RFQ 1305M321QNRMA0051.pdf

PDF 938 KB Posted

Attached to
NOAA Pacific Marine Environmental Lab R/V SP Hayes Repair
Solicitation number
1305M321QNRMA0051
Issued by

About this file

This is a solicitation for repair services for the NOAA research vessel R/V SP Hayes. The National Oceanic and Atmospheric Administration requires repairs to be completed at the contractor's shipyard. Work includes items like replacing control station components in the main cabin, inspecting and repairing bilge pumps and plumbing, servicing engines and propulsion systems, and cleaning bilges. The solicitation provides a schedule of line items with descriptions and pricing. Offerors must submit quotes by July 30, 2021. The contract will have a base performance period determined upon award plus optional six-month extensions. The solicitation incorporates numerous standard clauses on topics like contract terms, disputes, and insurance requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ IFB RFP

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER PAGE OF

2. CONTRACT NO. 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODEFACILITY

CODE

CODE

TELEPHONE NO.

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

29. AWARD OF CONTRACT: REF.

DATE . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

OFFER

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

17a CONTRACTOR/

OFFEROR.

CODE

8 (A)

SIZE STANDARD:

NAICS:

% FOR:SET ASIDE:UNRESTRICTED OR

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

10. THIS ACQUISITION IS

EDWOSB

SMALL BUSINESS PROGRAM

NR-MAH000-21-00656

1305M321QNRMA0051

DARRIN MOORE

DARRIN.MOORE@NOAA.GOV 303-497-5588

AJ730004

WESTERN ACQUISITION DIVISION

325 BROADWAY, SOU6

BOULDER CO 80305

336611

MAH00031

PACIFIC MARINE ENVIRO LAB

7600 SAND POINT WAY NE

/R/PMEL

SEATTLE WA 98115-6349

see continuation page for line item details.

See Schedule

LOCAL TIME

30 July 2021

1200 MT

Please

STANDARD FORM 1449 (REV. 2/2012) BACK

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

40. PAID BY

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

PARTIAL FINAL

37. CHECK NUMBER

38. S/R ACCOUNT NO. 39. S/R VOUCHER NUMBER

36. PAYMENT

COMPLETE PARTIAL FINAL

1305M321QNRMA0051

SCHEDULE Continued

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 Work Item 1 Main Cabin - Control Station

1.00 JB

0002 Work Item 2 Main Cabin Bilge - Bilge pump

1.00 JB

0003 Work Item 3 Main Cabin Bilge - Thru-hull inspection

1.00 JB

0004 Work Item 4 Main Cabin Bilge - Starboard side cracked weld seam

1.00 JB

0005 Work Item 5 Main Cabin Bilge - Remove pitting and clean bilge

1.00 JB

0006 Work Item 7 Engine Compartment - Bilge pump

1.00 JB

0007 Work Item 8 Engine Compartment - Sea water strainers

1.00 JB

0008 Work Item 9 Engine Compartment - Engines

1.00 JB

0009 Work Item 10 Engine Exhaust Systems

1.00 JB

0010 Work Item 11 Engine Compartment - Transmissions

1.00 JB

0011 Work Item 12 Propeller Shaft

1.00 JB

0012 Work Item 13 Engine Compartment - Shaft Seal

1.00 JB

0013 Work Item 14 Engine Compartment - Seawater Intake Valves

1.00 JB

0014 Work Item 15 Engine Compartment - Clean Bilge

1.00 JB

0015 Work Item 16 Lazarette - Bilge Pump

1.00 JB

0016 Work Item 17 Lazarette - Steering System

1.00 JB

0017 Work Item 18 Lazarette - Portside Forward Bulkhead Hull Plating

1.00 JB

0018 Work Item 19 Lazarette - Sea Water Pump Hose Hull Penetration

1.00 JB

PAGE 3 OF 60 1305M321QNRMA0051

SCHEDULE Continued

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0019 1.00 JB

0020 1.00 JB

0021 1.00 JB

0022 1.00 JB

0023 1.00 JB

0024 1.00 JB

OPT

1001 1.00 JB

OPT

1002 1.00 JB

OPT

Work Item 20 Lazarette - Hull Plating In The Vicinity Of The Propellers

Work Item 21 Lazarette - Clean Bilge

Work Item 22 Lazarette - Battery Charger Connection Wires

Work Item 23 Lazarette - Rudders

Work Item 26 Propellers

Work Item 29 Lazarette - Generator

Optional Work Item 6 Engine Compartment - Engine Hatch Lift

Optional Work Item 24 Aft Deck Control Station

Optional Work Item 25 A-Frame

1.00 JB

OPT

1004 Optional Work Item 27

Bulkhead Penetrations

1.00 JB

OPT

1005 1.00 JB

OPT

Optional Work Item 28 Main Cabin Bilge - Configure existing unused tank in bilge to supply freshwater to back deck

Optional Work Item 30 Navigation Lights

1.00 JB

PAGE 4 OF 60 1305M321QNRMA0051

OPT

1007 Optional Work Item 31 Main Cabin Bilge - Install permanent edge tech transducer through hull

1.00 JB

1305M321QNRMA0051 - SP Hayes Ship Repair

Contents B SECTION B – SF1449 Continuation of Schedule

C SECTION C - Clauses and Contract Language

C.1 FAR 52.212-4 Contract Terms and Conditions -- Commercial Items (OCT 2018)

(DEVIATION 2017-02) (AUG 2017)

C.2 Addendum to FAR 52.212-4 Contract Terms and Conditions-Commercial Items, (OCT 2018) (DEVIATION 2017-02) (AUG 2017)

FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)

FAR 52.203-3 Gratuities (APR 1984)

FAR 52.203-12 Limitation on Payments to Influence Certain Federal Transactions

(JUN 2020)

FAR 52.204-13 System for Award Management Maintenance (OCT 2018)

FAR 52.204-18 Commercial and Government Entity Code Maintenance (JUL 2016) 9

FAR 52.204-21 Basic Safeguarding of Covered Contractor Information Systems

(JUN 2016)

FAR 52.229-12 Tax on Certain Foreign Procurements. (FEB 2021)

FAR 52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013)

FAR 52.245-1 Government Property (JAN 2017)

FAR 52.245-9 Use and Charges (APR 2012)

CAR 1352.201-70 Contracting Officer's Authority (MAR 2010)

CAR 1352.209-73 Compliance with the laws (APR 2010)

CAR 1352.209-74 Organizational conflict of interest (APR 2010)

FAR 52.217-7 Option for Increased Quantity-Separately Priced Line Item (MAR 1989) 10

FAR 52.252-6 Authorized Deviations in Clauses (APR 1984)

CAR 1352.201-72 Contracting Officer's Representative (COR) (APR 2010)

CAR 1352.245-70 Government furnished property (APR 2010)

CAR 1352.246-70 Place of Acceptance (APR 2010)

CAR 1352.270-70 Period of Performance (APR 2010)

CAR 1352.271-70 Inspection and Manner of Doing Work (APR 2010)

CAR 1352.271-71 Method of Payment and Invoicing Instructions for Ship Repair

(APR 2010)

CAR 1352.271-72 Additional Item Requirements (AIR) - Growth Work (APR 2010) 15

CAR 1352.271-73 Schedule of Work (APR 2010)

CAR 1352.271-75 Delivery and Shifting of the Vessel (APR 2010)

CAR 1352.271-76 Performance (APR 2010)

CAR 1352.271-77 Delays (APR 2010)

CAR 1352.271-78 Minimization of Delay Due To Government Furnished Property

(APR 2010)

CAR 1352.271-79 Liability and Insurance (APR 2010)

CAR 1352.271-80 Title (APR 2010)

CAR 1352.271-81 Discharge of Liens (APR 2010)

CAR 1352.271-83 Government Review, Comment, Acceptance and Approval

(APR 2010)

CAR 1352.271-84 Access To the Vessel (APR 2010)

CAR 1352.271-85 Documentation of Requests For Equitable Adjustment (APR 2010) 24

CAR 1352.271-86 Lay Days (APR 2010)

CAR 1352.271-87 Changes - Ship Repair (APR 2010)

CAR 1352.271-88 Guarantees (APR 2010)

CAR 1352.271-89 Temporary Services (APR 2010)

CAR 1352.271-90 Insurance Requirements (APR 2010)

NAM 1330-52.203-71 Notice of Post-Government Employment Restrictions (OCT 2015) 28

NAM 1330-52.215-70 Schedule of Deliverables (SEPT 2005)

NAM 1330-52.222-70 NOAA Sexual Assault and Sexual Harassment Prevention and Response Policy (MAY 2018)

NAM 1330-52.237-70 Contractor Communications

NAM 1330-52.237-71 NOAA Government-Contractor Relations – Non-Personal Services (SEP 2017)

NAM 1330-52.242-70 Submittal of Invoices (FEB 2011)

NAM 1330-52.243-70 Requests for Equitable Adjustment (OCT 2017)

NAM 1330-52.270-304 NOAA Acquisition and Grants Office Ombudsman (OCT 2016) 36

C.3 FAR 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders – Commercial Items (JAN 2021) (DEVIATION 2017-02)

(DEVIATION APR 2020)(DEVIATION 2020-11)

D SECTION D - Attachments

E SECTION E - Solicitation Provisions

E.1 FAR 52.212-1 Instructions to Offerors—Commercial Items (OCT 2018)

E.2 Addendum to FAR 52.212-1 Instructions to Offerors—Commercial Items (OCT 2018) 47

FAR 52.252-1 Solicitation Provisions Incorporated by Reference (FEB 1998)

FAR 52.204–7 System for Award Management (OCT 2018)

FAR 52.204-16 Commercial and Government Entity Code Reporting (AUG 2020)

FAR 52.212-3 Offeror Representations and Certifications-Commercial Items (FEB 2021) 47

FAR 52.217-5 Evaluation of Options (JUL 1990)

CAR 1352.242-70 Postaward conference. (APR 2010)

FAR 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (OCT 2020)

Quote Preparation

Quote Format

Instructions

FAR 52.229-11 Tax on Certain Foreign Procurements—Notice and Representation

(JUN 2020)

CAR 1352.213-70 Evaluation Utilizing Simplified Acquisition Procedures (APR 2010) 57

CAR 1352.215-72 Inquiries

CAR 1352.233-70 Agency protests (APR 2010)

CAR 1352.233-71 GAO and Court of Federal Claims protests (APR 2010)

CAR 1352.271-74 Foreseeable cost factors pertaining to different shipyard locations (APR 2010)

CAR 1352.271-82 Department of Labor occupational safety and health standards for ship repair (APR 2010)

B SECTION B – SF1449 Continuation of Schedule

B.1 General The United States Department of Commerce (DOC) National Oceanic Atmospheric Administration (NOAA), requires Repair Services for the R/V SP Hayes.

B.2 Commercial Acquisition This requirement is being solicited as a commercial service.

B.3 Contract Type The Government anticipates awarding a firm-fixed price contract.

B.4 Additional Rates The AIR labor rate in accordance with CAR 1352.271-72 Additional Item Requirements (AIR) -growth work (APR 2010) is $___________. (estimated quantity 40)

The Lay Day rate in accordance with CAR 1352.271-86 Lay Days (APR 2010) is $___________. (estimated quantity 90)

C SECTION C - Clauses and Contract Language

C.1 FAR 52.212-4 Contract Terms and Conditions -- Commercial Items (OCT 2018)

(DEVIATION 2017-02) (AUG 2017)

(deviation below) (a)* * * * *

(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 18 U.S.C. 431 relating to officials not to benefit; 40 U.S.C. chapter 37, Contract Work Hours and Safety Standards; 41 U.S.C. chapter 87, Kickbacks; 10 U.S.C. 2409 relating to whistleblower protections; 49 U.S.C. 40118, Fly American; and 41 U.S.C. chapter 21 relating to procurement integrity.

(c) is tailored as follows:

See CAR 1352.271-87 Changes - ship repair (APR 2010)

C.2 Addendum to FAR 52.212-4 Contract Terms and Conditions-Commercial Items, (OCT 2018) (DEVIATION 2017-02) (AUG 2017)

The following clauses are incorporated into this order as an addendum to FAR 52.212-4:

FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses, provisions, or contract language by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

Federal Acquisition Regulations (FAR) Clauses/Provisions:

https://www.acquisition.gov/browse/index/far

Department of Commerce Acquisition Regulations (CAR) Clauses/Provisions:

https://www.acquisition.gov/car

The following clauses are hereby incorporated by reference:

FAR 52.203-3 Gratuities (APR 1984) FAR 52.203-12 Limitation on Payments to Influence Certain Federal Transactions

(JUN 2020)

FAR 52.204-13 System for Award Management Maintenance (OCT 2018) FAR 52.204-18 Commercial and Government Entity Code Maintenance (JUL 2016) FAR 52.204-21 Basic Safeguarding of Covered Contractor Information Systems

(JUN 2016)

FAR 52.229-12 Tax on Certain Foreign Procurements. (FEB 2021)

FAR 52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013) FAR 52.245-1 Government Property (JAN 2017) FAR 52.245-9 Use and Charges (APR 2012) CAR 1352.201-70 Contracting Officer's Authority (MAR 2010) CAR 1352.209-73 Compliance with the laws (APR 2010) CAR 1352.209-74 Organizational conflict of interest (APR 2010)

The following clauses and/or contract language are hereby incorporated by full text:

FAR 52.217-7 Option for Increased Quantity-Separately Priced Line Item (MAR 1989)

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within the period of performance of the contract. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

FAR 52.252-6 Authorized Deviations in Clauses (APR 1984)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the clause.

(b) The use in this solicitation or contract of any Department of Commerce Acquisition Regulation (CAR) (48 CFR 13) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.

CAR 1352.201-72 Contracting Officer's Representative (COR) (APR 2010)

(a) (To Be Designated by Letter Upon Award) is hereby designated as the Contracting Officer's Representative (COR). The COR may be changed at any time by the Government without prior notice to the contractor by a unilateral modification to the contract. The COR is located at:

(To Be Designated by Letter Upon Award)

(b) The responsibilities and limitations of the COR are as follows:

(1) The COR is responsible for the technical aspects of the contract and serves as technical liaison with the contractor. The COR is also responsible for the final inspection and acceptance of all deliverables and such other responsibilities as may be specified in the contract.

(2) The COR is not authorized to make any commitments or otherwise obligate the Government or authorize any changes which affect the contract price, terms or conditions. Any contractor request for changes shall be referred to the Contracting Officer directly or through the COR. No such changes shall be made without the express written prior authorization of the Contracting Officer. The Contracting Officer may designate assistant or alternate COR(s) to act for the COR by naming such assistant/alternate(s) in writing and transmitting a copy of such designation to the contractor.

CAR 1352.245-70 Government furnished property (APR 2010)

The Government will provide the following item(s) of Government property to the contractor .

The contractor shall be accountable for, and have stewardship of, the property in the performance of this contract. This property shall be used and maintained by the contractor in accordance with provisions of the “Government Property” clause included in this contract.

Item No. Description Quantity Delivery Date Property/Tag No. (If Applicable)

R/V SP Hayes 1 TBD

CAR 1352.246-70 Place of Acceptance (APR 2010)

(a) The Contracting Officer or the duly authorized representative will accept supplies and services to be provided under this contract.

(b) The place of acceptance will be:

Seattle, Washington

CAR 1352.270-70 Period of Performance (APR 2010)

(a) The base period of performance of this contract is TBD. If an option is exercised, the period of performance shall be extended through the end of that option period.

(b) The option periods that may be exercised are up to six (6) months extension in accordance with FAR 52.217-8.

(c) The notice requirements for unilateral exercise of option periods are set out in FAR 52.217-8.

CAR 1352.271-70 Inspection and Manner of Doing Work (APR 2010)

(a) All work and material shall be subject to the approval of the Contracting Officer or duly authorized representative. Work shall be performed in accordance with the plans and specifications of this contract as modified by any contract modification.

(b) Unless otherwise specifically provided for in the contract, all operational practices of the contractor and all workmanship and material, equipment and articles used in the performance of work shall be in accordance with American Bureau of Shipping “Rules for Building and Classing Steel Vessels”, U.S. Coast Guard Marine Engineering Regulations and Material Specifications (46 CFR Subchapter F), U.S. Coast Guard Electrical Engineering Regulations (46 CFR Subchapter J), and U.S. Public Health Service “Handbook on Sanitation of Vessel Construction”, in effect at the time of the contract award; and the best commercial maritime practices, except where military specifications are specified, in which case such standards of material and workmanship shall be followed.

(c) All material and workmanship shall be subject to inspection and test at all times during the contractor's performance of the work to determine their quality and suitability for the purpose intended and compliance with the contract. In case any material or workmanship furnished by the contractor is found to be defective prior to redelivery of the vessel, or not in accordance with the requirements of the contract, the Government shall have the right prior to redelivery of the vessel to reject such material or workmanship, and to require its correction or replacement by the contractor at the contractor's cost and expense. This Government right is in addition to its rights under any Guarantee clause in this contract. If the contractor fails to proceed promptly with the replacement or correction of such material or workmanship, as required by the Contracting Officer, the Government may, by contract or otherwise, replace or correct such material or workmanship and charge to the contractor the excess cost to the Government. The contractor shall provide and maintain an inspection system acceptable to the Government covering the work specified in the contract. Records of all inspection work by the contractor shall be kept complete and available to the Government during the performance of the contract and for a period of two

(2) years after delivery of the vessel to the Government.

(d) No welding, including tack welding and brazing, shall be permitted in connection with repairs, completions, alterations, or addition to hulls, machinery or components of vessels unless the welder is, at the time, qualified to the standards established by the U.S. Coast Guard, the American Bureau of Shipping, or the Department of the Navy. The welder's qualifications shall be appropriate for the particular service application, filler material type, position of welding, and welding process involved in the work being undertaken. A welder may be required to re-qualify if the Contracting Officer believes there is a reasonable doubt concerning the welder's ability.

Welders' qualifications for this purpose shall be governed by the U.S. Coast Guard Marine Engineering Regulations and Material Specifications (46 CFR Subchapter F). When a welding process other than manual shielded arc is proposed or required, the contractor or fabricator shall submit procedure qualification tests for approval prior to production welding. Procedure qualification tests shall be conducted in accordance with the United States Coast Guard Marine Engineering Regulations and Material Specifications (46 CFR Subchapter F).

(e) The contractor shall exercise reasonable care to protect the vessel from fire, and the contractor shall maintain a reasonable system of inspection over the activities of welders, burners, riveters, painters, plumbers and similar workers, particularly where such activities are undertaken in the vicinity of the vessel's fuel oil tanks, magazines or storerooms containing flammable material. A reasonable number of hose lines shall be maintained by the contractor ready for immediate use on the vessel at all times while the vessel is berthed alongside the contractor's pier or in dry dock or on a marine railway. All tanks or bilge areas under alteration or repair shall be cleaned, washed, and steamed out or otherwise made safe by the contractor if and to the extent necessary as required by good marine practice or by current Occupational Safety and Health Administration regulations. The Contracting Officer's Representative (COR) shall be furnished with a “gas free” or “safe for hot work” or “safe for workers” certificate before any hot work or entry is done. Unless otherwise provided in this contract, the contractor shall at all times maintain a reasonable fire watch about the vessel, including a fire watch on the vessel while work is being performed thereon.

(f) The contractor shall place proper safeguards and/or effect such safety precautions as necessary, including suitable and sufficient lighting, for the prevention of accidents or injury to persons or property during the prosecution of work under this contract and/or from time of receipt of the vessel until acceptance by the Government of the work performed.

(g) Except as otherwise provided in this contract, when the vessel is in the custody of the contractor or in dry dock or on a marine railway and the temperature becomes as low as 35 degrees Fahrenheit, the contractor shall keep all pipelines, fixtures, traps, tanks, and other receptacles on the vessel drained to avoid damage from freezing, or if this is not practicable, the vessel shall be kept heated to prevent such damage. The vessel's stern tube and propeller hubs shall be protected from frost damage by applied heat through the use of a salamander or other proper means, as approved by the COR.

(h) Whenever practicable, the work shall be performed in a manner which does not interfere with the berthing and messing of personnel attached to the vessel. The contractor shall ensure that assigned personnel have access to the vessel at all times. It is understood that such personnel will not interfere with the work or the contractor's workers.

(i) The Government does not guarantee the correctness of the dimensions, sizes, and shapes shown in any sketches, drawings, plans or specifications prepared or furnished by the Government. Prior to submitting an offer, it is the responsibility of the bidder/offeror to verify the dimensions, sizes, and shapes in materials provided by the Government. Where practical, the Government will make the vessel available for inspection prior to bid opening or the date for receipt of proposals. If the contractor, as a result of inspection or otherwise, discovers any error in the sketches, drawings, plans or specifications, it shall immediately inform the Contracting Officer of the error and proceed in accord with instructions received from the Contracting Officer. The Government is not liable for any claims or charges resulting from additional work performed by the contractor as a result of a patent ambiguity in the sketches, drawings, plans or specifications that was not brought to the attention of the Contracting Officer. The contractor shall be responsible for the correctness of the shape, sizes and dimensions of parts furnished by the contractor under the contract.

(j) The contractor shall at all times keep the site of the work on the vessel free from accumulation of waste material or rubbish caused by contractor employees or the work, and at the completion of the work shall remove all rubbish from and about the site of the work and shall leave the work and its immediate vicinity “broom-clean” unless more exactly specified in this contract.

(k) While in drydock or on a marine railway, the contractor shall be responsible for the closing, before the end of working hours, of all valves and openings upon which work is being done by its workers when such closing is practicable. The contractor shall establish a list and keep the COR cognizant of the closure status of all valves and openings upon which the contractor's workers have been working.

(l) Without additional expense to the Government, the contractor shall employ specialty subcontractors where required by the specifications or when necessary for satisfactory performance of the work.

(m)

(1) Unless otherwise stated in the contract, the contractor shall notify the COR at least 72 hours in advance:

(i) Prior to starting inspections or tests; and

(ii) When supplies will be ready for Government inspection.

(2) Such notification shall be provided either verbally or in writing at the discretion of the

COR.

CAR 1352.271-71 Method of Payment and Invoicing Instructions for Ship Repair

(APR 2010)

(a) The Government will make payment under this contract based on a percentage of completion. The contractor may invoice for the percentage completed for each work item as work progresses. The amount invoiced shall be calculated based on prices stated in the Schedule, as follows: A work item may not be invoiced until the percentage complete reaches 25 percent.

Future invoices for that work item have no limitation as to the percentage of completion required before invoicing, but in no event may invoices be submitted more frequently than every 2 weeks, or for amounts less than $10,000, unless it is the final payment. The minimum percentage of completion (25%) to be reached prior to billing each work item may be waived by the Contracting Officer for large dollar work items on a case-by-case basis.

(b) Invoices submitted by the contractor which are deemed not proper, in accordance with FAR 52.232-25, will be returned. Invoices shall include:

(1) Name and Address of the contractor;

(2) DUNS Number;

(3) Invoice Date;

(4) Contract Number/Modification Number;

(5) CLIN/Work Item Number, to include: Description, Quantity, Unit of Measure, Unit Price and Extended Price;

(6) Shipping and Payment Terms; and,

(7) Contractor Point of Contact, including: Name, Title, Phone Number, and Mailing Address;

(8) The percentage of completion for each CLIN/work item identified;

(9) Name of the Contracting Officer ;

(10) Ship name;

(11) The overall percentage and dollar amount previously billed, currently billed and unbilled.

(c) When invoicing for changed work, the contractor shall identify it as a contract change and shall identify the modification authorizing the change, and the CLIN/Work Item associated with the change.

(d) All items of work invoiced under this contract will be verified and confirmed by the Contracting Officer's Representative as accurate and complete and approved by the designated billing office before payment will be made.

(e) Mail the original invoice to:

See NAM 1330-52.242-70 Submittal of Invoices (FEB 2011)

(f) The contractor's final invoice submitted under the contract must be marked as follows:

“THIS INVOICE CONSTITUTES THE FINAL INVOICE - UPON PAYMENT OF THIS

INVOICE NO OTHER MONIES ARE DUE UNDER CONTRACT NUMBER ________.” (To be assigned at contract award)

CAR 1352.271-72 Additional Item Requirements (AIR) - Growth Work (APR 2010)

(a) This clause applies to Additional Item Requirements (AIR), also known as growth and emergent work ordered by the Contracting Officer pursuant to the Changes - Ship Repair clause or mutually agreed upon by the parties. The contractor shall perform AIR at the labor billing rates designated in the Schedule, as described in paragraph (c) of this clause. The AIR handling fee designated in the Schedule shall be the sole fee used for direct material purchases and subcontractor handling. The estimated quantity of labor hours and handling fees represent the Government's best estimate for growth that may be required throughout the contract performance period. All growth work shall be paid at the prices stated in the Schedule.

(b) The contractor shall take into account the potential for ordering all estimated AIR quantities in developing the Production Schedule. The ordering of any portion of the AIR quantities does not in itself warrant an extension to the original contract completion date;

however, for planning purposes, the Government anticipates ordering AIR in accordance with the following schedule:

(1) No more than 75% of the hours during the first half of the contract period of performance.

(2) No more than 50% of the hours during the third quarter of the contract period of performance.

(3) No more than 30% of the hours during the fourth quarter of the contract period of performance.

(c) The AIR labor rate shall be a flat, hourly rate to cover the entire effort and shall be burdened to include:

(1) Direct production labor hour functions only. Direct production labor hours are hours of skilled labor at the journeyman level expended in direct production. Direct production is defined as work performed by a qualified craftsman that is directly related to the alteration, modification, or repair of the item or system identified as needing alteration, modification, or repair. The following functions are identified as direct production: Abrasive Cleaning/Water Blasting, Tank Cleaning, Welding, Burning, Brazing, Blacksmithing, Machining (inside and outside), Carpentry, Electrical/Electronic Work, Crane Operation, Shipfitting, Lagging/Insulating, Painting, Boilermaking, Pipe Fitting, Engineering (Production), Sheetmetal Work, Staging/Scaffolding, and Rigging.

(2) Non-production labor hours (whether charged directly or indirectly by contractor's accounting system) shall be for labor in support of production functions. For purposes of this clause, support functions are defined as functions that do not directly contribute to the alteration, modification, or repair of the item or system identified as needing alteration, modification, or repair. Necessary support functions should be priced into the burdened rate for production labor hours. Examples of support functions include: Testing, Quality Assurance (inspection), Engineering (support), Planning (including involvement of craft foreman/journeyman in planning a task), Estimating (including determination of necessary materials and equipment needed to perform a task), Material Handling, Set-up (moving tools and equipment from shop to ship to perform a task), Fire Watch, General Labor (including general support of journeyman tasks), Cleaning (including debris pickup and removal), Surveying, Security, Transportation, Supervision, and Lofting (sail/pattern making).

(d) Additional Item Requirements do not include replacement work performed pursuant to the Inspection and Manner of Doing Work or Guarantees clauses.

(e) It is the Government's intention to award any growth work identified during the repair to the contractor, if a fair and reasonable price can be negotiated for such work, based upon Schedule rates. If a fair and reasonable price cannot be negotiated, the Government may, at its discretion, obtain services outside of the contract. Such services may be performed while the ship is undergoing repair in the contractor's facility pursuant to the Access to Vessels clause.

(f) The contractor shall submit to the Contracting Officer the following information in all AIR proposals:

(1) Number of labor hours estimated; broken down by specific direct production labor category.

(2) Material estimates, individually broken out and priced. When requested by the Contracting Officer, material quotes shall be provided.

(3) Subcontractor estimates, individually broken out and priced along with the actual subcontractor quotes. The requirement to submit subcontractor quotes may be waived if deemed appropriate by the Contracting Officer.

(4) Material/subcontractor handling fee and the basis for the fee.

(g) The contractor shall not be entitled to payment for any hours ordered pursuant to this clause until such time as a written contract modification is executed.

CAR 1352.271-73 Schedule of Work (APR 2010)

(a) Notwithstanding other requirements specified in this contract, the contractor shall provide to the Contracting Officer and COR the following documents within five (5) working days of the vessel's arrival at the contractor's facility:

(1) Production Schedule.

(2) Work Package Network.

(3) Total Manpower Loading Curve.

(4) Trade Manning Curves.

(5) Subcontracting List.

(b) The Production Schedule shall list the earliest, latest, and scheduled start and completion date for each work item awarded and shall identify the critical path. The Work Package Network shall show the work items, milestones, key events, and activities and shall clearly identify the critical path. The Total Manpower Loading Curve shall show the required manning for the duration of the contract. The Trade Manning Curves shall show the required manning for each trade for the duration of the contract. The Subcontracting List shall show work items, milestones, key events, and activities to be accomplished by subcontractors.

(c) Additional Item Requirements ordered and agreed upon, whether or not yet formalized via a change order (contract modification), shall be added to the Production Schedule, Trade Manning Curves, and Subcontracting List and submitted to the Contracting Officer and COR at each weekly Progress Meeting. Any anticipated or unanticipated deviation (greater than five (5) calendar days) from the Production Schedule shall be immediately brought to the attention of the Contracting Officer and COR.

(d) Any unauthorized deviation in the Production Schedule which results in a delay in the completion of work on a vessel past the established performance period completion date may entitle the Government to remedies for late performance, including, but not limited to, liquidated damages.

CAR 1352.271-75 Delivery and Shifting of the Vessel (APR 2010)

(a) The Government shall deliver the vessel to the contractor, at the location specified in the contract.

(b) Whether the specified location of performance is the contractor's own facility or any other authorized facility, it shall be understood to mean the fairway of the facility. The contractor shall provide necessary tugs and pilot services to move the vessel from the fairway to the pier or dock, and, upon completion of all work, from the pier or dock to the fairway of the facility.

(c) While the vessel is in the possession of the contractor, any necessary movement of the vessel incidental to the work specified in the contract shall be furnished by the contractor without additional charge to the Government.

CAR 1352.271-76 Performance (APR 2010)

(a) The contractor shall not commence work until a notice to proceed has been issued by the Contracting Officer.

(b) The Government shall deliver the vessel described in the contract at such time and location as may be specified in the contract. Upon completion of the work, the Government shall accept delivery of the vessel at such time and location as may be specified in the contract.

(c) Without additional charge to the Government, and without specific requirement in the contract, the contractor shall:

(1) Make available, at the facility, to personnel of the vessel while in drydock or on a marine railway, sanitary facilities adequate for the number of personnel using them and acceptable to the Contracting Officer;

(2) Supply and maintain, in such condition as the Contracting Officer may reasonably require, suitable brows and gangways from the pier, drydock or marine railway to the vessel;

(3) Perform, or pay the cost of, any repair, reconditioning or replacement made necessary as the result of the use by the contractor of any of the vessel's machinery, equipment or fittings, including, but not limited to, winches, pumps, riggings, or pipe lines; and

(4) Furnish suitable offices, office equipment and telephones at or near the site of the work as the Contracting Officer reasonably requires for personnel designated by the Government.

(d) Except as otherwise provided in the contract, the contractor shall furnish all necessary material, labor, supervision, services, equipment, tools, supplies, power, accessories, facilities, and other things and services necessary for accomplishing the work.

(e) The contractor shall conduct dock and sea trials of the vessel as required by the contract.

Unless otherwise expressly provided in the contract, during the conduct of these trials the vessel shall be under the control of the vessel's commander and crew with representatives of the contractor and the Government on board to determine whether the work provided by the contractor has been satisfactorily performed. Dock and sea trials not specified which the contractor requires for its own benefit shall not be undertaken by the contractor without prior notice to and approval of the Contracting Officer; any such dock or sea trial shall be conducted at the risk and expense of the contractor. The contractor shall provide and install all fittings and appliances which may be necessary for the dock and sea trials to enable the representatives of the Government to determine whether the requirements of the contract plans and specifications have been met. The contractor shall also be responsible for the care, installation and removal of any instruments and apparatus furnished by the Government for such trials.

CAR 1352.271-77 Delays (APR 2010)

When, during the performance of this contract, the contractor is required to delay the work on a vessel temporarily, due to orders or actions of the Government respecting stoppage of work to permit shifting the vessel, stoppage of hot work to permit bunkering, fueling, embarking or debarking of passengers or loading or discharging of cargo, and the contractor is not given sufficient advance notice or is otherwise unable to avoid incurring additional costs on account thereof, an equitable adjustment may be made in the contract. Any such request for equitable adjustment shall be asserted in writing as soon as practicable after the delay or disruption, but not later than the day of final payment under the contract.

CAR 1352.271-78 Minimization of Delay Due To Government Furnished Property

(APR 2010)

(a) In order to assure timely performance under this contract, it is imperative that delay in the contract's performance period resulting from late, damaged, or unsuitable Government furnished property be held to an absolute minimum. In order to achieve minimization of delay, it is agreed that:

(1) Subject to adjustment as provided in paragraph (b) of this clause, the Government shall deliver each item of Government furnished property to the contractor on or before the date specified in the contract or, if later, in sufficient time for the contractor to meet the contract performance period.

(2) The Government may forego furnishing any item of Government property to the contractor. In that event, the contractor shall prepare the vessel in terms of piping, wiring, structure, foundation, ventilation, and any other pre-installation requirements of the item, so that the work on the vessel may continue without delay and disruption resulting from the absence of the item. If the Government does not furnish an item designated as Government furnished property, the contract price may be adjusted accordingly.

(b) The delivery or performance dates for the supplies or services to be furnished by the contractor under this contract are based upon the expectation that Government furnished property suitable for use (except for such property furnished “as is”) will be delivered to the contractor at the time stated in the specification or, if not so stated, in sufficient time to enable the contractor to meet such delivery or performance dates. If the Government furnished property is not furnished in the time stated in the contract, or, if a date is not specified, and the late delivery does not give the contractor sufficient time to enable the contractor to meet required contract delivery or performance dates, the contractor shall notify the Government in writing of the late delivery.

Notification shall include cost and schedule impacts, including delays and disruptions to schedules. This notification shall be submitted as soon as practical or known.

(c) The provisions in subsection (b) of this clause and in FAR 52.245-1, if applicable, provide the exclusive remedies to the contractor resulting from delay in delivery of Government furnished property or delivery of such property in a condition not suitable for its intended use.

CAR 1352.271-79 Liability and Insurance (APR 2010)

(a) The contractor shall exercise reasonable care and use its best efforts to prevent accidents, injury or damage to all employees, persons and property, in and about the work, and to the vessel or part thereof upon which work is done.

(b) The contractor shall be responsible for and make good at its own cost and expense any and all loss of or damage of whatsoever nature to the vessel (or part thereof), its equipment, movable stores and cargo, and Government-owned material and equipment for the repair, completion, alteration of or addition to the vessel in the possession of the contractor, whether at the plant or elsewhere, arising or growing out of the performance of the work, except where the contractor can affirmatively show that such loss or damage was due to causes beyond the contractor's control, was proximately caused by the fault or negligence of agents or employees of the Government, or which loss or damage the contractor by exercise of reasonable care was unable to prevent. However, the contractor shall not be responsible for any such loss or damage discovered after redelivery of the vessel unless the loss or damage is discovered within 90 days after redelivery of the vessel and loss or damage is affirmatively shown to be the result of the fault or negligence of the contractor. To induce the contractor to perform the work for the compensation provided, it is specifically agreed that the contractor's aggregate liability on account of loss of or damage to the vessel (or part thereof), its equipment, movable stores and cargo and Government-owned materials and equipment, shall in no event exceed the sum of $1,000,000.00. As to the contractor, the Government assumes the risk of loss or damage to the Government-owned vessel (or part thereof), its equipment, movable stores and cargo and said Government-owned materials and equipment in excess of $1,000,000.00. This assumption of risk includes but is not limited to loss or damage from negligence of whatsoever degree of the contractor's servants, employees, agents or subcontractors, but specifically excludes loss or damage from willful misconduct or lack of good faith on the part of contractor's personnel, who have supervision or direction of all or substantially all of the contractor's business, or all or substantially all of the contractor's operation at any one plant. However, as to such risk assumed and borne by the Government, the Government shall be subrogated to any claim, demand or cause of action against third persons which exists in favor of the contractor, and the contractor shall, if required, execute a formal assignment or transfer of claims, demands or causes of action.

Nothing contained in this paragraph shall create or give rise to any right, privilege or power in any person except the contractor, nor shall any person (except the contractor) be or become entitled thereby to proceed directly against the Government, or join the Government as a co-defendant in any action against the contractor brought to determine the contractor's liability, or for any other purpose.

(c) The contractor indemnifies and holds harmless the Government, its agencies and instrumentalities, and the vessel against all suits, actions, claims, costs or demands (including without limitation, suits, actions, claims, costs or demands resulting from death, personal injury and property damage) to which the Government, its agencies and instrumentalities, or the vessel may be subject or put by reason of damage or injury (including death) to the property or person of anyone other than the Government, its agencies, instrumentalities and personnel, or the vessel, arising or resulting in whole or in part from the fault, negligence, wrongful act or wrongful omission of the contractor, or any subcontractor, its or their servants, agents or employees;

provided that the contractor's obligation to indemnify under this paragraph (c) shall not exceed the sum of $1,000,000.00 on account of any one accident or occurrence in respect of any one vessel. Such indemnity shall include, without limitation, suits, actions, claims, costs or demands of any kind whatsoever, resulting from death, personal injury or property damage occurring during the period of performance of work on the vessel or within 90 days after redelivery of the vessel. Any new equipment warranties that extend beyond the 90 days after redelivery of the vessel shall be assigned to the Government upon redelivery of the vessel. With respect to any such suits, actions, claims, costs or demands resulting from death, personal injury or property damage occurring after the expiration of such period, the rights and liabilities of the Government and the contractor shall be as determined by other provisions of this contract and by law;

provided that such indemnity shall apply to death occurring after such period which results from any personal injury received during the period covered by the contractor's indemnity as provided herein.

(d) The contractor shall, at its own expense, procure, and thereafter maintain such casualty, accident and liability insurance, in such forms and amounts as may be approved by the Contracting Officer, insuring the performance of its obligations under paragraph (c) of this clause. In addition, the contractor shall at its own expense procure and thereafter maintain such ship repairer's legal liability insurance as may be necessary to insure the contractor against its liability as ship repairer in the amount of $1,000,000.00, or the value of the vessel as determined by the Contracting Officer, whichever is the lesser, with respect to each vessel on which work is performed. The contractor shall cause the Government to be named as an additional insured under any and all liability insurance policies, however, at the discretion of the Contracting Officer, such insurance need not be procured whenever the job order requires work on parts of a vessel only and the work is to be performed at a plant other than the site of the vessel. Further, the contractor shall procure and maintain in force Worker's Compensation Insurance (or its equivalent) covering its employees engaged in the work and shall ensure the procurement and maintenance of such insurance by all subcontractors engaged in the work. The contractor shall provide evidence of insurance as required by the Government.

(e) The contractor shall receive no allowance in the contract price for inclusion of any premium expense or charge for any reserve made on account of self-insurance for coverage against any risk assumed by the Government under this clause.

(f) As soon as practicable after the occurrence of any loss or damage, the risk of which the Government has assumed, written notice of the damage shall be given by the contractor to the Contracting Officer. The notice shall contain full particulars of the loss or damage. If claim is made or suit is brought thereafter against the contractor as the result or because of such event, the contractor shall immediately deliver to the Government every demand, notice, summons or other process received by it or its representatives. The contractor shall cooperate with the Government, and, upon the Government's request, shall assist in effecting settlements, securing and giving evidence; obtaining the attendance of witnesses, and other assistance required in the conduct of suits. The Government shall pay to the contractor the expense, other than the cost of maintaining the contractor's usual organization, incurred in this assistance. Except at its own cost, the contractor shall not voluntarily make any payment, assume any obligation or incur any expense not imperative for the protection of the vessel or vessels at the time of the event.

CAR 1352.271-80 Title (APR 2010)

(a) Title to all materials and equipment acquired, produced for, or allocated to the performance of this contract and incorporated in or placed on the vessel or any part thereof, shall vest in the Government.

(b) The contractor shall assume, without limitation, the risk of loss for any contractor-furnished materials and equipment until final acceptance by the Government of work performed under the contract.

CAR 1352.271-81 Discharge of Liens (APR 2010)

The contractor shall immediately discharge or cause to be discharged any lien or right in rem of any kind, other than in favor of the Government, which at any time exists or arises in connection with work done or materials furnished under the contract.