RFQ_10201420_-_Final.pdf
PDF 1 MB Posted
- Solicitation number
- 10201420
- Issued by
- California
About this file
This document is a Request for Qualifications (RFQ) issued by the Department of Water Resources (DWR), Division of Engineering, Environmental Coordination Section in California. DWR is seeking qualified firms to provide engineering and environmental services to support permitting needs related to the National Pollutant Discharge Elimination System (NPDES), compliance with the California State Water Resources Control Board Construction General Permit, and general stormwater protection for projects in Northern California. The services will be provided under a two-year agreement with options for up to two one-year extensions. A mandatory virtual pre-SOQ conference will be held on August 15, 2024, and statements of qualifications are due by August 30, 2024.
The RFQ outlines the selection criteria, which includes the professional experience of the firm, the qualifications and training of key personnel, and demonstrated competence with NPDES compliance and stormwater protection. The contract will be negotiated based on the firm's actual costs, with a fixed profit rate established by DWR. Firms are required to submit financial documents and a rate sheet as part of the negotiation process. The RFQ also includes information on the Disabled Veteran Business Enterprise (DVBE) and Small Business (SB) programs, as well as the requirements for contractor registration with the Department of Industrial Relations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 10201420_-_Information_Letter_and_Addendum_1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ No. 10201420
Division of Engineering
Architectural and Engineering Contract Program
715 P Street 4th Floor
Sacramento, CA 95814
REQUEST FOR QUALIFICATIONS NO. RFQ No. 10201420 Northern California On-Call Stormwater and Construction Permitting
TO ALL PROSPECTIVE APPLICANTS
August 2, 2024
The Department of Water Resources (DWR), Division of Engineering (DOE), Environmental Coordination Section (ECS) invites qualified firms to submit a Statement of Qualification (SOQ).
The services to be provided will be engineering and environmental services to support with permitting needs as follows for the Environmental Coordination Section (ECS), Division of Engineering: National Pollutant Discharge Elimination System (NPDES) permitting support, compliance with the California State Water Resources Control Board Construction General Permit, and general stormwater protection for projects in Northern California.
The specific work and deliverables are identified in Exhibit A, Description of Services, and will support DOE’s ECS.
This package contains Request for Qualifications (RFQ) No. 10201420. In submitting your SOQ you will comply with the instructions found herein. The SOQ must be received by 2:00 p.m. on Friday, August 30, 2024, at the address indicated in Section IX, Submission of SOQs of the enclosed RFQ.
The services to be provided may require that work be done independently or partnered with other DWR employees but always at the direction of the DWR.
The estimated length of the term for this agreement is November 11, 2024, through November 11, 2026 (two years) with the option of up to two one-year amendments (see Exhibit E, Multiple Years Option(s), paragraph 22).
DWR reserves the right to cancel or modify this RFQ up to the date and time the SOQ is due and to waive immaterial deviations with any of the SOQs. Additionally, DWR is not responsible for any preparation costs incurred by firms submitting an SOQ.
A copy of the State of California’s (State) General Terms and Conditions, Special Terms and Conditions for Department of Water Resources (Architectural and Engineering), and Additional Provisions (Exhibits C, D and E) are provided in this RFQ. These terms and conditions are NON-NEGOTIABLE. Any questions regarding these, or any other, terms and conditions MUST be addressed in writing during the question-and-answer period.
The Contractor Certification Clauses (available at:
https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List- Folder/Standard-Contract-Language#@ViewBag.JumpTo), contain terms and conditions that may apply to person(s) doing business with the State, and that may apply to your agreement. If awarded the contract, you must sign and return Page One of the CCC 04/2017 prior to award.
The Certification must be renewed every three years and will be updated when the State makes revisions to the clauses.
STATE OF CALIFORNIA – CALIFORNIA NATURAL RESOURCES AGENCY GAVIN NEWSOM, Governor
DEPARTMENT OF WATER RESOURCES
https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language#@ViewBag.JumpTo https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language#@ViewBag.JumpTo
ATTENTION: SIGNIFICANT UPDATES TO THE REQUEST FOR QUALIFICATIONS (RFQ)
PROCESS ARE IDENTIFIED ON THIS COVER LETTER AND DESCRIBED FURTHER IN
THE ATTACHED RFQ. THIS RFQ CONTAINS REVISED LANGUAGE AND A NEW FORMAT.
PLEASE READ IN ITS ENTIRETY.
DUE TO NEW NEGOTIATION REQUIREMENTS, PARTICIPATION IN THIS SOLICITATION
REQUIRES MANDATORY ATTENDANCE OF THE PRE-SOQ CONFERENCE.
PLEASE NOTE THE FOLLOWING CHANGES:
1. A mandatory virtual Pre-SOQ Conference specific to the new negotiations process will be held as stated in Section III, Mandatory Pre-SOQ Conference. Also in RFQ Section III, directions are given for the Question and Answer period for non-negotiation related RFQ questions.
2. Section VII, Negotiation Process is a new section, which describes the updated negotiations process for DWR for Architectural & Engineering (A&E) contracts.
a. Negotiations will be based on a Firm’s (including subcontractor(s)) true and actual cost.
b. Negotiations will now require submission of company policies on how they compensate their employees.
3. Exhibit E, Substitution or Addition of Personnel, paragraph 13, contains revisions.
4. The following Exhibit E clauses are now published as part of the RFQ and are no longer negotiable items:
a. Exhibit E, Reimbursement Clause, paragraph 2.
b. Exhibit E, Short- term Excess Lodging, paragraph 3.
c. Exhibit, E, Profit, paragraph 19 (identifies published profit that will be calculated into fully loaded hourly rates).
d. Exhibit E, Escalation, paragraph 20 (identifies how escalation will be addressed).
e. Exhibit E, Mark-up, paragraph 21 (for subcontractor and other direct costs).
f. Exhibit E, Multiple year option(s), paragraph 22 (identifies options to amend for additional years)
5. Exhibit E, Other Contracts with Similar Services, paragraph 23.
TABLE OF CONTENTS
1. Request for Qualifications
Section I - Authority Section II – Definitions for Purposes of this Solicitation Section III - Questions and Answers/(Mandatory)Pre-SOQ Conference Section IV - Statement of Qualification (SOQ) Requirements Section V - Selection Criteria Section VI - Evaluation Process Section VII – Negotiation Process…………………………………………………………………………...10 Section VIII - SOQ Conditions Section IX - Submission of SOQs Section X - Time Schedule Section XI - Contract Obligations Section XII - Disabled Veterans Business Enterprise Requirement Section XIII - Small Business Program Section XIV – Department of Industrial Relations Registration of Contractors and Prevailing Wage Monitoring and Enforcement………………………………………………………………………………….15
2. Payee Data Record (Std. 204)
3. SOQ Checklist
4. Potential Qualified Firms Certification Sheet
5. Explanation of Items on Potential Qualified Firms Certification Sheet
6. References
7. Sample Standard Agreement (Std. 213)
8. Exhibit A Scope of Work Attachment 1 – Sample Task Order Attachment 2 – Sample Task Order Budget Cost Detail
9. Exhibit B
Budget Detail and Payment Provisions Attachment 1 – Rate Sheet Attachment 2 – Additional Payment Provisions
10. Exhibit C
General Terms and Conditions
11. Exhibit D
Special Terms and Conditions – Department of Water Resources Attachment 1 – Recycled Content Certification
12. Exhibit E
Additional Provisions Attachment 1 – Standard Contract Provisions Regarding Political Reform Act Compliance Attachment 2 – Protection of Confidential and Sensitive Information Attachment 3 – Non-Disclosure Certificate
13. Exhibit FEMA
Certificate Regarding Lobbying
I. Authority
The Department of Water Resources (DWR) is authorized to contract with qualified firms, as described in Government Code Section 4525(a), for the services listed in Government Code Section 4525(d), 4525(e), and 4525(f).
A. California Public Contract Code § 6106 B. Regulations adopted pursuant to Government Code Section 4526:
C. California Code of Regulations Title 23, Division 2, Chapter 1.7, Sections 380 through 391
II. Definitions For Purposes of this Solicitation
A. “DWR” means the Department of Water Resources.
B. The term “architectural and engineering (hereafter “A&E”) services” shall include all architectural, landscape architectural, environmental, engineering, land surveying, and construction project management services, as well as incidental services that members of these professions and those in their employ may logically or justifiably perform, including permitting and environmental studies, rights-of-way services, design phase services, construction phase services, public outreach and meeting facilitation related to the foregoing. “A&E services” shall not include legal services rendered to the Department, provided that nothing in these regulations shall prevent an A&E contractor from consulting legal counsel and including the fees as part of its reasonable overhead. (23 CCR § 381)
C. “Firm” means any individual, firm, partnership, corporation, association, or other legal entity permitted by law to practice the professions of architecture, landscape architecture, engineering, environmental services, land surveying, or construction project management. (23 CCR § 381)
D. For information regarding “subcontractors” or “subcontracting”, please reference Exhibit D, paragraphs 5 and 6.
E. Key Personnel are individual(s) who are expected to perform key roles to meet contract requirements, including subcontractors. The Key Personnel composition shall be representative of the categories identified in Section V, Selection Criteria. Key Personnel are expected to be utilized throughout the life of the contract(s) that result(s) from the RFQ. The Firm is required to identify the key personnel in their organization chart (see Section IV, Statement of Qualifications (SOQ) Requirements) with a symbol (i.e. such as a star or picture of a key).
F. Agreement also means Contract.
https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=GOV§ionNum=4525.
https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=PCC§ionNum=6106.
https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=GOV§ionNum=4526.
https://govt.westlaw.com/calregs/Browse/Home/California/CaliforniaCodeofRegulations?guid=IB819C6F05B6E11EC9451000D3A7C4BC3&originationContext=documenttoc&transitionType=Default&contextData=(sc.Default) https://govt.westlaw.com/calregs/Browse/Home/California/CaliforniaCodeofRegulations?guid=IB819C6F05B6E11EC9451000D3A7C4BC3&originationContext=documenttoc&transitionType=Default&contextData=(sc.Default)
G. “RFQ” is an acronym for Request for Qualifications, the solicitation document used to request a Statement of Qualifications of firms that perform A&E services (23 CCR § 381).
H. “SOQ” is an acronym for Statement of Qualifications, the response to an RFQ or annual announcement submitted by firms that perform A&E services (23
CCR § 381).
III. Mandatory Pre-SOQ Conference:
Virtual Meeting Information Thursday, August 15, 2024 at 9:00 AM
Microsoft Teams Meeting
Join the meeting now
Meeting ID: 265 249 881 507
Passcode: cJCEfM
Dial in by phone
+1 916-573-2034,,168568288# United States, Sacramento
Find a local number
Phone conference ID: 168 568 288#
For organizers: Meeting options | Reset dial-in PIN
Prospective firms attending this mandatory pre-SOQ conference will receive information specific to the new negotiations process. At the time of selection, the most qualified firm will be instructed to submit their financial documents and rate sheet per Section VII.
Negotiations. The negotiations process will be discussed in further detail during the pre- SOQ Submittal Conference.
In the event a prospective firm is unable to attend the mandatory negotiation question and answer meeting, an authorized representative may attend on the prospective firm’s behalf. The representative may sign-in for only one (1) firm.
https://teams.microsoft.com/l/meetup-join/19%3ameeting_NDdjNmJhZGQtZDk5Zi00NTBlLWFkOWQtYWVkOGNkN2IyNjQy%40thread.v2/0?context=%7b%22Tid%22%3a%22b71d5652-4b83-4257-afcd-7fd177884564%22%2c%22Oid%22%3a%22480744d5-e2d3-482a-9fb5-443249dd715f%22%7d tel:+19165732034,,168568288 https://dialin.teams.microsoft.com/464bff6b-35d5-4089-a809-0d998fd161ce?id=168568288 https://teams.microsoft.com/meetingOptions/?organizerId=480744d5-e2d3-482a-9fb5-443249dd715f&tenantId=b71d5652-4b83-4257-afcd-7fd177884564&threadId=19_meeting_NDdjNmJhZGQtZDk5Zi00NTBlLWFkOWQtYWVkOGNkN2IyNjQy@thread.v2&messageId=0&language=en-US https://dialin.teams.microsoft.com/usp/pstnconferencing
Two Phase Question and Answer Period
General RFQ Questions and Answers
Questions must be submitted in writing via email by 2:00 PM on Tuesday, August 13, 2024, to James Tedeschi at james.tedeschi@water.ca.gov
Answers regarding general RFQ questions will be provided via information letter/addendum on Monday, August 19, 2024.
Mandatory Pre-SOQ Conference
There will be a mandatory, virtual, negotiation question and answer meeting held on Thursday, August 15, 2024 at 9:00 AM. Negotiation follow-up questions must be submitted in writing via email by 5:00 PM on Thursday, August 15, 2024 to James Tedeschi at james.tedeschi@water.ca.gov
No SOQ will be accepted unless Firm attends the mandatory Pre-SOQ Conference meeting.
At the Mandatory Pre-SOQ Conference all attendees will be required to identify their name, name of firm they represent, telephone number and email address.
Answers regarding Negotiations, Scope of Work and general RFQ questions will be provided via information letter/addendum on Monday, August 19, 2024.
Please note this mandatory pre-SOQ conference negotiation may not be recorded.
IV. Statement of Qualification (SOQ) Requirements
A. The SOQ should contain, at minimum, information for an objective evaluation of the
Firm’s qualifications as it relates to Part VI, Selection Criteria. Please limit your SOQ to a maximum of 25 pages double sided excluding cover letters, resumes, and licenses. Materials such as SOQ Checklist, Potential Qualified Firms – Certification Sheet, References, Conflict of Interest Statement, Certification Regarding Lobbying (See Exhibit FEMA), Table of Contents, Cover Sheets, tabs and dividers do not count towards the 25 pages. SOQs must be tabbed and labeled consistent with the below sections and contain the following information:
1. Introduction of Firm’s Team
a. Legal name and corresponding address of Firm, as written in the Potential
Qualified Firms - Certification Sheet (see page 19).
b. Firm’s Point of Contact.
i. Name, Title, Name of Firm, Telephone Number and E-mail Address.
Provide contact information for a representative of the firm that DWR can contact for additional information.
c. Complete this section for the Firm and all subcontractors.
i. Firm Name and address, including subcontractor(s) names and mailto:james.tedeschi@water.ca.gov mailto:james.tedeschi@water.ca.gov addresses. If a firm has branch offices, indicate each individual branch that will have a key role on the team.
ii. Describe the organization of the Firm’s team, including identifying the Key Personnel and each of their roles and responsibilities as it relates to the services found in Exhibit A, Scope of Work.
iii. Organizational Chart. The Firm is required to identify key personnel, including subcontractor(s), in their organizational chart with a symbol (e.g. such as a star or a key). Limited to (# of pages) folded to 8-1/2” x 11”, not to exceed 11” x 17”.
iv. Staff Availability. The Firm will provide a table or a graph (bar chart, pie chart, etc.) showing the percentage of staff availability of the team proposed to work on the contract.
v. Firm, including subcontractor(s) registration numbers with the California Department of Industrial Relations (If applicable).
vi. Nature, quality, and complexity of applicable completed work.
vii. Reliability of Firm and continuity of proposed Firm’s staff and subcontractors with Firm.
viii. Firm’s ability to meet DWR’s need of full-time dedicated resources, including ability to adequately service multiple projects concurrently.
ix. Location of Firm office(s) in relation to the work to be performed in Exhibit A, SOW, Location of Work.
2. Qualifications of Firm’s Key Personnel (Includes Subcontractors)
a. Describe the education and experience of the Key Personnel corresponding with Section V, Selection Criteria, Paragraph A.
b. Provide resumes of all Key Personnel on organizational chart and expected to be utilized. Resumes are not to exceed 2 pages. For each example project listed in the resumes, include the length of time spent on each project (month/year to month/year).
All proposed personnel to be utilized will be grouped by Firm. Personnel resumes shall be arranged by classification and numbered for each individual firm.
c. Provide copies of valid professional licenses as follows:
i. Include a copy of valid California Professional Civil Engineer license/registration.
ii. QSD (Qualified Stormwater Developer) certification
iii. QSP (Qualified Stormwater Preparer) certification
3. Firm’s Team Project Experience
a. Provide example projects that best illustrate the Firm’s competencies and qualifications as they relate to the services found in Exhibit A, Scope of Work.
Provide brief project descriptions and current client contact information for verification (this is in addition to references required in Section IV, Statement of Qualification (SOQ) Requirements, References). The example projects, which best illustrate the proposed team’s competencies and qualifications for the contract, will represent services performed by individuals from the Firm, including subcontractors, available to do the work and listed on the Organizational Chart.
4. Certification Sheets
a. Provide the Potential Qualifying Firms Certification Sheet (see page (page number 19)) signed by an individual who is authorized to bind the firm contractually. The signature must indicate the title or position that the individual holds in the firm. The Certification Sheet must be returned in the SOQ package. A SOQ will be rejected if the certification sheet is unsigned or omitted.
b. The Certificate Regarding Lobbying (see Exhibit FEMA, page 5 of 7) must be signed by the Contractor’s authorized official. The name and title of the Contractor’s authorized official signing the Certification must be identified. The Certification must be returned in the SOQ package. An SOQ will be rejected if the certification is unsigned or omitted.
5. References
a. Provide three references for similar types of services within the last five years. At a minimum, complete references form on page 21. At least two of the provided references must be non-DWR.
6. Conflict of Interest Statement
a. Firm will identify any of the conditions listed in and state their ability to meet the terms and conditions addressed in Exhibit D – Conflict of Interest, and Exhibit E, Political Reform Act.
V. Selection Criteria
A. Each Firm’s SOQ for the proposed contract services found in Exhibit A, Scope of Work (SOW) will be evaluated and scored in accordance with the below selection criteria.
These criteria will also be used during the interview process.
1. Professional experience of the firm in relation to the work to be performed in Exhibit
A, SOW, including appropriate licenses.
2. Professional experience and training of key personnel.
3. Demonstrated competence and relevant experience with professional and technical environmental services ensuring compliance with Federal and State requirements related to National Pollutant Discharge Elimination System (NPDES) compliance and stormwater protection during project development and construction as described in Exhibit A, SOW.
4. Education and specialized experience of key personnel to be assigned.
i. A documented minimum of four years of experience in construction
ii. inspection of major public works projects performing the duties described in this Exhibit A, SOW, with two of these four years inspecting SWPPP (Storm Water Pollution Prevention Plan) work.
iii. Possession of relevant professional licenses or certifications in the following:
a. QSD (Qualified Stormwater Developer)
b. QSP (Qualified Stormwater Preparer)
c. California Professional Civil Engineer license
iv. Implementation of Storm Water Pollution Prevention Plan (SWPPPs) at construction sites.
v. Meets the requirements of a Qualified SWPPP Developer (QSD) and Qualified SWPPP Practitioner (QSP) under the new construction general permit.
vi. Knowledge of computers, computer applications, and computer software programs such as Microsoft Office (Word, Excel, PowerPoint, and others);
Critical Path Method (CPM) software such as Primavera Project Planner (P3, P6).
vii. Knowledge and experience with principals of effective communication and supervision.
viii. Knowledge and experience with the Construction General Permit.
ix. Knowledge and experience with State Water Resources Control Board General NPDES Wastewater Permits.
x. Review and evaluation of environmental compliance at construction sites relative to water quality.
xi. Knowledge of construction dewatering operations and treatment systems.
xii. Knowledge of California Stormwater Quality Association BMP handbooks.
5. Nature, quality, and complexity of applicable completed work.
6. Reliability of Firm and continuity of proposed Firm’s staff and subcontractors with Firm.
7. Firm’s ability to meet DWR’s need of full-time dedicated resources, including ability to adequately service multiple projects concurrently.
8. Location of Firm office(s) in relation to the work to be performed in Exhibit A, SOW, Location of Work.
VI. Evaluation Process
A. After the SOQ submittal date and time, each SOQ will be checked for the presence or absence of required information in conformance with Section IV, Statement of Qualification (SOQ) Requirements. If any required information is absent, the SOQ may be rejected. DWR reserves the right to cancel or modify this RFQ up to the date and time the SOQ is due and to waive immaterial deviations with any of the SOQs.
B. A panel of DWR personnel will evaluate the SOQs in accordance with the published Selection Criteria in this RFQ. All submitted SOQ’s will be scored by the panel.
Separate interviews will then be held with at least three of the firms deemed to be the most highly qualified to provide the needed services or with all firms if less than three apply. If any presentations are required to be made, the presentation’s cost will be the responsibility of the Firm. No reimbursement will be made by DWR.
C. Once the most qualified has been selected by the DWR panel, DWR will notify that respective Firm.
VII. Negotiations
A. The DWR negotiation process will be based on: Firm’s actual cost with a fixed profit rate that has been established by DWR. See Exhibit E, Additional Provisions for the published profit rate, the annual escalation for the hourly billing rates, and subcontractor mark-up for this contract.
B. At time of selection, the most qualified firm will be instructed to submit their financial documents and rate sheet. The Firm’s submission must be electronic and must be submitted no later than five (5) business days after notification of selection or otherwise determined by DWR. Financial documents will include resumes for all personnel; true and actual payroll records; financial records that support fringe benefits, overhead costs, and general administration; documentation or records that support costs incurred by utilizing subcontractors; historical and true records of other direct cost charges; and compensation policies. Compensation policies will include shift differential policies, holiday policies, and how the Firm’s personnel and subcontractor personnel receive compensation for overtime (hours worked over an established work week). The specific financial documents and format of the rate sheet will be identified during the Mandatory Pre-SOQ Conference (see Section III) and when the most qualified firm gets notified of selection. The prime Firm will be responsible for submitting the complete financial documents for their personnel, including any subcontractors. Submissions of the Firm’s rate sheet must be provided electronically to DWR on a Microsoft Excel spreadsheet titled RFQ No. 10201420 followed by the name of the Firm as it appears on SOQ. Failure to submit a complete financial documents package or rate sheet may result in termination of negotiations.
C. After the financial documents and rate sheet have been received, DWR will begin to review the documentation to ensure the documents are complete and requested reimbursement is appropriate. Discussions with the most qualified applicant regarding the submitted financial documents, rate sheet, and resumes will occur after DWR’s review in order to determine a cost that is fair and reasonable to the State. Any missing documentation or comments from DWR will need to be resolved timely; see Section X, Time Schedule. If DWR is unable to successfully negotiate a cost agreement with the most qualified Firm, negotiations will begin with the next most qualified Firm, and so on. If DWR is unable to negotiate a fair and reasonable cost with any Firm, DWR may elect not to award the contract and may elect to proceed with a new solicitation.
D. Unsuccessful Firm’s will be notified by DWR following award of the contract.
E. Nothing in this RFQ shall require DWR to award a contract.
VIII. SOQ Conditions
In addition to Section V, Selection Criteria and Section VI, Evaluation Process, the following SOQ conditions apply:
A. Firms must keep the interview selection, interview content, most qualified selection, and contract negotiations confidential until the contract is awarded.
B. Evaluations will be available for public inspection at the conclusion of the selection and award process under the California Public Records Act (Government Code Section 6250 et seq.) and subject to review by the public.
C. DWR considers confidential financial information provided by firms as a part of negotiations to not be subject to the Public Records Act.
D. On March 4, 2022, Governor Gavin Newsom issued Executive Order N-6-22 (the
EO) regarding Economic Sanctions against Russia and Russian entities and individuals. “Economic Sanctions” refers to sanctions imposed by the U.S.
government in response to Russia’s actions in Ukraine, as well as any sanctions imposed under state law. By submitting a bid or proposal a Statement of Qualifications (SOQ), Contractor represents that it is not a target of Economic Sanctions. Should the State determine Contractor is a target of Economic Sanctions or is conducting prohibited transactions with sanctioned individuals or entities, that shall be grounds for rejection of the Contractor’s SOQ any time prior to contract execution, or, if determined after contract execution, shall be grounds for termination by the State.
https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.gov.ca.gov%2Fwp-content%2Fuploads%2F2022%2F03%2F3.4.22-Russia-Ukraine-Executive-Order.pdf&data=05%7C01%7C%7C28a4c28038ae446efda008da6679d6cf%7Cb71d56524b834257afcd7fd177884564%7C0%7C0%7C637934970719385209%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=UrRQWpdi0r26m4VTb2rnqz66qeF%2BBB%2B4Yk3HtTmfPpY%3D&reserved=0
IX. Submission of SOQs
A. Two (2) hard copies and one (1) text readable pdf copy on a USB Flash Drive of the SOQ must be submitted (mailed or hand delivered) to the following addresses:
Mail: Overnight or Hand Delivery:
Department of Water Resources Department of Water Resources Division of Engineering Division of Engineering Attention: James Tedeschi Attention: James Tedeschi P. O. Box 942836 715 P Steet, 4th Floor Sacramento, CA 94236-0001 Sacramento, CA 95814 Phone: (916) 803-6196 Phone: (916) 803-6196
B. The SOQs must be received by 2:00 PM on Friday, August 30, 2024. Envelopes should be clearly labeled: “Statement of Qualifications, No. 10201420. SOQs WILL NOT BE OPENED UNTIL FRIDAY, AUGUST 30, 2024.” SOQs received after the due date and time will be returned unopened to the submitting party.
C. DWR is not responsible for any costs incurred by the Firms’ for preparation of
SOQs.
D. All materials (except brochures) submitted in response to this RFQ shall become
State property and will not be returned. Brochures of non-selected Firm’s may be picked up where they were submitted after award has been made.
E. An SOQ may be rejected if it is conditional or incomplete, or if it contains any proposed alternate terms, alterations of form, or other irregularities of any kind.
The State may reject all SOQs and may cancel or modify this RFQ up to the date the SOQ is due. DWR reserves the right to reject all SOQs.
F. Before the SOQ submission deadline, an Firm may withdraw its SOQ by submitting a written withdrawal request to the State, signed by the Firm or an agent authorized in accordance with the preceding paragraph. An Firm may thereafter submit a new SOQ prior to the SOQ submission deadline. SOQs may not be revised without good cause and DWR’s consent subsequent to SOQ submission deadline.
G. DWR may modify the RFQ prior to the date fixed for submission of SOQs by the issuance of an addendum posted to California State Contracts Register via Cal eProcure (FI$Cal).
H. Firms are cautioned not to rely on DWR, during the evaluation, to discover and report any defects and errors in the submitted documents. Firms, before submitting their documents, should carefully proof them for errors and adherence to the RFQ requirements. DWR may, but is not required to, waive minor deviations from submission requirements.
X. Time Schedule*
A. RFQ published CSCR 8-2-24 Integrated Marketing Systems 8-2-24
B. SOW and General RFQ Questions Deadline 8-13-24 at 2:00 PM
C. Mandatory Pre-SOQ Conference 8-15-24 at 9:00 AM
D. Answers Deadline 8-19-24
E. SOQ Submission Deadline 8-30-24 at 2:00 PM
DWR will make every effort to commit to the dates listed below. DWR expects the same commitment from firms. If a firm is not able to meet the timelines listed below F – M, DWR may opt to begin negotiations with the next most qualified firm. DWR reserves the right to change the dates:
F. Interview Dates (estimated dates) 9-6-24 - 9-13-24
G. Most qualified Firm is selected and request of Financial Documents and Rate Sheet (estimated date) 9-16-24
H. Submission of Financial Documents and Rate Sheet Due **Start of Negotiations (estimated date, 5 days after selection) 9-23-24
I. DWR Completes Review of Financial Documents and Rate Sheet; DWR Provides Comments and Requests Missing Information (estimated date) 9-26-24
J. Submission of resumes for all staff, if needed (estimated date, 3 days after DWR completes review) 9-30-24
K. Submission of requested documentation necessary to complete negotiations (estimated date, 3 days after DWR completes review) 9-30-24
L. Completion date for final Rate Sheet (estimated date) 10-7-24
M. Completion date for contract negotiations (estimated date) 10-7-24
N. Contract approval (estimated date) 11-6-24
**Negotiation Workshop: After the most qualified is determined and financial documentation has been received, DWR will start rate negotiations. A negotiation workshop may be held if necessary to complete the negotiation process.
XI. Contract Obligations
A. The following documents, when completed and approved, along with the resume(s) will comprise the contract (sample contract starting on page 22):
1. A Standard Agreement (STD. 213).
2. Scope of Work in Exhibit A and any corresponding attachments.
3. Budget Detail and Payment Provisions in Exhibit B and any corresponding attachments.
4. General Terms and Conditions in Exhibit C.
5. Special Terms and Conditions for the Department of Water Resources in
Exhibit D and any corresponding attachments.
6. Additional Provisions listed in Exhibit E and any corresponding attachments.
7. Required Provisions Under Code of Federal Regulations in Exhibit FEMA.
B. The following documents are not exhibits, but are required prior to award of contract:
1. Contractor Certification Clause (CCC 04/2017)
2. Payee Data Record (Std. 204)
3. Insurance certificates and endorsements as stated in Exhibit E.
XII. Disabled Veteran Business Enterprise (DVBE) Requirement
A. Firms are strongly encouraged to provide certification of Disabled Veterans
Business Enterprise (DVBE) status. DVBE certification may be obtained from the Department of General Services, Office of Small Business and DVBE Services (OSDS), and should be attached to the SOQ if DVBE status is claimed. DVBE participation is not required and in no way affects the selection process criteria for this contract.
B. For additional DVBE information DWR encourages you to work with and contact Rich Zmuda, Small Business and DVBE Program Manager at (916) 820-7833 or via email at SB.DVBE@water.ca.gov.
XIII. Small Business (SB) Program
A. In recognition of the significant economic contribution made by California’s small business sector, Government Code 14838 (a) mandates each California agency and department to meet an annual California Small Business participation goal of 25 percent of non-governmental procurements. This goal is achieved through contract awards made directly to the Small Business community or through subcontracted partnerships between Prime firms and California certified small businesses. DWR strongly encourages Prime Firms to partner with California certified Small Businesses in response to this solicitation. Firms that include California certified small businesses as an initial team member, or those which are mailto:SB.DVBE@water.ca.gov https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fleginfo.legislature.ca.gov%2Ffaces%2Fcodes_displaySection.xhtml%3FsectionNum%3D14838.%26lawCode%3DGOV&data=05%7C01%7C%7Ce37584d997f047245a2608db99e16991%7Cb71d56524b834257afcd7fd177884564%7C0%7C0%7C638272965640869848%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=A2acIySFo1oRvViSicW18%2B1jzyM9DBtB9qi4tMsTOIc%3D&reserved=0 added subsequent to contract execution through the amendment or task order process, are required to identify the Small Business firm status of each firm as appropriate and will be required to report expenditures made to these business concerns. This will allow DWR to track, tabulate and report overall expenditures made in the Small Business sector as required by the Department of General Services.
B. For questions regarding Small Business Program regulations, contact Joanne
Arcilla, Small Business and DVBE Program Manager at (916) 707-4593 or via email at SB.DVBE@water.ca.gov.
C. Government Code 14838.1 mandates that Department contracts financed with proceeds from Proposition 1E, “Disaster Preparedness and Flood Protection Act of 2006” and Proposition 84, “California Safe Drinking Water, Quality and Supply, Flood Control, River and Coastal Protection Bond Act of 2006” establish a 25 percent Small Business participation 25% goal. DWR has determined that services outlined within this solicitation include opportunities for Prime Firm - Small Business partnerships.
This goal is achieved through contract awards made directly to the Small Business community or through subcontracted partnerships between Prime firms and California certified small businesses. DWR strongly encourages Prime Firms to partner with California certified Small Businesses in response to this solicitation. Firms that include California certified small businesses as an initial team member, or those which are added subsequent to contract execution through the amendment or task order process, are required to identify the Small Business firm status of each firm as appropriate and will be required to report expenditures made to these business concerns. This will allow DWR to track, tabulate and report overall expenditures made in the Small Business sector as required by the Department of General Services.
XIV. Department of Industrial Relations Registration of Contractors and Prevailing
Wage Monitoring and Enforcement
A. In addition to complying with other applicable laws, effective for all submissions of Statement of Qualifications (SOQs), that include public works, received on or after March 1, 2015, each Firm submitting an SOQ for such contract work must be a Department of Industrial Relations Registered Contractor pursuant to Labor Code Section 1725.5 (“DIR registered contractor”). A Firm that is not a DIR registered contractor when submitting an SOQ for the contract work is deemed “not qualified.” Pursuant to Labor Code Section 1725.5, all subcontractors performing public works shall also be DIR registered contractors.
B. Effective for contracts that include public works awarded on or after April 1, 2015, all awarded prime contractors, and all subcontractors of any tier, performing public works shall be DIR registered contractors. Also, all such contractors and subcontractors must furnish electronic certified payroll records, for work that is considered “public works” under Labor Code Sections 1720 et seq., directly to the Labor Commissioner (of the Division of Labor Standards Enforcement). The contracts are subject to compliance monitoring and enforcement by the Department of Industrial Relations.
mailto:SB.DVBE@water.ca.gov
RFQ No.10201420
SOQ CHECKLIST
Please submit the following items in your SOQ in the order listed below. Additionally, the SOQ will not be considered responsive unless the following documents are included in your SOQ Submission. DWR reserves the right to waive immaterial deviations:
Introduction of Firm’s Team
Legal name and corresponding address of Firm.
Name, title, address, telephone number, and email address of person DWR can concerning the Firm’s SOQ.
Proposed Team, including legal names, list of office address(es), description of organization of Firm’s team, Organization Chart of Firm’s team, percentage of availability, (if applicable) DIR registration numbers, Nature, quality, and complexity of applicable completed work, Reliability of Firm and continuity of proposed Firm’s staff and subcontractors with Firm, Firm’s ability to meet DWR’s need of full-time dedicated resources, including ability to adequately service multiple projects concurrently, and Location of Firm office(s) in relation to the work to be performed in Exhibit A, SOW, Location of Work.
Qualification of Firm’s Key Personnel
Education and experience of Key Personnel
Resumes of all Key Personnel
Copies of valid professional California Professional Civil Engineer license/registration, California QSD (Qualified Stormwater Developer) certification, and California QSP (Qualified Stormwater Preparer) certification
Firm Project Experience
Example projects provided to illustrate Firm’s competencies and qualifications.
Certification Sheets
Potential Qualified Firms Certification Sheet (signed by Firm’s authorized individual)
Certification Regarding Lobbying (Page 5 of Exhibit FEMA) (Signed by Firm’s authorized individual)
Section 5 – References
Three references within the last five years, at least two must be Non-DWR references.
Section 6 - Conflict of Interest Statement that identifies any of the conditions listed in and states the Firm’s ability to meet the terms and conditions addressed in Exhibit D – Conflict of Interest, and Exhibit E, Political Reform Act.
One text readable digital (pdf) copy of the SOQ emailed, or one text readable digital (pdf) copy on a USB Flash Drive of the SOQ mailed, overnighted, or hand delivered.
Please return a completed copy of this checklist with your SOQ.
POTENTIAL QUALIFIED FIRMS - CERTIFICATION SHEET
Services – RFQ No. 10201420
This Potential Qualification Firms – Certification Sheet must be signed and returned along with all the required documents, as indicated in Section VI, Statement of Qualification (SOQ) Requirements. The SOQ must be transmitted in a sealed envelope in accordance with all SOQ instructions.
A. Your all-inclusive SOQ is submitted as follows:
B. All Attachments follow behind this cover letter. (See SOQ Checklist)
C. Your signature affixed hereon and dated certifies that you have complied with all the requirements of this RFQ document. Your signature authorizes the verification of this certification.
>>> AN INCOMPLETE OR UNSIGNED SOQ WILL BE CAUSE FOR REJECTION <<<
1. Company Legal Name 2. Telephone Number
2a. Fax Number
3. Address
Indicate your organization type:
4. Sole Proprietorship 5. Partnership 6. Corporation
Indicate the applicable employee and/or corporation number:
7. Federal ID No. (FEIN) 8. California Corporation No.
Indicate applicable license and/or certification information:
9. Contractors’ State License Board Number
10. PUC License Number
CAL-T-
11. Required Licenses/Certifications
12. Authorized Individual’s Name (Print) 13. Title
14. Signature 15. Date
16. Are you certified with the Department of General Services, Office of Small Business and DVBE Services (OSDS) as:
a. Small Business Enterprise Yes No If yes, enter certification number:
b. Disabled Veteran Business Enterprise Yes No If yes, enter your service code below:
NOTE: A copy of your Certification is required to be included if either of the above items is checked “YES.”
Date application was submitted to OSDS, if an application is pending:
(SEE NEXT PAGE FOR EXPLANATIONS ON POTENTIAL QUALIFIED FIRMS
CERTIFICATION SHEET)
EXPLANATION OF ITEMS ON POTENTIAL QUALIFIED FIRMS
CERTIFICATION SHEET
The Potential Qualified Firms – Certification Sheet on page 19 will be completed and submitted in accordance with the SOQ requirements. An authorized individual’s signature on this document certifies that the Firm complied with all the RFQ requirements.
(1), (2), (2a), and (3) are self-explanatory.
(4) A sole proprietorship is a form of business in which one person owns all the assets of the business in contrast to a partnership and corporation. The sole proprietor is solely liable for all the debts of the business.
(5) A partnership is a voluntary agreement between two or more competent persons, as co-owners, to place their money, effects, labor, and skill, or some or all of them in lawful commerce or business, with the understanding that there shall be a proportional sharing of the profits and losses between them.
(6) A corporation is an artificial person or legal entity created by or under the authority of the laws of a state or nation, composed, in some rare instances, of a single person and his successors, being the incumbents of a particular office, but ordinarily consisting of an association of numerous individuals.
(7) (If applicable) The Federal Employer Identification Number will need to be provided and will used for company identification and verification of tax compliance.
(8) (If applicable) The California Corporation Number will need to be provided and will be used to check if the corporation is in good standing with the State of California.
(9) (If applicable) A Contractors’ State License Board Number will be provided and used for verification of Contractor’s license for Public Works Agreements.
(10) (If applicable) A Public Utilities Commission (PUC) license for Public Works Agreements will be provided and used for verification.
(11) Complete by indicating the type of license and/or certification for services described.
(12), (13), (14), and (15) are self-explanatory.
(16) Identify if Firm is a certified Small Business Enterprise (a) or Disabled Veteran Business
Enterprise (b). If Firm is either a Small Business Enterprise or Disable Veteran Business Enterprise, the Firm’s certification number will need to be provided or when the application to the Department of General Services, Office of Small Business and DVBE Services (OSDS) was submitted.
REFERENCES
Provide three references of similar types of services performed within the last five years. At least two should be non-DWR.
Name of Firm: Telephone Number:
Name of Contact:
Street Address: City: State: Zip Code:
Year Service Performed:
Service:
STATE OF CALIFORNIA RFQ No. 10201420
STANDARD AGREEMENT
STD 213 (Rev 06/03) AGREEMENT NUMBER
REGISTRATION NUMBER
1. This Agreement is entered into between the State Agency and the Contractor named below:
STATE AGENCY'S NAME
CONTRACTOR'S NAME
2. The term of this through
Agreement is:
3. The maximum amount $ of this Agreement is:
4. The parties agree to comply with the terms and conditions of the following exhibits which are by this reference made a part of the Agreement.
Exhibit A – Scope of Work pages
Exhibit B – Budget Detail and Payment Provisions pages
Exhibit C – General Terms and Conditions pages
Exhibit D – Special Terms and Conditions for DWR (Over $5,000 Standard Payable), DWR 9544 (Rev 9/06) pages
Exhibit E – Additional Provisions pages
Items shown with an Asterisk (*) are hereby incorporated by reference and made part of this agreement as if attached hereto.
These documents can be viewed at www.ols.dgs.ca.gov/Standard+Language
IN WITNESS WHEREOF, this Agreement has been executed by the parties hereto.
CONTRACTOR California Department of General Services Use Only
CONTRACTOR’S NAME (if other than an individual, state whether a corporation, partnership, etc.)
BY (Authorized Signature)
DATE SIGNED(Do not type)
PRINTED NAME AND TITLE OF PERSON SIGNING
ADDRESS
STATE OF CALIFORNIA
AGENCY NAME
BY (Authorized Signature)
DATE SIGNED(Do not type)
PRINTED NAME AND TITLE OF PERSON SIGNING
DGS Approval not required per Public Contract Code 10335 (a)
ADDRESS
Exhibit A
ARCHITECTURAL & ENGINEERING CONTRACTS
Department of Water Resources, Division of Engineering, Environmental Coordination Section
SCOPE OF WORK
I. DESCRIPTION OF SERVICES:
The contractor will provide engineering and environmental services to support with permitting needs as follows for the Environmental Coordination Section (ECS), Division of Engineering: National Pollutant Discharge Elimination System (NPDES) permitting support, compliance with the California State Water Resources Control Board Construction General Permit, and general stormwater protection for projects in Northern California. Contractor will perform the following work on an as needed as directed basis in the geographical area identified in LOCATION OF WORK:
1. The Contractor will provide professional and technical environmental services to ensure that the Department of Water Resources (DWR) complies with all Federal and State requirements related to NPDES compliance and stormwater protection during project development and construction.
2. Provide engineering and environmental support to ensure compliance with the following regulations and requirements:
a. California State Water Resources Control Board Construction General
Permit
b. State Water Resources Control Board General NPDES Wastewater Permits
c. General stormwater management and protection on construction sites
3. Perform the inspection and compliance monitoring of Stormwater Pollution Prevention Plans (SWPPP)/Best Management Practices (BMPs) and Water Quality Control Program (WQCP)/BMPs.
4. Evaluate SWPPPs, WQCP, and other permit documents including Construction General Permit, and stormwater and erosion control protection plans prepared by DWR construction contractors for compliance with contract documents and project permits.
5. Identify actual and potential problems associated with the following areas:
a. Stormwater management and protection
b. NPDES permit compliance
c. Construction site dewatering operations
d. Treatment systems-related project work
e. Supportable engineering recommendations and considerations
II. LOCATION OF WORK:
The work identified under DESCRIPTION OF SERVICES will be performed within and north of the State Water Project Delta Field Division. The specific location of the work to be performed will be identified in each Task Order.
III. DELIVERABLES:
Detail, clarification, and direction regarding services to be performed and deliverables to be provided, pursuant to this scope of work, will be issued by task order (See Exhibit A, Attachment 1 and 2, Sample Task Order and Budget Detail). Deliverables will be provided in accordance with the Deliverables and Other Work Product clause in Exhibit E.
The specific deliverable item(s) listed will be associated with the corresponding services in DESCRIPTION OF SERVICES as identified by Task Order. The Contractor will be responsible for providing intermediate work products and original documents for the following deliverables:
1. Original field notes
2. Photographs
3. Reports
4. Permit applications
5. Documents
6. Plans
7. Letters
8. Meeting notes
9. Written comments
10. Data, data files, edits to field data
11. Illustration
12. Calculation
13. Search results and final results
14. Drawings
15. Specifications
16. Schedules
17. Estimates
18. Findings from studies and surveys
19. Records
20. Books
21. Maps
22. Manuscripts
23. Background information
24. Spreadsheets
25. Analysis
26. Conceptual plans and designs
27. Notes
28. Graphics
29. Product data
30. Manuals
31. Details
IV. SCHEDULE AND BUDGET:
See Task Order for the specific Schedule and Budget Details.
V. CONTACT INFORMATION:
The Contract Managers during the term of this agreement will be:
Department of Water Resources (Name of Selected Contractor)
Sarah Cannon (Name)
715 P Street (Street Address)
Sacramento, CA 95814 (City, State Zip Code)
Phone: (916) 882-2829 Phone:
Email: Sarah.Cannon@water.ca.gov Email:
Contract Managers may be changed by written notice to the other party.
Exhibit A, Attachment 1
ARCHITECTURAL & ENGINEERING CONTRACTS
SAMPLE TASK ORDER
(To be developed by DWR Contract/Task Order Manager)
TASK ORDER NO. XX
Contractor:
Request for Services under Standard Agreement No. 46000XXXXX
Dated:
(Instructions: The purpose of a task order is to provide specific detail regarding deliverables, schedule, and cost detail of each task. Applicable terms and conditions of the original contract, as amended, apply. Do not address terms and conditions in this document.)
DESCRIPTION OF TASK:
Provide a one or two sentence summary of work to be performed under this task order.
Only tasks that fit within the original scope of work may be assigned by a task order.
SCOPE OF WORK:
A. Description
Detailed description and location of service being requested – may include several separate subtasks which are related to completing the main project or task. Include reference from Contract Scope of Work for which the subtask is related. For example:
1. Contractor will conduct a site visit to the five repair sites to document the existing conditions, surrounding land uses, and view the construction areas. This task is covered under original scope of work, contract number 46000XXXXX, Exhibit A, Item X.x.xxx.
2. Contractor will prepare a brief description of the project (including defining the repairs to five sites along the Santa Ana Pipeline (SAPL). This brief description will provide sufficient information to allow for the determination that the SAPL Repairs Project does qualify for a CEQA Exemption.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .