIATION DEC

2025)

52.222-62 (DEV) Paid Sick Leave Under Executive Order 13706 (Jan

2022) (DEVIATION DEC 2025)

52.223-2 (DEV) Reporting of Biobased Products Under Service and

Construction Contracts (May 2024) (DEVIATION DEC

2025)

52.223-5 Pollution Prevention and Right-to-Know Information

(May 2024)

52.223-11 (DEV) Ozone-Depleting Substances (May 2024) (DEVIATION

DEC 2025)

Substance(s): "refrigerant"

52.223-12 (DEV) Maintenance, Service, Repair, or Disposal of

Refrigeration Equipment and Air Conditioners (May

2024) (DEVIATION DEC 2025)

52.223-20 Aerosols (May 2024)

52.223-21 Foams (May 2024)

52.223-23 (DEV) Sustainable Products (May 2024) (DEVIATION DEC

2025)

52.226-7 Drug-Free Workplace (May 2024)

52.226-8 Encouraging Contractor Policies To Ban Text

Messaging While Driving (May 2024)

52.227-1 Authorization and Consent (Jun 2020)

15BBNF26Q00000003 Page 17 of 23

52.227-2 Notice and Assistance Regarding Patent and Copyright

Infringement (Jun 2020)

52.227-4 Patent Indemnity-Construction Contracts (Dec 2007)

52.228-5 Insurance-Work on a Government Installation (Jan

1997)

52.228-11 Individual Surety-Pledge of Assets (Feb 2021)

52.228-12 Prospective Subcontractor Requests for Bonds (Dec

2022)

52.228-14 Irrevocable Letter of Credit (Nov 2014)

52.228-15 Performance and Payment Bonds-Construction (Jun

2020)

52.229-12 (DEV) Tax on Certain Foreign Procurements (Feb 2021)

(DEVIATION AUG 2025)

52.232-5 Payments under Fixed-Price Construction Contracts

(May 2014)

52.232-17 Interest (May 2014)

52.232-23 Assignment of Claims (May 2014)

52.232-27 Prompt Payment for Construction Contracts (Jan 2017)

52.232-33 Payment by Electronic Funds Transfer-System for

Award Management (Oct 2018)

52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013)

52.232-40 Providing Accelerated Payments to Small Business

Subcontractors (Mar 2023)

52.233-1 Alt I (DEV) Disputes (May 2014) - Alternate I (Dec 1991)

(DEVIATION NOV 2025)

52.233-3 (DEV) Protest after Award (Aug 1996) (DEVIATION NOV 2025)

52.233-4 (DEV) Applicable Law for Breach of Contract Claim (Oct 2004)

(DEVIATION NOV 2025)

52.236-2 (DEV) Differing Site Conditions (Apr 1984) (DEVIATION AUG

2025)

15BBNF26Q00000003 Page 18 of 23

52.236-3 (DEV) Site Investigation and Conditions Affecting the Work

(Apr 1984) (DEVIATION AUG 2025)

52.236-5 (DEV) Material and Workmanship (Apr 1984) (DEVIATION

AUG 2025)

52.236-6 (DEV) Superintendence by the Contractor (Apr 1984)

(DEVIATION AUG 2025)

52.236-7 (DEV) Permits and Responsibilities (Nov 1991) (DEVIATION

AUG 2025)

52.236-8 (DEV) Other Contracts (Apr 1984) (DEVIATION AUG 2025)

52.236-9 (DEV) Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984)

(DEVIATION AUG 2025)

52.236-10 (DEV) Operations and Storage Areas (Apr 1984) (DEVIATION

AUG 2025)

52.236-11 (DEV) Use and Possession Prior to Completion (Apr 1984)

(DEVIATION AUG 2025)

52.236-12 (DEV) Cleaning Up (Apr 1984) (DEVIATION AUG 2025)

52.236-14 (DEV) Availability and Use of Utility Services (Apr 1984)

(DEVIATION AUG 2025)

52.236-15 (DEV) Schedules for Construction Contracts (Apr 1984)

(DEVIATION AUG 2025)

52.236-17 (DEV) Layout of Work (Apr 1984) (DEVIATION AUG 2025)

52.240-91 (DEV) Security Prohibitions and Exclusions (DEVIATION NOV

2025)

52.240-92 Alt II (DEV) Security Requirements - Alternate II (DEVIATION NOV

2025)

52.240-93 (DEV) Basic Safeguarding of Covered Contractor Information

Systems (DEVIATION NOV 2025)

52.242-13 Bankruptcy (July 1995)

52.242-14 Suspension of Work (Apr 1984)

52.243-4 (DEV) Changes (June 2007) (DEVIATION JUL 2025)

15BBNF26Q00000003 Page 19 of 23

52.244-6 (DEV) Subcontracts for Commercial Products and Commercial

Services (JAN 2025) (DEVIATION FEB 2025)

52.246-12 Inspection of Construction (Aug 1996)

52.246-21 Warranty of Construction (Mar 1994)

52.248-3 Value Engineering-Construction (Oct 2025)

52.249-1 Termination for Convenience of the Government (Fixed-

Price) (Short Form) (Apr 1984)

52.249-10 Default (Fixed-Price Construction) (Apr 1984)

52.252-6 Authorized Deviations in Clauses (Nov 2020) Regulation Name: " "

CFR: " "

52.253-1 (DEV) Computer Generated Forms (Jan 1991) (DEVIATION

NOV 2025)

2852.201-70 Contracting Officer's Representative (COR) (NOV 2020)

DOJ-02 Contractor Privacy Requirements (JAN 2022)

DOJ-03 Personnel Security Requirements For Contractor

Employees (Nov 2021)

DOJ-08 Continuing Contract Performance During a Pandemic

Influenza or other National Emergency (OCT 2007)

FAO-0015 Changes

Clauses By Full Text

FAO-0016 Equitable Adjustments: Waiver and Release of Claims

(a) When the Contractor, after receipt of notification of a change made pursuant to the clause of this contract entitled "Changes" or after affirmation of constructive change thereunder, submits any claim for equitable adjustment under this clause, such claim shall include all types of adjustments in the total amounts to which that clause entitles the Contractor, including but not limited to adjustments arising out of delays or disruptions or both caused by such change. Except as the parties may otherwise expressly agree, the Contractor shall be deemed to have waived (i) any adjustments to which it otherwise might be entitled under the aforesaid clause where such claim fails to request such adjustment, and (ii) any increase in the amount of equitable adjustments additional to those requested in its claim.

(b) Further, the Contractor agrees that, if required by the Contracting Officer, it will execute a release, in form and substance satisfactory to the Contracting Officer, as part of the supplemental agreement setting forth the aforesaid adjustment, and that such release shall discharge the Government, its officers, agents, and employees, from any further claims, including but not limited, to further claims arising out of delays or disruptions or both caused by the aforesaid change.

15BBNF26Q00000003 Page 20 of 23

Section 5 - Attachments

Identifier Title Number of Pages

1 25Z1AC4 SOW Approved 3-25-25.pdf 14 2 Wage Determination VA20260009.pdf 6 3 SF 24 Bid Bond.pdf 4 4 Criminal History Check Form.pdf 2 5 Drawings 2

15BBNF26Q00000003 Page 21 of 23

Section 6 - Solicitation Provisions

Provisions By Reference

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es): www.acquisition.gov

Provision Title Fill-ins (if applicable)

52.204-7 (DEV) System for Award Management-Registration (Nov 2024)

(DEVIATION NOV 2025)

52.214-6 Explanation to Prospective Bidders (Apr 1984)

52.214-34 Submission of Offers in the English Language (Apr

1991)

52.214-35 Submission of Offers in U.S. Currency (Apr 1991)

52.215-20 Alt IV (DEV) Requirements for Certified Cost or Pricing Data and

Data Other Than Certified Cost or Pricing Data (Nov

2021) - Alternate IV (Oct 2010) (DEVIATION DEC 2025)

(b): "None"

52.216-1 (DEV) Type of Contract (Apr 1984) (DEVIATION DEC 2025)

52.222-5 (DEV) Construction Wage Rate Requirements - Secondary Site of the Work (May 2014) (DEVIATION DEC 2025)

52.225-10 Notice of Buy American Requirement-Construction

Materials (May 2014)

52.228-1 Bid Guarantee (Sept 1996) (c)Percent: "20"

(c)BidPrice: "3,000,000.00"

52.228-17 Individual Surety-Pledge of Assets (Bid Guarantee) (Feb

2021)

52.252-5 Authorized Deviations in Provisions (Nov 2020) Regulation Name: "Any"

15BBNF26Q00000003 Page 22 of 23

Provision Title Fill-ins (if applicable)

Chapter: "Any"

Provisions By Full Text

52.236-27 Alt I Site Visit (Construction) (Feb 1995) - Alternate I (Feb 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for - 12 February 2026 @ 10:00am

(c) Participants will meet at - FCI Lee - Front Lobby (End of provision)

15BBNF26Q00000003 Page 23 of 23

Section 7 - Representations and Certifications

Provisions By Reference

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es): www.acquisition.gov

Provision Title Fill-ins (if applicable)

52.240-90 (DEV) Security Prohibitions and Exclusions Representations and Certifications (DEVIATION NOV 2025)

Provisions By Full Text

FAO-0022 List of References and Bank Information

Offerors are required by the Contracting Officer to submit past performance information with their solicitation. All information is required to be submitted directly from the contractor reference to rcalandra@bop.gov “Instructions to Offerors” included with this solicitation has an attached Past Performance Questionnaire and Banking Reference Questionnaire that are required. Provide at least 5 references and one bank reference. Both Questionnaires should be submitted prior to the bid closing date to the email address stated above. You must have current work or completed work with the firms you forward the questionnaires to in the last 24 months. The companies/Government agencies you forward the reference documents should send their response to rcalandra@bop.gov prior to closure of the solicitation bid opening.

(End of Provision)